Permit #2024110527

Permit Details

Status: COED

Parcel Id: 07-11-31-7011-00100-0170
CONDITIONED SPACE: 1810 sqft
GARAGE: 713 sqft
PATIO/DECK (NO ROOF) : 136 sqft
PATIO/DECK (NO ROOF) : 123 sqft
Total Square Footage: 2782 sqft
Block: 00100
Subdivision: -
Job Phone: 904-888-6443
Location Address: 70 BENNETT LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/19/2025
NOC: RECORDED
Applicant name: AMIR BENTOV
Owner: PCRE6 LLC

Address

2800 N 6TH STREET

SAINT AUGUSTINE, FL 32084

Address

UNIT 790

SAINT AUGUSTINE, FL 32084

Lot: 0170
Contracted Stated Job Value: ¤270,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MAVEN HOMES LLC
Status Location Address State License Number Phone
ACTIVE

2800 N 6TH ST UNIT 790

,

CRC1333741 (Exp: 08/31/2026) 904-667-4330

Sub Contractors

OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/24/2026 Approval - Private Provider PPROVIDER
Note: 2/23/2026 1:29:47 PM- PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 02/24/2026 FINAL APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9035 No CC, No IRR.
BLD - BUILDING FINAL 02/20/2026 Disapproved- Private Provider PPROVIDER
ELECTRIC - EARLY POWER 01/28/2026 Approval - Private Provider PPROVIDER
Note: 1/27/2026 7:18:20 AM- PREVIOUS INSPECTION NOTES
ELECTRIC - EARLY POWER 01/26/2026 CANCELLED BY APPLICANT PPROVIDER
U-CROSS CONNECTION 12/02/2025 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR.
ROW - FINAL APRON (AFTER POUR) 12/02/2025 APPROVED EMADISON
Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW - STORMWATER FINAL 12/02/2025 APPROVED EMADISON
Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/24/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 11/24/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PRE-APRON (PRE-POUR) 10/24/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/24/25 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 10/03/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ____________________________________________________________________________________________________________________ 9/30/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP THE SWALE AND TEMP CULVERT SO WATER CAN FLOW CORRECTLY 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY. YOU WILL HAVE TILL FRIDAY TO CORRECT ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
SEWER TIE IN 10/16/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW - DRAINAGE 10/03/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/03/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY AND WATERWAYS ____________________________________________________________________________________________________________________ 9/30/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP THE SWALE AND TEMP CULVERT SO WATER CAN FLOW CORRECTLY 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY. YOU WILL HAVE TILL FRIDAY TO CORRECT ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 09/30/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO OPEN UP THE SWALE AND TEMP CULVERT SO WATER CAN FLOW CORRECTLY 2) NEED TO RE-ESTABLISH SILT FENCE AROUND THE PROPERTY. YOU WILL HAVE TILL FRIDAY TO CORRECT ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
GRAVITY SEWER TEST 09/03/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 08/07/2025 Approval - Private Provider PPROVIDER
INSULATION 07/28/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 07/16/2025 Approval - Private Provider PPROVIDER
Note: 7/14/2025 4:45:38 PM- PREVIOUS INSPECTION NOTES
ALL ROUGH 07/14/2025 CANCELLED BY APPLICANT PPROVIDER
WALL SHEATHING 05/02/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/02/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 05/02/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 03/27/2025 Approval - Private Provider PPROVIDER
Note: 3/26/2025 11:34:48 AM- PREVIOUS INSPECTION NOTES
TIE BEAM / LINTEL 03/26/2025 Disapproved- Private Provider PPROVIDER
TIE BEAM / LINTEL 03/25/2025 CANCELLED BY INSPECTOR PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 03/05/2025 APPROVED RRICKS
MONOLITHIC SLAB 02/27/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 02/21/2025 APPROVED PFLANAGAN
Note: CORRECTIONS MADE TO SITE IT IS YOUR RESPONSIBILITY TO CHECK ALL YOUR SEMIDENT CONTROL DEVICES EVERY 7 BUSINESS DAYS OR EVERY 1/2" OF RAIN THIS IS REQUIRED ----------------------------------------------------------------------------------- 2/19/2025 - PREVIOUS INSPECTION NOTES ** 02/19/25 BUILDER NEEDS TO RE-ESTABLISH SILT FENCE AROND SITEAS NOTED IN PREVIOUS INSPECTION IT'S THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF SITE ** FOLLOW UP INSPECTION ON 02/21/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 02/11/25 CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 2/4/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL A SILT FENCE AROUND LOT TO KEEP ALL DIRT AND SEDIMENT FROM LEAVING YOUR LOT. 2) NEED TO KEEP OPEN ROADSIDE SWALE AT ALL TIMES BY PUTTING IN A TEMP. CULVERT OR REMOVE ALL DIRT FROM THE SWALE AT ALL TIME DURING CONSTRUCTION. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 02/19/25 BUILDER NEEDS TO RE-ESTABLISH SILT FENCE AROND SITEAS NOTED IN PREVIOUS INSPECTION IT'S THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF SITE ** FOLLOW UP INSPECTION ON 02/21/25
ROW - DRAINAGE 02/19/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 02/19/25 BUILDER NEEDS TO RE-ESTABLISH SILT FENCE AROND SITEAS NOTED IN PREVIOUS INSPECTION IT'S THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF SITE ** FOLLOW UP INSPECTION ON 02/21/25 ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 02/11/25 CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 2/4/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL A SILT FENCE AROUND LOT TO KEEP ALL DIRT AND SEDIMENT FROM LEAVING YOUR LOT. 2) NEED TO KEEP OPEN ROADSIDE SWALE AT ALL TIMES BY PUTTING IN A TEMP. CULVERT OR REMOVE ALL DIRT FROM THE SWALE AT ALL TIME DURING CONSTRUCTION. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. ** 02/19/25 BUILDER NEEDS TO RE-ESTABLISH SILT FENCE AROND SITEAS NOTED IN PREVIOUS INSPECTION IT'S THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF SITE ** FOLLOW UP INSPECTION ON 02/21/25
PLUMBING 1ST ROUGH UNDERGROUND 02/18/2025 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 02/13/2025 APPROVED CPISCITELLI
ROW - DRAINAGE 02/11/2025 APPROVED - AS NOTED EMADISON
Note: ** 02/11/25 CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ________________________________________________________________________________________________________________________ 2/4/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO INSTALL A SILT FENCE AROUND LOT TO KEEP ALL DIRT AND SEDIMENT FROM LEAVING YOUR LOT. 2) NEED TO KEEP OPEN ROADSIDE SWALE AT ALL TIMES BY PUTTING IN A TEMP. CULVERT OR REMOVE ALL DIRT FROM THE SWALE AT ALL TIME DURING CONSTRUCTION. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
WATER METER INSTALLATION REQUEST 02/04/2025 APPROVED CBOWERMASTER
ROW - DRAINAGE 02/04/2025 Disapproved - NO FEE PFLANAGAN
Note: 1) NEED TO INSTALL A SILT FENCE AROUND LOT TO KEEP ALL DIRT AND SEDIMENT FROM LEAVING YOUR LOT. 2) NEED TO KEEP OPEN ROADSIDE SWALE AT ALL TIMES BY PUTTING IN A TEMP. CULVERT OR REMOVE ALL DIRT FROM THE SWALE AT ALL TIME DURING CONSTRUCTION. YOU WILL HAVE 7DAY TO FIX ALL ISSUES OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/05/2025 03/05/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/05/2025 03/05/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 02/11/2025 02/13/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 01/24/2025 01/24/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Noc is for the wrong address
BADMIN INFORMATION 01/24/2025 01/24/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM NOC needs to be recorded seperately. They are for two different addresses. this has been escalated to a supervisor please wait to resubmit.
BADMIN INFORMATION 01/23/2025 01/23/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM NOC needs to be recorded.
BADMIN INFORMATION 01/21/2025 01/21/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The NOC must be a recorded copy.
ZON COMPLETE 11/20/2024 11/20/2024
Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM
MECH COMPLETE 11/20/2024 11/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 11/20/2024 11/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 11/12/2024 11/19/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 11/12/2024 11/19/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet or truss layout need shop drawing approval stamp by EOR 2. Geo Tech needs to be digitally signed and sealed.
CUSVC COMPLETE 11/12/2024 11/15/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 11/12/2024 11/18/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/12/2024 11/12/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 11/12/2024 11/18/2024
LOCATE COMPLETE 11/12/2024 11/14/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 11/12/2024 11/18/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM State Card needs to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition
SW1 COMPLETE 11/12/2024 11/13/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any deviation from the approved site plan with significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON HOLD 11/12/2024 11/14/2024
Note: Held By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM A/C pad on the landscape plan does not match the Site Plan/Floor Plan
SWALE COMPLETE 11/12/2024 12/12/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 02/24/2026
SW ENG - INSPECTION 20 ¤20.00 02/24/2026
SW ENG - INSPECTION 20 ¤20.00 02/24/2026
SW ENG - INSPECTION 20 ¤20.00 02/24/2026
SW ENG - INSPECTION 20 ¤20.00 02/24/2026
SW ENG - INSPECTION 20 ¤20.00 02/24/2026
SW ENG INSPECTION 80 ¤80.00 01/19/2025
SW ENG PRE APRON ¤30.00 01/19/2025
SW ENG - REVIEW 20 ¤20.00 01/19/2025
SW ENG RES REVIEW 200 ¤200.00 01/19/2025
SEWER CREDIT (¤1,147.00) 01/19/2025
SEWER INSPECTION ¤25.00 01/19/2025
SEWER CAPITAL FACILITY ¤6,120.52 01/19/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 01/19/2025
SITE PLAN 30 ¤30.00 01/19/2025
WATER- TURN ON ¤25.00 01/19/2025
ADJUSTMENT 10% (¤31.55) 01/19/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/19/2025
ADMINISTRATIVE - RESID PP ¤225.00 01/19/2025
PLAN REVIEW - RESIDENTIAL ¤285.48 01/19/2025
CONNECTION FEES ¤1,187.26 01/19/2025
FC IMPACT FEE EMS ¤62.00 01/19/2025
IMPACT FEE FIRE ¤434.51 01/19/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/19/2025
FC IMPACT FEE LIBRARY ¤268.00 01/19/2025
IMPACT FEE PARKS ¤1,828.01 01/19/2025
IMPACT FEE SCHOOL ¤5,450.00 01/19/2025
IMPACT FEE TRANSPORTATION ¤1,862.00 01/19/2025
WATER -IRRIGATION INSPECTION ¤25.00 01/19/2025
SURCHARGE FS 533.721 ¤5.09 01/19/2025
SURCHARGE - FS 468.631 ¤7.64 01/19/2025
SW ENG - FOUNDATION SURVEY ¤20.00 01/19/2025
Fees Total Due: ¤0.00 Total Paid: ¤21,731.10