Status: COED

Parcel Id: 07-11-31-7021-00100-0280
CONDITIONED SPACE: 1298 sqft
CONDITIONED SPACE: 1298 sqft
GARAGE: 262 sqft
GARAGE: 262 sqft
OPENED PORCH (WITH ROOF) : 27 sqft
OPENED PORCH (WITH ROOF) : 27 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
Total Square Footage: 3274 sqft
Block: 00100
Subdivision: -
Job Phone: 863-647-5815
Location Address: 59 WELLSTREAM LN
Type: DU - DUPLEX
Issue Date: 02/07/2025
NOC: RECORDED
Applicant name: MARK ALLAN HULBERT
Owner: HULBERT HOMES INC

Address

5116 S LAKELAND DRIVE

LAKELAND, FL 33813

Lot: 0280
Contracted Stated Job Value: ¤380,000.00
Job Description: Opportunity I Duplex
Type: CN
Original Permit #: 2024050541

Contractor

HULBERT HOMES INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 6254

LAKELAND, FL 33813

CRC1331304 (Exp: 08/31/2026) 863-647-5815

Sub Contractors

KYLE RODBOURN
Status Location Address State License Number Phone
ACTIVE

1325 W HWY 100

BUNNELL, FL 32110

CAC1821358 (Exp: 08/31/2026) 386-586-9039
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 11/06/2025 APPROVED TPOLACEK
Note: 11-06-25 TPOLACEK*** CORE SAMPLE SHEET HAS BEEN APPROVED AND ALL CORE DEPTHS MEET COPC REQUIREMENTS. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/3/2025 - PREVIOUS INSPECTION NOTES 11-03-25 TPOLACEK*** DUE TO BUILDER POURING UPPER SECTION OF DRIVEWAY WITHOUT AN INSPECTION THE BUILDER WAS REQUIRED TO PROVIDE 6 CORE SAMPLES OF DRIVEWAY THICKNESS. THE RESULTS OF THE CORE TESTS MUST BE UPLOADED INTO THE SYSTEM AS A SUPPORTING DOCUMENT BEFORE AFTER POUR INSPECTION CAN BE APPROVED. ***INSPECTOR NOTE*** BUILDER MUST UPLOAD CORE SAMPLE CERTIFICATION SHOWING ALL 6 LOCATIONS AND RESULTS BEFORE APPROVING THE AFTER-POUR INSPECTION***
U -UTILITY RESIDENTIAL FINAL 11/04/2025 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 IRR WITH POTABLE WATER USING PVB. NO CC
ROW - FINAL APRON (AFTER POUR) 11/03/2025 Disapproved - NO FEE TPOLACEK
Note: 11-03-25 TPOLACEK*** DUE TO BUILDER POURING UPPER SECTION OF DRIVEWAY WITHOUT AN INSPECTION THE BUILDER WAS REQUIRED TO PROVIDE 6 CORE SAMPLES OF DRIVEWAY THICKNESS. THE RESULTS OF THE CORE TESTS MUST BE UPLOADED INTO THE SYSTEM AS A SUPPORTING DOCUMENT BEFORE AFTER POUR INSPECTION CAN BE APPROVED. ***INSPECTOR NOTE*** BUILDER MUST UPLOAD CORE SAMPLE CERTIFICATION SHOWING ALL 6 LOCATIONS AND RESULTS BEFORE APPROVING THE AFTER-POUR INSPECTION***
ROW - FINAL INSPECTION 11/03/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW FIELD SURVEY /GRADING CERTIFICATION 10/30/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ELEVATION CERTIFICATE-FINAL APPROVAL 10/29/2025 APPROVED JMYERS
BLD - BUILDING FINAL 10/27/2025 FINAL APPROVED MKRASKI
Note:
U-CROSS CONNECTION 10/22/2025 APPROVED - AS NOTED BWRIGHT
Note: IRR WITH POTABLE WATER USING PVB. NO CC
BLD - BUILDING FINAL 10/17/2025 CANCELLED BY APPLICANT MKRASKI
ROW- FINAL SURVEY/GRADING CERTIFICATION 10/08/2025 APPROVED FSLADISH
ELECTRIC - EARLY POWER 09/25/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 9/25/25 Email sent to FPL
ELECTRIC-TUG 09/25/2025 CANCELLED BY INSPECTOR MCONTRYMAN
Note: No tug pulled or wired up at all. Will not have one
ELECTRIC-TUG 09/04/2025 CANCELLED BY INSPECTOR MCONTRYMAN
Note: Temp pole was approved at earlier date. All service is overhead. Need early power inspection Inspector Notes from Inspection 2170 Emailed FPL @ 9:30am
ROW- PRE-APRON (PRE-POUR) 08/28/2025 APPROVED - AS NOTED TPOLACEK
Note: 08/28/25 TPOLACEK*** THE CORES ARE GOING TO BE COMPLETED TODAY. I WILL APPROVE THE APRON POUR NOW HOWEVER, PROVIDING CORE SAMPLE PROVE THERE IS NOT THE 4" REQUIRED CONCRETE THE SCTIONS THAT FAIL WILL HAVE TO BE REMOVED AND REPOURED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK*** MET CONTRACTOR ON SITE AND MARKED OUT 6 RANDOM LOCATIONS ACROSS THE POURED AREA. ONCE CORE SAMPLE VERIFIES A MINIMUM OF 4" AT EACH LOCATION BUILDER CAN CALL IN PRE POUR FOR APRON AREA. BUILDER REQUESTED INSPECTION BE CANCELED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES UPPER PORTION OF DRIVEWAY WAS POURED WITH OUT PRE POUR.
ROW- PRE-APRON (PRE-POUR) 08/25/2025 CANCELLED BY APPLICANT TPOLACEK
Note: 08/25/25 TPOLACEK*** MET CONTRACTOR ON SITE AND MARKED OUT 6 RANDOM LOCATIONS ACROSS THE POURED AREA. ONCE CORE SAMPLE VERIFIES A MINIMUM OF 4" AT EACH LOCATION BUILDER CAN CALL IN PRE POUR FOR APRON AREA. BUILDER REQUESTED INSPECTION BE CANCELED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES UPPER PORTION OF DRIVEWAY WAS POURED WITH OUT PRE POUR.
ROW- PRE-APRON (PRE-POUR) 08/22/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: UPPER PORTION OF DRIVEWAY WAS POURED WITH OUT PRE POUR.
ROW - DRAINAGE 07/24/2025 APPROVED GBERTOLA
Note: Meeting with the builder
FIREWALL FINAL 07/10/2025 APPROVED MKRASKI
GRAVITY SEWER TEST 06/27/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2095 THIS WAS A FLAG LOT AND TAP WAS MADE BY ASAP PLUMBING WENT TO ADDRESS AND SAW TIE IN THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 06/25/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A FLAG LOT AND TAP WAS MADE BY ASAP PLUMBING WENT TO ADDRESS AND SAW TIE IN
INSULATION 06/24/2025 CANCELLED BY APPLICANT WEB
INSULATION 06/24/2025 APPROVED - AS NOTED MKRASKI
Note: Spray foam insulation installed
LATH/BRICK/ WATER BARRIER 06/18/2025 APPROVED MCONTRYMAN
ALL ROUGH 06/12/2025 APPROVED MKRASKI
ALL ROUGH 06/11/2025 CANCELLED BY APPLICANT WEB
Note: 6/5/2025 - PREVIOUS INSPECTION NOTES 5/30/2025 - PREVIOUS INSPECTION NOTES 1. Make ALL repairs before calling in re-inspection truss straps still missing from tie down, check all previous notes FBC 107.4 2. No product approval sheet onsite FBC 107.3.1 3. Interior load bearing wall (short wall near front door) over hangs slab and needs to be supported proerly FBC (A)107.4 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Registers missing seals FBC EC R402.4.1.1 6. Exhaust fans not wired FBC (A)107.4 7. Panel wiring missing proper phasing NEC 210.5(C)(1) 8. 5' head pressure test is not 5' above highest fixture (laundry washer drain) FBCR P2503.7 9. CMU firewall has multiple penitrations , no penitrations in firewall per detail FBC (A)107.4 ***Not ready a full re-inspection required***
ALL ROUGH 06/05/2025 CANCELLED BY APPLICANT MKRASKI
Note: 5/30/2025 - PREVIOUS INSPECTION NOTES 1. Make ALL repairs before calling in re-inspection truss straps still missing from tie down, check all previous notes FBC 107.4 2. No product approval sheet onsite FBC 107.3.1 3. Interior load bearing wall (short wall near front door) over hangs slab and needs to be supported proerly FBC (A)107.4 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Registers missing seals FBC EC R402.4.1.1 6. Exhaust fans not wired FBC (A)107.4 7. Panel wiring missing proper phasing NEC 210.5(C)(1) 8. 5' head pressure test is not 5' above highest fixture (laundry washer drain) FBCR P2503.7 9. CMU firewall has multiple penitrations , no penitrations in firewall per detail FBC (A)107.4 ***Not ready a full re-inspection required***
ALL ROUGH 05/30/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Make ALL repairs before calling in re-inspection truss straps still missing from tie down, check all previous notes FBC 107.4 2. No product approval sheet onsite FBC 107.3.1 3. Interior load bearing wall (short wall near front door) over hangs slab and needs to be supported proerly FBC (A)107.4 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Registers missing seals FBC EC R402.4.1.1 6. Exhaust fans not wired FBC (A)107.4 7. Panel wiring missing proper phasing NEC 210.5(C)(1) 8. 5' head pressure test is not 5' above highest fixture (laundry washer drain) FBCR P2503.7 ***Not ready a full re-inspection required***
FIREWALL FRAMING 05/30/2025 APPROVED MKRASKI
ALL ROUGH 05/28/2025 CANCELLED BY APPLICANT MKRASKI
Note: Via super phone call, make sure to check notes from tie down inspection
ROW - DRAINAGE 05/28/2025 APPROVED TPOLACEK
Note: 05/28/25 TPOLACEK*** A NEW TEMPORARY CULVERT HAS BEEN INSTALLED WITH PROPER DIMENSIONS. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/23/2025 - PREVIOUS INSPECTION NOTES 05/23/25 TPOLACEK*** TEMPORARY PIPE IS CLOGGED AND NOT FUNCTIONING. BUILDER MUST REPLACE TEMPORARY PIPE WITHA PIPE OF 12' DIAM MIN. AND KEEP SWALE OPEN AT ALL TIMES THROUGHOUT BUILD. NEXT INSPECTION WED
ALL ROUGH 05/27/2025 CANCELLED BY APPLICANT MKRASKI
Note: Via super phone call, make sure to check notes from tie down inspection
ALL ROUGH 05/23/2025 CANCELLED BY APPLICANT WEB
ROW - DRAINAGE 05/23/2025 Disapproved - NO FEE TPOLACEK
Note: 05/23/25 TPOLACEK*** TEMPORARY PIPE IS CLOGGED AND NOT FUNCTIONING. BUILDER MUST REPLACE TEMPORARY PIPE WITHA PIPE OF 12' DIAM MIN. AND KEEP SWALE OPEN AT ALL TIMES THROUGHOUT BUILD. NEXT INSPECTION WED
FIREWALL DRYWALL NAILING 05/22/2025 APPROVED - AS NOTED MKRASKI
Note: Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung.
FIREWALL DRYWALL NAILING 05/14/2025 Disapproved - NO FEE MCONTRYMAN
Note: 5/14/25 1. Nailing needs to be 6" on center at edges and in the field FBC R702.3.5 Notes: 1. Electrical panels need to have solid blocking with holes bored into them for wires to go through for annualar spacing requirements NEC 302.11(4) & 302.11.1
ROOF VALLEY & METAL 05/13/2025 APPROVED MCONTRYMAN
WALL SHEATHING 05/09/2025 APPROVED MCONTRYMAN
Note: Inspector Notes from Inspection 2460 5/6/25 Approved to keep job moving 3. Silt fence on right side needs to be redone. This must be done by next inspection to avoid failure and fees FBC 3307.1 Unit A: 1. Garage door buck missing fasteners b per detail FBC(A) 107.4 2. Missing straps in bearing wall in back door area per plan FBC(A) 107.4 3. Missing straps at truss' A03 and B04 Unit B: 1. Missing strap at truss B03 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/06/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 5/6/25 Approved to keep job moving 3. Silt fence on right side needs to be redone. This must be done by next inspection to avoid failure and fees FBC 3307.1 Unit A: 1. Garage door buck missing fasteners b per detail FBC(A) 107.4 2. Missing straps in bearing wall in back door area per plan FBC(A) 107.4 3. Missing straps at truss' A03 and B04 Unit B: 1. Missing strap at truss B03 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/02/2025 CANCELLED BY APPLICANT WEB
Note: 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/24/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2
TIE BEAM / LINTEL 04/08/2025 APPROVED FWILLIS
Note: 4/4/2025 - PREVIOUS INSPECTION NOTES 1. Wrong set of plans in box, plans are stamped with Building Dept. approval but is the wrong permit number FBC 107.3.1 unable to do inspection ***Make sure to check all bed joint limitations of 1/2'' max as well as dowels to close to face of the block***
TIE BEAM / LINTEL 04/04/2025 Disapproved - NO FEE MKRASKI
Note: 1. Wrong set of plans in box, plans are stamped with Building Dept. approval but is the wrong permit number FBC 107.3.1 unable to do inspection ***Make sure to check all bed joint limitations of 1/2'' max as well as dowels to close to face of the block***
TIE BEAM / LINTEL 04/03/2025 Disapproved - NO FEE MKRASKI
Note: 4/3/25 From previous inspection: Swale is still not clear, swale must stay clear to allow water to flow freely, repair temp culvert as well as remove porta jon from swale and silt fence FBC 3303.5 Inspector Notes from Inspection 2250 1. Remove silt fence from swale to allow water tp flow freely FBC 3303.5
ELEV CERT-FOUNDATION APPROVAL 04/03/2025 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 04/02/2025 APPROVED RRICKS
MONOLITHIC SLAB 03/24/2025 APPROVED - AS NOTED MKRASKI
Note: 1. Remove silt fence from swale to allow water tp flow freely FBC 3303.5
MONOLITHIC SLAB 03/21/2025 Disapproved - NO FEE MKRASKI
Note: 1. Entire lab must be a min of 4'' per plans FBC (A)107.4 2. Re-compaction is required where soil is soft in EXCAVATED AREAS FBCR 506.2.1
PLUMBING 1ST ROUGH UNDERGROUND 03/18/2025 APPROVED MGIBSON
PLUMBING PRESSURE TEST 03/18/2025 CANCELLED BY INSPECTOR MGIBSON
Note: PRESSURE TEST NOT NEEDED FOR THIS ISPECTION
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/14/2025 APPROVED JMUNSON
ELECTRIC TEMP POLE 03/05/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 9:30am
WATER METER INSTALLATION REQUEST 02/19/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
RSI COMPLETE 11/06/2025 11/06/2025
Note: Released By: TOM POLACEK - (386)346-8986 -
BLD CANCEL 11/05/2025 11/06/2025
PLFM COMPLETE 10/31/2025 10/31/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM
PLFM COMPLETE 10/28/2025 10/29/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
MECH COMPLETE 10/23/2025 10/23/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 10/20/2025 10/21/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc for both sides of duplex. Only one page submitted
ELEC COMPLETE 09/09/2025 09/11/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC COMPLETE 05/28/2025 05/29/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLFM COMPLETE 04/02/2025 04/03/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation Elevation Certificate has been approved. Please provide Final prior to CO.
ENGIN1 COMPLETE 04/02/2025 04/02/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 04/02/2025 04/02/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/02/2025 04/02/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/26/2025 04/01/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/14/2025 03/14/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 01/22/2025 01/22/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 01/22/2025 01/22/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. Please provide Foundation and Final prior to receiving CO.
BADMIN INFORMATION 01/22/2025 01/22/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM label the documents as what they are Site plan + site plan no names or numbers
ENGIN1 COMPLETE 01/22/2025 01/28/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/22/2025 01/22/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 01/15/2025 01/16/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM No elevation certificate was uploaded.
SW1 HOLD 01/15/2025 01/15/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please address previous comment: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please adjust drainage along Western property line adjacent to lot 27 to drain to the waterway. As shown, water will drain onto lot 27 before reaching the common swale along the 10' driveway which will cause issues in the future. A revised site plan for lot 27 may be necessary as well to achieve this
BADMIN COMPLETE 01/15/2025 01/22/2025
Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM
SW1 HOLD 01/09/2025 01/14/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please address previous comment: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please adjust drainage along Western property line adjacent to lot 27 to drain to the waterway. As shown, water will drain onto lot 27 before reaching the common swale along the 10' driveway which will cause issues in the future. A revised site plan for lot 27 may be necessary as well to achieve this
BADMIN HOLD 01/09/2025 01/15/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2.  Report to be conducted per Sections 1803.3 through 1803.5.  Completed report shall comply with Section 1803.6.  Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead.
PLFM HOLD 01/09/2025 01/10/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Base Flood Determination has been accepted. Due to the structure falling inside the SFHA, elevation certificates are required at construction drawings, foundation, and final.
MECH COMPLETE 12/05/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 11/08/2024 12/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM HOLD 11/08/2024 11/18/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM There is Flood Zone A on this property, per 10.02.07.B in the Land Development Code, the Base Flood Elevation must be established by an engineer and submitted to the City for review. Additional comments may apply when the analysis is submitted.
BADMIN HOLD 11/06/2024 11/12/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2.  Report to be conducted per Sections 1803.3 through 1803.5.  Completed report shall comply with Section 1803.6.  Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead.
CUSVC COMPLETE 11/06/2024 11/07/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ENGIN1 COMPLETE 11/06/2024 11/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 11/06/2024 11/08/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/06/2024 11/12/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 11/06/2024 11/08/2024
Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please adjust drainage along Western property line adjacent to lot 27 to drain to the waterway. As shown, water will drain onto lot 27 before reaching the common swale along the 10' driveway which will cause issues in the future. A revised site plan for lot 27 may be necessary as well to achieve this.
ZON COMPLETE 11/06/2024 11/08/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 11/06/2025
SW ENG - INSPECTION 20 ¤20.00 11/06/2025
SW ENG REINSPECTION 30 ¤30.00 11/06/2025
SW ENG - INSPECTION 20 ¤20.00 06/17/2025
SW ENG - INSPECTION 20 ¤20.00 06/17/2025
REINSPECTION RESIDENTIAL ¤40.00 06/17/2025
REINSPECTION RESIDENTIAL ¤40.00 06/17/2025
CONNECTION FEES ¤2,374.52 02/07/2025
FC IMPACT FEE EMS ¤124.00 02/07/2025
IMPACT FEE FIRE ¤869.02 02/07/2025
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 02/07/2025
FC IMPACT FEE LIBRARY ¤536.00 02/07/2025
IMPACT FEE PARKS ¤3,656.02 02/07/2025
IMPACT FEE SCHOOL ¤10,900.00 02/07/2025
IMPACT FEE TRANSPORTATION ¤2,974.00 02/07/2025
WATER -IRRIGATION INSPECTION ¤50.00 02/07/2025
WATER -IRRIGATION INSPECTION ¤25.00 02/07/2025
SURCHARGE FS 533.721 ¤11.04 02/07/2025
SURCHARGE - FS 468.631 ¤16.56 02/07/2025
SW ENG - FOUNDATION SURVEY ¤20.00 02/07/2025
SW ENG INSPECTION 80 ¤80.00 02/07/2025
SW ENG PRE APRON ¤30.00 02/07/2025
WATER-METER ¤514.49 02/07/2025
WATER- TURN ON ¤25.00 02/07/2025
WATER- TURN ON ¤50.00 02/07/2025
ADJUSTMENT 10% (¤122.70) 02/07/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/07/2025
INSPECTION - RESIDENTIAL ¤1,045.00 02/07/2025
PLAN REVIEW - APPROVED MASTER ¤152.00 02/07/2025
SW ENG - REVIEW 20 ¤20.00 02/07/2025
SW ENG RES REVIEW 200 ¤200.00 02/07/2025
SEWER CREDIT (¤1,147.00) 02/07/2025
SEWER INSPECTION ¤25.00 02/07/2025
SEWER CAPITAL FACILITY ¤12,241.04 02/07/2025
WATER CAPITAL FACILITY FEE ¤8,702.28 02/07/2025
SITE PLAN 30 ¤30.00 02/07/2025
Fees Total Due: ¤0.00 Total Paid: ¤44,069.77