Permit #2024110287

Permit Details

Status: COED

Parcel Id: 07-11-31-7021-00100-0270
CONDITIONED SPACE: 1480 sqft
CONDITIONED SPACE: 1480 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
GARAGE: 500 sqft
GARAGE: 500 sqft
Total Square Footage: 4080 sqft
Block: 00100
Subdivision: -
Job Phone: 863-647-5815
Location Address: 57 WELLSTREAM LN
Type: DU - DUPLEX
Issue Date: 11/22/2024
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: HULBERT HOMES INC

Address

5116 S LAKELAND DRIVE

LAKELAND, FL 33813

Lot: 0270
Contracted Stated Job Value: ¤380,000.00
Job Description: Opportunity II Duplex
Type: CN
Original Permit #: 2024050542

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

KYLE RODBOURN
Status Location Address State License Number Phone
ACTIVE

1325 W HWY 100

BUNNELL, FL 32110

CAC1821358 (Exp: 08/31/2026) 386-586-9039
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/27/2025 FINAL APPROVED MKRASKI
ROW - STORMWATER FINAL 10/24/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 10/21/2025 - PREVIOUS INSPECTION NOTES 10-21-25 TPOLACEK*** BUILDER MUST REMOVE SEDIMENT FROM CULVERT BEFORE FINAL ROW WILL BE APPROVED
U-CROSS CONNECTION 10/22/2025 APPROVED - AS NOTED BWRIGHT
Note: IRR WITH POTABLE WATER USING PVB. NO CC
ROW - FINAL APRON (AFTER POUR) 10/21/2025 APPROVED - AS NOTED TPOLACEK
Note: 10-21-25 TPOLACEK*** THERE IS TOO MUCH SEDIMENT INSIDE CULVERTS. INSPECTOR WILL APPROVE AFTER POUR AND DISAPPROVE THE FINAL ROW UNTIL CULVERTS ARE CLEAR. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 10/21/2025 Disapproved - NO FEE TPOLACEK
Note: 10-21-25 TPOLACEK*** BUILDER MUST REMOVE SEDIMENT FROM CULVERT BEFORE FINAL ROW WILL BE APPROVED
ROW - DRAINAGE 10/17/2025 APPROVED TPOLACEK
Note: Inspector Notes from Inspection 9200 10/14/25= Parren and I stop by and look on the final grade requested by the builder. He need to submit a final survey 4/28/2025 - PREVIOUS INSPECTION NOTES 04/28/25 TPOLACEK*** CONCRETE HAS BEEN REMOVED HOWEVER TEMPORARY CULVERT PIPE IS STILL TOO SMALL. BUILDER MUST EITHER REMOVE TEMP PIPE AND GRADE SWALE OR INSTALL A NEW PIPE MINIMUM 12". 4/23/2025 - PREVIOUS INSPECTION NOTES 04/23/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM PREMISES, TEMPORARY PIPE MUST BE 12" MINIMUM AND SWALE MUST BE KEPT OPEN THROUGHOUT BUILD. NEXT INSPECTION MONDAY
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/17/2025 APPROVED TPOLACEK
Note: SEE PROJECT STATUS NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 10/8/25 YOU DO NOT HAVE POSITIVE FORWARD DRAINAGE IN THE REAR. WATER WILL POOL AT INDICATED AREA ON PHOTO. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet Upon walking property, determined the right side drainage pattern not located properly. Survey indicates the elevations on the property line. In the field the drainage is 5' off of property line. Survey indicates swale between culverts is low, grass is moldy and dead.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/17/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 10/17/2025 CANCELLED BY APPLICANT MKRASKI
ROW- PROJECT STATUS 10/14/2025 APPROVED - AS NOTED GBERTOLA
Note: 10/14/25= Parren and I stop by and look on the final grade requested by the builder. He need to submit a final survey
ROW- PROJECT STATUS 10/09/2025 Status Check TPOLACEK
Note: 10-09-25 TPOLACEK*** MET WITH BUILDER AND GBERTOLA, PFLANAGAN. BUILDER WILL NEED TO GRADE FROM DRAIN BOX IN REAR TO FRONT SWALE ALONG RIGHT SIDE OF STRUCTURE. BUILDER WILL CALL BEFORE LAYING SOD SO INSPECTOR CAN TAKE A LOOK AND MAKE SURE DRAINAGE WILL FLOW FROM THE REAR TO THE FRONT.
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/08/2025 Disapproved - NO FEE FSLADISH
Note: 10/8/25 YOU DO NOT HAVE POSITIVE FORWARD DRAINAGE IN THE REAR. WATER WILL POOL AT INDICATED AREA ON PHOTO. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet
ELECTRIC - EARLY POWER 09/25/2025 Disapproved - NO FEE MCONTRYMAN
Note: 9/25/25 1. Both units have the electrical in communication box not safed off NEC 440.14
ELECTRIC - EARLY POWER 09/25/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 9 25/25 Email sent to FPL 9/25/2025 - PREVIOUS INSPECTION NOTES 9/25/25 1. Both units have the electrical in communication box not safed off NEC 440.14
ELECTRIC-TUG 09/04/2025 CANCELLED BY INSPECTOR MCONTRYMAN
Note: Temp pole was approved at earlier date. All service is overhead. Need early power inspection Inspector Notes from Inspection 2170 Emailed FPL @ 9:30am
ROW- PRE-APRON (PRE-POUR) 08/22/2025 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
FIREWALL FINAL 08/05/2025 APPROVED MKRASKI
INSULATION 07/23/2025 APPROVED MKRASKI
Note:
INSULATION 07/18/2025 CANCELLED BY APPLICANT MKRASKI
Note: 7/16/2025 - PREVIOUS INSPECTION NOTES Previous Notes not rectified. 1. Dryer vent missing required strap FBCR M1501.1 (also missing nail shields both sides.) 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 NOTE: will need a revision of HVAC to show fresh air connection from revised change of unvented attic space. NOTE: ducts in garage left side Need to be sealed to plenum boxes. will be noted on final inspection. 7/14/2025 - PREVIOUS INSPECTION NOTES 7/14/25 Make all repairs before calling in for re-inspection 1. Dryer vent missing required strap FBCR M1501.1 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Insulation have been removed from wood frame garage wall FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
INSULATION 07/16/2025 Disapproved - NO FEE JSTEWART
Note: Previous Notes not rectified. 1. Dryer vent missing required strap FBCR M1501.1 (also missing nail shields both sides.) 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 NOTE: will need a revision of HVAC to show fresh air connection from revised change of unvented attic space. NOTE: ducts in garage left side Need to be sealed to plenum boxes. will be noted on final inspection. 7/14/2025 - PREVIOUS INSPECTION NOTES 7/14/25 Make all repairs before calling in for re-inspection 1. Dryer vent missing required strap FBCR M1501.1 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Insulation have been removed from wood frame garage wall FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
INSULATION 07/14/2025 Disapproved - NO FEE MKRASKI
Note: 7/14/25 Make all repairs before calling in for re-inspection 1. Dryer vent missing required strap FBCR M1501.1 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Insulation have been removed from wood frame garage wall FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
GRAVITY SEWER TEST 06/25/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 9450 WENT BY ADDRESS AND SAW THAT TAP WAS MADE BY ASAP PLUMBING THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 06/25/2025 APPROVED - AS NOTED MGIBSON
Note: WENT BY ADDRESS AND SAW THAT TAP WAS MADE BY ASAP PLUMBING
LATH/BRICK/ WATER BARRIER 06/24/2025 APPROVED - AS NOTED MKRASKI
Note: 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
LATH/BRICK/ WATER BARRIER 06/20/2025 Disapproved - NO FEE MKRASKI
Note: 6/20/25 1. All exterior penitrations require water barrier and lath, spray foam is not a water barrier per manufacturer specs, remove spray from in all locations and install proper water barrier and lath FBC EC R402.4.1.1/FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
ALL ROUGH 06/18/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
FIREWALL DRYWALL NAILING 05/23/2025 APPROVED - AS NOTED MKRASKI
Note: Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
ROOF VALLEY & METAL 05/16/2025 APPROVED JSTEWART
FIREWALL DRYWALL NAILING 05/14/2025 Disapproved - NO FEE MCONTRYMAN
Note: 5/14/25 1. Nailing needs to be 6" on center at edges and in the field FBC R702.3.5 Notes: 1. Electrical panels need to have solid blocking with holes bored into them for wires to go through for annualar spacing requirements NEC 302.11(4) & 302.11.1 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
ROW - DRAINAGE 04/28/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 04/28/25 TPOLACEK*** CONCRETE HAS BEEN REMOVED HOWEVER TEMPORARY CULVERT PIPE IS STILL TOO SMALL. BUILDER MUST EITHER REMOVE TEMP PIPE AND GRADE SWALE OR INSTALL A NEW PIPE MINIMUM 12". 4/23/2025 - PREVIOUS INSPECTION NOTES 04/23/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM PREMISES, TEMPORARY PIPE MUST BE 12" MINIMUM AND SWALE MUST BE KEPT OPEN THROUGHOUT BUILD. NEXT INSPECTION MONDAY
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/24/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4
ROW - DRAINAGE 04/23/2025 Disapproved - NO FEE TPOLACEK
Note: 04/23/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM PREMISES, TEMPORARY PIPE MUST BE 12" MINIMUM AND SWALE MUST BE KEPT OPEN THROUGHOUT BUILD. NEXT INSPECTION MONDAY
TIE BEAM / LINTEL 04/08/2025 APPROVED FWILLIS
Note: 4/4/2025 - PREVIOUS INSPECTION NOTES 1. Rebar in down cells to close to face of block (3 locations highlighted on print) FBCR 606.3.1 2. Window sill bed joints exceed limitations (several locations highlighted on print) FBCR 606.3.4
TIE BEAM / LINTEL 04/07/2025 Disapproved - NO FEE MKRASKI
Note: 1. Rebar in down cells to close to face of block (3 locations highlighted on print) FBCR 606.3.1 2. Window sill bed joints exceed limitations (several locations highlighted on print) FBCR 606.3.4
TIE BEAM / LINTEL 04/03/2025 Disapproved - NO FEE MKRASKI
Note: 4/3/25 From previous inspection: Swale is still not clear, swale must stay clear to allow water to flow freely, repair temp culvert as well as remove porta jon from swale and silt fence FBC 3303.5
FOUND SURVEY APPROVED (OFFICE) 03/31/2025 APPROVED RRICKS
MONOLITHIC SLAB 03/21/2025 APPROVED MKRASKI
PLUMBING 1ST ROUGH UNDERGROUND 03/18/2025 APPROVED MGIBSON
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/14/2025 APPROVED JMUNSON
ELECTRIC TEMP POLE 03/06/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 9:30am
ELECTRIC TEMP POLE 03/04/2025 Disapproved - NO FEE MKRASKI
Note: 1. Outlets are required to be weather resistant NEC 406.3 2. Hub for panel is missing screws, must have all 4 machined (no pointed screws) installed per manufacturer specs 3. Dead front missing screw per manufacturer specs
WATER METER INSTALLATION REQUEST 02/19/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 10/23/2025 10/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 10/20/2025 10/21/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc for both sides of duplex. Only one page submitted
BLD COMPLETE 07/18/2025 07/22/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 05/28/2025 05/29/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/03/2025 04/07/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/31/2025 03/31/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/31/2025 03/31/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 03/14/2025 03/14/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 03/07/2025 03/10/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report uploaded not geotech certification.
MECH COMPLETE 12/11/2024 12/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/02/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 11/12/2024 11/19/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2024 11/12/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SWALE COMPLETE 11/08/2024 12/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN HOLD 11/06/2024 11/12/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2.  Report to be conducted per Sections 1803.3 through 1803.5.  Completed report shall comply with Section 1803.6.  Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead.
CUSVC COMPLETE 11/06/2024 11/07/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ENGIN1 COMPLETE 11/06/2024 11/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/06/2024 11/08/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/06/2024 11/12/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/06/2024 11/07/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 11/06/2024 11/07/2024
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Side banding must show that the length is 2ft long

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 10/27/2025
PLAN REVIEW - REVISION ¤32.50 10/27/2025
RSI GENERAL INSPECTION 16.25 ¤32.50 10/27/2025
SW ENG - INSPECTION 20 ¤20.00 06/17/2025
SW ENG - INSPECTION 20 ¤20.00 06/17/2025
SW ENG - INSPECTION 20 ¤20.00 06/17/2025
PLAN REVIEW - REVISION ¤32.50 06/17/2025
SW ENG INSPECTION 80 ¤80.00 11/22/2024
SW ENG PRE APRON ¤30.00 11/22/2024
SW ENG - REVIEW 20 ¤20.00 11/22/2024
SW ENG RES REVIEW 200 ¤200.00 11/22/2024
SEWER CREDIT (¤1,147.00) 11/22/2024
SEWER INSPECTION ¤25.00 11/22/2024
SEWER CAPITAL FACILITY ¤12,241.04 11/22/2024
WATER CAPITAL FACILITY FEE ¤8,702.28 11/22/2024
SITE PLAN 30 ¤30.00 11/22/2024
SURCHARGE FS 533.721 ¤11.04 11/22/2024
SURCHARGE - FS 468.631 ¤16.56 11/22/2024
SW ENG - FOUNDATION SURVEY ¤20.00 11/22/2024
WATER-METER ¤514.49 11/22/2024
WATER- TURN ON ¤25.00 11/22/2024
WATER- TURN ON ¤50.00 11/22/2024
ADJUSTMENT 10% (¤122.70) 11/22/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/22/2024
INSPECTION - RESIDENTIAL ¤1,045.00 11/22/2024
PLAN REVIEW - APPROVED MASTER ¤152.00 11/22/2024
CONNECTION FEES ¤2,374.52 11/22/2024
FC IMPACT FEE EMS ¤124.00 11/22/2024
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 11/22/2024
FC IMPACT FEE LIBRARY ¤536.00 11/22/2024
WATER -IRRIGATION INSPECTION ¤50.00 11/22/2024
WATER -IRRIGATION INSPECTION ¤25.00 11/22/2024
Fees Total Due: ¤0.00 Total Paid: ¤25,658.23