I want to search for...

Permit #2024110444

Permit Details

Status: COED

Parcel Id: 03-12-31-1125-00000-0580
CONDITIONED SPACE: 2394 sqft
GARAGE: 502 sqft
OPENED PORCH (WITH ROOF) : 52 sqft
OPENED PORCH (WITH ROOF) : 176 sqft
Total Square Footage: 3124 sqft
Subdivision: 1125 - MC QUEENS PARK
Job Phone: 813-917-1689
Location Address: 14 GEOSAM DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/25/2024
NOC: RECORDED
Applicant name: SCOTT EVAN KEUNING
Owner: TAYLOR MORRISON OF FLORIDA INC

Address

1275 W GRANADA BLVD

ORMOND BEACH, FL 32174

Address

SUITE 3B

ORMOND BEACH, FL 32174

Lot: 58
Contracted Stated Job Value: ¤183,103.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

TAYLOR MORRISON OF FLORIDA INC
Status Location Address State License Number Phone
ACTIVE

7785 BAY MEADOWS WAY, SUITE 105

JACKSONVILLE, FL 32256

CBC1265083 (Exp: 08/31/2026) 813-917-1689

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
BENJAMIN MICHAEL RAY
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

6310 MABLETON PKWY

JACKSONVILLE, FL 32216

SUITE 1000

MABLETON, GA 30126

CFC1428415 (Exp: 08/31/2026) 904-861-5421 904-861-5426
CHASE RANDOLPH MASSEY
Status Location Address State License Number Phone
ACTIVE

10048 103RD ST

JACKSONVILLE, FL 32210

CCC1332486 (Exp: 08/31/2026) 904-248-1133

Inspection History

Type Request Date Result Inspector
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/21/2025 APPROVED PFLANAGAN
Note: FINAL SURVEY MEETS STANDARDS
ROW FIELD SURVEY /GRADING CERTIFICATION 04/21/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
ROW - STORMWATER FINAL 04/21/2025 APPROVED - AS NOTED PFLANAGAN
Note: PASSING AS NOTED THAT I TALK TO CM AND HE IS GOING FIX THE SILT SO IT UP TO THE SOD ON THE LOT
U -UTILITY RESIDENTIAL FINAL 04/21/2025 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 3/14/2025 - PREVIOUS INSPECTION NOTES irrigation not yet installed IRR with potable using DC. No CC
ROW - FINAL APRON (AFTER POUR) 04/21/2025 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
BLD - BUILDING FINAL 04/16/2025 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 04/16/2025 APPROVED - AS NOTED BWRIGHT
Note: 3/14/2025 - PREVIOUS INSPECTION NOTES irrigation not yet installed IRR with potable using DC. No CC
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/15/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/15/25 YOUR ENTIRE REAR YARD AREA IS FLAT AND WILL HOLD WATER YOU NEED TO HAVE POSITIVE FLOW FROM THE REAR TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ____________________________________________________________________________________________________________________ 4/2/2025 - PREVIOUS INSPECTION NOTES ** 04/02/24 Chapter 4, R401.3- DRAINAGE FROM THE STRUCTURE IS TO BE 5 INCHES (5%) MINIMUM SLOPE FOR THE FIRST 10 FT (E) ** YOUR FINAL SURVEY SHOWS YOUR WATER FLOWING TO THE ADJACENT PROPERTY IN THE REAR ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/02/2025 Disapproved - NO FEE EMADISON
Note: ** 04/02/24 Chapter 4, R401.3- DRAINAGE FROM THE STRUCTURE IS TO BE 5 INCHES (5%) MINIMUM SLOPE FOR THE FIRST 10 FT (E) ** YOUR FINAL SURVEY SHOWS YOUR WATER FLOWING TO THE ADJACENT PROPERTY IN THE REAR ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16
ELECTRIC - EARLY POWER 03/17/2025 APPROVED - AS NOTED BTAYLOR
Note: 3-17-25 1. Emailed FPL at 9:55. New inspection due to canceled inspection Inspector Notes from Inspection 2200 1-22-25 1. Emailed FPL at 9:19. 1/17/2025 - PREVIOUS INSPECTION NOTES 1-17-25 1. Breakers not labled.
ELECTRIC - EARLY POWER 03/14/2025 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2200 1-22-25 1. Emailed FPL at 9:19. 1/17/2025 - PREVIOUS INSPECTION NOTES 1-17-25 1. Breakers not labled.
U-CROSS CONNECTION 03/14/2025 Disapproved -FEE REQUIRED LFITZGERALD
Note: irrigation not yet installed
ROW- PRE-APRON (PRE-POUR) 03/10/2025 APPROVED FSLADISH
Note: 3/10/25 . BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 3/6/2025 - PREVIOUS INSPECTION NOTES ** 03/06/25 CANCELLED ON SITE BY CM NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE ABOVE THE ROW NEEDTO HAVE A MINIMUM OF 6 INHES OF CONCRETE IN THE APRON AND THE SIDEWALK THAT CROSSES THOUGH THE APRON ** MATERIAL NEEDS COMPACTION ** WIND IN BLOWING SEDIMENT INTO POUR AREA _______________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 CANCELLED INSPECTION AS A COURTESY LET CM KNOW NEED TO MAKE SURE THERE IS A MINIMUM OF 6" OF CONCRETE IN ROW, 4" ABOVE ROW AND MATERIAL IS COMPACTED TO COPC STANDARD.
ROW- PRE-APRON (PRE-POUR) 03/06/2025 CANCELLED BY APPLICANT EMADISON
Note: ** 03/06/25 CANCELLED ON SITE BY CM NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE ABOVE THE ROW NEEDTO HAVE A MINIMUM OF 6 INHES OF CONCRETE IN THE APRON AND THE SIDEWALK THAT CROSSES THOUGH THE APRON ** MATERIAL NEEDS COMPACTION ** WIND IN BLOWING SEDIMENT INTO POUR AREA _______________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 CANCELLED INSPECTION AS A COURTESY LET CM KNOW NEED TO MAKE SURE THERE IS A MINIMUM OF 6" OF CONCRETE IN ROW, 4" ABOVE ROW AND MATERIAL IS COMPACTED TO COPC STANDARD.
ROW- PRE-APRON (PRE-POUR) 03/05/2025 CANCELLED BY APPLICANT FSLADISH
Note: 3/5/25 CANCELLED INSPECTION AS A COURTESY LET CM KNOW NEED TO MAKE SURE THERE IS A MINIMUM OF 6" OF CONCRETE IN ROW, 4" ABOVE ROW AND MATERIAL IS COMPACTED TO COPC STANDARD.
INSULATION 02/06/2025 APPROVED BTAYLOR
Note: 2/4/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1-30-25 1. No 5' head pressure.
GRAVITY SEWER TEST 02/05/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 02/05/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 02/04/2025 CANCELLED BY APPLICANT BTAYLOR
Note: Inspector Notes from Inspection 2420 1-30-25 1. No 5' head pressure.
ALL ROUGH 01/30/2025 APPROVED - AS NOTED BTAYLOR
Note: 1-30-25 1. No 5' head pressure.
ROOF VALLEY & METAL 01/22/2025 APPROVED BTAYLOR
Note: 1/8/2025 - PREVIOUS INSPECTION NOTES
LATH/BRICK/ WATER BARRIER 01/22/2025 APPROVED BTAYLOR
ELECTRIC-TUG 01/22/2025 APPROVED - AS NOTED BTAYLOR
Note: 1-22-25 1. Emailed FPL at 9:19. 1/17/2025 - PREVIOUS INSPECTION NOTES 1-17-25 1. Breakers not labled.
ELECTRIC-TUG 01/17/2025 Disapproved - NO FEE BTAYLOR
Note: 1-17-25 1. Breakers not labled.
WALL SHEATHING 01/08/2025 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/08/2025 APPROVED - AS NOTED BTAYLOR
Note: 1-8-25 1. Need engineering letter for rear beam missing hanger on top of post.
ROOF VALLEY & METAL 01/08/2025 CANCELLED BY APPLICANT BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 01/07/2025 APPROVED TBAKER
MONOLITHIC SLAB 12/13/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 12/10/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 12/09/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 03/25/2025 03/27/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 03/17/2025 03/17/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME TO ENEREGY CALCS.PDF
MECH COMPLETE 03/17/2025 03/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/02/2025 01/07/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/02/2025 01/02/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BADMIN COMPLETE 11/12/2024 11/19/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 11/12/2024 11/19/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 11/12/2024 11/13/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/12/2024 11/18/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/12/2024 11/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/12/2024 11/18/2024
LOCATE COMPLETE 11/12/2024 11/15/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 11/12/2024 11/18/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 11/12/2024 11/12/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ZON COMPLETE 11/12/2024 11/13/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 11/12/2024 11/18/2024
Note: Released By: MATTHEW SIERRA - -

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/16/2025
SURCHARGE FS 533.721 ¤14.53 11/25/2024
SURCHARGE - FS 468.631 ¤21.80 11/25/2024
SW ENG - FOUNDATION SURVEY ¤20.00 11/25/2024
SW ENG INSPECTION 80 ¤80.00 11/25/2024
SW ENG PRE APRON ¤30.00 11/25/2024
SW ENG - REVIEW 20 ¤20.00 11/25/2024
SW ENG RES REVIEW 200 ¤200.00 11/25/2024
SEWER INSPECTION ¤25.00 11/25/2024
SEWER CAPITAL FACILITY ¤3,129.62 11/25/2024
WATER CAPITAL FACILITY FEE ¤2,745.73 11/25/2024
SITE PLAN 30 ¤30.00 11/25/2024
WATER-METER ¤514.49 11/25/2024
WATER-METER ¤514.49 11/25/2024
WATER- TURN ON ¤25.00 11/25/2024
ADJUSTMENT 10% (¤161.50) 11/25/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/25/2024
INSPECTION - RESIDENTIAL ¤1,234.75 11/25/2024
PLAN REVIEW - RESIDENTIAL ¤350.22 11/25/2024
CONNECTION FEES ¤25.00 11/25/2024
FC IMPACT FEE EMS ¤62.00 11/25/2024
IMPACT FEE FIRE ¤434.51 11/25/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/25/2024
FC IMPACT FEE LIBRARY ¤268.00 11/25/2024
IMPACT FEE PARKS ¤1,828.01 11/25/2024
IMPACT FEE TRANSPORTATION ¤3,404.00 11/25/2024
WATER -IRRIGATION INSPECTION ¤25.00 11/25/2024
Fees Total Due: ¤0.00 Total Paid: ¤15,128.65