I want to search for...

Permit #2024100583

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00430-0220
CONDITIONED SPACE: 1800 sqft
GARAGE: 434 sqft
OPENED PORCH (WITH ROOF) : 108 sqft
OPENED PORCH (WITH ROOF) : 132 sqft
Total Square Footage: 2474 sqft
Block: 00430
Subdivision: -
Job Phone: 832-726-2202
Location Address: 45 FENHILL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/20/2024
NOC: RECORDED
Applicant name: JONATHON AMBAR
Owner: ARANGO GONZALO

Address

5240 SAPPHIRE LANE SW

VERO BEACH, FL 32968

Lot: 0220
Contracted Stated Job Value: ¤140,000.00
Job Description: Single Family Residence
Type: CN

Contractor

CASPIAN HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

1802 N ALAFAYA TRAIL

ORLANDO, FL 32826

SUITE 162

ORLANDO, FL 32826

CBC1264918 (Exp: 08/31/2026) 832-726-2202

Sub Contractors

MOISES MERINO DIAZ
Status Location Address State License Number Phone
ACTIVE

3104 ORANOLE ROAD

ORLANDO, FL 32810

CAC1820980 (Exp: 08/31/2026) 407-225-3149
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/02/2025 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 07/01/2025 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 07/01/2025 FINAL APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/30/2025 APPROVED - AS NOTED PFLANAGAN
Note: CONTRATOR HAS SUBMITTED A LETTER AND FINAL DRAINAGE LETTER STATING WHY SITE PLAN WAS DIFFERANT FROM THE FINAL SURVEY. PASSING AS NOTED THAT CORRECTIONS WAS MADE TO COME TO CITY STANDARDS OTHER THEN THE 10" HIGHER THE THE ADJACENT LOT. ------------------------------------------------------------------------------- 6/17/2025 - PREVIOUS INSPECTION NOTES 6/17/25=1) YOU ARE STILL SUBMITTING THE SAME FINAL SURVEY THAT WE FAILED THREE TIMES. THE CITY OF PALM COAST NEEDS A NEW SURVEY AND A LETTER EXPLAINING WHY THE FINISHED FLOOR ELEVATIONS (FFE) FROM THE NEIGHBORING HOUSES HAVE MORE THAN A 2/10 VARIATION AND WON'T MATCH THE NUMBERS ON YOUR SITE PLAN. 2)YOUR FINAL LOT GRADING & DRAINAGE CERTIFICATION IS MISSING THE PERMIT NUMBER. INCOMPLETE, ALTERED AND / OR REVISED FORMS WILL NOT BE ACCEPTED BY THE CITY. 3)FOR EACH STATEMENT, INITIALED WITH A “NO”. ATTACH AN EXPLANATION DETAILING THE DISCREPANCY, CHANGE, OR DEVIATION THAT OCCURRED AND ITS EFFECT. 4)THE FINAL LOT GRADING & DRAINAGE PLAN THAT GRAPHICALLY DOCUMENTS AND ILLUSTRATES THE “AS-BUILT” LOT GRADING AND DRAINAGE CONDITIONS AT COMPLETION OF THE HOME, AFTER ALL SITE IMPROVEMENTS AND LANDSCAPING INCLUDING INSTALLATION OF SOD IS COMPLETED 6/11/2025 - PREVIOUS INSPECTION NOTES NEED TO SUBMIT A LETTER EXPLAINING WHY FFES ON THE ADJACENT LOTS HAS CHANGED FROM THE SITE PLAN AND FINAL SURVEY PLEASE CONTACT CIEF BUILDING OFFICAL WITH ANY QUESTIONS. ----------------------------------------------------------------------------- 5/29/2025 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY STILL DOEN'T MATCH THE ELEVATIONS THAT OUR SURVEYORS HAVE ESTABLISHED BY USEING YOUR BENCHMARK. THE CIEF BUILDING OFFICAL WANT A EXPLANATION OF WHY THE ELEVATIONS ARE NOT THE SAME. PLEASE CALL HIM FOR ANY QUESTIONS. ---------------------------------------------------------------------- 5/21/2025 - PREVIOUS INSPECTION NOTES The new final survey shows the same elevations that were presented on the original foundation survey previously submitted. However, the City Surveyor has conducted an independent elevation assessment of the adjacent lots, and a discrepancy has been identified regarding the Finished Floor Elevations (FFEs) of the neighboring properties. According to our surveyor’s findings, the FFE of the subject property is out of compliance with City Code Section 300.01(C)(3), which states that the FFE must not exceed 10 inches above the lowest adjacent lot. Please submit a revised final survey reflecting the correct elevations in accordance with the code requirements. For any questions or clarification, please contact the Chief Building Official directly. ---------------------------------------------------------------------------------------------------------------------- 5/20/2025 - PREVIOUS INSPECTION NOTES 5/20/25 YOUR FINAL SURVEY SHOWS THE FFE ON THE LEFT SIDE STRUCTURE OF 20.81 IS OVER A FOOT LOWER THAN YOUR FFE ON YOUR PROPERTY OF 22.12. YOUR FOUNDATION SURVEY SHOWS THE PROPERTY ON THE RIGHT FFE OF 22.62 AND YOUR FINAL SURVEY SHOWS THE SAME STRUCTURE AT 22.32 MORE THAN 2 TENTHS DEVIATION. YOU ALSO NEED TO IDENTIFY IF YOUR STRUCTURE IS WOOD OR BLOCK. FFE shall be no more than 10 inches different than the lowest adjacen Sec 300.01 C-3 "Sec 300.01 C-3=NOTE: FFE shall be no more than 10 inches different than the lowest adjacent (left and right side) lot’s FFE, unless specifically reviewed and approved by theCity Engineer." The FFE must be within 0.2 of a foot of the FFE that was approved and stated on the LGP. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. SEE PHOTO FOR REFERANCE 5/9/2025 - PREVIOUS INSPECTION NOTES ** 05/09/25 NEED TO IDENTIFY ALL DRAINAGE FEATURES WITHIN 100 FT OF YOUR PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the propertyor in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" ** NEED TO IDENTIFY ALL LOTS AS EITHER IMPROVED WITH FFE OR VACANT ** Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent ** NEED TO IDENTIFY WHAT TYPE OF STRUCTURE YOU CONSTRUCTED CONCRETE BLOCK OR WOOD FRAME
ROW FIELD SURVEY /GRADING CERTIFICATION 06/30/2025 APPROVED PFLANAGAN
Note: PLEASE SEE NOTES ON FINAL SURVEY
ROW - STORMWATER FINAL 06/30/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - FINAL APRON (AFTER POUR) 06/30/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/18/2025 Disapproved -FEE REQUIRED GBERTOLA
Note: 6/17/25=1) YOU ARE STILL SUBMITTING THE SAME FINAL SURVEY THAT WE FAILED THREE TIMES. THE CITY OF PALM COAST NEEDS A NEW SURVEY AND A LETTER EXPLAINING WHY THE FINISHED FLOOR ELEVATIONS (FFE) FROM THE NEIGHBORING HOUSES HAVE MORE THAN A 2/10 VARIATION AND WON'T MATCH THE NUMBERS ON YOUR SITE PLAN. 2)YOUR FINAL LOT GRADING & DRAINAGE CERTIFICATION IS MISSING THE PERMIT NUMBER. INCOMPLETE, ALTERED AND / OR REVISED FORMS WILL NOT BE ACCEPTED BY THE CITY. 3)FOR EACH STATEMENT, INITIALED WITH A “NO”. ATTACH AN EXPLANATION DETAILING THE DISCREPANCY, CHANGE, OR DEVIATION THAT OCCURRED AND ITS EFFECT. 4)THE FINAL LOT GRADING & DRAINAGE PLAN THAT GRAPHICALLY DOCUMENTS AND ILLUSTRATES THE “AS-BUILT” LOT GRADING AND DRAINAGE CONDITIONS AT COMPLETION OF THE HOME, AFTER ALL SITE IMPROVEMENTS AND LANDSCAPING INCLUDING INSTALLATION OF SOD IS COMPLETED 6/11/2025 - PREVIOUS INSPECTION NOTES NEED TO SUBMIT A LETTER EXPLAINING WHY FFES ON THE ADJACENT LOTS HAS CHANGED FROM THE SITE PLAN AND FINAL SURVEY PLEASE CONTACT CIEF BUILDING OFFICAL WITH ANY QUESTIONS. ----------------------------------------------------------------------------- 5/29/2025 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY STILL DOEN'T MATCH THE ELEVATIONS THAT OUR SURVEYORS HAVE ESTABLISHED BY USEING YOUR BENCHMARK. THE CIEF BUILDING OFFICAL WANT A EXPLANATION OF WHY THE ELEVATIONS ARE NOT THE SAME. PLEASE CALL HIM FOR ANY QUESTIONS. ---------------------------------------------------------------------- 5/21/2025 - PREVIOUS INSPECTION NOTES The new final survey shows the same elevations that were presented on the original foundation survey previously submitted. However, the City Surveyor has conducted an independent elevation assessment of the adjacent lots, and a discrepancy has been identified regarding the Finished Floor Elevations (FFEs) of the neighboring properties. According to our surveyor’s findings, the FFE of the subject property is out of compliance with City Code Section 300.01(C)(3), which states that the FFE must not exceed 10 inches above the lowest adjacent lot. Please submit a revised final survey reflecting the correct elevations in accordance with the code requirements. For any questions or clarification, please contact the Chief Building Official directly. ---------------------------------------------------------------------------------------------------------------------- 5/20/2025 - PREVIOUS INSPECTION NOTES 5/20/25 YOUR FINAL SURVEY SHOWS THE FFE ON THE LEFT SIDE STRUCTURE OF 20.81 IS OVER A FOOT LOWER THAN YOUR FFE ON YOUR PROPERTY OF 22.12. YOUR FOUNDATION SURVEY SHOWS THE PROPERTY ON THE RIGHT FFE OF 22.62 AND YOUR FINAL SURVEY SHOWS THE SAME STRUCTURE AT 22.32 MORE THAN 2 TENTHS DEVIATION. YOU ALSO NEED TO IDENTIFY IF YOUR STRUCTURE IS WOOD OR BLOCK. FFE shall be no more than 10 inches different than the lowest adjacen Sec 300.01 C-3 "Sec 300.01 C-3=NOTE: FFE shall be no more than 10 inches different than the lowest adjacent (left and right side) lot’s FFE, unless specifically reviewed and approved by theCity Engineer." The FFE must be within 0.2 of a foot of the FFE that was approved and stated on the LGP. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. SEE PHOTO FOR REFERANCE 5/9/2025 - PREVIOUS INSPECTION NOTES ** 05/09/25 NEED TO IDENTIFY ALL DRAINAGE FEATURES WITHIN 100 FT OF YOUR PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the propertyor in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" ** NEED TO IDENTIFY ALL LOTS AS EITHER IMPROVED WITH FFE OR VACANT ** Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent ** NEED TO IDENTIFY WHAT TYPE OF STRUCTURE YOU CONSTRUCTED CONCRETE BLOCK OR WOOD FRAME
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/11/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO SUBMIT A LETTER EXPLAINING WHY FFES ON THE ADJACENT LOTS HAS CHANGED FROM THE SITE PLAN AND FINAL SURVEY PLEASE CONTACT CIEF BUILDING OFFICAL WITH ANY QUESTIONS. ----------------------------------------------------------------------------- 5/29/2025 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY STILL DOEN'T MATCH THE ELEVATIONS THAT OUR SURVEYORS HAVE ESTABLISHED BY USEING YOUR BENCHMARK. THE CIEF BUILDING OFFICAL WANT A EXPLANATION OF WHY THE ELEVATIONS ARE NOT THE SAME. PLEASE CALL HIM FOR ANY QUESTIONS. ---------------------------------------------------------------------- 5/21/2025 - PREVIOUS INSPECTION NOTES The new final survey shows the same elevations that were presented on the original foundation survey previously submitted. However, the City Surveyor has conducted an independent elevation assessment of the adjacent lots, and a discrepancy has been identified regarding the Finished Floor Elevations (FFEs) of the neighboring properties. According to our surveyor’s findings, the FFE of the subject property is out of compliance with City Code Section 300.01(C)(3), which states that the FFE must not exceed 10 inches above the lowest adjacent lot. Please submit a revised final survey reflecting the correct elevations in accordance with the code requirements. For any questions or clarification, please contact the Chief Building Official directly. ---------------------------------------------------------------------------------------------------------------------- 5/20/2025 - PREVIOUS INSPECTION NOTES 5/20/25 YOUR FINAL SURVEY SHOWS THE FFE ON THE LEFT SIDE STRUCTURE OF 20.81 IS OVER A FOOT LOWER THAN YOUR FFE ON YOUR PROPERTY OF 22.12. YOUR FOUNDATION SURVEY SHOWS THE PROPERTY ON THE RIGHT FFE OF 22.62 AND YOUR FINAL SURVEY SHOWS THE SAME STRUCTURE AT 22.32 MORE THAN 2 TENTHS DEVIATION. YOU ALSO NEED TO IDENTIFY IF YOUR STRUCTURE IS WOOD OR BLOCK. FFE shall be no more than 10 inches different than the lowest adjacen Sec 300.01 C-3 "Sec 300.01 C-3=NOTE: FFE shall be no more than 10 inches different than the lowest adjacent (left and right side) lot’s FFE, unless specifically reviewed and approved by theCity Engineer." The FFE must be within 0.2 of a foot of the FFE that was approved and stated on the LGP. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. SEE PHOTO FOR REFERANCE 5/9/2025 - PREVIOUS INSPECTION NOTES ** 05/09/25 NEED TO IDENTIFY ALL DRAINAGE FEATURES WITHIN 100 FT OF YOUR PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the propertyor in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" ** NEED TO IDENTIFY ALL LOTS AS EITHER IMPROVED WITH FFE OR VACANT ** Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent ** NEED TO IDENTIFY WHAT TYPE OF STRUCTURE YOU CONSTRUCTED CONCRETE BLOCK OR WOOD FRAME
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/29/2025 Disapproved - NO FEE PFLANAGAN
Note: THE FINAL SURVEY STILL DOEN'T MATCH THE ELEVATIONS THAT OUR SURVEYORS HAVE ESTABLISHED BY USEING YOUR BENCHMARK. THE CIEF BUILDING OFFICAL WANT A EXPLANATION OF WHY THE ELEVATIONS ARE NOT THE SAME. PLEASE CALL HIM FOR ANY QUESTIONS. ---------------------------------------------------------------------- 5/21/2025 - PREVIOUS INSPECTION NOTES The new final survey shows the same elevations that were presented on the original foundation survey previously submitted. However, the City Surveyor has conducted an independent elevation assessment of the adjacent lots, and a discrepancy has been identified regarding the Finished Floor Elevations (FFEs) of the neighboring properties. According to our surveyor’s findings, the FFE of the subject property is out of compliance with City Code Section 300.01(C)(3), which states that the FFE must not exceed 10 inches above the lowest adjacent lot. Please submit a revised final survey reflecting the correct elevations in accordance with the code requirements. For any questions or clarification, please contact the Chief Building Official directly. ---------------------------------------------------------------------------------------------------------------------- 5/20/2025 - PREVIOUS INSPECTION NOTES 5/20/25 YOUR FINAL SURVEY SHOWS THE FFE ON THE LEFT SIDE STRUCTURE OF 20.81 IS OVER A FOOT LOWER THAN YOUR FFE ON YOUR PROPERTY OF 22.12. YOUR FOUNDATION SURVEY SHOWS THE PROPERTY ON THE RIGHT FFE OF 22.62 AND YOUR FINAL SURVEY SHOWS THE SAME STRUCTURE AT 22.32 MORE THAN 2 TENTHS DEVIATION. YOU ALSO NEED TO IDENTIFY IF YOUR STRUCTURE IS WOOD OR BLOCK. FFE shall be no more than 10 inches different than the lowest adjacen Sec 300.01 C-3 "Sec 300.01 C-3=NOTE: FFE shall be no more than 10 inches different than the lowest adjacent (left and right side) lot’s FFE, unless specifically reviewed and approved by theCity Engineer." The FFE must be within 0.2 of a foot of the FFE that was approved and stated on the LGP. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. SEE PHOTO FOR REFERANCE 5/9/2025 - PREVIOUS INSPECTION NOTES ** 05/09/25 NEED TO IDENTIFY ALL DRAINAGE FEATURES WITHIN 100 FT OF YOUR PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the propertyor in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" ** NEED TO IDENTIFY ALL LOTS AS EITHER IMPROVED WITH FFE OR VACANT ** Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent ** NEED TO IDENTIFY WHAT TYPE OF STRUCTURE YOU CONSTRUCTED CONCRETE BLOCK OR WOOD FRAME
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/21/2025 Disapproved - NO FEE PFLANAGAN
Note: The new final survey shows the same elevations that were presented on the original foundation survey previously submitted. However, the City Surveyor has conducted an independent elevation assessment of the adjacent lots, and a discrepancy has been identified regarding the Finished Floor Elevations (FFEs) of the neighboring properties. According to our surveyor’s findings, the FFE of the subject property is out of compliance with City Code Section 300.01(C)(3), which states that the FFE must not exceed 10 inches above the lowest adjacent lot. Please submit a revised final survey reflecting the correct elevations in accordance with the code requirements. For any questions or clarification, please contact the Chief Building Official directly. ---------------------------------------------------------------------------------------------------------------------- 5/20/2025 - PREVIOUS INSPECTION NOTES 5/20/25 YOUR FINAL SURVEY SHOWS THE FFE ON THE LEFT SIDE STRUCTURE OF 20.81 IS OVER A FOOT LOWER THAN YOUR FFE ON YOUR PROPERTY OF 22.12. YOUR FOUNDATION SURVEY SHOWS THE PROPERTY ON THE RIGHT FFE OF 22.62 AND YOUR FINAL SURVEY SHOWS THE SAME STRUCTURE AT 22.32 MORE THAN 2 TENTHS DEVIATION. YOU ALSO NEED TO IDENTIFY IF YOUR STRUCTURE IS WOOD OR BLOCK. FFE shall be no more than 10 inches different than the lowest adjacen Sec 300.01 C-3 "Sec 300.01 C-3=NOTE: FFE shall be no more than 10 inches different than the lowest adjacent (left and right side) lot’s FFE, unless specifically reviewed and approved by theCity Engineer." The FFE must be within 0.2 of a foot of the FFE that was approved and stated on the LGP. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. SEE PHOTO FOR REFERANCE 5/9/2025 - PREVIOUS INSPECTION NOTES ** 05/09/25 NEED TO IDENTIFY ALL DRAINAGE FEATURES WITHIN 100 FT OF YOUR PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the propertyor in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" ** NEED TO IDENTIFY ALL LOTS AS EITHER IMPROVED WITH FFE OR VACANT ** Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent ** NEED TO IDENTIFY WHAT TYPE OF STRUCTURE YOU CONSTRUCTED CONCRETE BLOCK OR WOOD FRAME
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/20/2025 Disapproved - NO FEE FSLADISH
Note: 5/20/25 YOUR FINAL SURVEY SHOWS THE FFE ON THE LEFT SIDE STRUCTURE OF 20.81 IS OVER A FOOT LOWER THAN YOUR FFE ON YOUR PROPERTY OF 22.12. YOUR FOUNDATION SURVEY SHOWS THE PROPERTY ON THE RIGHT FFE OF 22.62 AND YOUR FINAL SURVEY SHOWS THE SAME STRUCTURE AT 22.32 MORE THAN 2 TENTHS DEVIATION. YOU ALSO NEED TO IDENTIFY IF YOUR STRUCTURE IS WOOD OR BLOCK. FFE shall be no more than 10 inches different than the lowest adjacen Sec 300.01 C-3 "Sec 300.01 C-3=NOTE: FFE shall be no more than 10 inches different than the lowest adjacent (left and right side) lot’s FFE, unless specifically reviewed and approved by theCity Engineer." The FFE must be within 0.2 of a foot of the FFE that was approved and stated on the LGP. Sod elevation Sec 300.01 (A)(1)(C)(6) Sec300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. SEE PHOTO FOR REFERANCE 5/9/2025 - PREVIOUS INSPECTION NOTES ** 05/09/25 NEED TO IDENTIFY ALL DRAINAGE FEATURES WITHIN 100 FT OF YOUR PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the propertyor in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" ** NEED TO IDENTIFY ALL LOTS AS EITHER IMPROVED WITH FFE OR VACANT ** Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent ** NEED TO IDENTIFY WHAT TYPE OF STRUCTURE YOU CONSTRUCTED CONCRETE BLOCK OR WOOD FRAME
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/09/2025 Disapproved - NO FEE EMADISON
Note: ** 05/09/25 NEED TO IDENTIFY ALL DRAINAGE FEATURES WITHIN 100 FT OF YOUR PROPERTY ** "7) The elevations and/or inverts of all drainage structures within 100 feet of the property lines, including culverts, inlets, swales, weirs, etc., both upstream and downstream of the property. This includes the ditch bottom and top of bank of ditches located on the propertyor in Reserved Parcels adjacent to the property. Section 300.01 B(7) V-15" ** NEED TO IDENTIFY ALL LOTS AS EITHER IMPROVED WITH FFE OR VACANT ** Finished Floor Elevations (FFE): Section 300.01 B(2) V-15 2) Finished Floor Elevation (FFE) of the living area of all improved structures on adjacent ** NEED TO IDENTIFY WHAT TYPE OF STRUCTURE YOU CONSTRUCTED CONCRETE BLOCK OR WOOD FRAME
ROW- PROJECT STATUS 05/01/2025 APPROVED - AS NOTED FSLADISH
Note: 5/1/25 Gabe and I walked this address at the request of rich the grader of this property to see if the grade would be acceptable. We determined that the left side property slope while steep would work if the slope was consistent down the line, stabilized, and sod pinned in place. rich understood our requests and will grade as best as possible on the property line that will acheive a stable, consistent and durable finished slope. Rest of the grade looked as it will maintain COPC minimum standards at the time of this inspection.Inspector Notes from Inspection 9270 4/21/25 YOUR FORMBOARD ON THE LEFT SIDE OF THE DRIVEWAY APRON WAS DOWN, I PUT IT BACK UP, BUT IT NEEDS TO BE SECURED BEFORE YOU POUR CONCRETE. PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 5/1/25 Gabe and I walked this address at the request of rich the grader of this property to see if the grade would be acceptable. We determined that the left side property slope while steep would work if the slope was consistent down the line, stabilized, and sod pinned in place. rich understood our requests and will grade as best as possible on the property line that will acheive a stable, consistent and durable finished slope. Rest of the grade looked as it will maintain COPC minimum standards at the time of this inspection.
ROW- PRE-APRON (PRE-POUR) 04/21/2025 APPROVED - AS NOTED FSLADISH
Note: 4/21/25 YOUR FORMBOARD ON THE LEFT SIDE OF THE DRIVEWAY APRON WAS DOWN, I PUT IT BACK UP, BUT IT NEEDS TO BE SECURED BEFORE YOU POUR CONCRETE. PIPE ELEVATION GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR.
ELECTRIC - EARLY POWER 04/21/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 03/06/2025 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 03/06/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 02/28/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 02/25/2025 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 02/20/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 02/18/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 02/11/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 02/03/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/03/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 01/16/2025 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 01/02/2025 APPROVED LSALYERDS
MONOLITHIC SLAB 12/31/2024 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 12/26/2024 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 12/26/2024 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 12/23/2024 APPROVED CPISCITELLI
WATER METER INSTALLATION REQUEST 12/05/2024 APPROVED BVITALE
WILDLIFE CHECK - ENVIRONMENTAL 10/18/2024 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
SW1 COMPLETE 06/27/2025 06/30/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 06/27/2025 06/27/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 06/17/2025 06/20/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Please addressed comments below Per Gabriel: 6/17/2025 - PREVIOUS INSPECTION NOTES 6/17/25=1) YOU ARE STILL SUBMITTING THE SAME FINAL SURVEY THAT WE FAILED THREE TIMES. THE CITY OF PALM COAST NEEDS A NEW SURVEY AND A LETTER EXPLAINING WHY THE FINISHED FLOOR ELEVATIONS (FFE) FROM THE NEIGHBORING HOUSES HAVE MORE THAN A 2/10 VARIATION AND WON'T MATCH THE NUMBERS ON YOUR SITE PLAN. 2)YOUR FINAL LOT GRADING & DRAINAGE CERTIFICATION IS MISSING THE PERMIT NUMBER. INCOMPLETE, ALTERED AND / OR REVISED FORMS WILL NOT BE ACCEPTED BY THE CITY. 3)FOR EACH STATEMENT, INITIALED WITH A “NO”. ATTACH AN EXPLANATION DETAILING THE DISCREPANCY, CHANGE, OR DEVIATION THAT OCCURRED AND ITS EFFECT. 4)THE FINAL LOT GRADING & DRAINAGE PLAN THAT GRAPHICALLY DOCUMENTS AND ILLUSTRATES THE “AS-BUILT” LOT GRADING AND DRAINAGE CONDITIONS AT COMPLETION OF THE HOME, AFTER ALL SITE IMPROVEMENTS AND LANDSCAPING INCLUDING INSTALLATION OF SOD IS COMPLETED
MECH COMPLETE 05/06/2025 05/08/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/13/2025 01/21/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/13/2025 01/13/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/30/2024 01/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 12/30/2024 12/30/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 12/18/2024 12/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 10/16/2024 12/05/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
PLENV COMPLETE 10/16/2024 10/18/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 10/18/24 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BADMIN COMPLETE 10/15/2024 10/21/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 10/15/2024 10/18/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/15/2024 10/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/15/2024 10/21/2024
LOCATE COMPLETE 10/15/2024 10/17/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 10/15/2024 10/16/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 10/15/2024 10/16/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 09/24/2025
CONTRACTOR CHANGE ¤20.00 09/24/2025
PLAN REVIEW - REVISION ¤32.50 09/24/2025
CONNECTION FEES ¤1,187.26 11/20/2024
WATER- TURN ON ¤25.00 11/20/2024
ADJUSTMENT 10% (¤3.00) 11/20/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/20/2024
ADMINISTRATIVE - RESID PP ¤225.00 11/20/2024
FC IMPACT FEE EMS ¤62.00 11/20/2024
IMPACT FEE FIRE ¤434.51 11/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/20/2024
FC IMPACT FEE LIBRARY ¤268.00 11/20/2024
IMPACT FEE PARKS ¤1,828.01 11/20/2024
IMPACT FEE SCHOOL ¤5,450.00 11/20/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 11/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 11/20/2024
SURCHARGE FS 533.721 ¤5.04 11/20/2024
SURCHARGE - FS 468.631 ¤7.56 11/20/2024
SW ENG - FOUNDATION SURVEY ¤20.00 11/20/2024
SW ENG INSPECTION 80 ¤80.00 11/20/2024
SW ENG PRE APRON ¤30.00 11/20/2024
SW ENG - REVIEW 20 ¤20.00 11/20/2024
SW ENG RES REVIEW 200 ¤200.00 11/20/2024
SEWER CREDIT (¤1,147.00) 11/20/2024
SEWER INSPECTION ¤25.00 11/20/2024
SEWER CAPITAL FACILITY ¤6,120.52 11/20/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 11/20/2024
WORK WITHOUT PERMIT ¤252.00 11/20/2024
SITE PLAN 30 ¤30.00 11/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤21,678.54