Permit #2024111155
Permit Details
Status: COED
| Parcel Id: 07-11-31-7016-00050-0110 |
| GARAGE: 566 sqft |
| SCREEN PORCH (SOLID ROOF) : 292 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| CONDITIONED SPACE: 2400 sqft |
| Total Square Footage: 3316 sqft |
| Block: 00050 |
| Subdivision: - |
| Job Phone: 386-283-2035 |
| Location Address: 21 COLUMBIA LN |
| Type: DU - DUPLEX |
| Issue Date: 12/26/2024 |
| NOC: RECORDED |
| Applicant name: OLEG BELINSKIY |
| Owner: WOLF JOHN & MARIA H&W |
|
Address 8 SUNRISE CIRCLE PALM COAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
FLORIDAS BEST BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE PALM COAST, FL 32164 |
CBC1264760 (Exp: 08/31/2026) | 386-283-2035 |
Sub Contractors
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SERGEY A VORONIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7631 SEVERN JACKSONVILLE, FL 32224 |
EC13011326 (Exp: 08/31/2026) | 360-798-2819 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/15/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| U-CROSS CONNECTION | 07/14/2025 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 07/14/2025 | Disapproved - NO FEE | JSTEWART |
| Note: 1. Please label main disconnects with unit. 2. Please check all exterior Receptacles required Weather Resistant listing. Side A: 1. Please seal garage ceiling penetrations. 2. Please seal wall penetration in AHU closet. 3. Please tighten Anchors at header height at garage door bucks. per plan Side B: 1. Please seal garage ceiling penetrations. 2. Please seal wall penetration in AHU closet. 3. Please install Anchors at header height (cut off) at garage door bucks. per plan | |||
| U -UTILITY RESIDENTIAL FINAL | 07/14/2025 | FINAL APPROVED | DHANEY |
| ROW - FINAL INSPECTION | 07/11/2025 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE CLEAN ALL DIRT FROM CULVERT PIPE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/11/2025 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE TO FINAL SURVEY ------------------------------------------------------------------------ 7/7/2025 - PREVIOUS INSPECTION NOTES LEFT SIDE DRAINAGE PATTERN STATES THAT YOU DON'T HAVE POSITIVE FALL FINAL SURVEY STATES YOU GO FROM A 11.20 TO A 11.50. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/11/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/11/2025 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/07/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: LEFT SIDE DRAINAGE PATTERN STATES THAT YOU DON'T HAVE POSITIVE FALL FINAL SURVEY STATES YOU GO FROM A 11.20 TO A 11.50. | |||
| ROW- PROJECT STATUS | 06/09/2025 | Status Check | EMADISON |
| Note: ** 06/09/25 SITE MEET WITH BUILDER REGARDING NATURAL AREA AT REAR OF PROPERTY ALSO PRESENT ONSITE G. BERTOLA, AND P. FLANAGAN | |||
| ROW- PROJECT STATUS | 06/06/2025 | Status Check | EMADISON |
| Note: ** 06/06/25 MET ON SITE WITH BUILDER AREA BEYOND PROPERTY LINE HAS BEEN LEF NATURAL WATER WILL FLOW FROM REAR TO THE FRONT AS NOTED ON THE REVISED STE PLAN | |||
| ROW - DRAINAGE | 05/23/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/23/25 CORRECTIONS HAVE BEEN MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY _____________________________________________________________________________________________________________________ 5/19/2025 - PREVIOUS INSPECTION NOTES ** 05/25 BUILDER CONTACTED THIS INSPECTOR REQUESTED UNTIL 05/23/25 TO GET FILTER SOCK TO PROTECT DRAINAGE BASIN INLET. IF NOT CORRECTED AT THE TIME OF THE NEXT INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL REQUIRED CORRECTIONS HAVE BEEN MADE AS NOTED IN PREVIOUS INSPECTIONS. SEE ALL NOTES ** REPLAIR ALL SILT FENCE AROUND SITE ** BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** FOLLOW UP INSPECTION ON 05/23/25 ______________________________________________________________________________________________________________________ 5/15/2025 - PREVIOUS INSPECTION NOTES ** 05/15/25 NO CORRECTIONS HAVE BEEN MADE AS NOTED IN PREVIOUS INSPECTION BUILDER WILL HAVE UP TO 05/20/25 TO MAKE ALL CORRECTIONS NOTED IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS IN ADDITION TO THE PREVIOUS CORRECTIONS NEEDED YOU ARE REQUIRED TO: ** REPLAIR ALL SILT FENCE AROUND SITE ** BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** FOLLOW UP INSPECTION ON 05/20/25 ____________________________________________________________________________________________________________________ 5/12/2025 - PREVIOUS INSPECTION NOTES ** 05/12/25 BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 05/15/25 | |||
| ROW - DRAINAGE | 05/20/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/25 BUILDER CONTACTED THIS INSPECTOR REQUESTED UNTIL 05/23/25 TO GET FILTER SOCK TO PROTECT DRAINAGE BASIN INLET. IF NOT CORRECTED AT THE TIME OF THE NEXT INSPECTION YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD UNTIL ALL REQUIRED CORRECTIONS HAVE BEEN MADE AS NOTED IN PREVIOUS INSPECTIONS. SEE ALL NOTES ** REPLAIR ALL SILT FENCE AROUND SITE ** BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** FOLLOW UP INSPECTION ON 05/23/25 ______________________________________________________________________________________________________________________ 5/15/2025 - PREVIOUS INSPECTION NOTES ** 05/15/25 NO CORRECTIONS HAVE BEEN MADE AS NOTED IN PREVIOUS INSPECTION BUILDER WILL HAVE UP TO 05/20/25 TO MAKE ALL CORRECTIONS NOTED IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS IN ADDITION TO THE PREVIOUS CORRECTIONS NEEDED YOU ARE REQUIRED TO: ** REPLAIR ALL SILT FENCE AROUND SITE ** BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** FOLLOW UP INSPECTION ON 05/20/25 ____________________________________________________________________________________________________________________ 5/12/2025 - PREVIOUS INSPECTION NOTES ** 05/12/25 BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 05/15/25 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/20/2025 | APPROVED | FSLADISH |
| Note: 5/20/25 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ 5/15/2025 - PREVIOUS INSPECTION NOTES ** 05/15/25 CORRECTIONS MADE ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ________________________________________________________________________________________________________________ 5/14/2025 - PREVIOUS INSPECTION NOTES ** 05/14/25 RIGHT SIDE CULVERT IS TWISTED AND NOT INSTALLED FLAT BUILDER NEEDS TO STRAIGHTEN THE CULVERT ____________________________________________________________________________________________________________________ 5/12/2025 - PREVIOUS INSPECTION NOTES ** 05/12/25 ENTIRE POUR AREA TOO WET WATER FLOWING INTO POUR AREA. ** SEE ATTACHED PHOTOS | |||
| ROW- PAVER RESTRAINTS | 05/15/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/15/25 ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 05/15/2025 | PARTIALLY APPROVED | EMADISON |
| Note: ** 05/15/25 CORRECTIONS MADE ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED ________________________________________________________________________________________________________________ 5/14/2025 - PREVIOUS INSPECTION NOTES ** 05/14/25 RIGHT SIDE CULVERT IS TWISTED AND NOT INSTALLED FLAT BUILDER NEEDS TO STRAIGHTEN THE CULVERT ____________________________________________________________________________________________________________________ 5/12/2025 - PREVIOUS INSPECTION NOTES ** 05/12/25 ENTIRE POUR AREA TOO WET WATER FLOWING INTO POUR AREA. ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 05/15/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/15/25 NO CORRECTIONS HAVE BEEN MADE AS NOTED IN PREVIOUS INSPECTION BUILDER WILL HAVE UP TO 05/20/25 TO MAKE ALL CORRECTIONS NOTED IF ALL CORRECTIONS HAVE NOT BEEN COMPLETED YOUR PERMIT WILL BE PLACED ON AN INSPECTION HOLD PRIORITY (1) STATUS IN ADDITION TO THE PREVIOUS CORRECTIONS NEEDED YOU ARE REQUIRED TO: ** REPLAIR ALL SILT FENCE AROUND SITE ** BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** FOLLOW UP INSPECTION ON 05/20/25 ____________________________________________________________________________________________________________________ 5/12/2025 - PREVIOUS INSPECTION NOTES ** 05/12/25 BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 05/15/25 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/14/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/14/25 RIGHT SIDE CULVERT IS TWISTED AND NOT INSTALLED FLAT BUILDER NEEDS TO STRAIGHTEN THE CULVERT ____________________________________________________________________________________________________________________ 5/12/2025 - PREVIOUS INSPECTION NOTES ** 05/12/25 ENTIRE POUR AREA TOO WET WATER FLOWING INTO POUR AREA. ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/12/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/12/25 ENTIRE POUR AREA TOO WET WATER FLOWING INTO POUR AREA. ** SEE ATTACHED PHOTOS | |||
| ROW - DRAINAGE | 05/12/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/12/25 BUILDER NEEDS TO INSTALL DRAINAGE PROTECTION AROUND THE CATCH BASIN ON THE RIGHT SIDE IN SWALE TO PREVENT THE EROSION OF SEDIMENT AND OTHER DEBRIS INTO THE STORMWATER SYSTEM ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 05/15/25 | |||
| ELECTRIC - EARLY POWER | 05/01/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Outdoor Outlets need to be WR. What is currently installed is TR. NEC 406.9(B)(1) | |||
| FIREWALL FINAL | 04/11/2025 | APPROVED | HCAMACHO |
| Note: | |||
| FIREWALL DRYWALL NAILING | 04/07/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: Inspector Notes from Inspection 2490 Energy Calcs were submitted for revision of R5 insulation on block wall. | |||
| INSULATION | 04/03/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Energy Calcs were submitted for revision of R5 insulation on block wall. | |||
| GRAVITY SEWER TEST | 03/31/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATEWR SERVICE NOT RAN THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 03/31/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATEWR SERVICE NOT RAN THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 03/26/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. 3/4" R5 Insulation board installed on block wall and partition wall. Energy calcs call for R6. Energy calcs need to be revised because it could affect type of equipment and other things installed. * This was mentioned at Rough inspection. See Notes from Rough inspection.* | |||
| LATH/BRICK/ WATER BARRIER | 03/19/2025 | APPROVED | HCAMACHO |
| ALL ROUGH | 03/19/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. (3) A/C boots in side B need gasket/seal.R402.4.1.1 2. Move Smoke detector in living room outside master away from Fan blades 3'. NFPA 72 SMOKE DETECTORS NEED TO BE 3` FROM FAN BLADES AND A/C VENT 3. Need to Fire caulk pipe for service passing throug Fire Wall both sides.FBC EC R402.4.5 4. All bath Fans need second mechanical attachemnt.FBCR M1604.4.1 5. Move outlet in kitchen wall to make sure it is over the peninsula counter so it counts for counter space.NEC 210.52 Note- Doing Blown insulation. Energy Calcs calls for R6 on block walls, but only R5 is installed. Please Revise for insulation Inspection. | |||
| FIREWALL FINAL | 03/12/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: The wall above the ceiling is ok. Need to sheetrock bottom wall. | |||
| FIREWALL DRYWALL NAILING | 03/05/2025 | APPROVED | HCAMACHO |
| ROOF VALLEY & METAL | 03/04/2025 | APPROVED | HCAMACHO |
| FIREWALL FRAMING | 03/03/2025 | APPROVED | HCAMACHO |
| WALL SHEATHING | 02/25/2025 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/25/2025 | APPROVED | FWILLIS |
| TIE BEAM / LINTEL | 02/14/2025 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 02/13/2025 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 02/06/2025 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 01/23/2025 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/21/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WATEWR SERVICE NOT RAN | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 01/17/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 01/03/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 05/29/2025 | 06/02/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/29/2025 | 06/02/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Approved contigent on final survey to ensure changes to property line on left side does not negative impact lot 10'. | |||
| ZON | COMPLETE | 05/29/2025 | 05/29/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/02/2025 | 04/03/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/01/2025 | 04/01/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM This property is deeded in a trust. You must submit the correct Right of Way Utilization Agreement for Paver Driveways for properties deeded in a trust. The Agreement must be filled out completely and once the correct form is complete, please submit the Agreement electronically for staff review. | |||
| SW1 | COMPLETE | 04/01/2025 | 04/04/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/01/2025 | 04/04/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/01/2025 | 04/01/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM This property is deeded in a trust. You must submit the correct Right of Way Utilization Agreement for Paver Driveways for PROPERTIES DEEDED IN A TRUST (THIS IS A DIFFERENT AGREEMENT THAN YOU SUBMITTED - THE ONE YOU USED WAS FOR PROPERTIES NOT DEEDED IN A TRUST). The Agreement must be filled out completely and once the correct form is complete, please submit the Agreement electronically for staff review. | |||
| MECH | COMPLETE | 03/27/2025 | 03/28/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/19/2025 | 03/21/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/11/2025 | 03/11/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 03/11/2025 | 03/17/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per Gabriel, drainage in the back pass the natural buffer needs to flow to the front of property and not towards the Parkway. | |||
| ZON | HOLD | 03/11/2025 | 03/11/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please fillout the correct right away agreement with the trust as John and Maria are trustees for the trust and the home is in the name of the trust | |||
| ENGIN1 | COMPLETE | 02/05/2025 | 02/06/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/05/2025 | 02/05/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/14/2025 | 01/17/2025 |
| Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/23/2024 | 12/23/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/18/2024 | 12/18/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment LANDSCAPE PLAN IS MISSING ONE TREE. THIS LOT SIZE REQUIRES 5 TREES | |||
| CUSVC | COMPLETE | 12/18/2024 | 12/20/2024 |
| Note: Released By: PAMELA MILLER - - | |||
| MECH | COMPLETE | 12/18/2024 | 12/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/18/2024 | 12/19/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/18/2024 | 12/19/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 11/25/2024 | 12/16/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 11/25/2024 | 11/25/2024 |
| Note: Held By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM LANDSCAPE PLAN IS MISSING ONE TREE. THIS LOT SIZE REQUIRES 5 TREES. | |||
| BADMIN | COMPLETE | 11/22/2024 | 12/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/22/2024 | 12/03/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 11/22/2024 | 11/27/2024 |
| Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Please correct the utility application to reflect the correct property address | |||
| ELEC | COMPLETE | 11/22/2024 | 12/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/22/2024 | 11/25/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 11/22/2024 | 12/02/2024 |
| LOCATE | COMPLETE | 11/22/2024 | 12/02/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/22/2024 | 12/02/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy calcs and state cards need to be signed by the builders 2. State card needs to have a file name of state card | |||
| SW1 | HOLD | 11/22/2024 | 12/11/2024 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Common swales are preferred and can be achieved with the existing grades, please review and revise the inside swales on both the right and the left sides. Please show type of construction, either concrete block or wood frame. Culvert for Lot 12 needs to be shown. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/11/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/16/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/16/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 03/11/2025 |
| IMPACT FEE TRANSPORTATION | ¤2,890.00 | 12/26/2024 |
| SURCHARGE FS 533.721 | ¤14.95 | 12/26/2024 |
| SURCHARGE - FS 468.631 | ¤22.42 | 12/26/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/26/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/26/2024 |
| SW ENG PRE APRON | ¤30.00 | 12/26/2024 |
| ADJUSTMENT 10% | (¤166.09) | 12/26/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/26/2024 |
| INSPECTION - RESIDENTIAL | ¤1,270.50 | 12/26/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤360.36 | 12/26/2024 |
| FC IMPACT FEE EMS | ¤124.00 | 12/26/2024 |
| IMPACT FEE FIRE | ¤869.02 | 12/26/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 12/26/2024 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 12/26/2024 |
| IMPACT FEE PARKS | ¤3,656.02 | 12/26/2024 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/26/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/26/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/26/2024 |
| SITE PLAN 30 | ¤30.00 | 12/26/2024 |
| SEWER CREDIT | (¤1,147.00) | 12/26/2024 |
| SEWER INSPECTION | ¤25.00 | 12/26/2024 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 12/26/2024 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 12/26/2024 |
| CONNECTION FEES | ¤2,374.52 | 12/26/2024 |
| WATER- TURN ON | ¤50.00 | 12/26/2024 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 12/26/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤36,433.02 |