Permit #2024110290
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00350-0010 |
| CONDITIONED SPACE: 2287 sqft |
| GARAGE: 712 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| SCREEN PORCH (SOLID ROOF) : 173 sqft |
| Total Square Footage: 3209 sqft |
| Block: 00350 |
| Subdivision: 7060 - |
| Job Phone: 386-931-5741 |
| Location Address: 35 SLOWDRIFT TURN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/23/2024 |
| NOC: RECORDED |
| Applicant name: MICHAEL MARINO HANSEN |
| Owner: JENNINGS SANDRA A & RAY CALFEE JTWROS |
|
Address 7 BEECHWOOD LANE PALM COAST, FL 32137 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤282,000.00 |
| Job Description: Single Family |
| Type: CN |
Contractor
RBI HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 1347 PALM COAST, FL 32137 |
RB29003877 (Exp: 08/31/2027) | 386-585-4097 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
REBECCA L CHAMBERS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
671 W CADILLAC DRIVE , 0 |
CCC1332582 (Exp: 08/31/2026) | 407-915-3195 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/12/2025 | FINAL APPROVED | BTAYLOR |
| Note: 9/11/2025 - PREVIOUS INSPECTION NOTES 9-11-25 1. Pep tank is not wired in. 2. Outlet on back of house needs to be weather resitant. 3. Master sink left drain not holding water. 4. Pep tank needs to have GFI breaker. | |||
| BLD - BUILDING FINAL | 09/11/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 9-11-25 1. Pep tank is not wired in. 2. Outlet on back of house needs to be weather resitant. 3. Master sink left drain not holding water. 4. Pep tank needs to have GFI breaker. | |||
| U-CROSS CONNECTION | 09/11/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC. IRR using Potable water. PVB in place | |||
| U -UTILITY RESIDENTIAL FINAL | 09/11/2025 | APPROVED - AS NOTED | BHAINES |
| Note: Utilities is correcting a wiring issue with peptank | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/10/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 9/10/25= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25 YOU DO NOT HAVE POSITIVE DRAINAGE FLOW IN YOUR FRONT SWALE. PLEASE SEE PHOTO FOR REFERENCE. YOU ARE SHOWING A 24.40 FLAT TO A 24.40 TO A 24.15 BACK UP TO 25.30 UP AGAIN TO A 24.40. THIS WILL CAUSE DRAINAGE TO POOL AND NOT HAVE POSITIVE FLOW. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/10/2025 | APPROVED | GBERTOLA |
| Note: Inspector Notes from Inspection 9463 9/10/25= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25 YOU DO NOT HAVE POSITIVE DRAINAGE FLOW IN YOUR FRONT SWALE. PLEASE SEE PHOTO FOR REFERENCE. YOU ARE SHOWING A 24.40 FLAT TO A 24.40 TO A 24.15 BACK UP TO 25.30 UP AGAIN TO A 24.40. THIS WILL CAUSE DRAINAGE TO POOL AND NOT HAVE POSITIVE FLOW. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 09/10/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 09/10/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- PROJECT STATUS | 09/04/2025 | Status Check | PFLANAGAN |
| Note: MEETING WITH JIM AND GRADE FOR THE ROADSIDE SWALE THEY NEED TO GRADE IT SO THERE ARE NO LOW SPOTS. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/02/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 9/2/25 YOU DO NOT HAVE POSITIVE DRAINAGE FLOW IN YOUR FRONT SWALE. PLEASE SEE PHOTO FOR REFERENCE. YOU ARE SHOWING A 24.40 FLAT TO A 24.40 TO A 24.15 BACK UP TO 25.30 UP AGAIN TO A 24.40. THIS WILL CAUSE DRAINAGE TO POOL AND NOT HAVE POSITIVE FLOW. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ELECTRIC - EARLY POWER | 07/22/2025 | APPROVED | KSANDOE |
| ROW- PRE-APRON (PRE-POUR) | 06/23/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 6/23/25=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR. IF IT RAINS, PLEASE BUILD THE DOUBLE THE CULVERT ELEVATIONS TO MAKE SURE IT IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING | |||
| GRAVITY SEWER TEST | 05/23/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 2/3/2025 - PREVIOUS INSPECTION NOTES WATER SERVICE NOT RAN YET. tTHIS WAS APPROVED ON 2/3/25 | |||
| SEWER TIE IN | 05/23/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 2/3/2025 - PREVIOUS INSPECTION NOTES WATER SERVICE NOT RAN YET. tTHIS WAS APPROVED ON 2/3/25 | |||
| PEP TANK INSTALLATION REQUEST | 04/08/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 04/03/2025 | APPROVED | BTAYLOR |
| Note: 4/2/2025 - PREVIOUS INSPECTION NOTES 4-2-25 1. Missing stucco band on bottom of window by a/c pad. 2. Door to a/c pad missing stucco band. 3. Holes by a/c pad need lath. | |||
| LATH/BRICK/ WATER BARRIER | 04/02/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-2-25 1. Missing stucco band on bottom of window by a/c pad. 2. Door to a/c pad missing stucco band. 3. Holes by a/c pad need lath. | |||
| INSULATION | 03/28/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 3-24-25 1. Rear slider not installed. | |||
| ALL ROUGH | 03/24/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-24-25 1. Rear slider not installed. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/21/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: 2/3/2025 - PREVIOUS INSPECTION NOTES WATER SERVICE NOT RAN YET. tTHIS WAS APPROVED ON 2/3/25 | |||
| ROOF VALLEY & METAL | 03/12/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 3-6-25 1. Bearing walls that are built are not connected to block wall properly. 2. Electrical panel build out needs to have 2x4 across the top. 3/4/2025 - PREVIOUS INSPECTION NOTES 3-4-25 1. Missing bearing walls. 2. Bearing walls that are built are not connected to block wall properly. All are circled in plans. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/06/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-6-25 1. Bearing walls that are built are not connected to block wall properly. 2. Electrical panel build out needs to have 2x4 across the top. 3/4/2025 - PREVIOUS INSPECTION NOTES 3-4-25 1. Missing bearing walls. 2. Bearing walls that are built are not connected to block wall properly. All are circled in plans. | |||
| WALL SHEATHING | 03/04/2025 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/04/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-4-25 1. Missing bearing walls. 2. Bearing walls that are built are not connected to block wall properly. All are circled in plans. | |||
| GRAVITY SEWER TEST | 03/03/2025 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 03/03/2025 | APPROVED | CGONCALVES |
| TIE BEAM / LINTEL | 02/13/2025 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 02/05/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/03/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: WATER SERVICE NOT RAN YET | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/29/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 01/13/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/19/2025 | 08/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/20/2025 | 03/20/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/12/2025 | 03/17/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/14/2025 | 02/14/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/14/2025 | 02/14/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2025 | 01/29/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/17/2025 | 01/23/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1 You need to submit your first letter. | |||
| ZON | COMPLETE | 12/11/2024 | 12/12/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/11/2024 | 12/20/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD Final PEP location to be provided by COPC. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lid/cover. | |||
| ENGIN1 | COMPLETE | 12/11/2024 | 12/12/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/22/2024 | 11/25/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: All windows and doors facing a right of way must have banding. (RIGHT SIDE) | |||
| SW1 | HOLD | 11/22/2024 | 12/11/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Previous comments not addressed, revised Site Plan not submitted. There are multiple spots where the property line elevation is lower than the edge of pavement, please review and revise to be even with the edge of pavement. | |||
| ZON | HOLD | 11/14/2024 | 11/14/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM All windows and doors facing a right of way must have banding. (RIGHT SIDE) 8 trees required for this lot size. | |||
| BLD | COMPLETE | 11/14/2024 | 11/21/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/14/2024 | 11/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 11/14/2024 | 11/21/2024 |
| Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM One minor comment: Front property line elevations shall be even with the EOP. There are some proposed property line elevations that are lower than those in the EOP, for example, 25, 24.9, and a few more. Please revise. General Notes: SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD SW1 approval valid with the following note: Final PEP location to be provided by COPC. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lid/cover. | |||
| SWALE | COMPLETE | 11/13/2024 | 12/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 11/06/2024 | 11/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/06/2024 | 11/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/06/2024 | 11/07/2024 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 11/06/2024 | 11/14/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/06/2024 | 11/13/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/06/2024 | 11/13/2024 |
| LOCATE | COMPLETE | 11/06/2024 | 11/08/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/06/2024 | 11/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/06/2024 | 11/08/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | HOLD | 11/06/2024 | 11/07/2024 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan for garage left. Plans and landscape for garage right All plans must match All windows and doors facing a right of way must have banding. (Street Side) Cannot have a windowless wall facing a right of way 8 trees required for this lot size. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 12/23/2024 |
| IMPACT FEE FIRE | ¤434.51 | 12/23/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/23/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/23/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 12/23/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 12/23/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 12/23/2024 |
| SURCHARGE FS 533.721 | ¤14.34 | 12/23/2024 |
| SURCHARGE - FS 468.631 | ¤21.52 | 12/23/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/23/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/23/2024 |
| SW ENG PRE APRON | ¤30.00 | 12/23/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/23/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/23/2024 |
| ADJUSTMENT 10% | (¤159.38) | 12/23/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/23/2024 |
| INSPECTION - RESIDENTIAL | ¤1,218.25 | 12/23/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤345.54 | 12/23/2024 |
| SITE PLAN 30 | ¤30.00 | 12/23/2024 |
| WATER- TURN ON | ¤25.00 | 12/23/2024 |
| CONNECTION FEES | ¤1,187.26 | 12/23/2024 |
| SEWER CREDIT | (¤1,466.00) | 12/23/2024 |
| SEWER INSPECTION | ¤25.00 | 12/23/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 12/23/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 12/23/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/23/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,240.71 |