Permit #2024100964
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7028-00720-0470 |
| Total Square Footage: 1368 sqft |
| Block: 00720 |
| Subdivision: 7028 - |
| Job Phone: 856-776-3930 |
| Location Address: 2 POINSETTIA LN |
| Type: BA - BUILDING ADDITION |
| Issue Date: 12/02/2024 |
| NOC: RECORDED |
| Applicant name: NEFTALI DEJESUS III |
| Owner: RUIZ DOROTHY & JOSE H&W |
|
Address 2 POINSETTIA LANE PALM COAST, FL 32164 |
| Lot: 0470 |
| Contracted Stated Job Value: ¤30,000.00 |
| Job Description: Front entryway addition |
| Type: CN |
Contractor
1621 BUILDING AND REMODELING LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW UNIT 3-N PALM COAST, FL 32137 |
CGC1534626 (Exp: 08/31/2026) | 386-597-5984 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/26/2025 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 08/07/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 8/7/2025 2:54:55 PM *** 8/7/25: 1). Excess construction material needs to be removed from site as required. FBC-[A] 110.3.11 / FBC-[A] 111.1 2). Light fixture removed during construction is incomplete. (missing fixture or weatherproof cover). FBC [A]107.4 / NEC - 406.6 / 406.9(2E) 3). Previously noted kickout/flashing on the right side remains unresolved. (counter flashing kickout on right side is incomplete exposing roof deck underlayment.) 4). Stucco patching is not sealed/finished as required. FBC-R404.1.3.3.8 5). All walls need to be sealed at the bottom where meeting the slab per manufacturer. FBC [A]107.4 / FBC-R404.1.6 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. NOTES: Engineer's revision required for approval of hardi panel siding as finished fascade as plans require to match existing fascade which is stucco. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. | |||
| LATH/BRICK/ WATER BARRIER | 07/07/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/7/2025 1:44:58 PM *** 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / engineer's revision required for approval of hardi panel siding as finished fascade as plans require to match existing fascade which is stucco. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 Previous note not rectified 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/07/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 7/7/2025 1:44:33 PM *** 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. New inspection due to canceled inspection 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/09/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/9/2025 9:56:35 AM *** 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. New inspection due to canceled inspection 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| LATH/BRICK/ WATER BARRIER | 06/09/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 6/9/2025 10:01:24 AM *** 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / engineer's revision required for approval of hardi panel siding as finished fascade as plans require to match existing fascade which is stucco. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 Previous note not rectified 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/28/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/16/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| LATH/BRICK/ WATER BARRIER | 04/16/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/16/25 Previous note not rectified 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection. | |||
| WALL SHEATHING | 04/14/2025 | APPROVED | JSTEWART |
| LATH/BRICK/ WATER BARRIER | 04/14/2025 | Disapproved - NO FEE | JSTEWART |
| Note: L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/14/2025 | Disapproved - NO FEE | JSTEWART |
| Note: submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| ROOF VALLEY & METAL | 04/14/2025 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/27/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/27/2025 11:42:14 AM *** 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/19/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/31/2025 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 1/31/2025 4:12:02 PM *** 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to coplete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection. | |||
| FOOTER | 12/20/2024 | APPROVED - AS NOTED | KSANDOE |
| Note: Reviewed plans online. Please have full copy on site for next inspection. | |||
| FOOTER | 12/19/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/19/2024 9:33:40 AM *** 12/19/24: Correction or Revision required. 1). Footers are not completed as required on S-1 detail page. (highlighted) FBC [A]107.4 2). S-1 detail page on site does not match page submitted to the City. On-site plan is missing almost all of the individual footer requirements, etc. (could not highlight required details due to missing information). FBC [A]107.4 | |||
| LATH/BRICK/ WATER BARRIER | 12/18/2024 | Disapproved - NO FEE | PKNAPIK |
| Note: 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/24/2025 | 06/30/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/23/2025 | 06/23/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please resubmit and be more specific/detailed on the revision sheet what revisions are being made. | |||
| BLD | COMPLETE | 05/19/2025 | 05/23/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/19/2025 | 05/19/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/01/2025 | 04/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 04/01/2025 | 04/01/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For future submittals, your plan sheets should be uploaded under PLANS and not SITE PLAN. The site plan is the property layout/survey. | |||
| BADMIN | INFORMATION | 12/16/2024 | 12/16/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC is cut off on top. Please submit full copy. | |||
| BLD | COMPLETE | 11/08/2024 | 11/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/25/2024 | 10/25/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 10/22/2024 | 10/29/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. All pages need to be uploaded separately and digitall signed sealed and verifiable. AHJ 2. Provide lumber grade and species for all rafters, beams, joist etc....R802.10.1 3. Provide completed city of palm coast roofing worksheet 107.2.1 4. Provide code analysis showing wind design, exposure category etc... R301 5. Provide roof sheathing material R803.1and R803.2.2/ table R803.2.2 | |||
| ELEC | CANCEL | 10/22/2024 | 10/28/2024 |
| MECH | CANCEL | 10/22/2024 | 10/28/2024 |
| PLUM | CANCEL | 10/22/2024 | 10/28/2024 |
| ZON | HOLD | 10/22/2024 | 10/22/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Front entry must meet minimum front setback of 25ft. Please submit a site plan/survey showing front entry addition with dimensions and setbacks Plans must state that walls and roof will match existing |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/25/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/17/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 12/02/2024 |
| SURCHARGE - FS 468.631 | ¤2.40 | 12/02/2024 |
| SITE PLAN 30 | ¤30.00 | 12/02/2024 |
| ADJUSTMENT 10% | (¤17.75) | 12/02/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/02/2024 |
| INSPECTION - RESIDENTIAL | ¤82.50 | 12/02/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 12/02/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤354.15 |