Permit #2024111126
Permit Details
Status: EXPIRED
| Subdivision: 2161 - RIGHT OF WAY/STREETS/PATHS |
| Job Phone: 386-257-7912 |
| Location Address: 10000 BELLE TERRE PKWY |
| Type: ROW - RIGHT OF WAY |
| Issue Date: 12/06/2024 |
| NOC: Unknown |
| Applicant name: ATT |
| Owner: CITY OF PALM COAST |
|
Address 160 LAKE AVENUE PALM COAST, FL 32164 |
| Job Description: 11 Belle Terre Pkwy, 34,850' buried FOC, 301 HH |
| Type: CN |
Contractor
AT&T
| Status | Location Address | State License Number | Phone |
| ACTIVE |
268 N RIDGEWOOD AVE ROOM 232 DAYTONA BEACH, FL 32114 |
ATT | 386-257-7912 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW- PROJECT STATUS | 03/06/2025 | Status Check | PFLANAGAN |
| Note: ALL HOLE DUG ON THIS SAY ON ZINNIA TRAIL MET ALL CITY STANDARDS | |||
| ROW CABLE PROJECT STATUS | 02/20/2025 | APPROVED | FSLADISH |
| Note: 2/20/25 PROJECT WRAPPING UP IN THIS AREA. WILL RIDE PERMIT AREA FOR ANY BOXES IN SWALES ETC. WHEN FINAL IS CALLED IN. | |||
| ROW CABLE PROJECT STATUS | 02/12/2025 | Status Check | FSLADISH |
| Note: 2/12/25 PERMIT PRODUCED. MEASURED AND INSPECTED SEVERAL HOLE ON ZENITH, ZEBU AND ZEBULAH'S TRAIL. FOUND ALL HOLES DUG MINIMUM OF 24" OR DEEPER AT THE TIME OF MY INSPECTION. SETTING ANOTHER PROJECT STATUS FOR 2/20/25. | |||
| ROW CABLE PROJECT STATUS | 02/06/2025 | Status Check | TPOLACEK |
| Note: 02/06/25 TPOLACEK & EMADISON*** Foreman had to bring permit to site. measured holes all seem to be 24" or deeper at this time. this inspection was performed on 11 Zaun trail | |||
| ROW - FINAL INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| UD1 | COMPLETE | 12/05/2024 | 12/06/2024 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/22/2024 | 12/03/2024 |
| Note: Released By: FRANK SLADISH - (386)871-6113 - FSLADISH@PALMCOASTGOV.COM 25 Permit Must be on site or job can be suspended LDC Sec.42-45b Sec.42-45b - The permit must be always available at the work site while work is being performed. Any work in progress on, or use of, the right-of-way without a valid permit available at the site, shall be suspended until such time as a valid permit is produced on the site. 25 Permit Must be on site or job can be suspended LDC Sec.42-45b Sec.42-45b - The permit must be always available at the work site while work is being performed. Any work in progress on, or use of, the right-of-way without a valid permit available at the site, shall be suspended until such time as a valid permit is produced on the site. Sec.42-45b - The permit must be always available at the work site while work is being performed. Any work in progress on, or use of, the right-of-way without a valid permit available at the site, shall be suspended until such time as a valid permit is produced on the site. | |||
| TRENG | COMPLETE | 11/22/2024 | 12/03/2024 |
| Note: Released By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM | |||
| UD1 | HOLD | 11/22/2024 | 11/26/2024 |
| Note: Held By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM 1. Cover sheet corrections: (a.) Westfall Ln should be Zerington Ct (b.) Two streets are noted as Zenith Ct. One of these streets, south of Zebulahs Tr, is Zeppo CT (c.) Please add Zinzendorf Pl (N of Zinnia Tr) (d.) Two streets are noted as Zither Ct, change one of these to Zircon Ct (S of Zinnia Tr, across from Zinzendorf Pl) (d.) MOT Note #5 reads " ... City of Jacksonville maintained right of way only", please note the appropriate City/AHJ. 2. Please note on the following sheets that the PEP line (green sewer line) continues straight through and beyond the end of the cul-de-sac, between the houses. (a.) DWG 15 of 80 - Zeppo Ct. (b.) DWG 35 of 80 - Zammer Ct (c.) DWG 56 of 80 - Zinnia Ct (d.) DWG 80 of 80 - Zonal Ct |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| DUMMY FEE | ¤1.00 | 12/06/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1.00 |