I want to search for...
Permit #2024100634
Permit Details
Status: COED
| Parcel Id: 03-12-31-1125-00000-0400 |
| CONDITIONED SPACE: 2394 sqft |
| GARAGE: 502 sqft |
| OPENED PORCH (WITH ROOF) : 43 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| Total Square Footage: 3115 sqft |
| Subdivision: 1125 - MC QUEENS PARK |
| Job Phone: 813-917-1689 |
| Location Address: 33 ARMOYAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/25/2024 |
| NOC: RECORDED |
| Applicant name: SCOTT EVAN KEUNING |
| Owner: TAYLOR MORRISON OF FLORIDA INC |
|
Address 1275 W GRANADA BLVD ORMOND BEACH, FL 32174 |
|
Address SUITE 3B ORMOND BEACH, FL 32174 |
| Lot: 40 |
| Contracted Stated Job Value: ¤183,103.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
TAYLOR MORRISON OF FLORIDA INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7785 BAY MEADOWS WAY, SUITE 105 JACKSONVILLE, FL 32256 |
CBC1265083 (Exp: 08/31/2026) | 813-917-1689 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
CHASE RANDOLPH MASSEY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10048 103RD ST JACKSONVILLE, FL 32210 |
CCC1332486 (Exp: 08/31/2026) | 904-248-1133 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 10/17/2025 | APPROVED | FSLADISH |
| Note: 10/17/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 10/15/2025 - PREVIOUS INSPECTION NOTES 10/15/25 PLEASE REFER TO PREVIOUS NOTES. NO CHANGES AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25 PLEASE REFER TO PREVIOUS NOTE FRON 8/11/25. YOU STILL HAVE NOT MADE SOD CORRECTION ON LEFT SIDE PROPERTY LINE AREA AT THE TIME OF THIS INSPECTION. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage Inspector Notes from Inspection 9465 8/11/25 YOU HAVE NOT MADE REQUIRED CORRECTION ON LEFT SIDE PROPERTY LINE AT THE TIME OF THIS INSPECTION. AS A COURTESY I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED THAT YOU WILL BE HELD UP ON ROW FINAL UNTIL CORRECTONS ARE COPMLETED TO COPC STANDARDS AND ANY OTHER INSPECTIONS THAT MAY REVEAL ADDITIONAL REQUIRED CORRECTIONS. 7/17/2025 - PREVIOUS INSPECTION NOTES 7/17/25 UPON WALKING PROPERTY DETERMINED THAT YOU WILL NEED TO REMOVE MULCH FROM DRAINAGE CONVEYANCE ON RIGHT SIDE NEXT TO HVAC UNIT. ALSO A MACHINE HAS DUG BEYONG PROPERTY LINE ON THE LEFT SIDE AND ALTERED GRADE AND ADDED A GOOD AMOUNT OF DIRT OVER THE LINE. THIS DIRT WILL NEED TO BE REMOVED THE PROPERTY LINE REPAIRED AND THE GRADE ELEVATIONS RESHOT TO MAKE SURE THAT THEY MATCH THE FINAL SURVEY. PHOTO ENCLOSED. | |||
| ROW - STORMWATER FINAL | 10/15/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 10/15/25 PLEASE REFER TO PREVIOUS NOTES. NO CHANGES AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. 9/23/2025 - PREVIOUS INSPECTION NOTES 9/23/25 PLEASE REFER TO PREVIOUS NOTE FRON 8/11/25. YOU STILL HAVE NOT MADE SOD CORRECTION ON LEFT SIDE PROPERTY LINE AREA AT THE TIME OF THIS INSPECTION. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage Inspector Notes from Inspection 9465 8/11/25 YOU HAVE NOT MADE REQUIRED CORRECTION ON LEFT SIDE PROPERTY LINE AT THE TIME OF THIS INSPECTION. AS A COURTESY I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED THAT YOU WILL BE HELD UP ON ROW FINAL UNTIL CORRECTONS ARE COPMLETED TO COPC STANDARDS AND ANY OTHER INSPECTIONS THAT MAY REVEAL ADDITIONAL REQUIRED CORRECTIONS. 7/17/2025 - PREVIOUS INSPECTION NOTES 7/17/25 UPON WALKING PROPERTY DETERMINED THAT YOU WILL NEED TO REMOVE MULCH FROM DRAINAGE CONVEYANCE ON RIGHT SIDE NEXT TO HVAC UNIT. ALSO A MACHINE HAS DUG BEYONG PROPERTY LINE ON THE LEFT SIDE AND ALTERED GRADE AND ADDED A GOOD AMOUNT OF DIRT OVER THE LINE. THIS DIRT WILL NEED TO BE REMOVED THE PROPERTY LINE REPAIRED AND THE GRADE ELEVATIONS RESHOT TO MAKE SURE THAT THEY MATCH THE FINAL SURVEY. PHOTO ENCLOSED. | |||
| ROW - STORMWATER FINAL | 09/23/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 9/23/25 PLEASE REFER TO PREVIOUS NOTE FRON 8/11/25. YOU STILL HAVE NOT MADE SOD CORRECTION ON LEFT SIDE PROPERTY LINE AREA AT THE TIME OF THIS INSPECTION. STORMWATER FINAL INSPECTION Sec 300.03 F4-A / V-22 Sec 300.03 F4-The Stormwater Final Inspection will include visual inspection of the site and adjacent properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage Inspector Notes from Inspection 9465 8/11/25 YOU HAVE NOT MADE REQUIRED CORRECTION ON LEFT SIDE PROPERTY LINE AT THE TIME OF THIS INSPECTION. AS A COURTESY I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED THAT YOU WILL BE HELD UP ON ROW FINAL UNTIL CORRECTONS ARE COPMLETED TO COPC STANDARDS AND ANY OTHER INSPECTIONS THAT MAY REVEAL ADDITIONAL REQUIRED CORRECTIONS. 7/17/2025 - PREVIOUS INSPECTION NOTES 7/17/25 UPON WALKING PROPERTY DETERMINED THAT YOU WILL NEED TO REMOVE MULCH FROM DRAINAGE CONVEYANCE ON RIGHT SIDE NEXT TO HVAC UNIT. ALSO A MACHINE HAS DUG BEYONG PROPERTY LINE ON THE LEFT SIDE AND ALTERED GRADE AND ADDED A GOOD AMOUNT OF DIRT OVER THE LINE. THIS DIRT WILL NEED TO BE REMOVED THE PROPERTY LINE REPAIRED AND THE GRADE ELEVATIONS RESHOT TO MAKE SURE THAT THEY MATCH THE FINAL SURVEY. PHOTO ENCLOSED. | |||
| U -UTILITY RESIDENTIAL FINAL | 09/23/2025 | FINAL APPROVED | BHAINES |
| ROW - FINAL APRON (AFTER POUR) | 09/23/2025 | APPROVED | FSLADISH |
| Note: 9/23/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 8/11/25 YOU HAVE NOT MADE REQUIRED CORRECTION ON LEFT SIDE PROPERTY LINE AT THE TIME OF THIS INSPECTION. AS A COURTESY I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED THAT YOU WILL BE HELD UP ON ROW FINAL UNTIL CORRECTONS ARE COPMLETED TO COPC STANDARDS AND ANY OTHER INSPECTIONS THAT MAY REVEAL ADDITIONAL REQUIRED CORRECTIONS. 7/17/2025 - PREVIOUS INSPECTION NOTES 7/17/25 UPON WALKING PROPERTY DETERMINED THAT YOU WILL NEED TO REMOVE MULCH FROM DRAINAGE CONVEYANCE ON RIGHT SIDE NEXT TO HVAC UNIT. ALSO A MACHINE HAS DUG BEYONG PROPERTY LINE ON THE LEFT SIDE AND ALTERED GRADE AND ADDED A GOOD AMOUNT OF DIRT OVER THE LINE. THIS DIRT WILL NEED TO BE REMOVED THE PROPERTY LINE REPAIRED AND THE GRADE ELEVATIONS RESHOT TO MAKE SURE THAT THEY MATCH THE FINAL SURVEY. PHOTO ENCLOSED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/11/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/11/25 YOU HAVE NOT MADE REQUIRED CORRECTION ON LEFT SIDE PROPERTY LINE AT THE TIME OF THIS INSPECTION. AS A COURTESY I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED THAT YOU WILL BE HELD UP ON ROW FINAL UNTIL CORRECTONS ARE COPMLETED TO COPC STANDARDS AND ANY OTHER INSPECTIONS THAT MAY REVEAL ADDITIONAL REQUIRED CORRECTIONS. 7/17/2025 - PREVIOUS INSPECTION NOTES 7/17/25 UPON WALKING PROPERTY DETERMINED THAT YOU WILL NEED TO REMOVE MULCH FROM DRAINAGE CONVEYANCE ON RIGHT SIDE NEXT TO HVAC UNIT. ALSO A MACHINE HAS DUG BEYONG PROPERTY LINE ON THE LEFT SIDE AND ALTERED GRADE AND ADDED A GOOD AMOUNT OF DIRT OVER THE LINE. THIS DIRT WILL NEED TO BE REMOVED THE PROPERTY LINE REPAIRED AND THE GRADE ELEVATIONS RESHOT TO MAKE SURE THAT THEY MATCH THE FINAL SURVEY. PHOTO ENCLOSED. | |||
| U-CROSS CONNECTION | 08/11/2025 | APPROVED | BWRIGHT |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/17/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/17/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 7/17/25 UPON WALKING PROPERTY DETERMINED THAT YOU WILL NEED TO REMOVE MULCH FROM DRAINAGE CONVEYANCE ON RIGHT SIDE NEXT TO HVAC UNIT. ALSO A MACHINE HAS DUG BEYONG PROPERTY LINE ON THE LEFT SIDE AND ALTERED GRADE AND ADDED A GOOD AMOUNT OF DIRT OVER THE LINE. THIS DIRT WILL NEED TO BE REMOVED THE PROPERTY LINE REPAIRED AND THE GRADE ELEVATIONS RESHOT TO MAKE SURE THAT THEY MATCH THE FINAL SURVEY. PHOTO ENCLOSED. | |||
| BLD - BUILDING FINAL | 07/02/2025 | FINAL APPROVED | BTAYLOR |
| ROW- PRE-APRON (PRE-POUR) | 05/29/2025 | APPROVED | FSLADISH |
| Note: 5/30/25 . BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/27/2025 - PREVIOUS INSPECTION NOTES 5/27/25 YOU DO NOT HAVE THE SIDEWALK PORTION ON THE RIGHT SIDE FRAMED FOR POURING AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE | |||
| ROW- PRE-APRON (PRE-POUR) | 05/27/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 5/27/25 YOU DO NOT HAVE THE SIDEWALK PORTION ON THE RIGHT SIDE FRAMED FOR POURING AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE | |||
| ELECTRIC - EARLY POWER | 05/20/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-20-25 1. Emailed FPL at 10:37. Inspector Notes from Inspection 2200 4/3/25 Okay to release e-mail to FPL 1. Please secure GFCi under meter/main | |||
| GRAVITY SEWER TEST | 05/12/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 05/12/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 04/22/2025 | APPROVED | BTAYLOR |
| Note: 4/21/2025 - PREVIOUS INSPECTION NOTES Via call Inspector Notes from Inspection 2420 1. Range vent requires 3 mechanical attachments at joints FBCR M1601.4.1 2. Low voltage panel missing outlet box NEC 314.4 3. Door gap exceeds 1/4'' solid blocking required FBCR 609.1 4. Window taping not finished FBC EC R402.4.1.1 ***Check on insulation*** | |||
| INSULATION | 04/21/2025 | CANCELLED BY APPLICANT | PKNAPIK |
| Note: Via call Inspector Notes from Inspection 2420 1. Range vent requires 3 mechanical attachments at joints FBCR M1601.4.1 2. Low voltage panel missing outlet box NEC 314.4 3. Door gap exceeds 1/4'' solid blocking required FBCR 609.1 4. Window taping not finished FBC EC R402.4.1.1 ***Check on insulation*** | |||
| ALL ROUGH | 04/15/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Range vent requires 3 mechanical attachments at joints FBCR M1601.4.1 2. Low voltage panel missing outlet box NEC 314.4 3. Door gap exceeds 1/4'' solid blocking required FBCR 609.1 4. Window taping not finished FBC EC R402.4.1.1 ***Check on insulation*** | |||
| LATH/BRICK/ WATER BARRIER | 04/08/2025 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 04/08/2025 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 04/03/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/3/25 Okay to release e-mail to FPL 1. Please secure GFCi under meter/main | |||
| WALL SHEATHING | 04/02/2025 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/02/2025 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 03/31/2025 | APPROVED | RRICKS |
| MONOLITHIC SLAB | 03/19/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/17/2025 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 03/06/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/25/2025 | 06/25/2025 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| MECH | COMPLETE | 05/07/2025 | 05/08/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/28/2025 | 03/31/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/28/2025 | 03/28/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/12/2024 | 11/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 10/17/2024 | 10/22/2024 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/16/2024 | 10/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/16/2024 | 10/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/16/2024 | 10/18/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/16/2024 | 10/21/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/16/2024 | 10/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/16/2024 | 10/22/2024 |
| LOCATE | COMPLETE | 10/16/2024 | 10/21/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/16/2024 | 10/22/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2023 8Th Edition | |||
| SW1 | COMPLETE | 10/16/2024 | 10/17/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/16/2024 | 10/17/2024 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 10/20/2025 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/01/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/25/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/25/2024 |
| SEWER INSPECTION | ¤25.00 | 11/25/2024 |
| SEWER CAPITAL FACILITY | ¤3,129.62 | 11/25/2024 |
| WATER CAPITAL FACILITY FEE | ¤2,745.73 | 11/25/2024 |
| SITE PLAN 30 | ¤30.00 | 11/25/2024 |
| SURCHARGE FS 533.721 | ¤14.50 | 11/25/2024 |
| SURCHARGE - FS 468.631 | ¤21.75 | 11/25/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/25/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/25/2024 |
| SW ENG PRE APRON | ¤30.00 | 11/25/2024 |
| WATER-METER | ¤514.49 | 11/25/2024 |
| WATER-METER | ¤514.49 | 11/25/2024 |
| WATER- TURN ON | ¤25.00 | 11/25/2024 |
| ADJUSTMENT 10% | (¤161.14) | 11/25/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/25/2024 |
| INSPECTION - RESIDENTIAL | ¤1,232.00 | 11/25/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤349.44 | 11/25/2024 |
| CONNECTION FEES | ¤25.00 | 11/25/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 11/25/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 11/25/2024 |
| IMPACT FEE FIRE | ¤434.51 | 11/25/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/25/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/25/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 11/25/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 11/25/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/25/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,160.40 |