I want to search for...
Permit #2024100625
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7025-00610-0200 |
| Block: 00610 |
| Subdivision: 7025 - |
| Job Phone: 386-793-6919 |
| Location Address: 107 PATRIC DR |
| Type: DR - DRIVEWAY |
| Issue Date: 11/05/2024 |
| NOC: Unknown |
| Applicant name: BRIAN A RUTHERFORD |
| Owner: GHERMAN OCTAVEAN & MARIA GHERMAN H&W |
|
Address 107 PATRIC DRIVE PALM COAST, FL 32164 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤2,400.00 |
| Job Description: CIRCULAR DRIVEWAY |
| Type: CN |
Contractor
CREATIVE TOUCH CONCRETE SURFACING, LLC
| Status | Location Address | Phone |
| ACTIVE |
1 CARDWELL COURT PALM COAST, FL 32137 |
386-793-6919 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 03/12/2025 | APPROVED | FSLADISH |
| Note: BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 03/12/2025 | APPROVED | FSLADISH |
| Note: BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/12/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 12/31/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 11/06/2024 | APPROVED | FSLADISH |
| Note: 11/6/24 PIPE ELEVATION OK. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIEMENT ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/16/2024 | 10/22/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 10/16/2024 | 10/23/2024 |
| Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/16/2024 | 10/16/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤3.00) | 11/05/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/05/2024 |
| SW ENG INSPECTION 40 | ¤40.00 | 11/05/2024 |
| SW ENG PRE APRON | ¤30.00 | 11/05/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/05/2024 |
| SITE PLAN 15 | ¤15.00 | 11/05/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤312.00 |