I want to search for...
Permit #2024110444
Permit Details
Status: COED
| Parcel Id: 03-12-31-1125-00000-0580 |
| CONDITIONED SPACE: 2394 sqft |
| GARAGE: 502 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| OPENED PORCH (WITH ROOF) : 176 sqft |
| Total Square Footage: 3124 sqft |
| Subdivision: 1125 - MC QUEENS PARK |
| Job Phone: 813-917-1689 |
| Location Address: 14 GEOSAM DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/25/2024 |
| NOC: RECORDED |
| Applicant name: SCOTT EVAN KEUNING |
| Owner: TAYLOR MORRISON OF FLORIDA INC |
|
Address 1275 W GRANADA BLVD ORMOND BEACH, FL 32174 |
|
Address SUITE 3B ORMOND BEACH, FL 32174 |
| Lot: 58 |
| Contracted Stated Job Value: ¤183,103.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
TAYLOR MORRISON OF FLORIDA INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7785 BAY MEADOWS WAY, SUITE 105 JACKSONVILLE, FL 32256 |
CBC1265083 (Exp: 08/31/2026) | 813-917-1689 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
BENJAMIN MICHAEL RAY
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
6310 MABLETON PKWY JACKSONVILLE, FL 32216 |
SUITE 1000 MABLETON, GA 30126 |
CFC1428415 (Exp: 08/31/2026) | 904-861-5421 | 904-861-5426 |
CHASE RANDOLPH MASSEY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10048 103RD ST JACKSONVILLE, FL 32210 |
CCC1332486 (Exp: 08/31/2026) | 904-248-1133 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/21/2025 | APPROVED | PFLANAGAN |
| Note: FINAL SURVEY MEETS STANDARDS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/21/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - STORMWATER FINAL | 04/21/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PASSING AS NOTED THAT I TALK TO CM AND HE IS GOING FIX THE SILT SO IT UP TO THE SOD ON THE LOT | |||
| U -UTILITY RESIDENTIAL FINAL | 04/21/2025 | FINAL APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9035 3/14/2025 - PREVIOUS INSPECTION NOTES irrigation not yet installed IRR with potable using DC. No CC | |||
| ROW - FINAL APRON (AFTER POUR) | 04/21/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| BLD - BUILDING FINAL | 04/16/2025 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 04/16/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: 3/14/2025 - PREVIOUS INSPECTION NOTES irrigation not yet installed IRR with potable using DC. No CC | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/15/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/15/25 YOUR ENTIRE REAR YARD AREA IS FLAT AND WILL HOLD WATER YOU NEED TO HAVE POSITIVE FLOW FROM THE REAR TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ____________________________________________________________________________________________________________________ 4/2/2025 - PREVIOUS INSPECTION NOTES ** 04/02/24 Chapter 4, R401.3- DRAINAGE FROM THE STRUCTURE IS TO BE 5 INCHES (5%) MINIMUM SLOPE FOR THE FIRST 10 FT (E) ** YOUR FINAL SURVEY SHOWS YOUR WATER FLOWING TO THE ADJACENT PROPERTY IN THE REAR ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/02/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 04/02/24 Chapter 4, R401.3- DRAINAGE FROM THE STRUCTURE IS TO BE 5 INCHES (5%) MINIMUM SLOPE FOR THE FIRST 10 FT (E) ** YOUR FINAL SURVEY SHOWS YOUR WATER FLOWING TO THE ADJACENT PROPERTY IN THE REAR ** 6) Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.Section 300.01 C(6) V-16 | |||
| ELECTRIC - EARLY POWER | 03/17/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-17-25 1. Emailed FPL at 9:55. New inspection due to canceled inspection Inspector Notes from Inspection 2200 1-22-25 1. Emailed FPL at 9:19. 1/17/2025 - PREVIOUS INSPECTION NOTES 1-17-25 1. Breakers not labled. | |||
| ELECTRIC - EARLY POWER | 03/14/2025 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2200 1-22-25 1. Emailed FPL at 9:19. 1/17/2025 - PREVIOUS INSPECTION NOTES 1-17-25 1. Breakers not labled. | |||
| U-CROSS CONNECTION | 03/14/2025 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: irrigation not yet installed | |||
| ROW- PRE-APRON (PRE-POUR) | 03/10/2025 | APPROVED | FSLADISH |
| Note: 3/10/25 . BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 3/6/2025 - PREVIOUS INSPECTION NOTES ** 03/06/25 CANCELLED ON SITE BY CM NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE ABOVE THE ROW NEEDTO HAVE A MINIMUM OF 6 INHES OF CONCRETE IN THE APRON AND THE SIDEWALK THAT CROSSES THOUGH THE APRON ** MATERIAL NEEDS COMPACTION ** WIND IN BLOWING SEDIMENT INTO POUR AREA _______________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 CANCELLED INSPECTION AS A COURTESY LET CM KNOW NEED TO MAKE SURE THERE IS A MINIMUM OF 6" OF CONCRETE IN ROW, 4" ABOVE ROW AND MATERIAL IS COMPACTED TO COPC STANDARD. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/06/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 03/06/25 CANCELLED ON SITE BY CM NEED TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE ABOVE THE ROW NEEDTO HAVE A MINIMUM OF 6 INHES OF CONCRETE IN THE APRON AND THE SIDEWALK THAT CROSSES THOUGH THE APRON ** MATERIAL NEEDS COMPACTION ** WIND IN BLOWING SEDIMENT INTO POUR AREA _______________________________________________________________________________________________________________________ 3/5/2025 - PREVIOUS INSPECTION NOTES 3/5/25 CANCELLED INSPECTION AS A COURTESY LET CM KNOW NEED TO MAKE SURE THERE IS A MINIMUM OF 6" OF CONCRETE IN ROW, 4" ABOVE ROW AND MATERIAL IS COMPACTED TO COPC STANDARD. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/05/2025 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 3/5/25 CANCELLED INSPECTION AS A COURTESY LET CM KNOW NEED TO MAKE SURE THERE IS A MINIMUM OF 6" OF CONCRETE IN ROW, 4" ABOVE ROW AND MATERIAL IS COMPACTED TO COPC STANDARD. | |||
| INSULATION | 02/06/2025 | APPROVED | BTAYLOR |
| Note: 2/4/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 1-30-25 1. No 5' head pressure. | |||
| GRAVITY SEWER TEST | 02/05/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 02/05/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 02/04/2025 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 1-30-25 1. No 5' head pressure. | |||
| ALL ROUGH | 01/30/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 1-30-25 1. No 5' head pressure. | |||
| ROOF VALLEY & METAL | 01/22/2025 | APPROVED | BTAYLOR |
| Note: 1/8/2025 - PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 01/22/2025 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 01/22/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 1-22-25 1. Emailed FPL at 9:19. 1/17/2025 - PREVIOUS INSPECTION NOTES 1-17-25 1. Breakers not labled. | |||
| ELECTRIC-TUG | 01/17/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-17-25 1. Breakers not labled. | |||
| WALL SHEATHING | 01/08/2025 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/08/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 1-8-25 1. Need engineering letter for rear beam missing hanger on top of post. | |||
| ROOF VALLEY & METAL | 01/08/2025 | CANCELLED BY APPLICANT | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 01/07/2025 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/13/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/10/2024 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/09/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/25/2025 | 03/27/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/17/2025 | 03/17/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME TO ENEREGY CALCS.PDF | |||
| MECH | COMPLETE | 03/17/2025 | 03/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/02/2025 | 01/07/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/02/2025 | 01/02/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 11/12/2024 | 11/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/12/2024 | 11/19/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 11/12/2024 | 11/13/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/12/2024 | 11/18/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/12/2024 | 11/12/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/12/2024 | 11/18/2024 |
| LOCATE | COMPLETE | 11/12/2024 | 11/15/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/12/2024 | 11/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/12/2024 | 11/12/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/12/2024 | 11/13/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 11/12/2024 | 11/18/2024 |
| Note: Released By: MATTHEW SIERRA - - |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/16/2025 |
| SURCHARGE FS 533.721 | ¤14.53 | 11/25/2024 |
| SURCHARGE - FS 468.631 | ¤21.80 | 11/25/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/25/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/25/2024 |
| SW ENG PRE APRON | ¤30.00 | 11/25/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/25/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/25/2024 |
| SEWER INSPECTION | ¤25.00 | 11/25/2024 |
| SEWER CAPITAL FACILITY | ¤3,129.62 | 11/25/2024 |
| WATER CAPITAL FACILITY FEE | ¤2,745.73 | 11/25/2024 |
| SITE PLAN 30 | ¤30.00 | 11/25/2024 |
| WATER-METER | ¤514.49 | 11/25/2024 |
| WATER-METER | ¤514.49 | 11/25/2024 |
| WATER- TURN ON | ¤25.00 | 11/25/2024 |
| ADJUSTMENT 10% | (¤161.50) | 11/25/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/25/2024 |
| INSPECTION - RESIDENTIAL | ¤1,234.75 | 11/25/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤350.22 | 11/25/2024 |
| CONNECTION FEES | ¤25.00 | 11/25/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 11/25/2024 |
| IMPACT FEE FIRE | ¤434.51 | 11/25/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/25/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/25/2024 |
| IMPACT FEE PARKS | ¤1,828.01 | 11/25/2024 |
| IMPACT FEE TRANSPORTATION | ¤3,404.00 | 11/25/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/25/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,128.65 |