I want to search for...

Permit #2024101428

Permit Details

Status: FINAL

Parcel Id: 28-10-30-5415-00000-1670
Subdivision: 5415 -
Job Phone: 386-931-1183
Location Address: 8 LUMBER JACK TRL
Type: PO - POOL
Issue Date: 11/18/2024
NOC: RECORDED
Applicant name: JASON EUGENE SLESSER
Owner: KOZERSKI RANDY A & GINA A H&W

Address

8 LUMBER JACK TRAIL

PALM COAST, FL 32137

Lot: 167
Contracted Stated Job Value: ¤45,987.00
Job Description: POOL AND SCREEN
Type: CN

Contractor

SLESSER CUSTOM POOLS AND SPAS, INC
Status Location Address State License Number Phone
ACTIVE

P. O. Box 2595

Bunnell, 32110

CPC1456546 (Exp: 08/31/2026) 386-931-1183

Sub Contractors

CHRISTOPHER I HALL
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 2413

Bunnell, FL 32110

EC13002161 (Exp: 08/31/2028) (386) 437-2966 386-437-5042
RICHARD SWAN TOWNSEND II
Status Location Address State License Number Phone
ACTIVE

3111 OPPORTUNITY CT SUITE D

PORT ORANGE, FL 32129

CGC1515792 (Exp: 08/31/2026) 386-756-8770

Inspection History

Type Request Date Result Inspector
POOL FINAL 03/21/2025 FINAL APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2610 *** NOTES ADDED BY JSTEWART 1/28/2025 11:53:53 AM *** Contractor cut (3) irrigation pipes out of Footing area, assuming a reroute or termination of the use. Approval on footing since Pipes were cut and removed, it is now in compliance to the FBC. 1/27/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/27/2025 12:02:10 PM *** All Plumbing pipes that are running thru the foundation (footing) require a sleeve of 2 pipe sizes larger then original Pipe. FBCR P2603.4 1/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/23/2025 10:31:31 AM *** Footing will need to be 12" below existing grade (visual of existing grass area) do to height of Footing per Plans Page 4 and footing will need to be constructed using Paver deck turn down detail, Requiring the height above grade needs to be 3/4" X Height distance of buried footing, and vertical supports to be installed. 1/22/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/22/2025 10:12:32 AM *** FBC R404.1.3.3.7.4 REBAR NEEDS CLEARANCE FROM SOIL (Min 3"). Inspector Notes from Inspection 2610 *** NOTES ADDED BY JSTEWART 1/28/2025 11:53:53 AM *** Contractor cut (3) irrigation pipes out of Footing area, assuming a reroute or termination of the use. Approval on footing since Pipes were cut and removed, it is now in compliance to the FBC. 1/27/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/27/2025 12:02:10 PM *** All Plumbing pipes that are running thru the foundation (footing) require a sleeve of 2 pipe sizes larger then original Pipe. FBCR P2603.4 1/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/23/2025 10:31:31 AM *** Footing will need to be 12" below existing grade (visual of existing grass area) do to height of Footing per Plans Page 4 and footing will need to be constructed using Paver deck turn down detail, Requiring the height above grade needs to be 3/4" X Height distance of buried footing, and vertical supports to be installed. 1/22/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/22/2025 10:12:32 AM *** FBC R404.1.3.3.7.4 REBAR NEEDS CLEARANCE FROM SOIL (Min 3").
U -UTILITY RESIDENTIAL FINAL 03/19/2025 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/17/2025 APPROVED PFLANAGAN
Note: FINAL SURVEY MEETS ALL CITY STANDARDS
ROW FIELD SURVEY /GRADING CERTIFICATION 03/17/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - FINAL INSPECTION 03/17/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ELECTRIC AND ALARM 02/28/2025 APPROVED JSTEWART
POOL DECK 01/28/2025 APPROVED - AS NOTED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 1/28/2025 11:53:53 AM *** Contractor cut (3) irrigation pipes out of Footing area, assuming a reroute or termination of the use. Approval on footing since Pipes were cut and removed, it is now in compliance to the FBC. 1/27/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/27/2025 12:02:10 PM *** All Plumbing pipes that are running thru the foundation (footing) require a sleeve of 2 pipe sizes larger then original Pipe. FBCR P2603.4 1/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/23/2025 10:31:31 AM *** Footing will need to be 12" below existing grade (visual of existing grass area) do to height of Footing per Plans Page 4 and footing will need to be constructed using Paver deck turn down detail, Requiring the height above grade needs to be 3/4" X Height distance of buried footing, and vertical supports to be installed. 1/22/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/22/2025 10:12:32 AM *** FBC R404.1.3.3.7.4 REBAR NEEDS CLEARANCE FROM SOIL (Min 3").
POOL DECK 01/27/2025 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 1/27/2025 12:02:10 PM *** All Plumbing pipes that are running thru the foundation (footing) require a sleeve of 2 pipe sizes larger then original Pipe. FBCR P2603.4 1/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/23/2025 10:31:31 AM *** Footing will need to be 12" below existing grade (visual of existing grass area) do to height of Footing per Plans Page 4 and footing will need to be constructed using Paver deck turn down detail, Requiring the height above grade needs to be 3/4" X Height distance of buried footing, and vertical supports to be installed. 1/22/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/22/2025 10:12:32 AM *** FBC R404.1.3.3.7.4 REBAR NEEDS CLEARANCE FROM SOIL (Min 3").
POOL DECK 01/23/2025 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 1/23/2025 10:31:31 AM *** Footing will need to be 12" below existing grade (visual of existing grass area) do to height of Footing per Plans Page 4 and footing will need to be constructed using Paver deck turn down detail, Requiring the height above grade needs to be 3/4" X Height distance of buried footing, and vertical supports to be installed. 1/22/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 1/22/2025 10:12:32 AM *** FBC R404.1.3.3.7.4 REBAR NEEDS CLEARANCE FROM SOIL (Min 3").
POOL DECK 01/22/2025 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 1/22/2025 10:12:32 AM *** FBC R404.1.3.3.7.4 REBAR NEEDS CLEARANCE FROM SOIL (Min 3").
STEEL AND GROUND 01/06/2025 APPROVED JSTEWART

Review History

Department Status Date In Date Out
ZON COMPLETE 11/18/2024 11/18/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 11/13/2024 11/13/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit revised screen enclosure plans. The screen enclosure is currently not meeting the minimum rear setback.
SW1 COMPLETE 11/13/2024 11/14/2024
Note: Released By: TOM POLACEK - (386)346-8986 -
BLD COMPLETE 10/31/2024 11/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 10/31/2024 11/05/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 10/31/2024 11/05/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 10/31/2024 11/04/2024
Note: Held By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM ** 11/04/24 YOUR DRAINAGE NEEDS TO BE FROM THE REAR TO THE FRONT OF THE PROPERTY. YOUR SUBMITTED SITE PLAN SHOWS WATER WILL DRAIN ONTO IMPROVE ADJACENT PROPERTIES BASED UPON YOUR FLOW ARROWS. YOUR DRAINAGE CAN NOT NEGATIVELY IMPACT THE ADJACENT PROPERTIES BA
ZON HOLD 10/31/2024 10/31/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Minimum rear setback is 10'. Please revise all plans/documents to reduce the size so that the required setback is met.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 03/14/2025
SURCHARGE FS 533.721 ¤2.30 11/18/2024
SURCHARGE - FS 468.631 ¤3.44 11/18/2024
SW ENG INSPECTION 40 ¤40.00 11/18/2024
SW ENG - REVIEW 20 ¤20.00 11/18/2024
SITE PLAN 30 ¤30.00 11/18/2024
ADJUSTMENT 10% (¤25.50) 11/18/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/18/2024
INSPECTION- POOL ¤160.00 11/18/2024
PLAN REVIEW - RESIDENTIAL ¤65.00 11/18/2024
Fees Total Due: ¤0.00 Total Paid: ¤365.24