I want to search for...

Permit #2024101146

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-1080
CONDITIONED SPACE: 2869 sqft
GARAGE: 675 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
OPENED PORCH (WITH ROOF) : 73 sqft
Total Square Footage: 3814 sqft
Block: 00000
Subdivision: -
Job Phone: 386-236-4133
Location Address: 19 OLD OAK DR N
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/10/2025
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: MAZZARELL DAVID MICHAEL

Address

126 DEL PALMA DRIVE

PALM COAST, FL 32137

Lot: 1080
Contracted Stated Job Value: ¤313,600.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

VOLUSIA RESIDENTIAL CONSTRUCTION, LLC
Status Location Address State License Number Phone
ACTIVE

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1262114 (Exp: 08/31/2026) 386-236-4133

Sub Contractors

BRENT JAMES STURGELL
Status Location Address State License Number Phone
ACTIVE

651 CARSWELL AVE

HOLLY HILL , FL 32117

CAC1822599 (Exp: 08/31/2026) 386-252-1878
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
HARLEY M BRYAN
Status Location Address State License Number Phone
ACTIVE

5223 EDGEWOOD CT

ORMOND BEACH, FL 32174

LI26657 (Exp: 08/31/2028) 386-463-2700
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 09/29/2025 FINAL APPROVED BWRIGHT
Note: 9/26/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 potable irr with PVB-NO Cc Potable water pit needs to be replace.
BLD - BUILDING FINAL 09/26/2025 FINAL APPROVED HCAMACHO
Note: 9/25/2025 - PREVIOUS INSPECTION NOTES 1. Need to revise energy calcs to match units installed. Please submitt revised copy to the city.
U -UTILITY RESIDENTIAL FINAL 09/26/2025 Disapproved - NO FEE BWRIGHT
Note: Inspector Notes from Inspection 9035 potable irr with PVB-NO Cc Potable water pit needs to be replace.
BLD - BUILDING FINAL 09/25/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Need to revise energy calcs to match units installed. Please submitt revised copy to the city.
FINAL SURVEY (OFFICE USE ONLY) 09/25/2025 APPROVED EMADISON
ROW - FINAL APRON (AFTER POUR) 09/24/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/24/2025 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 09/24/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 09/24/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U-CROSS CONNECTION 09/19/2025 APPROVED - AS NOTED LFITZGERALD
Note: potable irr with PVB-NO CC
TIE BEAM / LINTEL 09/11/2025 APPROVED - AS NOTED HCAMACHO
Note: This is for the A/C screen block wall.
MONOLITHIC SLAB 09/04/2025 CANCELLED BY INSPECTOR HCAMACHO
FOOTER 09/04/2025 APPROVED HCAMACHO
Note: Footer for A/C cover wall on left side.
ELECTRIC - EARLY POWER 08/25/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 11:15am
ROW- PRE-APRON (PRE-POUR) 08/22/2025 APPROVED - AS NOTED EMADISON
Note: ** 08/19/25 READY TO SET PAVERS AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________ 8/20/2025 - PREVIOUS INSPECTION NOTES ** 08/19/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________
ROW- PAVER RESTRAINTS 08/20/2025 APPROVED EMADISON
Note: ** 08/20/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE __________________________________________
ROW- PRE-APRON (PRE-POUR) 08/20/2025 PARTIALLY APPROVED EMADISON
Note: ** 08/19/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ____________________________________________________________________________________________________________________
GRAVITY SEWER TEST 08/08/2025 APPROVED MGIBSON
SEWER TIE IN 08/08/2025 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 07/08/2025 APPROVED HCAMACHO
Note:
INSULATION 07/08/2025 APPROVED HCAMACHO
Note:
ALL ROUGH 06/30/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. Could not verify screws on the sill of the slidder in the rear. 2, Missing 2 screws on the window in the garage. 3. Missing 3 screws where the extension attach(each one) on the Kit. range vent. Note - Check if outlet on the island is in the wrong place, on the right side. Will check at insualtion
WALL SHEATHING 06/27/2025 APPROVED HCAMACHO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/27/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. Post in the front missing 2ply per plan. Marked.
ROOF VALLEY & METAL 06/27/2025 APPROVED - AS NOTED HCAMACHO
Note: Inspector Notes from Inspection 2460 1. Post in the front missing 2ply per plan. Marked.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/23/2025 CANCELLED BY APPLICANT HCAMACHO
Note: Canceled via phone Inspector Notes from Inspection 2465 1. Please remove shiners all round the entire house close to the Facia board. * You can cover the sheathing once shiners have been removed. Will check at the next inspection.*
WALL SHEATHING 06/23/2025 APPROVED HCAMACHO
Note: Inspector Notes from Inspection 2465 1. Please remove shiners all round the entire house close to the Facia board. * You can cover the sheathing once shiners have been removed. Will check at the next inspection.*
ELECTRIC-TUG 06/02/2025 APPROVED HCAMACHO
ROOF SHEATHING 06/02/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. Please remove shiners all round the entire house close to the Facia board. * You can cover the sheathing once shiners have been removed. Will check at the next inspection.*
FOUND SURVEY APPROVED (OFFICE) 05/30/2025 APPROVED RRICKS
TIE BEAM / LINTEL 05/01/2025 APPROVED HCAMACHO
MONOLITHIC SLAB 04/23/2025 APPROVED HCAMACHO
PLUMBING 1ST ROUGH UNDERGROUND 04/07/2025 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 03/05/2025 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 02/04/2025 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
MECH COMPLETE 09/25/2025 09/26/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/24/2025 09/24/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Final Survey labeled as Site plan. Made changes in CDPLUS
ENGIN1 COMPLETE 09/18/2025 09/22/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 09/18/2025 09/19/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE LASTEST SITE PLAN DOESN'T HAVE ANY PROPOSED ELEVATIONS. NEED TO UPLOAD A NEW SITE PLAN WITH PROPOSED ELAVATIONS EVERY 20' FOR THE DRINAGE
ZON COMPLETE 09/18/2025 09/18/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 09/12/2025 09/17/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Grading Plan Approve as noted. This original site plan was approved with existing elevations. Gabriel, Ed, and I went out to the site and met with WIlliam. At the time of inspection site conditions appear to work and match grading plan with no negative impact to either adjacent lot. William will submit Final Survey.
ENGIN1 COMPLETE 09/12/2025 09/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 09/12/2025 09/12/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/29/2025 05/30/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Foundation Survey is approved, but there still is a hold on SW1 for this lot negatively impacting both lots. Please submit a revised site plan addressing drainage issues or an inspection hold will be placed on this permit.
ZON COMPLETE 05/29/2025 05/29/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
SW1 HOLD 05/06/2025 05/09/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM WATER WILL BE IMPACTING THE LOT TO THE LEFT OF THIS LOT NEED TO FIX SO NO WATER WILL FLOW ON TO THE ADJACENT LOT. ALL MEG NEED TO HAVE ELEAVTIONS IN THE BOXES
BADMIN INFORMATION 05/06/2025 05/06/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME FILE NAME TO REVISED SITE PLAN.PDF SELECT REVISED SITE PLAN FROM DROPDOWN MENU
ENGIN1 COMPLETE 05/06/2025 05/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 05/06/2025 05/07/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/01/2025 05/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 05/01/2025 05/06/2025
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL "MEG" NEED TO HAVE A ELEVATION SO WE CAN SEE IF DRAINAGE WILL WORK WITH THE EXISTING GRADE
ZON COMPLETE 05/01/2025 05/01/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 HOLD 03/05/2025 03/10/2025
Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Since the existing FFE's do not match the asbuilt and are too different for the newly proposed house to be within 10" of its neighbors, please adjust the proposed FFE to be in between both neighbors (around a 10.27). Please remove the retention area note.
SW1 HOLD 03/05/2025 03/12/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Since the existing FFE's do not match the asbuilt and are too different for the newly proposed house to be within 10" of its neighbors, please adjust the proposed FFE to be in between both neighbors (around a 10.27). Please remove the retention area note.
ZON COMPLETE 03/05/2025 03/05/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLENV COMPLETE 02/04/2025 02/04/2025
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
PLENV HOLD 01/17/2025 01/21/2025
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 11/01/24 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
SW1 COMPLETE 01/17/2025 01/23/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 01/17/2025 01/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/17/2025 01/21/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/17/2025 01/21/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 01/06/2025 01/06/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLENV HOLD 01/06/2025 01/06/2025
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 11/01/24 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
SW1 HOLD 01/06/2025 01/08/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site plan shows stormwater retention area that is not on the approved grading plan.
ENGIN1 COMPLETE 01/06/2025 01/07/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH HOLD 01/06/2025 01/10/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs missing heatload and duct layout
ZON HOLD 11/25/2024 11/25/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: HOUSE LAYOUT ON LANDSCAPE PLAN DOES NOT MATCH PLANS AND SITE PLAN
MECH HOLD 11/25/2024 12/03/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy calcs show 0 insultaion for vented attic. Only knee wall shows insulation.107.2.1 (second request)
GAS COMPLETE 11/25/2024 12/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/25/2024 12/03/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENV HOLD 11/25/2024 11/25/2024
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 11/01/24 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
SW1 HOLD 11/25/2024 12/11/2024
Note: Held By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM Site plan shows stormwater retention area that is not on the approved grading plan.
PLENV HOLD 10/29/2024 11/01/2024
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 11/01/24 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
URB COMPLETE 10/28/2024 10/30/2024
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BADMIN COMPLETE 10/25/2024 11/01/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 10/25/2024 11/01/2024
Note: Held By: ALPHANETTE WATERS - (386)986-2624 - AWATERS@PALMCOASTGOV.COM 1. S1 is not a foundation plan. Please rename file. 2. S1 - Slab Plan not signed and sealed per 61G1-16.005 3. There are two plan sheet files named cover sheet. Please rename one of the files.
CUSVC COMPLETE 10/25/2024 10/28/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/25/2024 10/28/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/25/2024 10/25/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS HOLD 10/25/2024 10/31/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide gas riser diagram and list gas subcontractor or put note on plans gas on separate permit. 2. Is tank above ground or below ground? Provide tank location on site plan showing size, setbacks to property lines, distance from house to tank.
LOCATE COMPLETE 10/25/2024 11/01/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 10/25/2024 10/31/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy calcs show 0 insultaion for vented attic. Only knee wall shows insulation.107.2.1 2. State card is only page with preparers signature.Upload only this page name file state card. AHJ 3. State card needs to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 4. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 HOLD 10/25/2024 10/29/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM 1) Please include all proposed elevations as shown on the Sanctuary lot grading plan. Also please show drainage from the structure as follows: 6" minimum slope from the structure for the first 10’. A 5% slope for 10’ totaling 0.5’ elevation difference perpendicular to the structure is a requirement of the Florida Building Code Section 1804.4 2) Please provide the FFE value as shown on the Sanctuary lot grading plan. Please see document entitled 'Sacntuary LGP_sheet 1' uploaded to the permit documents.
ZON HOLD 10/25/2024 10/29/2024
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM LANDSCAPE PLAN DOES NOT MATCH HOUSE LAYOUT

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/29/2025
CONTRACTOR CHANGE ¤20.00 03/05/2025
CONTRACTOR CHANGE ¤20.00 02/10/2025
FC IMPACT FEE EMS ¤62.00 02/10/2025
IMPACT FEE FIRE ¤434.51 02/10/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/10/2025
FC IMPACT FEE LIBRARY ¤268.00 02/10/2025
IMPACT FEE PARKS ¤1,828.01 02/10/2025
IMPACT FEE SCHOOL ¤5,450.00 02/10/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 02/10/2025
SURCHARGE FS 533.721 ¤17.49 02/10/2025
SURCHARGE - FS 468.631 ¤26.24 02/10/2025
SW ENG - FOUNDATION SURVEY ¤20.00 02/10/2025
SW ENG INSPECTION 80 ¤80.00 02/10/2025
SW ENG PRE APRON ¤30.00 02/10/2025
SW ENG - REVIEW 20 ¤20.00 02/10/2025
SW ENG RES REVIEW 200 ¤200.00 02/10/2025
SEWER INSPECTION ¤25.00 02/10/2025
SEWER CAPITAL FACILITY ¤6,120.52 02/10/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 02/10/2025
SITE PLAN 30 ¤30.00 02/10/2025
CONNECTION FEES ¤25.00 02/10/2025
WATER-METER ¤514.49 02/10/2025
ADJUSTMENT 10% (¤194.33) 02/10/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/10/2025
INSPECTION - RESIDENTIAL ¤1,490.50 02/10/2025
PLAN REVIEW - RESIDENTIAL ¤422.76 02/10/2025
Fees Total Due: ¤0.00 Total Paid: ¤25,043.83