Permit #2024110287
Permit Details
Status: COED
| Parcel Id: 07-11-31-7021-00100-0270 |
| CONDITIONED SPACE: 1480 sqft |
| CONDITIONED SPACE: 1480 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| GARAGE: 500 sqft |
| GARAGE: 500 sqft |
| Total Square Footage: 4080 sqft |
| Block: 00100 |
| Subdivision: - |
| Job Phone: 863-647-5815 |
| Location Address: 57 WELLSTREAM LN |
| Type: DU - DUPLEX |
| Issue Date: 11/22/2024 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: HULBERT HOMES INC |
|
Address 5116 S LAKELAND DRIVE LAKELAND, FL 33813 |
| Lot: 0270 |
| Contracted Stated Job Value: ¤380,000.00 |
| Job Description: Opportunity II Duplex |
| Type: CN |
| Original Permit #: 2024050542 |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
KYLE RODBOURN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1325 W HWY 100 BUNNELL, FL 32110 |
CAC1821358 (Exp: 08/31/2026) | 386-586-9039 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/27/2025 | FINAL APPROVED | MKRASKI |
| ROW - STORMWATER FINAL | 10/24/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 10/21/2025 - PREVIOUS INSPECTION NOTES 10-21-25 TPOLACEK*** BUILDER MUST REMOVE SEDIMENT FROM CULVERT BEFORE FINAL ROW WILL BE APPROVED | |||
| U-CROSS CONNECTION | 10/22/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: IRR WITH POTABLE WATER USING PVB. NO CC | |||
| ROW - FINAL APRON (AFTER POUR) | 10/21/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 10-21-25 TPOLACEK*** THERE IS TOO MUCH SEDIMENT INSIDE CULVERTS. INSPECTOR WILL APPROVE AFTER POUR AND DISAPPROVE THE FINAL ROW UNTIL CULVERTS ARE CLEAR. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 10/21/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 10-21-25 TPOLACEK*** BUILDER MUST REMOVE SEDIMENT FROM CULVERT BEFORE FINAL ROW WILL BE APPROVED | |||
| ROW - DRAINAGE | 10/17/2025 | APPROVED | TPOLACEK |
| Note: Inspector Notes from Inspection 9200 10/14/25= Parren and I stop by and look on the final grade requested by the builder. He need to submit a final survey 4/28/2025 - PREVIOUS INSPECTION NOTES 04/28/25 TPOLACEK*** CONCRETE HAS BEEN REMOVED HOWEVER TEMPORARY CULVERT PIPE IS STILL TOO SMALL. BUILDER MUST EITHER REMOVE TEMP PIPE AND GRADE SWALE OR INSTALL A NEW PIPE MINIMUM 12". 4/23/2025 - PREVIOUS INSPECTION NOTES 04/23/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM PREMISES, TEMPORARY PIPE MUST BE 12" MINIMUM AND SWALE MUST BE KEPT OPEN THROUGHOUT BUILD. NEXT INSPECTION MONDAY | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/17/2025 | APPROVED | TPOLACEK |
| Note: SEE PROJECT STATUS NOTES 10/8/2025 - PREVIOUS INSPECTION NOTES 10/8/25 YOU DO NOT HAVE POSITIVE FORWARD DRAINAGE IN THE REAR. WATER WILL POOL AT INDICATED AREA ON PHOTO. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet Upon walking property, determined the right side drainage pattern not located properly. Survey indicates the elevations on the property line. In the field the drainage is 5' off of property line. Survey indicates swale between culverts is low, grass is moldy and dead. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/17/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 10/17/2025 | CANCELLED BY APPLICANT | MKRASKI |
| ROW- PROJECT STATUS | 10/14/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 10/14/25= Parren and I stop by and look on the final grade requested by the builder. He need to submit a final survey | |||
| ROW- PROJECT STATUS | 10/09/2025 | Status Check | TPOLACEK |
| Note: 10-09-25 TPOLACEK*** MET WITH BUILDER AND GBERTOLA, PFLANAGAN. BUILDER WILL NEED TO GRADE FROM DRAIN BOX IN REAR TO FRONT SWALE ALONG RIGHT SIDE OF STRUCTURE. BUILDER WILL CALL BEFORE LAYING SOD SO INSPECTOR CAN TAKE A LOOK AND MAKE SURE DRAINAGE WILL FLOW FROM THE REAR TO THE FRONT. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/08/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 10/8/25 YOU DO NOT HAVE POSITIVE FORWARD DRAINAGE IN THE REAR. WATER WILL POOL AT INDICATED AREA ON PHOTO. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet | |||
| ELECTRIC - EARLY POWER | 09/25/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 9/25/25 1. Both units have the electrical in communication box not safed off NEC 440.14 | |||
| ELECTRIC - EARLY POWER | 09/25/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 9 25/25 Email sent to FPL 9/25/2025 - PREVIOUS INSPECTION NOTES 9/25/25 1. Both units have the electrical in communication box not safed off NEC 440.14 | |||
| ELECTRIC-TUG | 09/04/2025 | CANCELLED BY INSPECTOR | MCONTRYMAN |
| Note: Temp pole was approved at earlier date. All service is overhead. Need early power inspection Inspector Notes from Inspection 2170 Emailed FPL @ 9:30am | |||
| ROW- PRE-APRON (PRE-POUR) | 08/22/2025 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| FIREWALL FINAL | 08/05/2025 | APPROVED | MKRASKI |
| INSULATION | 07/23/2025 | APPROVED | MKRASKI |
| Note: | |||
| INSULATION | 07/18/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 7/16/2025 - PREVIOUS INSPECTION NOTES Previous Notes not rectified. 1. Dryer vent missing required strap FBCR M1501.1 (also missing nail shields both sides.) 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 NOTE: will need a revision of HVAC to show fresh air connection from revised change of unvented attic space. NOTE: ducts in garage left side Need to be sealed to plenum boxes. will be noted on final inspection. 7/14/2025 - PREVIOUS INSPECTION NOTES 7/14/25 Make all repairs before calling in for re-inspection 1. Dryer vent missing required strap FBCR M1501.1 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Insulation have been removed from wood frame garage wall FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| INSULATION | 07/16/2025 | Disapproved - NO FEE | JSTEWART |
| Note: Previous Notes not rectified. 1. Dryer vent missing required strap FBCR M1501.1 (also missing nail shields both sides.) 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 NOTE: will need a revision of HVAC to show fresh air connection from revised change of unvented attic space. NOTE: ducts in garage left side Need to be sealed to plenum boxes. will be noted on final inspection. 7/14/2025 - PREVIOUS INSPECTION NOTES 7/14/25 Make all repairs before calling in for re-inspection 1. Dryer vent missing required strap FBCR M1501.1 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Insulation have been removed from wood frame garage wall FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| INSULATION | 07/14/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 7/14/25 Make all repairs before calling in for re-inspection 1. Dryer vent missing required strap FBCR M1501.1 2. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 3. E-cals must have stamp of approval from Building Dept. on site FBC 107.3.1 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Insulation have been removed from wood frame garage wall FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| GRAVITY SEWER TEST | 06/25/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 9450 WENT BY ADDRESS AND SAW THAT TAP WAS MADE BY ASAP PLUMBING THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 06/25/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WENT BY ADDRESS AND SAW THAT TAP WAS MADE BY ASAP PLUMBING | |||
| LATH/BRICK/ WATER BARRIER | 06/24/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| LATH/BRICK/ WATER BARRIER | 06/20/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 6/20/25 1. All exterior penitrations require water barrier and lath, spray foam is not a water barrier per manufacturer specs, remove spray from in all locations and install proper water barrier and lath FBC EC R402.4.1.1/FBC (A)107.4 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| ALL ROUGH | 06/18/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 6/18/25 Will check at Insulation (both units) 1. Dryer vent missing required strap 2. Electrical wires coming from panel box need to be secured no more than 12" from the panel box 3. Need to have a solid top plate above electrical panel framing with holes bored for electrical wires to pass through for annular space required for firestop NEC 302.11(4) & 302.11.1 4. Need to update product approvals to show MI windows installed, by final FBC(A) 107.4 Inspector Notes from Inspection 2443 Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| FIREWALL DRYWALL NAILING | 05/23/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| ROOF VALLEY & METAL | 05/16/2025 | APPROVED | JSTEWART |
| FIREWALL DRYWALL NAILING | 05/14/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 5/14/25 1. Nailing needs to be 6" on center at edges and in the field FBC R702.3.5 Notes: 1. Electrical panels need to have solid blocking with holes bored into them for wires to go through for annualar spacing requirements NEC 302.11(4) & 302.11.1 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 Inspector Notes from Inspection 2460 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| ROW - DRAINAGE | 04/28/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 04/28/25 TPOLACEK*** CONCRETE HAS BEEN REMOVED HOWEVER TEMPORARY CULVERT PIPE IS STILL TOO SMALL. BUILDER MUST EITHER REMOVE TEMP PIPE AND GRADE SWALE OR INSTALL A NEW PIPE MINIMUM 12". 4/23/2025 - PREVIOUS INSPECTION NOTES 04/23/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM PREMISES, TEMPORARY PIPE MUST BE 12" MINIMUM AND SWALE MUST BE KEPT OPEN THROUGHOUT BUILD. NEXT INSPECTION MONDAY | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/24/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/24/25 Approved to keep job moving along (All highlighted on plans) Please have new set of plans available for next inspections. Plans were scattered and torn throughout the building Left Side: 1. Truss A10 needs proper truss connections per Mitek on both sides FBC(A) 107.4 2. Missing HTS20 on A10 per plan FBC(A) 107.4 3. Missing H10 hurricane clips on interior bearing wall per plan FBC(A) 107.4 Right Side: 1. Missing engineering on truss A3 and A4 per plan FBC(A) 107.4 2. Please have truss connections for Truss A10 on both sides to verify proper connections 3. Missing HTS20 on truss A10 per plan FBC(A) 107.4 4. Missing nails on A09 (HTU26) 5. Missing H10 hurricane clips on onterior bearing wall per plans FBC(A) 107.4 | |||
| ROW - DRAINAGE | 04/23/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/23/25 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM PREMISES, TEMPORARY PIPE MUST BE 12" MINIMUM AND SWALE MUST BE KEPT OPEN THROUGHOUT BUILD. NEXT INSPECTION MONDAY | |||
| TIE BEAM / LINTEL | 04/08/2025 | APPROVED | FWILLIS |
| Note: 4/4/2025 - PREVIOUS INSPECTION NOTES 1. Rebar in down cells to close to face of block (3 locations highlighted on print) FBCR 606.3.1 2. Window sill bed joints exceed limitations (several locations highlighted on print) FBCR 606.3.4 | |||
| TIE BEAM / LINTEL | 04/07/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Rebar in down cells to close to face of block (3 locations highlighted on print) FBCR 606.3.1 2. Window sill bed joints exceed limitations (several locations highlighted on print) FBCR 606.3.4 | |||
| TIE BEAM / LINTEL | 04/03/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 4/3/25 From previous inspection: Swale is still not clear, swale must stay clear to allow water to flow freely, repair temp culvert as well as remove porta jon from swale and silt fence FBC 3303.5 | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/31/2025 | APPROVED | RRICKS |
| MONOLITHIC SLAB | 03/21/2025 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/18/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/14/2025 | APPROVED | JMUNSON |
| ELECTRIC TEMP POLE | 03/06/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:30am | |||
| ELECTRIC TEMP POLE | 03/04/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Outlets are required to be weather resistant NEC 406.3 2. Hub for panel is missing screws, must have all 4 machined (no pointed screws) installed per manufacturer specs 3. Dead front missing screw per manufacturer specs | |||
| WATER METER INSTALLATION REQUEST | 02/19/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/23/2025 | 10/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/20/2025 | 10/21/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc for both sides of duplex. Only one page submitted | |||
| BLD | COMPLETE | 07/18/2025 | 07/22/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/28/2025 | 05/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/03/2025 | 04/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/31/2025 | 03/31/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/31/2025 | 03/31/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/14/2025 | 03/14/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 03/07/2025 | 03/10/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report uploaded not geotech certification. | |||
| MECH | COMPLETE | 12/11/2024 | 12/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/02/2024 | 12/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 11/12/2024 | 11/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/12/2024 | 11/12/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/08/2024 | 12/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 11/06/2024 | 11/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| CUSVC | COMPLETE | 11/06/2024 | 11/07/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/06/2024 | 11/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/06/2024 | 11/08/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/06/2024 | 11/12/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/06/2024 | 11/07/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 11/06/2024 | 11/07/2024 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Side banding must show that the length is 2ft long |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/27/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/27/2025 |
| RSI GENERAL INSPECTION 16.25 | ¤32.50 | 10/27/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2025 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/17/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/22/2024 |
| SW ENG PRE APRON | ¤30.00 | 11/22/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/22/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/22/2024 |
| SEWER CREDIT | (¤1,147.00) | 11/22/2024 |
| SEWER INSPECTION | ¤25.00 | 11/22/2024 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 11/22/2024 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 11/22/2024 |
| SITE PLAN 30 | ¤30.00 | 11/22/2024 |
| SURCHARGE FS 533.721 | ¤11.04 | 11/22/2024 |
| SURCHARGE - FS 468.631 | ¤16.56 | 11/22/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/22/2024 |
| WATER-METER | ¤514.49 | 11/22/2024 |
| WATER- TURN ON | ¤25.00 | 11/22/2024 |
| WATER- TURN ON | ¤50.00 | 11/22/2024 |
| ADJUSTMENT 10% | (¤122.70) | 11/22/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/22/2024 |
| INSPECTION - RESIDENTIAL | ¤1,045.00 | 11/22/2024 |
| PLAN REVIEW - APPROVED MASTER | ¤152.00 | 11/22/2024 |
| CONNECTION FEES | ¤2,374.52 | 11/22/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 11/22/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 11/22/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 11/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 11/22/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/22/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤25,658.23 |