I want to search for...
Permit #2024110288
Permit Details
Status: COED
| Parcel Id: 07-11-31-7021-00100-0280 |
| CONDITIONED SPACE: 1298 sqft |
| CONDITIONED SPACE: 1298 sqft |
| GARAGE: 262 sqft |
| GARAGE: 262 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| OPENED PORCH (WITH ROOF) : 27 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| OPENED PORCH (WITH ROOF) : 50 sqft |
| Total Square Footage: 3274 sqft |
| Block: 00100 |
| Subdivision: - |
| Job Phone: 863-647-5815 |
| Location Address: 59 WELLSTREAM LN |
| Type: DU - DUPLEX |
| Issue Date: 02/07/2025 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: HULBERT HOMES INC |
|
Address 5116 S LAKELAND DRIVE LAKELAND, FL 33813 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤380,000.00 |
| Job Description: Opportunity I Duplex |
| Type: CN |
| Original Permit #: 2024050541 |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
KYLE RODBOURN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1325 W HWY 100 BUNNELL, FL 32110 |
CAC1821358 (Exp: 08/31/2026) | 386-586-9039 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 11/06/2025 | APPROVED | TPOLACEK |
| Note: 11-06-25 TPOLACEK*** CORE SAMPLE SHEET HAS BEEN APPROVED AND ALL CORE DEPTHS MEET COPC REQUIREMENTS. PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/3/2025 - PREVIOUS INSPECTION NOTES 11-03-25 TPOLACEK*** DUE TO BUILDER POURING UPPER SECTION OF DRIVEWAY WITHOUT AN INSPECTION THE BUILDER WAS REQUIRED TO PROVIDE 6 CORE SAMPLES OF DRIVEWAY THICKNESS. THE RESULTS OF THE CORE TESTS MUST BE UPLOADED INTO THE SYSTEM AS A SUPPORTING DOCUMENT BEFORE AFTER POUR INSPECTION CAN BE APPROVED. ***INSPECTOR NOTE*** BUILDER MUST UPLOAD CORE SAMPLE CERTIFICATION SHOWING ALL 6 LOCATIONS AND RESULTS BEFORE APPROVING THE AFTER-POUR INSPECTION*** | |||
| U -UTILITY RESIDENTIAL FINAL | 11/04/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 IRR WITH POTABLE WATER USING PVB. NO CC | |||
| ROW - FINAL APRON (AFTER POUR) | 11/03/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 11-03-25 TPOLACEK*** DUE TO BUILDER POURING UPPER SECTION OF DRIVEWAY WITHOUT AN INSPECTION THE BUILDER WAS REQUIRED TO PROVIDE 6 CORE SAMPLES OF DRIVEWAY THICKNESS. THE RESULTS OF THE CORE TESTS MUST BE UPLOADED INTO THE SYSTEM AS A SUPPORTING DOCUMENT BEFORE AFTER POUR INSPECTION CAN BE APPROVED. ***INSPECTOR NOTE*** BUILDER MUST UPLOAD CORE SAMPLE CERTIFICATION SHOWING ALL 6 LOCATIONS AND RESULTS BEFORE APPROVING THE AFTER-POUR INSPECTION*** | |||
| ROW - FINAL INSPECTION | 11/03/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/30/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 10/29/2025 | APPROVED | JMYERS |
| BLD - BUILDING FINAL | 10/27/2025 | FINAL APPROVED | MKRASKI |
| Note: | |||
| U-CROSS CONNECTION | 10/22/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: IRR WITH POTABLE WATER USING PVB. NO CC | |||
| BLD - BUILDING FINAL | 10/17/2025 | CANCELLED BY APPLICANT | MKRASKI |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/08/2025 | APPROVED | FSLADISH |
| ELECTRIC - EARLY POWER | 09/25/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 9/25/25 Email sent to FPL | |||
| ELECTRIC-TUG | 09/25/2025 | CANCELLED BY INSPECTOR | MCONTRYMAN |
| Note: No tug pulled or wired up at all. Will not have one | |||
| ELECTRIC-TUG | 09/04/2025 | CANCELLED BY INSPECTOR | MCONTRYMAN |
| Note: Temp pole was approved at earlier date. All service is overhead. Need early power inspection Inspector Notes from Inspection 2170 Emailed FPL @ 9:30am | |||
| ROW- PRE-APRON (PRE-POUR) | 08/28/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 08/28/25 TPOLACEK*** THE CORES ARE GOING TO BE COMPLETED TODAY. I WILL APPROVE THE APRON POUR NOW HOWEVER, PROVIDING CORE SAMPLE PROVE THERE IS NOT THE 4" REQUIRED CONCRETE THE SCTIONS THAT FAIL WILL HAVE TO BE REMOVED AND REPOURED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/25/2025 - PREVIOUS INSPECTION NOTES 08/25/25 TPOLACEK*** MET CONTRACTOR ON SITE AND MARKED OUT 6 RANDOM LOCATIONS ACROSS THE POURED AREA. ONCE CORE SAMPLE VERIFIES A MINIMUM OF 4" AT EACH LOCATION BUILDER CAN CALL IN PRE POUR FOR APRON AREA. BUILDER REQUESTED INSPECTION BE CANCELED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES UPPER PORTION OF DRIVEWAY WAS POURED WITH OUT PRE POUR. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/25/2025 | CANCELLED BY APPLICANT | TPOLACEK |
| Note: 08/25/25 TPOLACEK*** MET CONTRACTOR ON SITE AND MARKED OUT 6 RANDOM LOCATIONS ACROSS THE POURED AREA. ONCE CORE SAMPLE VERIFIES A MINIMUM OF 4" AT EACH LOCATION BUILDER CAN CALL IN PRE POUR FOR APRON AREA. BUILDER REQUESTED INSPECTION BE CANCELED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES UPPER PORTION OF DRIVEWAY WAS POURED WITH OUT PRE POUR. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/22/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: UPPER PORTION OF DRIVEWAY WAS POURED WITH OUT PRE POUR. | |||
| ROW - DRAINAGE | 07/24/2025 | APPROVED | GBERTOLA |
| Note: Meeting with the builder | |||
| FIREWALL FINAL | 07/10/2025 | APPROVED | MKRASKI |
| GRAVITY SEWER TEST | 06/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2095 THIS WAS A FLAG LOT AND TAP WAS MADE BY ASAP PLUMBING WENT TO ADDRESS AND SAW TIE IN THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 06/25/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A FLAG LOT AND TAP WAS MADE BY ASAP PLUMBING WENT TO ADDRESS AND SAW TIE IN | |||
| INSULATION | 06/24/2025 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 06/24/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Spray foam insulation installed | |||
| LATH/BRICK/ WATER BARRIER | 06/18/2025 | APPROVED | MCONTRYMAN |
| ALL ROUGH | 06/12/2025 | APPROVED | MKRASKI |
| ALL ROUGH | 06/11/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 6/5/2025 - PREVIOUS INSPECTION NOTES 5/30/2025 - PREVIOUS INSPECTION NOTES 1. Make ALL repairs before calling in re-inspection truss straps still missing from tie down, check all previous notes FBC 107.4 2. No product approval sheet onsite FBC 107.3.1 3. Interior load bearing wall (short wall near front door) over hangs slab and needs to be supported proerly FBC (A)107.4 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Registers missing seals FBC EC R402.4.1.1 6. Exhaust fans not wired FBC (A)107.4 7. Panel wiring missing proper phasing NEC 210.5(C)(1) 8. 5' head pressure test is not 5' above highest fixture (laundry washer drain) FBCR P2503.7 9. CMU firewall has multiple penitrations , no penitrations in firewall per detail FBC (A)107.4 ***Not ready a full re-inspection required*** | |||
| ALL ROUGH | 06/05/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 5/30/2025 - PREVIOUS INSPECTION NOTES 1. Make ALL repairs before calling in re-inspection truss straps still missing from tie down, check all previous notes FBC 107.4 2. No product approval sheet onsite FBC 107.3.1 3. Interior load bearing wall (short wall near front door) over hangs slab and needs to be supported proerly FBC (A)107.4 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Registers missing seals FBC EC R402.4.1.1 6. Exhaust fans not wired FBC (A)107.4 7. Panel wiring missing proper phasing NEC 210.5(C)(1) 8. 5' head pressure test is not 5' above highest fixture (laundry washer drain) FBCR P2503.7 9. CMU firewall has multiple penitrations , no penitrations in firewall per detail FBC (A)107.4 ***Not ready a full re-inspection required*** | |||
| ALL ROUGH | 05/30/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Make ALL repairs before calling in re-inspection truss straps still missing from tie down, check all previous notes FBC 107.4 2. No product approval sheet onsite FBC 107.3.1 3. Interior load bearing wall (short wall near front door) over hangs slab and needs to be supported proerly FBC (A)107.4 4. Seal all slab penitrations FBC EC R402.4.1.1 5. Registers missing seals FBC EC R402.4.1.1 6. Exhaust fans not wired FBC (A)107.4 7. Panel wiring missing proper phasing NEC 210.5(C)(1) 8. 5' head pressure test is not 5' above highest fixture (laundry washer drain) FBCR P2503.7 ***Not ready a full re-inspection required*** | |||
| FIREWALL FRAMING | 05/30/2025 | APPROVED | MKRASKI |
| ALL ROUGH | 05/28/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: Via super phone call, make sure to check notes from tie down inspection | |||
| ROW - DRAINAGE | 05/28/2025 | APPROVED | TPOLACEK |
| Note: 05/28/25 TPOLACEK*** A NEW TEMPORARY CULVERT HAS BEEN INSTALLED WITH PROPER DIMENSIONS. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/23/2025 - PREVIOUS INSPECTION NOTES 05/23/25 TPOLACEK*** TEMPORARY PIPE IS CLOGGED AND NOT FUNCTIONING. BUILDER MUST REPLACE TEMPORARY PIPE WITHA PIPE OF 12' DIAM MIN. AND KEEP SWALE OPEN AT ALL TIMES THROUGHOUT BUILD. NEXT INSPECTION WED | |||
| ALL ROUGH | 05/27/2025 | CANCELLED BY APPLICANT | MKRASKI |
| Note: Via super phone call, make sure to check notes from tie down inspection | |||
| ALL ROUGH | 05/23/2025 | CANCELLED BY APPLICANT | WEB |
| ROW - DRAINAGE | 05/23/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 05/23/25 TPOLACEK*** TEMPORARY PIPE IS CLOGGED AND NOT FUNCTIONING. BUILDER MUST REPLACE TEMPORARY PIPE WITHA PIPE OF 12' DIAM MIN. AND KEEP SWALE OPEN AT ALL TIMES THROUGHOUT BUILD. NEXT INSPECTION WED | |||
| FIREWALL DRYWALL NAILING | 05/22/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Draft stop approved, call firewall framing inspection in once draft stop is mudded. Call fire wall final in once ceiling and walls are hung. | |||
| FIREWALL DRYWALL NAILING | 05/14/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 5/14/25 1. Nailing needs to be 6" on center at edges and in the field FBC R702.3.5 Notes: 1. Electrical panels need to have solid blocking with holes bored into them for wires to go through for annualar spacing requirements NEC 302.11(4) & 302.11.1 | |||
| ROOF VALLEY & METAL | 05/13/2025 | APPROVED | MCONTRYMAN |
| WALL SHEATHING | 05/09/2025 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2460 5/6/25 Approved to keep job moving 3. Silt fence on right side needs to be redone. This must be done by next inspection to avoid failure and fees FBC 3307.1 Unit A: 1. Garage door buck missing fasteners b per detail FBC(A) 107.4 2. Missing straps in bearing wall in back door area per plan FBC(A) 107.4 3. Missing straps at truss' A03 and B04 Unit B: 1. Missing strap at truss B03 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/06/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/6/25 Approved to keep job moving 3. Silt fence on right side needs to be redone. This must be done by next inspection to avoid failure and fees FBC 3307.1 Unit A: 1. Garage door buck missing fasteners b per detail FBC(A) 107.4 2. Missing straps in bearing wall in back door area per plan FBC(A) 107.4 3. Missing straps at truss' A03 and B04 Unit B: 1. Missing strap at truss B03 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/02/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 4/24/2025 - PREVIOUS INSPECTION NOTES 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/24/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 4/24/25 Needs to be completed by next scheduled inspection 1. Need complete set of stamped and approved plans on site FBC(A) 107.3.1 & FBC(A) 105.7 2. Need approved Mitek packet on site. 2 of them are in the box but do not match layout FBC(A) 107.3.1 3. Silt fence on right side needs to be redone FBC 3307.1 4. Dumpster needs to be changed out and job site cleaned up FBC 3302.2 | |||
| TIE BEAM / LINTEL | 04/08/2025 | APPROVED | FWILLIS |
| Note: 4/4/2025 - PREVIOUS INSPECTION NOTES 1. Wrong set of plans in box, plans are stamped with Building Dept. approval but is the wrong permit number FBC 107.3.1 unable to do inspection ***Make sure to check all bed joint limitations of 1/2'' max as well as dowels to close to face of the block*** | |||
| TIE BEAM / LINTEL | 04/04/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Wrong set of plans in box, plans are stamped with Building Dept. approval but is the wrong permit number FBC 107.3.1 unable to do inspection ***Make sure to check all bed joint limitations of 1/2'' max as well as dowels to close to face of the block*** | |||
| TIE BEAM / LINTEL | 04/03/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 4/3/25 From previous inspection: Swale is still not clear, swale must stay clear to allow water to flow freely, repair temp culvert as well as remove porta jon from swale and silt fence FBC 3303.5 Inspector Notes from Inspection 2250 1. Remove silt fence from swale to allow water tp flow freely FBC 3303.5 | |||
| ELEV CERT-FOUNDATION APPROVAL | 04/03/2025 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 04/02/2025 | APPROVED | RRICKS |
| MONOLITHIC SLAB | 03/24/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Remove silt fence from swale to allow water tp flow freely FBC 3303.5 | |||
| MONOLITHIC SLAB | 03/21/2025 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Entire lab must be a min of 4'' per plans FBC (A)107.4 2. Re-compaction is required where soil is soft in EXCAVATED AREAS FBCR 506.2.1 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/18/2025 | APPROVED | MGIBSON |
| PLUMBING PRESSURE TEST | 03/18/2025 | CANCELLED BY INSPECTOR | MGIBSON |
| Note: PRESSURE TEST NOT NEEDED FOR THIS ISPECTION | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/14/2025 | APPROVED | JMUNSON |
| ELECTRIC TEMP POLE | 03/05/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:30am | |||
| WATER METER INSTALLATION REQUEST | 02/19/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| RSI | COMPLETE | 11/06/2025 | 11/06/2025 |
| Note: Released By: TOM POLACEK - (386)346-8986 - | |||
| BLD | CANCEL | 11/05/2025 | 11/06/2025 |
| PLFM | COMPLETE | 10/31/2025 | 10/31/2025 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 10/28/2025 | 10/29/2025 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| MECH | COMPLETE | 10/23/2025 | 10/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/20/2025 | 10/21/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc for both sides of duplex. Only one page submitted | |||
| ELEC | COMPLETE | 09/09/2025 | 09/11/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/28/2025 | 05/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 04/02/2025 | 04/03/2025 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation Elevation Certificate has been approved. Please provide Final prior to CO. | |||
| ENGIN1 | COMPLETE | 04/02/2025 | 04/02/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/02/2025 | 04/02/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/02/2025 | 04/02/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/26/2025 | 04/01/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/14/2025 | 03/14/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/22/2025 | 01/22/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 01/22/2025 | 01/22/2025 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. Please provide Foundation and Final prior to receiving CO. | |||
| BADMIN | INFORMATION | 01/22/2025 | 01/22/2025 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM label the documents as what they are Site plan + site plan no names or numbers | |||
| ENGIN1 | COMPLETE | 01/22/2025 | 01/28/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/22/2025 | 01/22/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 01/15/2025 | 01/16/2025 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM No elevation certificate was uploaded. | |||
| SW1 | HOLD | 01/15/2025 | 01/15/2025 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please address previous comment: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please adjust drainage along Western property line adjacent to lot 27 to drain to the waterway. As shown, water will drain onto lot 27 before reaching the common swale along the 10' driveway which will cause issues in the future. A revised site plan for lot 27 may be necessary as well to achieve this | |||
| BADMIN | COMPLETE | 01/15/2025 | 01/22/2025 |
| Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/09/2025 | 01/14/2025 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please address previous comment: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please adjust drainage along Western property line adjacent to lot 27 to drain to the waterway. As shown, water will drain onto lot 27 before reaching the common swale along the 10' driveway which will cause issues in the future. A revised site plan for lot 27 may be necessary as well to achieve this | |||
| BADMIN | HOLD | 01/09/2025 | 01/15/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| PLFM | HOLD | 01/09/2025 | 01/10/2025 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Base Flood Determination has been accepted. Due to the structure falling inside the SFHA, elevation certificates are required at construction drawings, foundation, and final. | |||
| MECH | COMPLETE | 12/05/2024 | 12/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/08/2024 | 12/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 11/08/2024 | 11/18/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM There is Flood Zone A on this property, per 10.02.07.B in the Land Development Code, the Base Flood Elevation must be established by an engineer and submitted to the City for review. Additional comments may apply when the analysis is submitted. | |||
| BADMIN | HOLD | 11/06/2024 | 11/12/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| CUSVC | COMPLETE | 11/06/2024 | 11/07/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/06/2024 | 11/08/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 11/06/2024 | 11/08/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/06/2024 | 11/12/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/06/2024 | 11/08/2024 |
| Note: Held By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM Please adjust drainage along Western property line adjacent to lot 27 to drain to the waterway. As shown, water will drain onto lot 27 before reaching the common swale along the 10' driveway which will cause issues in the future. A revised site plan for lot 27 may be necessary as well to achieve this. | |||
| ZON | COMPLETE | 11/06/2024 | 11/08/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 11/06/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/06/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/06/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/17/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/17/2025 |
| CONNECTION FEES | ¤2,374.52 | 02/07/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 02/07/2025 |
| IMPACT FEE FIRE | ¤869.02 | 02/07/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 02/07/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 02/07/2025 |
| IMPACT FEE PARKS | ¤3,656.02 | 02/07/2025 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 02/07/2025 |
| IMPACT FEE TRANSPORTATION | ¤2,974.00 | 02/07/2025 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 02/07/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/07/2025 |
| SURCHARGE FS 533.721 | ¤11.04 | 02/07/2025 |
| SURCHARGE - FS 468.631 | ¤16.56 | 02/07/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/07/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/07/2025 |
| SW ENG PRE APRON | ¤30.00 | 02/07/2025 |
| WATER-METER | ¤514.49 | 02/07/2025 |
| WATER- TURN ON | ¤25.00 | 02/07/2025 |
| WATER- TURN ON | ¤50.00 | 02/07/2025 |
| ADJUSTMENT 10% | (¤122.70) | 02/07/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/07/2025 |
| INSPECTION - RESIDENTIAL | ¤1,045.00 | 02/07/2025 |
| PLAN REVIEW - APPROVED MASTER | ¤152.00 | 02/07/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/07/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/07/2025 |
| SEWER CREDIT | (¤1,147.00) | 02/07/2025 |
| SEWER INSPECTION | ¤25.00 | 02/07/2025 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 02/07/2025 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 02/07/2025 |
| SITE PLAN 30 | ¤30.00 | 02/07/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤44,069.77 |