Permit #2024100964

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7028-00720-0470
Total Square Footage: 1368 sqft
Block: 00720
Subdivision: 7028 -
Job Phone: 856-776-3930
Location Address: 2 POINSETTIA LN
Type: BA - BUILDING ADDITION
Issue Date: 12/02/2024
NOC: RECORDED
Applicant name: NEFTALI DEJESUS III
Owner: RUIZ DOROTHY & JOSE H&W

Address

2 POINSETTIA LANE

PALM COAST, FL 32164

Lot: 0470
Contracted Stated Job Value: ¤30,000.00
Job Description: Front entryway addition
Type: CN

Contractor

1621 BUILDING AND REMODELING LLC
Status Location Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW UNIT 3-N

PALM COAST, FL 32137

CGC1534626 (Exp: 08/31/2026) 386-597-5984

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/26/2025 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 08/07/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 8/7/2025 2:54:55 PM *** 8/7/25: 1). Excess construction material needs to be removed from site as required. FBC-[A] 110.3.11 / FBC-[A] 111.1 2). Light fixture removed during construction is incomplete. (missing fixture or weatherproof cover). FBC [A]107.4 / NEC - 406.6 / 406.9(2E) 3). Previously noted kickout/flashing on the right side remains unresolved. (counter flashing kickout on right side is incomplete exposing roof deck underlayment.) 4). Stucco patching is not sealed/finished as required. FBC-R404.1.3.3.8 5). All walls need to be sealed at the bottom where meeting the slab per manufacturer. FBC [A]107.4 / FBC-R404.1.6 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. NOTES: Engineer's revision required for approval of hardi panel siding as finished fascade as plans require to match existing fascade which is stucco. / counter flashing kickout on right side is incomplete exposing roof deck underlayment.
LATH/BRICK/ WATER BARRIER 07/07/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 7/7/2025 1:44:58 PM *** 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / engineer's revision required for approval of hardi panel siding as finished fascade as plans require to match existing fascade which is stucco. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 Previous note not rectified 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/07/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 7/7/2025 1:44:33 PM *** 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. New inspection due to canceled inspection 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/09/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 6/9/2025 9:56:35 AM *** 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. New inspection due to canceled inspection 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
LATH/BRICK/ WATER BARRIER 06/09/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 6/9/2025 10:01:24 AM *** 6/9/25: *** Met with Contractor Representative to discuss requirements on plans. Highlighted areas on plans. Informed Representative that all anchors shown on plans need to be exposed to verify that all meet plan and minimum code requirements. NOTES: Missing collar ties, sole plate anchors and header anchors. / Anchors into house do not match plan requirements. / 7/16" sheathing is not installed as required on plans. / engineer's revision required for approval of hardi panel siding as finished fascade as plans require to match existing fascade which is stucco. / counter flashing kickout on right side is incomplete exposing roof deck underlayment. 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 Previous note not rectified 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/28/2025 CANCELLED BY APPLICANT WEB
Note: 4/16/2025 - PREVIOUS INSPECTION NOTES 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/16/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 4/16/25 1. Plans call for collar tie to connect existing beam to house with 2 lag bolts. (Detail 3) There is no horizontal beam as its an archway. No lag bolts connecting rafters to building in place either FBC(A) 107.4 2. Missing CS16x3' straps on each rafter to collar tie and rr47 / equivalent FBC(A) 107.4 3. Missing anchor bolts per plan FBC(A) 107.4 4. Plans call for sheathing to be 7/16" w/8D common nails @6" on edges and 12" in the field 5. Detail 4 calls for H1A hurricaine ties and A23Z angle brackets are used 6. Cannot see any anchors/lags for beams to building attachment 4/14/2025 - PREVIOUS INSPECTION NOTES submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
LATH/BRICK/ WATER BARRIER 04/16/2025 Disapproved - NO FEE MCONTRYMAN
Note: 4/16/25 Previous note not rectified 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing 4/14/2025 - PREVIOUS INSPECTION NOTES L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection.
WALL SHEATHING 04/14/2025 APPROVED JSTEWART
LATH/BRICK/ WATER BARRIER 04/14/2025 Disapproved - NO FEE JSTEWART
Note: L flashing from roof to existing wall needs fastened 6" OC and cement flashing to shed moisture. R905.2.8.1 Base and counter flashing. 12/18/2024 - PREVIOUS INSPECTION NOTES 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/14/2025 Disapproved - NO FEE JSTEWART
Note: submitted revision has not been approved. anchors in beam to post are not to the detail on the revision plan. Install anchors per plan, or submit a revision for what is installed. 2/27/2025 - PREVIOUS INSPECTION NOTES 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
ROOF VALLEY & METAL 04/14/2025 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/27/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 2/27/2025 11:42:14 AM *** 2/27/25: Met with CM to identify everything that needs to be exposed for inspection. Could not see post to header brackets or headers in general. Need all exposed to inspect. FBC [A]107.4 / FBC [A]110.1. 2/19/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 2/19/2025 9:37:59 AM *** 2/19/25: 1). Plans on site are not stamped approved by the City as required. FBC [A]107.3.1 2). Still cannot view any of the post or base anchors as only one piece of Hardi panel has been removed for inspection. FBC- Section 110 Inspections / FBC-A] 110.1 General. 1/31/2025 - PREVIOUS INSPECTION NOTES 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to complete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/31/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 1/31/2025 4:12:02 PM *** 1/31/25: A complete inspection still needs to be performed. 1). Plans need to be of size that all details are easily readable. 8.5" x 11" plans do not meet the requirements. Please have full size plans available and on site for the inspection. FBC 107.2.1 2). Cannot see anchors as all framing is covered with exterior plywood and trim. Framing needs to be exposed in order for us to coplete this inspection. FBC [A]107.4 NOTE: The installed underlayment on roof sheathing does not meet code requirements. You will need to correct before Roof Valley Metal Inspection. Inspector Notes from Inspection 2270 Reviewed plans online. Please have full copy on site for next inspection.
FOOTER 12/20/2024 APPROVED - AS NOTED KSANDOE
Note: Reviewed plans online. Please have full copy on site for next inspection.
FOOTER 12/19/2024 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/19/2024 9:33:40 AM *** 12/19/24: Correction or Revision required. 1). Footers are not completed as required on S-1 detail page. (highlighted) FBC [A]107.4 2). S-1 detail page on site does not match page submitted to the City. On-site plan is missing almost all of the individual footer requirements, etc. (could not highlight required details due to missing information). FBC [A]107.4
LATH/BRICK/ WATER BARRIER 12/18/2024 Disapproved - NO FEE PKNAPIK
Note: 12/18/2024 Wrong inspection called in. Footer needs to be done before this inspection.

Review History

Department Status Date In Date Out
BLD COMPLETE 06/24/2025 06/30/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 06/23/2025 06/23/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please resubmit and be more specific/detailed on the revision sheet what revisions are being made.
BLD COMPLETE 05/19/2025 05/23/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 05/19/2025 05/19/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/01/2025 04/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN INFORMATION 04/01/2025 04/01/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For future submittals, your plan sheets should be uploaded under PLANS and not SITE PLAN. The site plan is the property layout/survey.
BADMIN INFORMATION 12/16/2024 12/16/2024
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC is cut off on top. Please submit full copy.
BLD COMPLETE 11/08/2024 11/18/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 10/25/2024 10/25/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD HOLD 10/22/2024 10/29/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. All pages need to be uploaded separately and digitall signed sealed and verifiable. AHJ 2. Provide lumber grade and species for all rafters, beams, joist etc....R802.10.1 3. Provide completed city of palm coast roofing worksheet 107.2.1 4. Provide code analysis showing wind design, exposure category etc... R301 5. Provide roof sheathing material R803.1and R803.2.2/ table R803.2.2
ELEC CANCEL 10/22/2024 10/28/2024
MECH CANCEL 10/22/2024 10/28/2024
PLUM CANCEL 10/22/2024 10/28/2024
ZON HOLD 10/22/2024 10/22/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Front entry must meet minimum front setback of 25ft. Please submit a site plan/survey showing front entry addition with dimensions and setbacks Plans must state that walls and roof will match existing

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 08/25/2025
REINSPECTION RESIDENTIAL ¤40.00 08/06/2025
REINSPECTION RESIDENTIAL ¤40.00 08/06/2025
REINSPECTION RESIDENTIAL ¤40.00 02/17/2025
SURCHARGE FS 533.721 ¤2.00 12/02/2024
SURCHARGE - FS 468.631 ¤2.40 12/02/2024
SITE PLAN 30 ¤30.00 12/02/2024
ADJUSTMENT 10% (¤17.75) 12/02/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/02/2024
INSPECTION - RESIDENTIAL ¤82.50 12/02/2024
PLAN REVIEW - RESIDENTIAL ¤65.00 12/02/2024
Fees Total Due: ¤0.00 Total Paid: ¤354.15