Permit #2024100461

Permit Details

Status: INSPECT

Parcel Id: 17-10-30-0000-01020-0010
Block: 01020
Subdivision: 2346 - SAWMILL BRANCH PH 3
Job Phone: 386-547-6093
Location Address: 314 SAWMILL BRANCH BLVD
Type: SDD - SUBDIVISION SITE DEVELOPMENT
Issue Date: 02/03/2025
NOC: Unknown
Applicant name: JOSEPH D WEBER
Owner: FORESTAR USA REAL ESTATE GROUP, INC

Address

2221 E LAMAR BLVD

ARLINGTON, TX 76006

Address

STE 790

ARLINGTON, TX 76006

Lot: 0010
Job Description: SITE WORK: SAWMILL BRANCH PH 3 SUBDIVSION
Type: CN

Contractor

JD WEBER CONSTRUCTION CO.
Status Location Address State License Number Phone Fax
ACTIVE

150 BUSINESS CENTER DRIVE

ORMOND BEACH, FL 32174

CUC1224075 (Exp: 08/31/2026) (386)671-2727 (386)671-2471

Inspection History

Type Request Date Result Inspector
UC-FINAL SITE INSPECTION 06/09/2026 PARTIALLY APPROVED LFITZGERALD
Note: 1)2 EMERGENCY ACCESS STABILIZED ROADS NOT CONSTRUSTED PER APPROVED DETAIL-CHAD WITH JD WEBER AGREES AND WILL ATEMPT TO BUILD IT ACCORDING TO DETAIL D1.012)-Jordan-NUMEROUS EROSIONS/UNDERMINING OF POND OUTFALL STRUCTURES(FES) THROUGHOUT PROJECT-CHAD INFORMED as WELL AS SETH(FORESTAR)
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/09/2026 JMYERS
Note: Inspector Notes from Inspection 9200 1/15/2026 - PREVIOUS INSPECTION NOTES Received a resident complaint-21 springwood drive-Kathy regarding a Vacall truck dumping dirty black water behind her home in sawmill phase 3 area-they were dumping out all the vac storm soils in ph 3 storm structuresthat i discovered and that Jordan was enforcing to be cleaned-BUT they should not be dumping so close and partly into a buffered landscape area where some water was now builtup-brown dirty water-Chadn with Hazen informed and agreed- they should dump further away on the empty lots-pics in sub folder in project folder no more issues 4/17/2026 - PREVIOUS INSPECTION NOTES 4/17/26 EROSION CONTROL MEASURES IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26 INLET PROTECTION RE-INSTALLED AND DIRT CLEANED UP. STILL NEED TO STABILIZE LOT AREAS WITH SEED. 2/17/2026 - PREVIOUS INSPECTION NOTES 2/17/26 CORRECTIONS NOT MADE, INLETS STILL COVERED IN SAND, SOME MISSING PROTECTION, AND LOT AREAS NOT STABILIZED. FOLLOW UP INSPECTION FRIDAY 2/20, STOP WORK ORDER WILL BE ISSUED IF CORRECTIONS ARE NOT MADE. 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/26 INLET PROTECTION NOT INSTALLED, INLETS COVERED IN SAND, AND LOT AREAS NOT STABILIZED; PHOTOS ATTACHED. FOLLOW UP INSPECTION TUESDAY 2/17, A STOP WORK ORDER MAY BE PLACED IF ISSUES ARE NOT CORRECTED. 2/10/2026 2:55:33 PM- PREVIOUS INSPECTION NOTES 2/10/26 INLET PROTECTION MISSING ON SOME CURB INLETS, OTHERS COVERED COMPLETELY IN DIRT. INLETS NEED TO BE CLEANED OF ALL SEDIMENT. IF NO FURTHER WORK IS BEING DONE IN THE LOT AREAS WITHIN 7 DAYS, THEY SHALL BE STABILIZED WITH SEED. FOLLOW UP INSPECTION FRIDAY 2/13/26. 1/13/2026 12:57:23 PM- PREVIOUS INSPECTION NOTES 1/13/26 EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
UROW - FINAL DRAINAGE 06/09/2026 JMYERS
U-ROW FINAL 06/08/2026 APPROVED - AS NOTED LFITZGERALD
Note: CONCRETE 5FT-ON RIGHT SIDE AND 8FT ASPHALT PATH ON LEFT SIDE MAIN DRIVE AND PERIMETER OF PROJECT NOW CONSTRUCTED-2 AREAS FOR EMRGENCY ACCESS STABILIZED ACCESS TO BE CONSTRUCTED
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 06/02/2026 FINAL APPROVED LFITZGERALD
UROW-SUBSTANTIAL WALK-THRU 06/02/2026 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9101 1/15/2026 - PREVIOUS INSPECTION NOTES EROSIONS INTO HULETT CREEK AREA-while attempting to perform a pressure test on the reclaim main,the restaint bell clamp came apart and high water pressure and volume ran down/over to adjacent conservation area and then into creek body of water-Jordan and myself on site and observed lots of sandy soils in upland area and creek water now a light brown in color -turbid from erosions-Dave Jones of Windham and Windham contacted and he would evaluate and clean it all -by hand -up 1/15/26-OBSERVED 2 LABORES REMOVING SANDY SOIL WITH SHOVELS-NO EQUIPMENT-AND CREEK BACK TO REGULAER COLOR-PICS IN SUB FOLDER IN PROJECT FOLDER all now cleaned up-water back to natural color 4/29/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end 1/22/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded slopes behind sidewalk and pedestrian path now with sod/all ponds with sod to above water line currently Punch list items must be complete.
UROW- PRELIMINARY AS-BUILTS 06/02/2026 APPROVED LFITZGERALD
Note: 4/29/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES Changes need to be made 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end 1/22/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded slopes behind sidewalk and pedestrian path now with sod/all ponds with sod to above water line currently
ROW- PROJECT STATUS 06/02/2026 APPROVED - AS NOTED LFITZGERALD
Note: 1/15/2026 - PREVIOUS INSPECTION NOTES Received a resident complaint-21 springwood drive-Kathy regarding a Vacall truck dumping dirty black water behind her home in sawmill phase 3 area-they were dumping out all the vac storm soils in ph 3 storm structuresthat i discovered and that Jordan was enforcing to be cleaned-BUT they should not be dumping so close and partly into a buffered landscape area where some water was now builtup-brown dirty water-Chadn with Hazen informed and agreed- they should dump further away on the empty lots-pics in sub folder in project folder no more issues
UC - PROJECT STATUS 06/02/2026 APPROVED - AS NOTED LFITZGERALD
Note: 1/15/2026 - PREVIOUS INSPECTION NOTES EROSIONS INTO HULETT CREEK AREA-while attempting to perform a pressure test on the reclaim main,the restaint bell clamp came apart and high water pressure and volume ran down/over to adjacent conservation area and then into creek body of water-Jordan and myself on site and observed lots of sandy soils in upland area and creek water now a light brown in color -turbid from erosions-Dave Jones of Windham and Windham contacted and he would evaluate and clean it all -by hand -up 1/15/26-OBSERVED 2 LABORES REMOVING SANDY SOIL WITH SHOVELS-NO EQUIPMENT-AND CREEK BACK TO REGULAER COLOR-PICS IN SUB FOLDER IN PROJECT FOLDER all now cleaned up-water back to natural color
UC-SUBSTANTIAL WALK-THRU 04/28/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end 1/22/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded slopes behind sidewalk and pedestrian path now with sod/all ponds with sod to above water line currently Drainage-with Jordan and Tom-noted all deficiencies sent out via e-mail from Jordan
UC- PRELIMINARY AS-BUILTS 04/28/2026 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 4/28/2026 11:23:58 AM *** Drainage Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end 1/22/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded slopes behind sidewalk and pedestrian path now with sod/all ponds with sod to above water line currently Oceanside -dark actual with light proposed
UROW- PRELIMINARY AS-BUILTS 04/28/2026 Disapproved - NO FEE BWRIGHT
Note: Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES Changes need to be made 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end 1/22/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded slopes behind sidewalk and pedestrian path now with sod/all ponds with sod to above water line currently
UROW-SUBSTANTIAL WALK-THRU 04/28/2026 Disapproved - NO FEE BWRIGHT
Note: Inspector Notes from Inspection 9225 Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end 1/22/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded slopes behind sidewalk and pedestrian path now with sod/all ponds with sod to above water line currently Punch list items must be complete.
UC-ASPHALT PRE PLACEMENT 04/22/2026 APPROVED - AS NOTED LFITZGERALD
Note: 3/18/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 04/22/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end
UROW-RETENT/DETENT STABILI 04/22/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9220 Inspector Notes from Inspection 9111 3/18/2026 - PREVIOUS INSPECTION NOTES 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT 2nd lift now installed thru out all project including spine thru roadway 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway all sidewalk right side now installed from start to bridge/asphalt path now installed from end to end 1/22/2026 - PREVIOUS INSPECTION NOTES 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded slopes behind sidewalk and pedestrian path now with sod/all ponds with sod to above water line currently
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/17/2026 PARTIALLY APPROVED JMYERS
Note: 4/17/26 EROSION CONTROL MEASURES IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 2/20/2026 - PREVIOUS INSPECTION NOTES 2/20/26 INLET PROTECTION RE-INSTALLED AND DIRT CLEANED UP. STILL NEED TO STABILIZE LOT AREAS WITH SEED. 2/17/2026 - PREVIOUS INSPECTION NOTES 2/17/26 CORRECTIONS NOT MADE, INLETS STILL COVERED IN SAND, SOME MISSING PROTECTION, AND LOT AREAS NOT STABILIZED. FOLLOW UP INSPECTION FRIDAY 2/20, STOP WORK ORDER WILL BE ISSUED IF CORRECTIONS ARE NOT MADE. 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/26 INLET PROTECTION NOT INSTALLED, INLETS COVERED IN SAND, AND LOT AREAS NOT STABILIZED; PHOTOS ATTACHED. FOLLOW UP INSPECTION TUESDAY 2/17, A STOP WORK ORDER MAY BE PLACED IF ISSUES ARE NOT CORRECTED. 2/10/2026 2:55:33 PM- PREVIOUS INSPECTION NOTES 2/10/26 INLET PROTECTION MISSING ON SOME CURB INLETS, OTHERS COVERED COMPLETELY IN DIRT. INLETS NEED TO BE CLEANED OF ALL SEDIMENT. IF NO FURTHER WORK IS BEING DONE IN THE LOT AREAS WITHIN 7 DAYS, THEY SHALL BE STABILIZED WITH SEED. FOLLOW UP INSPECTION FRIDAY 2/13/26. 1/13/2026 12:57:23 PM- PREVIOUS INSPECTION NOTES 1/13/26 EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
UC-ASPHALT PRE PLACEMENT 03/18/2026 PARTIALLY APPROVED LFITZGERALD
Note: 1/22/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road NOW PAVING ALL PHASE 3 AND SPINE ROAD TO hULETT BRANCH-FULL DEPTH ASPHALT
UC-DRAINAGE PIPE PLACEMENT/LAMPING 03/05/2026 APPROVED LFITZGERALD
Note: 11/18/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/21/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES all pipe associated with installed structures inspected by Don and will continue now with Larry now at far north pipe associated with curb inlets up to S-60A along Sawmill branch blvd. heading to hulett bridge culvert all pipe associated with curb inlets/cb to mes's up to S66-65
UC-DRAINAGE STRUCT PLACMNT 03/05/2026 APPROVED LFITZGERALD
Note: 11/18/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/21/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 2:06:45 PM *** About 25% installed - in progress several curb inlets/pond mes's and control structure/5 barrel rcp culvert all installed during Don tenure-remaining drainage will be inspected by Larry now at far north end curb inlets along sawmill branch blvd heading to hulett bridge culvert now setting S-60A curb inlets along spine road up to S-66/65 AND CB TO POND MES'S
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 03/05/2026 PARTIALLY APPROVED LFITZGERALD
Note: 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 03/05/2026 PARTIALLY APPROVED LFITZGERALD
Note: 3/5/2026 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert 5ft sidewalk now installed along Spine road base installed and being compacted with Bomag roller for 8ft pedestrian path along left side of main roadway
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/20/2026 PARTIALLY APPROVED JMYERS
Note: 2/20/26 INLET PROTECTION RE-INSTALLED AND DIRT CLEANED UP. STILL NEED TO STABILIZE LOT AREAS WITH SEED. 2/17/2026 - PREVIOUS INSPECTION NOTES 2/17/26 CORRECTIONS NOT MADE, INLETS STILL COVERED IN SAND, SOME MISSING PROTECTION, AND LOT AREAS NOT STABILIZED. FOLLOW UP INSPECTION FRIDAY 2/20, STOP WORK ORDER WILL BE ISSUED IF CORRECTIONS ARE NOT MADE. 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/26 INLET PROTECTION NOT INSTALLED, INLETS COVERED IN SAND, AND LOT AREAS NOT STABILIZED; PHOTOS ATTACHED. FOLLOW UP INSPECTION TUESDAY 2/17, A STOP WORK ORDER MAY BE PLACED IF ISSUES ARE NOT CORRECTED. 2/10/2026 2:55:33 PM- PREVIOUS INSPECTION NOTES 2/10/26 INLET PROTECTION MISSING ON SOME CURB INLETS, OTHERS COVERED COMPLETELY IN DIRT. INLETS NEED TO BE CLEANED OF ALL SEDIMENT. IF NO FURTHER WORK IS BEING DONE IN THE LOT AREAS WITHIN 7 DAYS, THEY SHALL BE STABILIZED WITH SEED. FOLLOW UP INSPECTION FRIDAY 2/13/26. 1/13/2026 12:57:23 PM- PREVIOUS INSPECTION NOTES 1/13/26 EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/17/2026 Disapproved -FEE REQUIRED JMYERS
Note: 2/17/26 CORRECTIONS NOT MADE, INLETS STILL COVERED IN SAND, SOME MISSING PROTECTION, AND LOT AREAS NOT STABILIZED. FOLLOW UP INSPECTION FRIDAY 2/20, STOP WORK ORDER WILL BE ISSUED IF CORRECTIONS ARE NOT MADE. 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/26 INLET PROTECTION NOT INSTALLED, INLETS COVERED IN SAND, AND LOT AREAS NOT STABILIZED; PHOTOS ATTACHED. FOLLOW UP INSPECTION TUESDAY 2/17, A STOP WORK ORDER MAY BE PLACED IF ISSUES ARE NOT CORRECTED. 2/10/2026 2:55:33 PM- PREVIOUS INSPECTION NOTES 2/10/26 INLET PROTECTION MISSING ON SOME CURB INLETS, OTHERS COVERED COMPLETELY IN DIRT. INLETS NEED TO BE CLEANED OF ALL SEDIMENT. IF NO FURTHER WORK IS BEING DONE IN THE LOT AREAS WITHIN 7 DAYS, THEY SHALL BE STABILIZED WITH SEED. FOLLOW UP INSPECTION FRIDAY 2/13/26. 1/13/2026 12:57:23 PM- PREVIOUS INSPECTION NOTES 1/13/26 EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/13/2026 Disapproved -FEE REQUIRED JMYERS
Note: 2/13/26 INLET PROTECTION NOT INSTALLED, INLETS COVERED IN SAND, AND LOT AREAS NOT STABILIZED; PHOTOS ATTACHED. FOLLOW UP INSPECTION TUESDAY 2/17, A STOP WORK ORDER MAY BE PLACED IF ISSUES ARE NOT CORRECTED. 2/10/2026 2:55:33 PM- PREVIOUS INSPECTION NOTES 2/10/26 INLET PROTECTION MISSING ON SOME CURB INLETS, OTHERS COVERED COMPLETELY IN DIRT. INLETS NEED TO BE CLEANED OF ALL SEDIMENT. IF NO FURTHER WORK IS BEING DONE IN THE LOT AREAS WITHIN 7 DAYS, THEY SHALL BE STABILIZED WITH SEED. FOLLOW UP INSPECTION FRIDAY 2/13/26. 1/13/2026 12:57:23 PM- PREVIOUS INSPECTION NOTES 1/13/26 EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/10/2026 Disapproved - NO FEE JMYERS
Note: 2/10/26 INLET PROTECTION MISSING ON SOME CURB INLETS, OTHERS COVERED COMPLETELY IN DIRT. INLETS NEED TO BE CLEANED OF ALL SEDIMENT. IF NO FURTHER WORK IS BEING DONE IN THE LOT AREAS WITHIN 7 DAYS, THEY SHALL BE STABILIZED WITH SEED. FOLLOW UP INSPECTION FRIDAY 2/13/26. 1/13/2026 12:57:23 PM- PREVIOUS INSPECTION NOTES 1/13/26 EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
UROW-RETENT/DETENT STABILI 01/22/2026 PARTIALLY APPROVED LFITZGERALD
Note: 1/15/2026 - PREVIOUS INSPECTION NOTES ponds in ph 3 housing now sodded-keep eye on for potential washouts/erosions ponds/drainage ditches along Spine road now sodded
UROW- CURBING & GUTTER 01/22/2026 APPROVED - AS NOTED LFITZGERALD
Note: 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES
UC-ASPHALT PRE PLACEMENT 01/22/2026 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9235 1/13/2026 - PREVIOUS INSPECTION NOTES 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge miami curb now all installed along spine road up to HULETT BRIDGE-BOTH SIDES pedestrian path along left side now with compacted base upto start of spine road
UC - PROJECT STATUS 01/15/2026 PARTIALLY APPROVED LFITZGERALD
Note: EROSIONS INTO HULETT CREEK AREA-while attempting to perform a pressure test on the reclaim main,the restaint bell clamp came apart and high water pressure and volume ran down/over to adjacent conservation area and then into creek body of water-Jordan and myself on site and observed lots of sandy soils in upland area and creek water now a light brown in color -turbid from erosions-Dave Jones of Windham and Windham contacted and he would evaluate and clean it all -by hand -up 1/15/26-OBSERVED 2 LABORES REMOVING SANDY SOIL WITH SHOVELS-NO EQUIPMENT-AND CREEK BACK TO REGULAER COLOR-PICS IN SUB FOLDER IN PROJECT FOLDER
ROW- PROJECT STATUS 01/15/2026 PARTIALLY APPROVED LFITZGERALD
Note: Received a resident complaint-21 springwood drive-Kathy regarding a Vacall truck dumping dirty black water behind her home in sawmill phase 3 area-they were dumping out all the vac storm soils in ph 3 storm structuresthat i discovered and that Jordan was enforcing to be cleaned-BUT they should not be dumping so close and partly into a buffered landscape area where some water was now builtup-brown dirty water-Chadn with Hazen informed and agreed- they should dump further away on the empty lots-pics in sub folder in project folder
UROW-RETENT/DETENT STABILI 01/15/2026 PARTIALLY APPROVED LFITZGERALD
Note: ponds now sodded-keep eye on for potential washouts/erosions
UROW- CURBING & GUTTER 01/13/2026 PARTIALLY APPROVED LFITZGERALD
Note: 10/28/2025 - PREVIOUS INSPECTION NOTES 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets now installing miami curb on next phase saw mill branch blvd-west side only about half way towards Hulett bridge
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 01/13/2026 PARTIALLY APPROVED JMYERS
Note: 1/13/26 EROSION CONTROL MEASURES ARE IN PLACE ANDFUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 12/26/2025 - PREVIOUS INSPECTION NOTES 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 12/26/2025 PARTIALLY APPROVED JMYERS
Note: 12/26/25 INLET PROTECTION HAS BEEN INSTALLED. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THROUGHOUT CONSTRUCTION. 12/19/2025 - PREVIOUS INSPECTION NOTES 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 12/19/2025 PARTIALLY APPROVED JMYERS
Note: 12/19/25 CONTRACTOR WAS IN THE PROCESS OF INSTALLING INLET PROTECTION DURING INSPECTION. FOLLOW UP INSPECTION 12/26/25 TO ENSURE ALL PROTECTION HAS BEEN INSTALLED. 12/12/2025 - PREVIOUS INSPECTION NOTES 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 12/12/2025 PARTIALLY APPROVED JMYERS
Note: 12/12/25 APS WAS CLEANING OUT INLETS DURING INSPECTION AND SAID TV WAS BEING DONE MONDAY. AS SOON AS TV IS DONE, INLET PROTECTION SHALL BE INSTALLED. FOLLOW UP INSPECTION ON 12/19/25. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 12/09/2025 Disapproved - NO FEE JMYERS
Note: 12/9/25 NO INLET PROTECTION WAS FOUND ON ANY INSTALLED INLETS. INLET PROTECTION SHALL BE INSTALLED IMMEDIATELY. DUE TO THE LACK OF INLET PROTECTION, PRIOR TO PROJECT CLOSE OUT THE SYSTEM SHALL BE CLEANED OUT AND VIDEO SUBMITTED TO THE CITY FOR REVIEW. FOLLOW UP INSPECTION FOR INLET PROTECTION ON 12/12/25. 10/7/2025 - PREVIOUS INSPECTION NOTES 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
UC-DRAINAGE STRUCT PLACMNT 11/18/2025 PARTIALLY APPROVED LFITZGERALD
Note: 11/7/2025 - PREVIOUS INSPECTION NOTES 10/21/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 2:06:45 PM *** About 25% installed - in progress several curb inlets/pond mes's and control structure/5 barrel rcp culvert all installed during Don tenure-remaining drainage will be inspected by Larry now at far north end curb inlets along sawmill branch blvd heading to hulett bridge culvert now setting S-60A curb inlets along spine road up to S-66/65 AND CB TO POND MES'S
UC-DRAINAGE PIPE PLACEMENT/LAMPING 11/18/2025 PARTIALLY APPROVED LFITZGERALD
Note: 11/7/2025 - PREVIOUS INSPECTION NOTES 10/21/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES all pipe associated with installed structures inspected by Don and will continue now with Larry now at far north pipe associated with curb inlets up to S-60A along Sawmill branch blvd. heading to hulett bridge culvert all pipe associated with curb inlets/cb to mes's up to S66-65
UC-DRAINAGE PIPE PLACEMENT/LAMPING 11/07/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/21/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES all pipe associated with installed structures inspected by Don and will continue now with Larry now at far north pipe associated with curb inlets up to S-60A along Sawmill branch blvd. heading to hulett bridge culvert
UC-DRAINAGE STRUCT PLACMNT 11/07/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/21/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 2:06:45 PM *** About 25% installed - in progress several curb inlets/pond mes's and control structure/5 barrel rcp culvert all installed during Don tenure-remaining drainage will be inspected by Larry now at far north end curb inlets along sawmill branch blvd heading to hulett bridge culvert now setting S-60A
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 11/07/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/16/2025 - PREVIOUS INSPECTION NOTES now starting placing sidewalk-right side -main entrance-100ft north of entrance sidewalk along main entrance road(sawmill branch blvd) right side up to 5 barrel culvert
UROW- CURBING & GUTTER 10/28/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/15/2025 - PREVIOUS INSPECTION NOTES started installing miami curb just west of entrance miami curb continuing and now placing at curb inlets
UC-DRAINAGE STRUCT PLACMNT 10/21/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/8/2025 - PREVIOUS INSPECTION NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 2:06:45 PM *** About 25% installed - in progress several curb inlets/pond mes's and control structure/5 barrel rcp culvert all installed during Don tenure-remaining drainage will be inspected by Larry now at far north end
UC-DRAINAGE PIPE PLACEMENT/LAMPING 10/21/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/8/2025 - PREVIOUS INSPECTION NOTES all pipe associated with installed structures inspected by Don and will continue now with Larry now at far north area
U-REUSE MAIN INSTALL/TESTING 10/16/2025 PARTIALLY APPROVED BWRIGHT
Note: 10/7/2025 - PREVIOUS INSPECTION NOTES 8/15/2025 - PREVIOUS INSPECTION NOTES In progress. 10inch Reclaim pig and flush on Sawmill Branch Blvd sta. 0+00 to 28+00 In progress
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 10/16/2025 PARTIALLY APPROVED LFITZGERALD
Note: now starting placing sidewalk-right side -main entrance-100ft north of entrance
UROW- CURBING & GUTTER 10/15/2025 PARTIALLY APPROVED LFITZGERALD
Note: started installing miami curb just west of entrance
UC-DRAINAGE STRUCT PLACMNT 10/08/2025 PARTIALLY APPROVED LFITZGERALD
Note: 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 2:06:45 PM *** About 25% installed - in progress several curb inlets/pond mes's and control structure/5 barrel rcp culvert all installed
UC-DRAINAGE STRUCT PLACMNT 10/08/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/8/2025 - PREVIOUS INSPECTION NOTES 6/30/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/30/2025 2:06:45 PM *** About 25% installed - in progress several curb inlets/pond mes's and control structure/5 barrel rcp culvert all installed during Don tenure-remaining drainage will be inspected by Larry
UC-DRAINAGE PIPE PLACEMENT/LAMPING 10/08/2025 PARTIALLY APPROVED LFITZGERALD
Note: all pipe associated with installed structures inspected by Don and will continue now with Larry
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 10/07/2025 PARTIALLY APPROVED JMYERS
Note: 10-07-25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. 6/18/2025 - PREVIOUS INSPECTION NOTES 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
U-SEWER FORCE MAIN INSTALL/TESTING 10/07/2025 PARTIALLY APPROVED BWRIGHT
Note: 8in forcemain pig and flush on Sawmill Branch blvd sta 0+00 to 28+00
U-REUSE MAIN INSTALL/TESTING 10/07/2025 PARTIALLY APPROVED BWRIGHT
Note: 8/15/2025 - PREVIOUS INSPECTION NOTES In progress. 10inch Reclaim pig and flush on Sawmill Branch Blvd sta. 0+00 to 28+00
U-REUSE MAIN INSTALL/TESTING 08/15/2025 PARTIALLY APPROVED BWRIGHT
Note: In progress.
U-GRAVITY SEWER INSTALL/TESTING 08/15/2025 PARTIALLY APPROVED BWRIGHT
Note: 6/11/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/11/2025 10:21:06 AM *** LS still being installed . 6/10/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/10/2025 9:18:46 AM *** New Lift station being installed . In progress.
U-WATER SERVICE INSTALLATION 08/15/2025 PARTIALLY APPROVED BWRIGHT
Note: 7/15/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/15/2025 11:13:48 AM *** 12" Water main being installed . In progress.
U-WATER SERVICE INSTALLATION 07/15/2025 PARTIALLY APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 7/15/2025 11:13:48 AM *** 12" Water main being installed .
U-PUMP STATION START-UP 07/03/2025 CANCELLED BY APPLICANT WEB
U-PUMP STATION PRE-INSTALLATION 06/30/2025 APPROVED DHANEY
UC-DRAINAGE STRUCT PLACMNT 06/30/2025 PARTIALLY APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 6/30/2025 2:06:45 PM *** About 25% installed - in progress .
UC-CONSTRUCTION ENTRANCE 06/30/2025 APPROVED DHANEY
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/16/2025 PARTIALLY APPROVED JMYERS
Note: 6/18/25 SILT FENCE HAS BEEN RE-INSTALLED. SILT FENCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. FOLLOW UP INSPECTION IN ONE MONTH 6/13/2025 - PREVIOUS INSPECTION NOTES 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/13/2025 Disapproved -FEE REQUIRED JMYERS
Note: 6/13/25 SILT FENCE HAS NOT BEEN RE-INSTALLED. SILT FENCE SHALL BE RE-INSTALLED OR STOP WORK ORDER SHALL BE PLACED ON THE PROJECT. FOLLOW UP INSPECTION MONDAY 6/16. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
U-GRAVITY SEWER INSTALL/TESTING 06/11/2025 PARTIALLY APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 6/11/2025 10:21:06 AM *** LS still being installed . 6/10/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/10/2025 9:18:46 AM *** New Lift station being installed .
U-GRAVITY SEWER INSTALL/TESTING 06/10/2025 PARTIALLY APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 6/10/2025 9:18:46 AM *** New Lift station being installed .
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/10/2025 Disapproved - NO FEE JMYERS
Note: 6/10/25 SILT FENCE HAS BEEN REMOVED FROM A PORTION OF THE WEST SIDE OF THE PROJECT. SILT FENCE SHALL BE RE-INSTALLED BY FRIDAY 6/13/25.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/03/2025 CANCELLED BY INSPECTOR JMYERS
Note: 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 SILT FENCE STILL FUNCTIONING, CLEARING ACTIVITIES STILL OCCURRING. FOLLOW UP INSPECTION IN ONE MONTH 4/1/2025 - PREVIOUS INSPECTION NOTES 4/1/25 SILT FENCE ON PERIMETER HAS BEEN INSTALLED. FOLLOW UP INSPECTION IN ONE MONTH 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 IT APPEARS THAT TIMBER ACTIVITY IS STILL ON GOING. FOLLOW UP INSPECTION NEXT MONTH
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/06/2025 PARTIALLY APPROVED JMYERS
Note: 5/6/25 SILT FENCE STILL FUNCTIONING, CLEARING ACTIVITIES STILL OCCURRING. FOLLOW UP INSPECTION IN ONE MONTH 4/1/2025 - PREVIOUS INSPECTION NOTES 4/1/25 SILT FENCE ON PERIMETER HAS BEEN INSTALLED. FOLLOW UP INSPECTION IN ONE MONTH 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 IT APPEARS THAT TIMBER ACTIVITY IS STILL ON GOING. FOLLOW UP INSPECTION NEXT MONTH
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/01/2025 PARTIALLY APPROVED JMYERS
Note: 4/1/25 SILT FENCE ON PERIMETER HAS BEEN INSTALLED. FOLLOW UP INSPECTION IN ONE MONTH 3/4/2025 - PREVIOUS INSPECTION NOTES 3/4/25 IT APPEARS THAT TIMBER ACTIVITY IS STILL ON GOING. FOLLOW UP INSPECTION NEXT MONTH
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/04/2025 PARTIALLY APPROVED JMYERS
Note: 3/4/25 IT APPEARS THAT TIMBER ACTIVITY IS STILL ON GOING. FOLLOW UP INSPECTION NEXT MONTH
PLAN - PRE-CON 386-986-3750 02/07/2025 APPROVED - AS NOTED LFITZGERALD
Note: john-forestar/chad-weber/jordan-gabe city met on site next to ph3
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY
IRRIGATION AFFIDAVIT
LDSC-IRRIGATION FINAL
LDSC- LANDSCAPE / IRRIGATION AS-BUILT
LDSC- LANDSCAPE FINAL
CLOSE OUT DOCUMENTS
U-SEWER FORCE MAIN INSTALL/TESTING
Note: 10/7/2025 - PREVIOUS INSPECTION NOTES 8in forcemain pig and flush on Sawmill Branch blvd sta 0+00 to 28+00
U-WATER SERVICE INSTALLATION
Note: 8/15/2025 - PREVIOUS INSPECTION NOTES 7/15/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 7/15/2025 11:13:48 AM *** 12" Water main being installed . In progress.
U-GRAVITY SEWER INSTALL/TESTING
Note: 8/15/2025 - PREVIOUS INSPECTION NOTES 6/11/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/11/2025 10:21:06 AM *** LS still being installed . 6/10/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 6/10/2025 9:18:46 AM *** New Lift station being installed . In progress.
U-PUMP STATION START-UP
U-REUSE MAIN INSTALL/TESTING
Note: 10/16/2025 - PREVIOUS INSPECTION NOTES 10/7/2025 - PREVIOUS INSPECTION NOTES 8/15/2025 - PREVIOUS INSPECTION NOTES In progress. 10inch Reclaim pig and flush on Sawmill Branch Blvd sta. 0+00 to 28+00 In progress
U-CROSS CONNECTION
U-WATER MAIN DISINFECTION
U-WATER MAIN DISINFECTION SAMPLING
UC-FINAL SITE INSPECTION
Note: 6/10/2026 - PREVIOUS INSPECTION NOTES 1)2 EMERGENCY ACCESS STABILIZED ROADS NOT CONSTRUSTED PER APPROVED DETAIL-CHAD WITH JD WEBER AGREES AND WILL ATEMPT TO BUILD IT ACCORDING TO DETAIL D1.012)-Jordan-NUMEROUS EROSIONS/UNDERMINING OF POND OUTFALL STRUCTURES(FES) THROUGHOUT PROJECT-CHAD INFORMED as WELL AS SETH(FORESTAR)
U - UTILITY COMMERCIAL FINAL

Review History

Department Status Date In Date Out
PLENG COMPLETE 10/14/2024 10/14/2024
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 10/14/2024 10/14/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 10/14/2024 10/23/2024
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤12.50) 02/03/2025
ADMINISTRATIVE- SITE DEVELOP ¤125.00 02/03/2025
SITE INSPECTION ¤560.00 02/03/2025
REINSPECTION- SITE INSPECTOR ¤40.00
REINSPECTION- SITE INSPECTOR ¤40.00
REINSPECTION- SITE INSPECTOR ¤40.00
Fees Total Due: ¤120.00 Total Paid: ¤672.50