I want to search for...

Permit #2024110720

Permit Details

Status: FINAL

Parcel Id: 06-12-31-5815-00000-06B0
Block: 00000
Subdivision: 5815 -
Job Phone: 904-305-7055
Location Address: 15 MARKET AVE
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 01/06/2025
NOC: Unknown
Applicant name: TIMOTHY WAYNE YOUNG
Owner: GHM PROPERTY SOLUTIONS LLC

Address

8411 SOUTHSIDE BLVD

JACKSONVILLE, FL 32256

Address

SUITE 100

JACKSONVILLE, FL 32256

Lot: 06B0
Job Description: SITE WORK: THE LEARNING EXPERIENCE DAY CARE FACILITY
Type: CN

Contractor

TIM YOUNG CONSTRUCTION INC
Status Location Address State License Number Phone
ACTIVE

9310 OLD KINGS RDS SUITE 1702

,

CGC055192 (Exp: 08/31/2026) 904-305-7055

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 04/23/2026 APPROVED DRAMIREZ
CLOSE OUT DOCUMENTS 04/14/2026 APPROVED DRAMIREZ
U - UTILITY COMMERCIAL FINAL 04/14/2026 FINAL APPROVED LFITZGERALD
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/07/2026 APPROVED - AS NOTED LFITZGERALD
Note: 3/25/2026 2:02:55 PM- PREVIOUS INSPECTION NOTES 3/25/26 STRUCTURE A-4.1, A-5.1, A-5, AND THE EXISTING INLET THAT WAS CONNECTED TO NEED TO BE CLEANED. THE VACANT PROPERTY TO THE EAST NEEDS TO BE SEEDED AND THE ROW SODDED. PLEASE INFORM INSPECTOR WHEN THESE ITEMS HAVE BEEN COMPLETED. 2/17/2026 11:37:16 AM- PREVIOUS INSPECTION NOTES 2/17/26 EROSION CONTROL MEASURES HAVE BEEN RE-INSTALLED AND ROAD CLEANED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE SITE PER SWPPP. FOLLOW UP INSPECTION NEXT MONTH. 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/26 A STOP WORK ORDER HAS BEEN PLACED ON THIS PROPERTY UNTIL SILT FENCE IS RE-ESTABLISHED AND THE DIRT ON MARKET AVE HAS BEEN REMOVED. ONLY THE APPROVED ENTRACE SHALL BE UTILIZED. 2/12/2026 - PREVIOUS INSPECTION NOTES 2/12/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. SHALL BE RE-INSTALLED OR STOP WORK ORDER WILL BE PLACED ON SITE. FOLLOW UP INSPECTION FRIDAY 2/13/26. 2/10/2026 - PREVIOUS INSPECTION NOTES 2/10/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. FENCE SHALL BE RE-INSTALLED, FOLLOW UP INSPECTION WEDNESDAY 2/11/26. 2/4/2026 - PREVIOUS INSPECTION NOTES 2/4/26 SILT FENCE SHALL BE RE-INSTALLED PER SWPPP. FOLLOW UP INSPECTION FRIDAY 2/6/26. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH. all drainage structures that Jordan required now free of built up soils
FDEP WATERMAIN CLEARANCE 04/07/2026 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9245 3/25/2026 - PREVIOUS INSPECTION NOTES required to sod ROW/SEED STRAW REMAINING AREAS IN VACANT LOT NEXT DOOR all completed now
IRRIGATION AFFIDAVIT 04/07/2026 APPROVED RPICATAGI
Note: 3/25/2026 4:53:03 PM- PREVIOUS INSPECTION NOTES Irrigation Affidavit has not been received (uploaded to portal)
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 04/07/2026 APPROVED DRAMIREZ
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/07/2026 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9245 3/25/2026 - PREVIOUS INSPECTION NOTES required to sod ROW/SEED STRAW REMAINING AREAS IN VACANT LOT NEXT DOOR all completed now
U-ROW FINAL 04/01/2026 APPROVED - AS NOTED LFITZGERALD
Note: 3/25/2026 - PREVIOUS INSPECTION NOTES required to sod ROW/SEED STRAW REMAINING AREAS IN VACANT LOT NEXT DOOR all completed now
U-ROW FINAL 03/25/2026 PARTIALLY APPROVED LFITZGERALD
Note: required to sod ROW/SEED STRAW REMAINING AREAS IN VACANT LOT NEXT DOOR
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 03/25/2026 FINAL APPROVED LFITZGERALD
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/25/2026 PARTIALLY APPROVED JMYERS
Note: 3/25/26 STRUCTURE A-4.1, A-5.1, A-5, AND THE EXISTING INLET THAT WAS CONNECTED TO NEED TO BE CLEANED. THE VACANT PROPERTY TO THE EAST NEEDS TO BE SEEDED AND THE ROW SODDED. PLEASE INFORM INSPECTOR WHEN THESE ITEMS HAVE BEEN COMPLETED. 2/17/2026 11:37:16 AM- PREVIOUS INSPECTION NOTES 2/17/26 EROSION CONTROL MEASURES HAVE BEEN RE-INSTALLED AND ROAD CLEANED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE SITE PER SWPPP. FOLLOW UP INSPECTION NEXT MONTH. 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/26 A STOP WORK ORDER HAS BEEN PLACED ON THIS PROPERTY UNTIL SILT FENCE IS RE-ESTABLISHED AND THE DIRT ON MARKET AVE HAS BEEN REMOVED. ONLY THE APPROVED ENTRACE SHALL BE UTILIZED. 2/12/2026 - PREVIOUS INSPECTION NOTES 2/12/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. SHALL BE RE-INSTALLED OR STOP WORK ORDER WILL BE PLACED ON SITE. FOLLOW UP INSPECTION FRIDAY 2/13/26. 2/10/2026 - PREVIOUS INSPECTION NOTES 2/10/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. FENCE SHALL BE RE-INSTALLED, FOLLOW UP INSPECTION WEDNESDAY 2/11/26. 2/4/2026 - PREVIOUS INSPECTION NOTES 2/4/26 SILT FENCE SHALL BE RE-INSTALLED PER SWPPP. FOLLOW UP INSPECTION FRIDAY 2/6/26. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
UC-SUBSTANTIAL WALK-THRU 03/25/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9235 2/19/2026 - PREVIOUS INSPECTION NOTES perma-curb-Bob now on site installing D curb thoughout parking area all curb including piece work on market where asphalt patch was constructed storm ,paving, drainage walk thru-some drainage issues to be corrected and reinspected by Jordan/1 8inx8in area where needs asphalt over the exposed base-jay informed/vacant lot that was heavily used needs sod along ROW and seed/straw remaining areas
UC-FINAL SITE INSPECTION 03/25/2026 FINAL APPROVED LFITZGERALD
LANDSCAPE PRE-CONSTRUCTION MEETING 03/25/2026 APPROVED RPICATAGI
IRRIGATION AFFIDAVIT 03/25/2026 Disapproved - NO FEE RPICATAGI
Note: Irrigation Affidavit has not been received (uploaded to portal)
LDSC- LANDSCAPE FINAL 03/25/2026 FINAL APPROVED RPICATAGI
UC- PRELIMINARY AS-BUILTS 03/24/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9235 2/19/2026 - PREVIOUS INSPECTION NOTES perma-curb-Bob now on site installing D curb thoughout parking area all curb including piece work on market where asphalt patch was constructed as -blts required to be on approved construction plans-red lined-this format to be submitted to city portal/need to call out existing storm drain that site drainage tied into
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 03/23/2026 APPROVED RPICATAGI
Note: 3/13/2026 9:06:42 AM- PREVIOUS INSPECTION NOTES UNDERSIZED PLANTS: --------------------------------------------- 77 Walters Viburnum at north buffer line, many are undersized - check size and replace with larger plants to meet specified size as required 5 Bottlebrush trees specified at 8 feet ht., None reach 8 feet ht. Remove and replace with 8 feet ht bottlebrush trees 10 Dahoon Holly specified at 10 feet ht. All are undersized, remove and replace with10' ht Dahoon Hollies 51 VO- Fragrant Viburnum specified at 48" ht. at East Buffer/Frontage (alternate viburnum species was requested and approved) However, 51 Podocarpus (species not approved) were planted with only a portion (40-60%) reaching full specified ht. Undersized plants (less than 48" ht.,) shall be removed and replaced with full size (48" ht) plants of same species - contractor shall coordinate possible alternate species with city landscape architect ,to find available appropriate available nursery stock. 5 East Paltka Holly @ 12 feet ht. shown on approved plan at rear of site. 5 Cedar trees below 8 feet ht are planted. Contractor shall remove and replace with specified species and size. Un-screened above-ground structure that require screening per LCD Sec 11.03.01 H ------------------------------------------------------------------------------------------------------------------------------------------- Rear of dumpster enclosure needs to be screened Backflow Preventer apparatus needs to be screened Freestanding electric meter See Table 11-4 for MEDIUM SCREEN/ shrub size (30" ht. space at 4 feet max. in 7 gallon containers) MULCH DEFICIENCY - Per approved plans, 3" thick layer of mulch is required in all planting areas. I inspection shows only 1" thick layer. Contractor to add mulch to meet spec requirement throughout project regardless of small plant size in parking islands DOCUMENTS REQUIRED -------------------------------------------------------- Landscape As Built plan signed and sealed by FLLORIDA RLA Irrigation As Built plan signed and sealed by FLORIDA RLA Irrigation Affidavit signed and sealed by FLORIDA RLA OR CERTIFIED IRRIGATION PROFESSIONAL
LDSC-IRRIGATION FINAL 03/23/2026 CANCELLED BY APPLICANT WEB
LDSC-IRRIGATION FINAL 03/23/2026 APPROVED RPICATAGI
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 03/12/2026 Disapproved - NO FEE RPICATAGI
Note: UNDERSIZED PLANTS: --------------------------------------------- 77 Walters Viburnum at north buffer line, many are undersized - check size and replace with larger plants to meet specified size as required 5 Bottlebrush trees specified at 8 feet ht., None reach 8 feet ht. Remove and replace with 8 feet ht bottlebrush trees 10 Dahoon Holly specified at 10 feet ht. All are undersized, remove and replace with10' ht Dahoon Hollies 51 VO- Fragrant Viburnum specified at 48" ht. at East Buffer/Frontage (alternate viburnum species was requested and approved) However, 51 Podocarpus (species not approved) were planted with only a portion (40-60%) reaching full specified ht. Undersized plants (less than 48" ht.,) shall be removed and replaced with full size (48" ht) plants of same species - contractor shall coordinate possible alternate species with city landscape architect ,to find available appropriate available nursery stock. 5 East Paltka Holly @ 12 feet ht. shown on approved plan at rear of site. 5 Cedar trees below 8 feet ht are planted. Contractor shall remove and replace with specified species and size. Un-screened above-ground structure that require screening per LCD Sec 11.03.01 H ------------------------------------------------------------------------------------------------------------------------------------------- Rear of dumpster enclosure needs to be screened Backflow Preventer apparatus needs to be screened Freestanding electric meter See Table 11-4 for MEDIUM SCREEN/ shrub size (30" ht. space at 4 feet max. in 7 gallon containers) MULCH DEFICIENCY - Per approved plans, 3" thick layer of mulch is required in all planting areas. I inspection shows only 1" thick layer. Contractor to add mulch to meet spec requirement throughout project regardless of small plant size in parking islands DOCUMENTS REQUIRED -------------------------------------------------------- Landscape As Built plan signed and sealed by FLLORIDA RLA Irrigation As Built plan signed and sealed by FLORIDA RLA Irrigation Affidavit signed and sealed by FLORIDA RLA OR CERTIFIED IRRIGATION PROFESSIONAL
UC-MOT MAINTENANCE OF TRAFFIC 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: Flaging for lane closures on Market for thermo striping the asphalt patch
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 03/09/2026 APPROVED LFITZGERALD
Note: 1/8/2026 - PREVIOUS INSPECTION NOTES 1/7/2026 - PREVIOUS INSPECTION NOTES 12/1/2025 - PREVIOUS INSPECTION NOTES 11/18/2025 - PREVIOUS INSPECTION NOTES 11/12/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES compact soils in front sidewalk and 4in required from edge to edge-correct/remove cold conrete left over in side bldg sidewalk-all conrete should be fresh and consistent left and right sides now poured-front sidewalk satisfactory for concrete but still awaiting final engineering for ADA ramps east side parking from building corner southward now front sidewalk poured Sidewalk in ROW along Market Ave-half way from west property line 5FT wide along Market ROW last section middle to east property line/6ft connection to already placed sidewalk
UROW- CURBING & GUTTER 03/09/2026 APPROVED - AS NOTED LFITZGERALD
Note: 2/19/2026 - PREVIOUS INSPECTION NOTES perma-curb-Bob now on site installing D curb thoughout parking area all curb including piece work on market where asphalt patch was constructed
U - SEWER TIE IN 03/09/2026 APPROVED BWRIGHT
BLD- ADA PARKING 03/06/2026 APPROVED KSANDOE
BLD- ADA SIGNAGECONTROL 03/06/2026 APPROVED KSANDOE
BLD - ADA SIGNAGE- INFOR/DIRECT 03/06/2026 APPROVED KSANDOE
BLD - SITE LIGHTING-POLE SET/FIXTURE 02/19/2026 APPROVED RMARTIN
UC-CONSTRUCTION ENTRANCE 02/19/2026 APPROVED - AS NOTED LFITZGERALD
Note: 11/12/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES entrance now not adequate-needs refershing so soils don't get in access roadway-needs to be done next couple of days or possible project shut down until rectified new rock now installed now all is paved
UC-MOT MAINTENANCE OF TRAFFIC 02/19/2026 APPROVED LFITZGERALD
Note: flagging operation -Market -in order to repave 2 utility cuts
UC-ASPHALT PRE PLACEMENT 02/19/2026 APPROVED LFITZGERALD
Note: flagging operation on Market in order to pave over 2 patches on Market from 2 utility tie ins-top layered milled,tac coat applied with thickened edge at each end
UROW- CURBING & GUTTER 02/19/2026 PARTIALLY APPROVED LFITZGERALD
Note: perma-curb-Bob now on site installing D curb thoughout parking area
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/17/2026 PARTIALLY APPROVED JMYERS
Note: 2/17/26 EROSION CONTROL MEASURES HAVE BEEN RE-INSTALLED AND ROAD CLEANED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN THE SITE PER SWPPP. FOLLOW UP INSPECTION NEXT MONTH. 2/13/2026 - PREVIOUS INSPECTION NOTES 2/13/26 A STOP WORK ORDER HAS BEEN PLACED ON THIS PROPERTY UNTIL SILT FENCE IS RE-ESTABLISHED AND THE DIRT ON MARKET AVE HAS BEEN REMOVED. ONLY THE APPROVED ENTRACE SHALL BE UTILIZED. 2/12/2026 - PREVIOUS INSPECTION NOTES 2/12/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. SHALL BE RE-INSTALLED OR STOP WORK ORDER WILL BE PLACED ON SITE. FOLLOW UP INSPECTION FRIDAY 2/13/26. 2/10/2026 - PREVIOUS INSPECTION NOTES 2/10/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. FENCE SHALL BE RE-INSTALLED, FOLLOW UP INSPECTION WEDNESDAY 2/11/26. 2/4/2026 - PREVIOUS INSPECTION NOTES 2/4/26 SILT FENCE SHALL BE RE-INSTALLED PER SWPPP. FOLLOW UP INSPECTION FRIDAY 2/6/26. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/13/2026 Disapproved -FEE REQUIRED JMYERS
Note: 2/13/26 A STOP WORK ORDER HAS BEEN PLACED ON THIS PROPERTY UNTIL SILT FENCE IS RE-ESTABLISHED AND THE DIRT ON MARKET AVE HAS BEEN REMOVED. ONLY THE APPROVED ENTRACE SHALL BE UTILIZED. 2/12/2026 - PREVIOUS INSPECTION NOTES 2/12/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. SHALL BE RE-INSTALLED OR STOP WORK ORDER WILL BE PLACED ON SITE. FOLLOW UP INSPECTION FRIDAY 2/13/26. 2/10/2026 - PREVIOUS INSPECTION NOTES 2/10/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. FENCE SHALL BE RE-INSTALLED, FOLLOW UP INSPECTION WEDNESDAY 2/11/26. 2/4/2026 - PREVIOUS INSPECTION NOTES 2/4/26 SILT FENCE SHALL BE RE-INSTALLED PER SWPPP. FOLLOW UP INSPECTION FRIDAY 2/6/26. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/11/2026 Disapproved -FEE REQUIRED JMYERS
Note: 2/12/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. SHALL BE RE-INSTALLED OR STOP WORK ORDER WILL BE PLACED ON SITE. FOLLOW UP INSPECTION FRIDAY 2/13/26. 2/10/2026 - PREVIOUS INSPECTION NOTES 2/10/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. FENCE SHALL BE RE-INSTALLED, FOLLOW UP INSPECTION WEDNESDAY 2/11/26. 2/4/2026 - PREVIOUS INSPECTION NOTES 2/4/26 SILT FENCE SHALL BE RE-INSTALLED PER SWPPP. FOLLOW UP INSPECTION FRIDAY 2/6/26. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
UC-ASPHALT PRE PLACEMENT 02/11/2026 APPROVED LFITZGERALD
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/06/2026 Disapproved -FEE REQUIRED JMYERS
Note: 2/10/26 SILT FENCE HAS NOT BEEN RE-INSTALLED PER SWPPP. FENCE SHALL BE RE-INSTALLED, FOLLOW UP INSPECTION WEDNESDAY 2/11/26. 2/4/2026 - PREVIOUS INSPECTION NOTES 2/4/26 SILT FENCE SHALL BE RE-INSTALLED PER SWPPP. FOLLOW UP INSPECTION FRIDAY 2/6/26. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
UC-ASPHALT PRE PLACEMENT 02/05/2026 CANCELLED BY APPLICANT WEB
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 02/04/2026 Disapproved - NO FEE JMYERS
Note: 2/4/26 SILT FENCE SHALL BE RE-INSTALLED PER SWPPP. FOLLOW UP INSPECTION FRIDAY 2/6/26. 11/13/2025 - PREVIOUS INSPECTION NOTES 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 01/20/2026 APPROVED MKRASKI
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 01/16/2026 Disapproved - NO FEE RMARTIN
Note: BONDING CONDUCTOR NOT INSTALLED 11/12/2025 - PREVIOUS INSPECTION NOTES Right side of entry to corner 11/7/2025 - PREVIOUS INSPECTION NOTES 5FT wide along Market ROW last section middle to east property line/6ft connection to already placed sidewalk
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 01/08/2026 APPROVED - AS NOTED LFITZGERALD
Note: 11/12/2025 - PREVIOUS INSPECTION NOTES Right side of entry to corner 11/7/2025 - PREVIOUS INSPECTION NOTES 5FT wide along Market ROW last section middle to east property line/6ft connection to already placed sidewalk
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 01/08/2026 PARTIALLY APPROVED LFITZGERALD
Note: 1/7/2026 - PREVIOUS INSPECTION NOTES 12/1/2025 - PREVIOUS INSPECTION NOTES 11/18/2025 - PREVIOUS INSPECTION NOTES 11/12/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES compact soils in front sidewalk and 4in required from edge to edge-correct/remove cold conrete left over in side bldg sidewalk-all conrete should be fresh and consistent left and right sides now poured-front sidewalk satisfactory for concrete but still awaiting final engineering for ADA ramps east side parking from building corner southward now front sidewalk poured Sidewalk in ROW along Market Ave-half way from west property line 5FT wide along Market ROW last section middle to east property line/6ft connection to already placed sidewalk
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 01/07/2026 PARTIALLY APPROVED LFITZGERALD
Note: 12/1/2025 - PREVIOUS INSPECTION NOTES 11/18/2025 - PREVIOUS INSPECTION NOTES 11/12/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES compact soils in front sidewalk and 4in required from edge to edge-correct/remove cold conrete left over in side bldg sidewalk-all conrete should be fresh and consistent left and right sides now poured-front sidewalk satisfactory for concrete but still awaiting final engineering for ADA ramps east side parking from building corner southward now front sidewalk poured Sidewalk in ROW along Market Ave-half way from west property line
WATERMAIN FLUSH & PRESSURE TESTED 12/18/2025 FINAL APPROVED BWRIGHT
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 12/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 11/18/2025 - PREVIOUS INSPECTION NOTES 11/12/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES compact soils in front sidewalk and 4in required from edge to edge-correct/remove cold conrete left over in side bldg sidewalk-all conrete should be fresh and consistent left and right sides now poured-front sidewalk satisfactory for concrete but still awaiting final engineering for ADA ramps east side parking from building corner southward now front sidewalk poured
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 11/18/2025 PARTIALLY APPROVED LFITZGERALD
Note: 11/12/2025 - PREVIOUS INSPECTION NOTES 11/7/2025 - PREVIOUS INSPECTION NOTES compact soils in front sidewalk and 4in required from edge to edge-correct/remove cold conrete left over in side bldg sidewalk-all conrete should be fresh and consistent left and right sides now poured-front sidewalk satisfactory for concrete but still awaiting final engineering for ADA ramps east side parking from building corner southward
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 11/12/2025 PARTIALLY APPROVED LFITZGERALD
Note: 11/7/2025 - PREVIOUS INSPECTION NOTES compact soils in front sidewalk and 4in required from edge to edge-correct/remove cold conrete left over in side bldg sidewalk-all conrete should be fresh and consistent left and right sides now poured-front sidewalk satisfactory for concrete but still awaiting final engineering for ADA ramps
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 11/12/2025 PARTIALLY APPROVED KSANDOE
Note: Right side of entry to corner 11/7/2025 - PREVIOUS INSPECTION NOTES
UC-CONSTRUCTION ENTRANCE 11/12/2025 PARTIALLY APPROVED LFITZGERALD
Note: 11/7/2025 - PREVIOUS INSPECTION NOTES entrance now not adequate-needs refershing so soils don't get in access roadway-needs to be done next couple of days or possible project shut down until rectified new rock now installed
UC-CONSTRUCTION ENTRANCE 11/07/2025 PARTIALLY APPROVED LFITZGERALD
Note: entrance now not adequate-needs refershing so soils don't get in access roadway-needs to be done next couple of days or possible project shut down until rectified
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 11/07/2025 CANCELLED BY APPLICANT KSANDOE
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 11/07/2025 Disapproved - NO FEE JMYERS
Note: 11/13/25 SILT FENCE NEEDS TO BE RE-ESTABLISHED ON THE NORTH AND WEST PROPERTY LINES. 6/10/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 11/07/2025 PARTIALLY APPROVED LFITZGERALD
Note: compact soils in front sidewalk and 4in required from edge to edge-correct/remove cold conrete left over in side bldg sidewalk-all conrete should be fresh and consistent
BLD - UNDERGROUND SITE LIGHTING CONDUITS 09/26/2025 APPROVED RMARTIN
U-GRAVITY SEWER INSTALL/TESTING 08/18/2025 APPROVED LFITZGERALD
UC-DRAINAGE STRUCT PLACMNT 08/18/2025 APPROVED - AS NOTED LFITZGERALD
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/18/2025 APPROVED LFITZGERALD
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/05/2025 PARTIALLY APPROVED BWRIGHT
Note: 6 inch wet-tap done by Dave Jones. Joel Wirzman was onsite.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/10/2025 PARTIALLY APPROVED JMYERS
Note: 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION NEXT MONTH.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/03/2025 CANCELLED BY INSPECTOR JMYERS
Note: 5/6/2025 - PREVIOUS INSPECTION NOTES 5/6/25 SILT FENCE STILL FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH 3/28/2025 - PREVIOUS INSPECTION NOTES 3/28/25 SILT FENCE INSTALLED ACCORDING TO SWPPP. FOLLOW UP INSPECTION EARLY MAY.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/06/2025 PARTIALLY APPROVED JMYERS
Note: 5/6/25 SILT FENCE STILL FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH 3/28/2025 - PREVIOUS INSPECTION NOTES 3/28/25 SILT FENCE INSTALLED ACCORDING TO SWPPP. FOLLOW UP INSPECTION EARLY MAY.
UC-CONSTRUCTION ENTRANCE 04/24/2025 APPROVED BWRIGHT
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/28/2025 PARTIALLY APPROVED JMYERS
Note: 3/28/25 SILT FENCE INSTALLED ACCORDING TO SWPPP. FOLLOW UP INSPECTION EARLY MAY.
PLAN - PRE-CON 386-986-3750 01/14/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/14/2025 9:43:09 AM *** cline-eric chuck, city-ken and gc on site discussed all particulars

Review History

Department Status Date In Date Out
BADMIN INFORMATION 03/26/2026 03/26/2026
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM These documents are to be submitted to the planning division. Please contact Damaris Ramirez to inquire about their process for submittal. dramirez@palmcoastgov.com
PLENG COMPLETE 12/09/2025 12/09/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
BLD COMPLETE 11/14/2024 11/15/2024
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 11/14/2024 11/15/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 11/14/2024 11/15/2024
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 11/14/2024 11/19/2024
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 11/14/2024 11/15/2024
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION- SITE INSPECTOR ¤40.00 04/07/2026
REINSPECTION- SITE INSPECTOR ¤40.00 04/07/2026
REINSPECTION- SITE INSPECTOR ¤40.00 04/07/2026
SITE PLAN 30 ¤30.00 01/06/2025
ADJUSTMENT 10% (¤40.50) 01/06/2025
ADMINISTRATIVE- SITE DEVELOP ¤125.00 01/06/2025
SITE INSPECTION ¤880.00 01/06/2025
Fees Total Due: ¤0.00 Total Paid: ¤1,114.50