Permit #2024110290

Permit Details

Status: COED

Parcel Id: 07-11-31-7060-00350-0010
CONDITIONED SPACE: 2287 sqft
GARAGE: 712 sqft
OPENED PORCH (WITH ROOF) : 37 sqft
SCREEN PORCH (SOLID ROOF) : 173 sqft
Total Square Footage: 3209 sqft
Block: 00350
Subdivision: 7060 -
Job Phone: 386-931-5741
Location Address: 35 SLOWDRIFT TURN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/23/2024
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: JENNINGS SANDRA A & RAY CALFEE JTWROS

Address

7 BEECHWOOD LANE

PALM COAST, FL 32137

Lot: 0010
Contracted Stated Job Value: ¤282,000.00
Job Description: Single Family
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
ACTIVE

PO BOX 1347

PALM COAST, FL 32137

RB29003877 (Exp: 08/31/2027) 386-585-4097

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
REBECCA L CHAMBERS
Status Location Address State License Number Phone
INACTIVE

671 W CADILLAC DRIVE

, 0

CCC1332582 (Exp: 08/31/2026) 407-915-3195
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/12/2025 FINAL APPROVED BTAYLOR
Note: 9/11/2025 - PREVIOUS INSPECTION NOTES 9-11-25 1. Pep tank is not wired in. 2. Outlet on back of house needs to be weather resitant. 3. Master sink left drain not holding water. 4. Pep tank needs to have GFI breaker.
BLD - BUILDING FINAL 09/11/2025 Disapproved - NO FEE BTAYLOR
Note: 9-11-25 1. Pep tank is not wired in. 2. Outlet on back of house needs to be weather resitant. 3. Master sink left drain not holding water. 4. Pep tank needs to have GFI breaker.
U-CROSS CONNECTION 09/11/2025 APPROVED - AS NOTED BHAINES
Note: No CC. IRR using Potable water. PVB in place
U -UTILITY RESIDENTIAL FINAL 09/11/2025 APPROVED - AS NOTED BHAINES
Note: Utilities is correcting a wiring issue with peptank
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/10/2025 APPROVED - AS NOTED GBERTOLA
Note: 9/10/25= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25 YOU DO NOT HAVE POSITIVE DRAINAGE FLOW IN YOUR FRONT SWALE. PLEASE SEE PHOTO FOR REFERENCE. YOU ARE SHOWING A 24.40 FLAT TO A 24.40 TO A 24.15 BACK UP TO 25.30 UP AGAIN TO A 24.40. THIS WILL CAUSE DRAINAGE TO POOL AND NOT HAVE POSITIVE FLOW. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ROW FIELD SURVEY /GRADING CERTIFICATION 09/10/2025 APPROVED GBERTOLA
Note: Inspector Notes from Inspection 9463 9/10/25= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25 YOU DO NOT HAVE POSITIVE DRAINAGE FLOW IN YOUR FRONT SWALE. PLEASE SEE PHOTO FOR REFERENCE. YOU ARE SHOWING A 24.40 FLAT TO A 24.40 TO A 24.15 BACK UP TO 25.30 UP AGAIN TO A 24.40. THIS WILL CAUSE DRAINAGE TO POOL AND NOT HAVE POSITIVE FLOW. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 09/10/2025 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 09/10/2025 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- PROJECT STATUS 09/04/2025 Status Check PFLANAGAN
Note: MEETING WITH JIM AND GRADE FOR THE ROADSIDE SWALE THEY NEED TO GRADE IT SO THERE ARE NO LOW SPOTS.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/02/2025 Disapproved - NO FEE FSLADISH
Note: 9/2/25 YOU DO NOT HAVE POSITIVE DRAINAGE FLOW IN YOUR FRONT SWALE. PLEASE SEE PHOTO FOR REFERENCE. YOU ARE SHOWING A 24.40 FLAT TO A 24.40 TO A 24.15 BACK UP TO 25.30 UP AGAIN TO A 24.40. THIS WILL CAUSE DRAINAGE TO POOL AND NOT HAVE POSITIVE FLOW. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Swale must flow in the right direction SWALE PLAN Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan.
ELECTRIC - EARLY POWER 07/22/2025 APPROVED KSANDOE
ROW- PRE-APRON (PRE-POUR) 06/23/2025 APPROVED - AS NOTED GBERTOLA
Note: 6/23/25=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR. IF IT RAINS, PLEASE BUILD THE DOUBLE THE CULVERT ELEVATIONS TO MAKE SURE IT IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING
GRAVITY SEWER TEST 05/23/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 2/3/2025 - PREVIOUS INSPECTION NOTES WATER SERVICE NOT RAN YET. tTHIS WAS APPROVED ON 2/3/25
SEWER TIE IN 05/23/2025 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 2/3/2025 - PREVIOUS INSPECTION NOTES WATER SERVICE NOT RAN YET. tTHIS WAS APPROVED ON 2/3/25
PEP TANK INSTALLATION REQUEST 04/08/2025 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 04/03/2025 APPROVED BTAYLOR
Note: 4/2/2025 - PREVIOUS INSPECTION NOTES 4-2-25 1. Missing stucco band on bottom of window by a/c pad. 2. Door to a/c pad missing stucco band. 3. Holes by a/c pad need lath.
LATH/BRICK/ WATER BARRIER 04/02/2025 Disapproved - NO FEE BTAYLOR
Note: 4-2-25 1. Missing stucco band on bottom of window by a/c pad. 2. Door to a/c pad missing stucco band. 3. Holes by a/c pad need lath.
INSULATION 03/28/2025 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 3-24-25 1. Rear slider not installed.
ALL ROUGH 03/24/2025 APPROVED - AS NOTED BTAYLOR
Note: 3-24-25 1. Rear slider not installed.
PLUMBING 1ST ROUGH UNDERGROUND 03/21/2025 APPROVED - AS NOTED MGIBSON
Note: 2/3/2025 - PREVIOUS INSPECTION NOTES WATER SERVICE NOT RAN YET. tTHIS WAS APPROVED ON 2/3/25
ROOF VALLEY & METAL 03/12/2025 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 3-6-25 1. Bearing walls that are built are not connected to block wall properly. 2. Electrical panel build out needs to have 2x4 across the top. 3/4/2025 - PREVIOUS INSPECTION NOTES 3-4-25 1. Missing bearing walls. 2. Bearing walls that are built are not connected to block wall properly. All are circled in plans.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/06/2025 APPROVED - AS NOTED BTAYLOR
Note: 3-6-25 1. Bearing walls that are built are not connected to block wall properly. 2. Electrical panel build out needs to have 2x4 across the top. 3/4/2025 - PREVIOUS INSPECTION NOTES 3-4-25 1. Missing bearing walls. 2. Bearing walls that are built are not connected to block wall properly. All are circled in plans.
WALL SHEATHING 03/04/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/04/2025 Disapproved - NO FEE BTAYLOR
Note: 3-4-25 1. Missing bearing walls. 2. Bearing walls that are built are not connected to block wall properly. All are circled in plans.
GRAVITY SEWER TEST 03/03/2025 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 03/03/2025 APPROVED CGONCALVES
TIE BEAM / LINTEL 02/13/2025 APPROVED BTAYLOR
MONOLITHIC SLAB 02/05/2025 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 02/03/2025 PARTIALLY APPROVED MGIBSON
Note: WATER SERVICE NOT RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/29/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 01/13/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 08/19/2025 08/20/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 03/20/2025 03/20/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/12/2025 03/17/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/14/2025 02/14/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/14/2025 02/14/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2025 01/29/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 01/17/2025 01/23/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1 You need to submit your first letter.
ZON COMPLETE 12/11/2024 12/12/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 12/11/2024 12/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD Final PEP location to be provided by COPC. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lid/cover.
ENGIN1 COMPLETE 12/11/2024 12/12/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 11/22/2024 11/25/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: All windows and doors facing a right of way must have banding. (RIGHT SIDE)
SW1 HOLD 11/22/2024 12/11/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Previous comments not addressed, revised Site Plan not submitted. There are multiple spots where the property line elevation is lower than the edge of pavement, please review and revise to be even with the edge of pavement.
ZON HOLD 11/14/2024 11/14/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM All windows and doors facing a right of way must have banding. (RIGHT SIDE) 8 trees required for this lot size.
BLD COMPLETE 11/14/2024 11/21/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/14/2024 11/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 11/14/2024 11/21/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM One minor comment: Front property line elevations shall be even with the EOP. There are some proposed property line elevations that are lower than those in the EOP, for example, 25, 24.9, and a few more. Please revise. General Notes: SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD SW1 approval valid with the following note: Final PEP location to be provided by COPC. The stormwater conveyance swales associated with the lot’s grading shall be diverted around the PEP lid/cover.
SWALE COMPLETE 11/13/2024 12/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 11/06/2024 11/14/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 11/06/2024 11/14/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 11/06/2024 11/07/2024
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC COMPLETE 11/06/2024 11/14/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/06/2024 11/13/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/06/2024 11/13/2024
LOCATE COMPLETE 11/06/2024 11/08/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/06/2024 11/14/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/06/2024 11/08/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 11/06/2024 11/07/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan for garage left. Plans and landscape for garage right All plans must match All windows and doors facing a right of way must have banding. (Street Side) Cannot have a windowless wall facing a right of way 8 trees required for this lot size.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
FC IMPACT FEE EMS ¤62.00 12/23/2024
IMPACT FEE FIRE ¤434.51 12/23/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/23/2024
FC IMPACT FEE LIBRARY ¤268.00 12/23/2024
IMPACT FEE PARKS ¤1,828.01 12/23/2024
IMPACT FEE SCHOOL ¤5,450.00 12/23/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 12/23/2024
SURCHARGE FS 533.721 ¤14.34 12/23/2024
SURCHARGE - FS 468.631 ¤21.52 12/23/2024
SW ENG - FOUNDATION SURVEY ¤20.00 12/23/2024
SW ENG INSPECTION 80 ¤80.00 12/23/2024
SW ENG PRE APRON ¤30.00 12/23/2024
SW ENG - REVIEW 20 ¤20.00 12/23/2024
SW ENG RES REVIEW 200 ¤200.00 12/23/2024
ADJUSTMENT 10% (¤159.38) 12/23/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/23/2024
INSPECTION - RESIDENTIAL ¤1,218.25 12/23/2024
PLAN REVIEW - RESIDENTIAL ¤345.54 12/23/2024
SITE PLAN 30 ¤30.00 12/23/2024
WATER- TURN ON ¤25.00 12/23/2024
CONNECTION FEES ¤1,187.26 12/23/2024
SEWER CREDIT (¤1,466.00) 12/23/2024
SEWER INSPECTION ¤25.00 12/23/2024
SEWER CAPITAL FACILITY ¤6,120.52 12/23/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 12/23/2024
WATER -IRRIGATION INSPECTION ¤25.00 12/23/2024
Fees Total Due: ¤0.00 Total Paid: ¤22,240.71