I want to search for...

Permit #2024120147

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7022-00030-0180
Block: 00030
Subdivision: 7022 -
Job Phone: 904-888-6443
Location Address: 110 WELLSTONE DR
Type: DR - DRIVEWAY
Issue Date: 12/10/2024
NOC: RECORDED
Applicant name: AMIR BENTOV
Owner: HAMMOCK MANAGEMENT LLC TRUSTEE

Address

84 RIVER TRAIL DRIVE

PALM COAST, FL 32137

Lot: 0180
Contracted Stated Job Value: ¤6,000.00
Job Description: Driveway
Type: CN

Contractor

MAVEN HOMES LLC
Status Location Address State License Number Phone
ACTIVE

2800 N 6TH ST UNIT 790

,

CRC1333741 (Exp: 08/31/2026) 904-667-4330

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 01/14/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 1/8/2025 - PREVIOUS INSPECTION NOTES 01/08/25 TPOLACEK** SOD ELEVATION ON RIGHT SIDE OF DRIVEWAY FROM ROAD EDGE TO MITERED END IS TOO LOW. THIS WILL CREATE A TRIPPING HAZARD AND WASHOUT. PLEASE RAISE THIS AREA TO MATCH GRADE AS WELL AS MITERED FOOTER END NEEEDS TO BE GRADED LEVEL AND SODDED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/23/2024 - PREVIOUS INSPECTION NOTES 12/22/24 TPOLACEK*** SHOT PIPE AND ELEVATION IS GOOD. BUILDER STILL NEEDS TO ADD SOD AND HOT PATCH BEFORE FINAL ROW WILL BE APPROVED. Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
ROW - FINAL INSPECTION 01/08/2025 Disapproved - NO FEE TPOLACEK
Note: 01/08/25 TPOLACEK** SOD ELEVATION ON RIGHT SIDE OF DRIVEWAY FROM ROAD EDGE TO MITERED END IS TOO LOW. THIS WILL CREATE A TRIPPING HAZARD AND WASHOUT. PLEASE RAISE THIS AREA TO MATCH GRADE AS WELL AS MITERED FOOTER END NEEEDS TO BE GRADED LEVEL AND SODDED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/23/2024 - PREVIOUS INSPECTION NOTES 12/22/24 TPOLACEK*** SHOT PIPE AND ELEVATION IS GOOD. BUILDER STILL NEEDS TO ADD SOD AND HOT PATCH BEFORE FINAL ROW WILL BE APPROVED. Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
ROW - FINAL APRON (AFTER POUR) 12/23/2024 APPROVED - AS NOTED TPOLACEK
Note: 12/22/24 TPOLACEK*** SHOT PIPE AND ELEVATION IS GOOD. BUILDER STILL NEEDS TO ADD SOD AND HOT PATCH BEFORE FINAL ROW WILL BE APPROVED. Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
ROW - FINAL INSPECTION 12/23/2024 Disapproved - NO FEE TPOLACEK
Note: 12/22/24 TPOLACEK*** SHOT PIPE AND ELEVATION IS GOOD. BUILDER STILL NEEDS TO ADD SOD AND HOT PATCH BEFORE FINAL ROW WILL BE APPROVED. Inspector Notes from Inspection 9270 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.
U -UTILITY RESIDENTIAL FINAL 12/23/2024 FINAL APPROVED BWRIGHT
ROW- PRE-APRON (PRE-POUR) 12/19/2024 APPROVED - AS NOTED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR.

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/04/2024 12/09/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
UTL COMPLETE 12/04/2024 12/04/2024
Note: Released By: LARRY FITZGERALD - (386)286-2041 - LFITZGERALD@PALMCOASTGOV.COM
ZON HOLD 12/04/2024 12/04/2024
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM site plan unclear on what is being done. Is this a repair? Completely new? Application just says driveway
ZON COMPLETE 12/04/2024 12/04/2024
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤3.00) 12/10/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/10/2024
SW ENG INSPECTION 40 ¤40.00 12/10/2024
SW ENG PRE APRON ¤30.00 12/10/2024
SW ENG RES REVIEW 200 ¤200.00 12/10/2024
SITE PLAN 15 ¤15.00 12/10/2024
Fees Total Due: ¤0.00 Total Paid: ¤312.00