I want to search for...
Permit #2024100402
Permit Details
Status: COED
| Parcel Id: 06-12-31-5180-00000-0390 |
| CONDITIONED SPACE: 2115 sqft |
| GARAGE: 425 sqft |
| OPENED PORCH (WITH ROOF) : 335 sqft |
| Total Square Footage: 2875 sqft |
| Subdivision: 2322 - RETREAT AT TOWN CENTER PHASE 1 |
| Job Phone: 904-669-7000 |
| Location Address: 40 MAHOGANY WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/18/2024 |
| NOC: RECORDED |
| Applicant name: PAUL GILBERT AXTELL |
| Owner: TOLL SOUTHEAST LP CO INC |
|
Address 1140 VIRGINIA DRIVE FORT WASHINGTON, PA 19034 |
| Lot: 39 |
| Contracted Stated Job Value: ¤403,274.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
TOLL BROS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
40 EVEREST LN, STE 5 ST JOHNS, FL 32259 |
CGC60445 (Exp: 08/31/2026) | 904-217-3852 |
Sub Contractors
JAMES F QUINN III
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3210 SW 40TH BLVD STE F GAINESVILLE, FL 32608 |
EC13010994 (Exp: 08/31/2026) | 352-378-9274 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
JAMES MICHAEL WATSON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
38115 YALE CIRCLE LEESBURG, FL 34748 |
SCC131152841 (Exp: 08/31/2026) | 352-434-0115 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 04/23/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/16/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 reclaim irr-no cc | |||
| ROW - FINAL APRON (AFTER POUR) | 04/16/2025 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| BLD - BUILDING FINAL | 04/16/2025 | FINAL APPROVED | MCONTRYMAN |
| ROW - STORMWATER FINAL | 04/16/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/16/25 AS NOTED IN PREVIOUS INSPECTION ** 04/14/25 WILL NEED TO INSTALL A COURSE OF SOD ON BACK SIDE OF SILT FENCE ALONG BOTH LEFT / RIGHT SIDE PROPERTY LINES UP TO THE BACK OF CURB AND GUTTER TO PREVENT WASHOUTS FROM GUTTERS . _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 04/14/25 WILL NEED TO INSTALL A COURSE OF SOD ON BACK SIDE OF SILT FENCE ALONG BOTH LEFT / RIGHT SIDE PROPERTY LINES UP TO THE BACK OF CURB AND GUTTER TO PREVENT WASHOUTS FROM GUTTERS . ** NEED TO REMOVE FORM BOARDS FROM SIDEWALK SLAB BE FORE FINALS AND ENSURE SOD AROUND THE END OF SDEWALK ______________________________________________________________________________________________________________________ ** 04/07/25 LEFT SIDE OF DRIVEWAY SIDEWALK SLAB WAS NOT POURED WITH THE DRIVEWAY ** BOTH THE LEFT AD RIGHT SIDE REAR CORNERS NEED TO FINISH SOD AT PROPERTY LINE AND COMMON AREA ** BOTH RIGHT AND LEFT SIDE NEED SILT FENCE INSTALLED ALONG PROPERTY LINE I | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/14/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/14/25 WILL NEED TO INSTALL A COURSE OF SOD ON BACK SIDE OF SILT FENCE ALONG BOTH LEFT / RIGHT SIDE PROPERTY LINES UP TO THE BACK OF CURB AND GUTTER TO PREVENT WASHOUTS FROM GUTTERS . ** NEED TO REMOVE FORM BOARDS FROM SIDEWALK SLAB BE FORE FINALS AND ENSURE SOD AROUND THE END OF SDEWALK ______________________________________________________________________________________________________________________ ** 04/07/25 LEFT SIDE OF DRIVEWAY SIDEWALK SLAB WAS NOT POURED WITH THE DRIVEWAY ** BOTH THE LEFT AD RIGHT SIDE REAR CORNERS NEED TO FINISH SOD AT PROPERTY LINE AND COMMON AREA ** BOTH RIGHT AND LEFT SIDE NEED SILT FENCE INSTALLED ALONG PROPERTY LINE I | |||
| ROW- PRE-APRON (PRE-POUR) | 04/10/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/10/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE *** THIS PRWE-POUR INSPECTION IS FOR THE LAST SECTION OF SIDEWALK ON THE LEFT SIDE ADJOINING WITH THE DRIVEWAY *** DO NOT USE ANY EXPANSION JOINT MATERIAL BETWEEN SIDEWALK AND DRIVEWAY*** USE A BONDING AGENT WITH THIS POUR AT THE EXISTING EDGE OF DRIVEWAY | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/07/2025 | APPROVED | EMADISON |
| Note: 4/3/2025 - PREVIOUS INSPECTION NOTES ALL ELEVATIONS AGAINST THE STRUCTURE NEEDS TO BE 6" BELOW FFE OF THE HOUSE. FLORIDA BUILDING CODE Chapter 4, R404.1.6- Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/07/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/07/25 LEFT SIDE OF DRIVEWAY SIDEWALK SLAB WAS NOT POURED WITH THE DRIVEWAY ** BOTH THE LEFT AD RIGHT SIDE REAR CORNERS NEED TO FINISH SOD AT PROPERTY LINE AND COMMON AREA ** BOTH RIGHT AND LEFT SIDE NEED SILT FENCE INSTALLED ALONG PROPERTY LINE I | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/03/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: ALL ELEVATIONS AGAINST THE STRUCTURE NEEDS TO BE 6" BELOW FFE OF THE HOUSE. FLORIDA BUILDING CODE Chapter 4, R404.1.6- Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. | |||
| U-CROSS CONNECTION | 04/02/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irr-no cc | |||
| ELECTRIC - EARLY POWER | 03/25/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 3/25/25 Okay to release e-mail to FPL 1. ODU does not match energy calcs (breakers are okay) FBC(A) 107.4 --moving forward, energy calcs are required at all early power inspections-- | |||
| ELECTRIC-TUG | 03/11/2025 | APPROVED | CVANSTRAHLEN |
| ELECTRIC-TUG | 03/05/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 3/5/25 1. Please secure conduit for service wire (missing bracket) NEC 352.3 2. Please secure GFCI outlet to building and tighten line to panel 3. Install surge protection at meter/main only NEC 230.67 | |||
| ROW- PRE-APRON (PRE-POUR) | 02/25/2025 | APPROVED | FSLADISH |
| Note: 2/25/25 READY TO POUR AT THE TIME OF THIS INSPECTION. . BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| GRAVITY SEWER TEST | 01/08/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 01/08/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 01/03/2025 | APPROVED | RSIMS |
| Note: 1/2/2025 - PREVIOUS INSPECTION NOTES 1/2/25: NOTE: Solid wood over SGD is good. Please foam perimeter. 1). Missing firestop at top plate area above breaker panel in garage. Stud below marked with FS. 2). Missing firestop at top plate penetration for pest control lines in right side bathroom and in left side bedrooms along with left back wall. Stud below marked with FS. 12/30/2024 - PREVIOUS INSPECTION NOTES 12/30/2024 Not Ready. Installers on site. Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. Inspector Notes from Inspection 2420 12/26/2024 Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. | |||
| INSULATION | 01/02/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/2/2025 10:48:32 AM *** 1/2/25: NOTE: Solid wood over SGD is good. Please foam perimeter. 1). Missing firestop at top plate area above breaker panel in garage. Stud below marked with FS. 2). Missing firestop at top plate penetration for pest control lines in right side bathroom and in left side bedrooms along with left back wall. Stud below marked with FS. 12/30/2024 - PREVIOUS INSPECTION NOTES 12/30/2024 Not Ready. Installers on site. Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. Inspector Notes from Inspection 2420 12/26/2024 Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. | |||
| INSULATION | 12/30/2024 | Disapproved - NO FEE | PKNAPIK |
| Note: 12/30/2024 Not Ready. Installers on site. Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. Inspector Notes from Inspection 2420 12/26/2024 Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. | |||
| LATH/BRICK/ WATER BARRIER | 12/30/2024 | APPROVED - AS NOTED | PKNAPIK |
| Note: 12/30/2024 Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. Inspector Notes from Inspection 2420 12/26/2024 Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. | |||
| ALL ROUGH | 12/26/2024 | APPROVED - AS NOTED | PKNAPIK |
| Note: 12/26/2024 Check at insulation. 1. Gap above Sliders too big. Please fill with wood. FBCR 609.1 2. FL approval, u-factor, and SHGC missing on sliders. | |||
| LATH/BRICK/ WATER BARRIER | 12/26/2024 | Disapproved - NO FEE | PKNAPIK |
| Note: 12/26/2024 1. Left side of slider, edge needs to be taped. | |||
| ROOF VALLEY & METAL | 12/13/2024 | APPROVED | PKNAPIK |
| Note: 12/9/2024 - PREVIOUS INSPECTION NOTES Not ready. | |||
| ROOF VALLEY & METAL | 12/09/2024 | Disapproved - NO FEE | PKNAPIK |
| Note: Not ready. | |||
| WALL SHEATHING | 12/03/2024 | APPROVED | PKNAPIK |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/03/2024 | APPROVED - AS NOTED | PKNAPIK |
| Note: 12/3/2024 Check at next inspection 1. (3) 2x6 post - one cut at bottom for dtt2z. need to add another to other side - marked on plans. | |||
| WATER METER INSTALLATION REQUEST | 11/26/2024 | APPROVED | CBOWERMASTER |
| FOUND SURVEY APPROVED (OFFICE) | 11/25/2024 | APPROVED | JMYERS |
| MONOLITHIC SLAB | 11/07/2024 | APPROVED | KSANDOE |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/06/2024 | APPROVED | MGIBSON |
| Note: 11/5/2024 - PREVIOUS INSPECTION NOTES 11/4/2024 - PREVIOUS INSPECTION NOTES FBCR-P-2504.5 HEAD TEST. NOT RESOLVED | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/05/2024 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: 11/4/2024 - PREVIOUS INSPECTION NOTES FBCR-P-2504.5 HEAD TEST. NOT RESOLVED | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/04/2024 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: FBCR-P-2504.5 HEAD TEST |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/31/2025 | 04/01/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/14/2025 | 01/17/2025 |
| Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/12/2024 | 12/17/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/10/2024 | 12/11/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/25/2024 | 12/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/18/2024 | 11/21/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/18/2024 | 11/25/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/18/2024 | 11/18/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/11/2024 | 10/17/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/11/2024 | 10/15/2024 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 10/11/2024 | 10/14/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Water/Sewer impact fees will be added at a later date after all utility agreements are final. Please note, meter will not be installed until all agreements complete and fees paid. | |||
| ELEC | COMPLETE | 10/11/2024 | 10/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/11/2024 | 10/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 10/11/2024 | 10/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 10/11/2024 | 10/16/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 10/11/2024 | 10/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/11/2024 | 10/14/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/11/2024 | 10/11/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 10/11/2024 | 10/18/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/17/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 03/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/08/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/08/2024 |
| CONNECTION FEES | ¤25.00 | 10/18/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 10/18/2024 |
| IMPACT FEE FIRE | ¤434.51 | 10/18/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/18/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/18/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 10/18/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/18/2024 |
| IMPACT FEE TRANSPORTATION | ¤2,638.00 | 10/18/2024 |
| SURCHARGE FS 533.721 | ¤13.11 | 10/18/2024 |
| SURCHARGE - FS 468.631 | ¤19.66 | 10/18/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/18/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/18/2024 |
| SW ENG PRE APRON | ¤30.00 | 10/18/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/18/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/18/2024 |
| SEWER INSPECTION | ¤25.00 | 10/18/2024 |
| SITE PLAN 30 | ¤30.00 | 10/18/2024 |
| WATER-METER | ¤514.49 | 10/18/2024 |
| WATER-METER | ¤427.42 | 10/18/2024 |
| ADJUSTMENT 10% | (¤145.61) | 10/18/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/18/2024 |
| INSPECTION - RESIDENTIAL | ¤1,111.00 | 10/18/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤315.12 | 10/18/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,733.71 |