Permit #2024110518

Permit Details

Status: COED

Parcel Id: 07-11-31-7010-00030-0270
GARAGE: 713 sqft
CONDITIONED SPACE: 1810 sqft
PATIO/DECK (NO ROOF) : 136 sqft
OPENED PORCH (WITH ROOF) : 123 sqft
Total Square Footage: 2782 sqft
Block: 00030
Subdivision: -
Job Phone: 904-888-6443
Location Address: 14 FERNGATE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/05/2024
NOC: RECORDED
Applicant name: AMIR BENTOV
Owner: 3DRE LLC

Address

2800 N 6TH ST

ST AUGUSTINE, FL 32084

Address

790

ST AUGUSTINE, FL 32084

Lot: 0270
Contracted Stated Job Value: ¤280,000.00
Job Description: Residential
Type: CN

Contractor

MAVEN HOMES LLC
Status Location Address State License Number Phone
ACTIVE

2800 N 6TH ST UNIT 790

,

CRC1333741 (Exp: 08/31/2026) 904-667-4330

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/30/2026 Approval - Private Provider PPROVIDER
Note: 3/11/2026 3:17:27 PM- PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 03/30/2026 PARTIALLY APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No IRR, No CC
U -UTILITY RESIDENTIAL FINAL 03/30/2026 FINAL APPROVED BWRIGHT
Note: 3/30/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 No IRR, No CC
BLD - BUILDING FINAL 03/10/2026 Disapproved- Private Provider PPROVIDER
ELECTRIC - EARLY POWER 02/11/2026 Approval - Private Provider PPROVIDER
ROW - STORMWATER FINAL 12/26/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 12/9/2025 - PREVIOUS INSPECTION NOTES ** 12/09/25 RIGHT SIDE AT REAR CORNER OF STRUCTURE ALONG PROPERTY LINE YOUR DRAINAGE IS INCONSISTANT AND IS HOLDING WATER ** RIGHT SIDE ROAD SIDE SWALE IS FLOW IS INCONSISTANT WILL HOLD WATER ALSO CENTER OF SWALE NEEDS TO BE RE-ESTABLISHED AND SHOULD BE 8 FT FROM EDGE OF ROAD TO THE CENTER. ** VACANT LOT NEED TO CUT IN SOD TO MATCH EXISTING GRADE __________________________________________________________________________________________________________________________ 11/18/2025 - PREVIOUS INSPECTION NOTES 11-18-25 TPOLACEK*** ENTIRE CULVERT MUST BE FREE AND CLEAR OF SEDIMENT FROM END TO END. RIGHT SIDE FROM BACK CORNER OF STRUCTURE DRAINAGE CONVEYANCE IS HOLDING WATER AND SHOULD BE GRADED TO ALLOW WATER TO FLOW TO FRONT SWALE. THERE IS PLENTY OF ELEVATION TO ACHIEVE THIS. IN FRONT SWALE ON RIGHT SIDE, SWALE SHOULD MATCH GRADE AT PROPERTY LINE AND BE GRADED TO ALLOW DRAINAGE TO FLOW AS REQUIRED. THERE ARE SEVERAL RUTS THAT WILL TRAP DRAINAGE FROM WHERE MACHINE MADE ENTRY. PLEASE MAKE ALL CORRECTIONS BEFORE REQUESTING STORMWATER FINAL ROW INSPECTION Inspector Notes from Inspection 9465 ** 10/20/25 BEFORE THE ROW STORMWATER FINAL YOU ARE REQUIRED TO CLEAN ENTIRE CULVERT PIPE OF ALL SEDIMENT ** YOU ALSO ARE REQUIRED TO CUT GRASS BEFORE ROW STORMWATER FINAL SO THE INSPECTOR CAN BETTER IDENTIFY ALL DRAINAGE FEATURES ** ENSURE ALL TRASH AND CONSTRUCTION DEBRIS IS REMOVED FROM VACANT LOT AND SEED AND STRAW ALL BARE EARTH AREAS
ROW - STORMWATER FINAL 12/09/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/09/25 RIGHT SIDE AT REAR CORNER OF STRUCTURE ALONG PROPERTY LINE YOUR DRAINAGE IS INCONSISTANT AND IS HOLDING WATER ** RIGHT SIDE ROAD SIDE SWALE IS FLOW IS INCONSISTANT WILL HOLD WATER ALSO CENTER OF SWALE NEEDS TO BE RE-ESTABLISHED AND SHOULD BE 8 FT FROM EDGE OF ROAD TO THE CENTER. ** VACANT LOT NEED TO CUT IN SOD TO MATCH EXISTING GRADE __________________________________________________________________________________________________________________________ 11/18/2025 - PREVIOUS INSPECTION NOTES 11-18-25 TPOLACEK*** ENTIRE CULVERT MUST BE FREE AND CLEAR OF SEDIMENT FROM END TO END. RIGHT SIDE FROM BACK CORNER OF STRUCTURE DRAINAGE CONVEYANCE IS HOLDING WATER AND SHOULD BE GRADED TO ALLOW WATER TO FLOW TO FRONT SWALE. THERE IS PLENTY OF ELEVATION TO ACHIEVE THIS. IN FRONT SWALE ON RIGHT SIDE, SWALE SHOULD MATCH GRADE AT PROPERTY LINE AND BE GRADED TO ALLOW DRAINAGE TO FLOW AS REQUIRED. THERE ARE SEVERAL RUTS THAT WILL TRAP DRAINAGE FROM WHERE MACHINE MADE ENTRY. PLEASE MAKE ALL CORRECTIONS BEFORE REQUESTING STORMWATER FINAL ROW INSPECTION Inspector Notes from Inspection 9465 ** 10/20/25 BEFORE THE ROW STORMWATER FINAL YOU ARE REQUIRED TO CLEAN ENTIRE CULVERT PIPE OF ALL SEDIMENT ** YOU ALSO ARE REQUIRED TO CUT GRASS BEFORE ROW STORMWATER FINAL SO THE INSPECTOR CAN BETTER IDENTIFY ALL DRAINAGE FEATURES ** ENSURE ALL TRASH AND CONSTRUCTION DEBRIS IS REMOVED FROM VACANT LOT AND SEED AND STRAW ALL BARE EARTH AREAS
ROW - STORMWATER FINAL 11/18/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 11-18-25 TPOLACEK*** ENTIRE CULVERT MUST BE FREE AND CLEAR OF SEDIMENT FROM END TO END. RIGHT SIDE FROM BACK CORNER OF STRUCTURE DRAINAGE CONVEYANCE IS HOLDING WATER AND SHOULD BE GRADED TO ALLOW WATER TO FLOW TO FRONT SWALE. THERE IS PLENTY OF ELEVATION TO ACHIEVE THIS. IN FRONT SWALE ON RIGHT SIDE, SWALE SHOULD MATCH GRADE AT PROPERTY LINE AND BE GRADED TO ALLOW DRAINAGE TO FLOW AS REQUIRED. THERE ARE SEVERAL RUTS THAT WILL TRAP DRAINAGE FROM WHERE MACHINE MADE ENTRY. PLEASE MAKE ALL CORRECTIONS BEFORE REQUESTING STORMWATER FINAL ROW INSPECTION Inspector Notes from Inspection 9465 ** 10/20/25 BEFORE THE ROW STORMWATER FINAL YOU ARE REQUIRED TO CLEAN ENTIRE CULVERT PIPE OF ALL SEDIMENT ** YOU ALSO ARE REQUIRED TO CUT GRASS BEFORE ROW STORMWATER FINAL SO THE INSPECTOR CAN BETTER IDENTIFY ALL DRAINAGE FEATURES ** ENSURE ALL TRASH AND CONSTRUCTION DEBRIS IS REMOVED FROM VACANT LOT AND SEED AND STRAW ALL BARE EARTH AREAS
ROW - FINAL APRON (AFTER POUR) 11/18/2025 APPROVED - AS NOTED TPOLACEK
Note: 11-18-25 TPOLACEK*** APPROVING AFTER POUR AS NOTED, CULVERT IS STILL 1/2 FULL OF SEDIMENT AND MUST BE CLEANED END TO END, INSPECTOR WILL ADD THIS TO THE FINAL ROW INSPECTION RESULTS. Inspector Notes from Inspection 9465 ** 10/20/25 BEFORE THE ROW STORMWATER FINAL YOU ARE REQUIRED TO CLEAN ENTIRE CULVERT PIPE OF ALL SEDIMENT ** YOU ALSO ARE REQUIRED TO CUT GRASS BEFORE ROW STORMWATER FINAL SO THE INSPECTOR CAN BETTER IDENTIFY ALL DRAINAGE FEATURES ** ENSURE ALL TRASH AND CONSTRUCTION DEBRIS IS REMOVED FROM VACANT LOT AND SEED AND STRAW ALL BARE EARTH AREAS
ROW FIELD SURVEY /GRADING CERTIFICATION 10/20/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/20/25 BEFORE THE ROW STORMWATER FINAL YOU ARE REQUIRED TO CLEAN ENTIRE CULVERT PIPE OF ALL SEDIMENT ** YOU ALSO ARE REQUIRED TO CUT GRASS BEFORE ROW STORMWATER FINAL SO THE INSPECTOR CAN BETTER IDENTIFY ALL DRAINAGE FEATURES ** ENSURE ALL TRASH AND CONSTRUCTION DEBRIS IS REMOVED FROM VACANT LOT AND SEED AND STRAW ALL BARE EARTH AREAS
ROW FIELD SURVEY /GRADING CERTIFICATION 09/30/2025 CANCELLED BY APPLICANT EMADISON
Note: ** 09/30/25 CANCELLED ON SITE BY CONSTRUCTION MANAGER ____________________________________________________________________________________________________________ 9/23/2025 - PREVIOUS INSPECTION NOTES ** 09/23/25 RIGHT REAR CORNER OFF REAR PATIO AND DOWN ENTIRE RIGHT SIDE HOLDING WATER NEED TO HAVE POSITIVE FALL OF WATER FROM THE REAR TO THE FRONT YOUR DRAINAGE CONVEYANCE HAS INCONSISTANT FLOW. ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** ROAD SIDE SWALE RIGHT FRONT HAS LOW AREA NEED TO ALSO HAVE POSITIVE FALL FROM LEFT TO RIGHT
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/23/2025 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 09/23/2025 Disapproved - NO FEE EMADISON
Note: ** 09/23/25 RIGHT REAR CORNER OFF REAR PATIO AND DOWN ENTIRE RIGHT SIDE HOLDING WATER NEED TO HAVE POSITIVE FALL OF WATER FROM THE REAR TO THE FRONT YOUR DRAINAGE CONVEYANCE HAS INCONSISTANT FLOW. ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** ROAD SIDE SWALE RIGHT FRONT HAS LOW AREA NEED TO ALSO HAVE POSITIVE FALL FROM LEFT TO RIGHT
U-CROSS CONNECTION 09/23/2025 APPROVED - AS NOTED BWRIGHT
Note: No IRR, No CC
ROW- PRE-APRON (PRE-POUR) 07/15/2025 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection.
GRAVITY SEWER TEST 07/01/2025 Approval - Private Provider PPROVIDER
SEWER TIE IN 07/01/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 06/20/2025 Approval - Private Provider PPROVIDER
INSULATION 06/10/2025 Approval - Private Provider PPROVIDER
Note: 6/5/2025 4:34:42 PM- PREVIOUS INSPECTION NOTES
INSULATION 06/05/2025 Disapproved- Private Provider PPROVIDER
ALL ROUGH 05/28/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 03/19/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/19/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 03/19/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 02/04/2025 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 02/04/2025 APPROVED RRICKS
TIE BEAM / LINTEL 02/03/2025 CANCELLED BY APPLICANT WEB
TIE BEAM / LINTEL 01/31/2025 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 01/24/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 01/22/2025 CANCELLED BY APPLICANT WEB
ROW - DRAINAGE 01/22/2025 APPROVED - AS NOTED EMADISON
Note: ** CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 1/15/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE PORTER JOHN FROM THE RIGHT OF WAY AND PLACE IT ON YOUR LOT. 2) NEED TO INSTALL A SILT FENCE AROUND LOT. 3) NEED TO KEEP TEMP. CULVERT OPEN AT ALL TIMES DURING CONSTRUCTION SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
PLUMBING 1ST ROUGH UNDERGROUND 01/21/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 01/15/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO REMOVE PORTER JOHN FROM THE RIGHT OF WAY AND PLACE IT ON YOUR LOT. 2) NEED TO INSTALL A SILT FENCE AROUND LOT. 3) NEED TO KEEP TEMP. CULVERT OPEN AT ALL TIMES DURING CONSTRUCTION SO WATER CAN FLOW TO OUTFALL. YOU WILL HAVE 7DAYS TO CORRECT ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 12/31/2024 APPROVED JMUNSON
WATER METER INSTALLATION REQUEST 12/11/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 11/20/2024 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/30/2025 02/04/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 01/30/2025 01/30/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 12/20/2024 12/31/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 11/20/2024 11/20/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLENV COMPLETE 11/20/2024 11/20/2024
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Attached letter from the QEP meets city requirements for compliance With 10.04.01 of the LDC. If any Gopher Tortoises or their burrows are found in the future, further coordination may be needed.
MECH COMPLETE 11/20/2024 11/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/20/2024 11/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 11/12/2024 11/19/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 11/12/2024 11/19/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or truss layout need shop drawing approval stamp by EOR 2. Geo Tech needs to be digitally signed and sealed.
CUSVC COMPLETE 11/12/2024 11/15/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/12/2024 11/18/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/12/2024 11/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/12/2024 11/18/2024
LOCATE COMPLETE 11/12/2024 11/14/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 11/12/2024 11/18/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM State Card needs to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 COMPLETE 11/12/2024 11/13/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 11/12/2024 11/13/2024
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House layout and ac location does not match on landscape plan
PLENV HOLD 11/12/2024 11/14/2024
Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 11/14/24 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
SWALE COMPLETE 11/12/2024 12/12/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 03/30/2026
SW ENG - INSPECTION 20 ¤20.00 03/30/2026
RSI REINSPECTION 1 ¤35.00 03/30/2026
RSI REINSPECTION 1 ¤35.00 03/30/2026
SURCHARGE FS 533.721 ¤5.09 12/05/2024
SURCHARGE - FS 468.631 ¤7.64 12/05/2024
SW ENG - FOUNDATION SURVEY ¤20.00 12/05/2024
SW ENG INSPECTION 80 ¤80.00 12/05/2024
SW ENG PRE APRON ¤30.00 12/05/2024
SW ENG - REVIEW 20 ¤20.00 12/05/2024
SW ENG RES REVIEW 200 ¤200.00 12/05/2024
SEWER CREDIT (¤3,042.43) 12/05/2024
SEWER INSPECTION ¤25.00 12/05/2024
SEWER CAPITAL FACILITY ¤6,120.52 12/05/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 12/05/2024
SITE PLAN 30 ¤30.00 12/05/2024
WATER- TURN ON ¤25.00 12/05/2024
ADJUSTMENT 10% (¤31.55) 12/05/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/05/2024
ADMINISTRATIVE - RESID PP ¤225.00 12/05/2024
PLAN REVIEW - RESIDENTIAL ¤285.48 12/05/2024
CONNECTION FEES ¤1,187.26 12/05/2024
FC IMPACT FEE EMS ¤62.00 12/05/2024
IMPACT FEE FIRE ¤434.51 12/05/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/05/2024
FC IMPACT FEE LIBRARY ¤268.00 12/05/2024
IMPACT FEE PARKS ¤1,828.01 12/05/2024
IMPACT FEE SCHOOL ¤5,450.00 12/05/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 12/05/2024
WATER -IRRIGATION INSPECTION ¤25.00 12/05/2024
Fees Total Due: ¤0.00 Total Paid: ¤19,825.67