Permit #2024100459

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7009-00160-0270
Block: 00160
Subdivision: 7009 -
Job Phone: 732-421-5880
Location Address: 14 FAIRBANK LN
Type: DR - DRIVEWAY
Issue Date: 11/04/2024
NOC: Unknown
Applicant name: CLAUDIO MIGUEL SARAIVA
Owner: HARKEN HOLLY

Address

14 FAIRBANK LANE

PALM COAST, FL 32137

Lot: 0270
Contracted Stated Job Value: ¤4,200.00
Job Description: CIRCULAR DRIVEWAY
Type: CN

Contractor

CMS CONSTRUCTION LLC
Status Location Address Phone
INACTIVE

19 BRADDOCK LN

PALM COAST, FL 32137

732-421-5880

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 03/14/2025 APPROVED PFLANAGAN
Note: CORRECTIONS MADE ------------------------------------------------------------- 3/4/2025 - PREVIOUS INSPECTION NOTES THE RUTS IN THE RIGHT OF WAY IN THE MIDDLE OF THE CIRCLE NEED TO BE REPAIRED WITH SOD. Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion.
U -UTILITY RESIDENTIAL FINAL 03/04/2025 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 03/04/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE RUTS IN THE RIGHT OF WAY IN THE MIDDLE OF THE CIRCLE NEED TO BE REPAIRED WITH SOD. Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion.
ROW - FINAL APRON (AFTER POUR) 12/19/2024 APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 11/06/2024 APPROVED PFLANAGAN
Note: CORRECTIONS MADE IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. --------------------------------------------------------------- 11/5/2024 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS FLOWING THE WRONG DIRECTION FROM THE SWALE PLAN DETAIL. 2) THE PIPES IN THE CENTER OF THE DRIVEWAY NEEDS TO BE BELOW GRADE AND GIVE YOU MINIMUM OF 4" OF CONCRETE.
ROW- PRE-APRON (PRE-POUR) 11/05/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) THE CULVERT PIPE IS FLOWING THE WRONG DIRECTION FROM THE SWALE PLAN DETAIL. 2) THE PIPES IN THE CENTER OF THE DRIVEWAY NEEDS TO BE BELOW GRADE AND GIVE YOU MINIMUM OF 4" OF CONCRETE.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/14/2024 10/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 10/14/2024 10/15/2024
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON COMPLETE 10/14/2024 10/14/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 03/13/2025
SW ENG REINSPECTION 30 ¤30.00 03/03/2025
SW ENG RES REVIEW 200 ¤200.00 11/04/2024
SITE PLAN 15 ¤15.00 11/04/2024
ADJUSTMENT 10% (¤3.00) 11/04/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/04/2024
SW ENG INSPECTION 40 ¤40.00 11/04/2024
SW ENG PRE APRON ¤30.00 11/04/2024
Fees Total Due: ¤0.00 Total Paid: ¤362.00