| Type |
Request Date |
Result |
Inspector |
|
ROW CABLE PROJECT STATUS |
10/15/2025 |
APPROVED |
PFLANAGAN |
|
Note:
2/26/2025 - PREVIOUS INSPECTION NOTES
2/26/25= on 11 HARGROVE GRADE NEED SOD ON THE ROW .SOD ALL DISTURBED AREAS IN ADJACENT SWALES DRAWING 300.D/Sec. 42-2. - Repair of roads, swales, etc., affected by construction or development/ALL DISTURBED AREAS SHALL BE STABILIZED WITH SOD./Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion/Sec 300.03 F4-A / V-22/ PICTURE ATTACHED
2/18/2025 - PREVIOUS INSPECTION NOTES
2/18/25= ACCORDING TO THE BUILDER'S NOTES, THE INSPECTOR WILL RETURN ON FEBRUARY 25, 2025. NO CHANGES ON THE FIEL AT THIS TIME
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PLEASE VERIFY WHETHER THE STRAW HAS BEEN REMOVED FROM THE CITY ROW AND THEY INSTALL BAHIA SOD
|
|
ROW - FINAL INSPECTION |
10/15/2025 |
APPROVED |
PFLANAGAN |
|
Note: not sure if gas company used sod but no bare aeas at this time
------------------------------------------------------------------------------------------
note to the inspector.ENSURE THE GAS COMPANY REMOVES ALL THE STRAWS FROM THE CITY RIGHT-OF-WAY AND INSTALLS BAHIA SOD. PER GBERTOLA
SEC 300,03 F4 V-21 Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion. Road damage in the area of construction is also attributable to the Permittee, unless a preconstruction inspection has previously documented the damage.Technical manual Sec 300.03 F4.
The Stormwater Final Inspection will include visual inspection of the site and adjacent
properties for debris, proper clean up and repair to damaged terrain. Bare earth on the site
or surrounding properties must be sodded, or seeded with pine straw cover, to prevent soil
erosion. Bare earth and damage to any City roadside swales, drainage ditches, canals or
other drainage conveyances must be graded to the proper elevation and sodded to prevent
soil erosion. Road damage in the area of construction is also attributable to the Permittee,
unless a preconstruction inspection has previously documented the damage.
|
|
ROW CABLE PROJECT STATUS |
02/25/2025 |
Disapproved - NO FEE |
GBERTOLA |
|
Note: 2/26/25= on 11 HARGROVE GRADE NEED SOD ON THE ROW .SOD ALL DISTURBED AREAS IN ADJACENT SWALES DRAWING 300.D/Sec. 42-2. - Repair of roads, swales, etc., affected by construction or development/ALL DISTURBED AREAS SHALL BE STABILIZED WITH SOD./Bare earth and damage to any City roadside swales, drainage ditches, canals or other drainage conveyances must be graded to the proper elevation and sodded to prevent soil erosion/Sec 300.03 F4-A / V-22/ PICTURE ATTACHED
2/18/2025 - PREVIOUS INSPECTION NOTES
2/18/25= ACCORDING TO THE BUILDER'S NOTES, THE INSPECTOR WILL RETURN ON FEBRUARY 25, 2025. NO CHANGES ON THE FIEL AT THIS TIME
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PLEASE VERIFY WHETHER THE STRAW HAS BEEN REMOVED FROM THE CITY ROW AND THEY INSTALL BAHIA SOD
|
|
ROW CABLE PROJECT STATUS |
02/18/2025 |
Disapproved - NO FEE |
GBERTOLA |
|
Note: 2/18/25= ACCORDING TO THE BUILDER'S NOTES, THE INSPECTOR WILL RETURN ON FEBRUARY 25, 2025. NO CHANGES ON THE FIEL AT THIS TIME
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
PLEASE VERIFY WHETHER THE STRAW HAS BEEN REMOVED FROM THE CITY ROW AND THEY INSTALL BAHIA SOD
|