Permit #2024120156

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00180-0080
CONDITIONED SPACE: 1403 sqft
GARAGE: 478 sqft
OPENED PORCH (WITH ROOF) : 83 sqft
Total Square Footage: 1964 sqft
Block: 00180
Subdivision: -
Job Phone: 386-586-6180
Location Address: 71 RAINTREE PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/06/2025
NOC: RECORDED
Applicant name: FLAGLER HABITAT
Owner: FLAGLER HABITAT FOR HUMANITY INC

Address

2 W MOODY BLVD

BUNNELL, FL 32110

Lot: 0080
Contracted Stated Job Value: ¤150,000.00
Job Description: Building single family home
Type: CN

Contractor

FLAGLER HABITAT
Status Location Address State License Number Phone
ACTIVE

2 WEST MOODY BLVD

BUNNELL, FL 32110

HABITAT 386-931-2131

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
MICHAEL A PENAGOS
Status Location Address State License Number Phone
ACTIVE

3321 GLENSHANE WAY

ORMOND BEACH, FL 32174

CCC1330460 (Exp: 08/31/2026) 386-569-9133

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 08/14/2025 APPROVED TPOLACEK
Note: PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 08/14/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 08/06/2025 APPROVED CVANSTRAHLEN
Note:
U -UTILITY RESIDENTIAL FINAL 08/04/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cc have pep panel lower going forward for ease of accessibilty
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/01/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 08/01/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
U-CROSS CONNECTION 07/30/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
ROW- PRE-APRON (PRE-POUR) 06/26/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. Inspector Notes from Inspection 9270 6/25/25=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVER DETAIL. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/24/2025 - PREVIOUS INSPECTION NOTES 06/24/25 TPOLACEK*** SPOKE WITH CM AND THE BENCHMARK NAIL FELL OUT OF POLE WHILE SETTING UP FOR INSPECTION. SURVEY COMPANY WILL NEED TO RESET NAIL AND CONFIRM IT MATCHES THE SITE PLAN/ SWALE PLAN. CM WILL GET POUR AREA DRIED OUT AS BEST HE CAN IN THE MEANTIME. 6/20/2025 - PREVIOUS INSPECTION NOTES 06/20/25 TPOLACEK**** POUR AREA STILL HOLDING TOO MUCH WATER AND HAQS WASHOUTS THAT NEED TO BE REESTABLISHED. SEE PHOTO FROM 6-20 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/16/2025 - PREVIOUS INSPECTION NOTES 06/16/25 TPOLACEK*** POUR AREA HOLDING TOO MUCH WATER. BUILDER MUST PIMP OUT AND DRY POUR AREA BEFORE REQUESTING ANOTHER INSPECTION.. IT IS THE BUILDERS RESPONSIBILITY TO CHECK SITE THE MORNING OF INSPECTION TO MAKE SURE IT IS READY. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 06/25/2025 APPROVED - AS NOTED GBERTOLA
Note: 6/25/25=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVER DETAIL. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/24/2025 - PREVIOUS INSPECTION NOTES 06/24/25 TPOLACEK*** SPOKE WITH CM AND THE BENCHMARK NAIL FELL OUT OF POLE WHILE SETTING UP FOR INSPECTION. SURVEY COMPANY WILL NEED TO RESET NAIL AND CONFIRM IT MATCHES THE SITE PLAN/ SWALE PLAN. CM WILL GET POUR AREA DRIED OUT AS BEST HE CAN IN THE MEANTIME. 6/20/2025 - PREVIOUS INSPECTION NOTES 06/20/25 TPOLACEK**** POUR AREA STILL HOLDING TOO MUCH WATER AND HAQS WASHOUTS THAT NEED TO BE REESTABLISHED. SEE PHOTO FROM 6-20 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/16/2025 - PREVIOUS INSPECTION NOTES 06/16/25 TPOLACEK*** POUR AREA HOLDING TOO MUCH WATER. BUILDER MUST PIMP OUT AND DRY POUR AREA BEFORE REQUESTING ANOTHER INSPECTION.. IT IS THE BUILDERS RESPONSIBILITY TO CHECK SITE THE MORNING OF INSPECTION TO MAKE SURE IT IS READY. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 06/24/2025 CANCELLED BY APPLICANT TPOLACEK
Note: 06/24/25 TPOLACEK*** SPOKE WITH CM AND THE BENCHMARK NAIL FELL OUT OF POLE WHILE SETTING UP FOR INSPECTION. SURVEY COMPANY WILL NEED TO RESET NAIL AND CONFIRM IT MATCHES THE SITE PLAN/ SWALE PLAN. CM WILL GET POUR AREA DRIED OUT AS BEST HE CAN IN THE MEANTIME. 6/20/2025 - PREVIOUS INSPECTION NOTES 06/20/25 TPOLACEK**** POUR AREA STILL HOLDING TOO MUCH WATER AND HAQS WASHOUTS THAT NEED TO BE REESTABLISHED. SEE PHOTO FROM 6-20 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/16/2025 - PREVIOUS INSPECTION NOTES 06/16/25 TPOLACEK*** POUR AREA HOLDING TOO MUCH WATER. BUILDER MUST PIMP OUT AND DRY POUR AREA BEFORE REQUESTING ANOTHER INSPECTION.. IT IS THE BUILDERS RESPONSIBILITY TO CHECK SITE THE MORNING OF INSPECTION TO MAKE SURE IT IS READY. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 06/20/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/20/25 TPOLACEK**** POUR AREA STILL HOLDING TOO MUCH WATER AND HAQS WASHOUTS THAT NEED TO BE REESTABLISHED. SEE PHOTO FROM 6-20 +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/16/2025 - PREVIOUS INSPECTION NOTES 06/16/25 TPOLACEK*** POUR AREA HOLDING TOO MUCH WATER. BUILDER MUST PIMP OUT AND DRY POUR AREA BEFORE REQUESTING ANOTHER INSPECTION.. IT IS THE BUILDERS RESPONSIBILITY TO CHECK SITE THE MORNING OF INSPECTION TO MAKE SURE IT IS READY. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PROJECT STATUS 06/20/2025 Status Check TPOLACEK
Note: 06/20/25 TPOLACEK*** IF BUILDER DOES NOT GO TO FINAL GRADE IN 7 DAYS THEY WILL BE REQUIRED TO INSTALL SILT FENCE ALONG 3 SIDES LEFT RIGHT AND BACK.
ELECTRIC - EARLY POWER 06/18/2025 APPROVED CVANSTRAHLEN
ROW- PRE-APRON (PRE-POUR) 06/16/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/16/25 TPOLACEK*** POUR AREA HOLDING TOO MUCH WATER. BUILDER MUST PIMP OUT AND DRY POUR AREA BEFORE REQUESTING ANOTHER INSPECTION.. IT IS THE BUILDERS RESPONSIBILITY TO CHECK SITE THE MORNING OF INSPECTION TO MAKE SURE IT IS READY. NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PROJECT STATUS 06/13/2025 Status Check TPOLACEK
Note: 06/13/25 TPOLACEK*** LOT HAS HAD PRE FINAL GRADING AND AT THIS TIME WILL NOT REQUIRE SILT FENCE UNLESS FINAL GRADE WILL BE OVER 7 CALENDAR DAYS FROM TODAY 06/20/25. WILL REINSPECT ON THAT DATE.
GRAVITY SEWER TEST 06/09/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 FBC 3307.1 SILT FENCE NEEDS TO BE INSTALLED, PLANS SHOW GARAGE ON RIGHT, FORMED WITH GARAGE ON LEFT, FILE FOR REVISION TO SHOW CORRECT FLOOR PLAN FOR GARAGE, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 06/09/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 FBC 3307.1 SILT FENCE NEEDS TO BE INSTALLED, PLANS SHOW GARAGE ON RIGHT, FORMED WITH GARAGE ON LEFT, FILE FOR REVISION TO SHOW CORRECT FLOOR PLAN FOR GARAGE, WATER SERVICE NOT RAN YET THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 05/23/2025 APPROVED CBOWERMASTER
INSULATION 05/07/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: 2 previous inspections item #1 is not been fix Please fix items before next inspection , #1-Fl approval number for windows do not match numbers on Fl approval sheet
ALL ROUGH 05/02/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please fix items before next inspection #1-Fl approval number for windows do not match numbers on Fl approval sheet #2-FBCR 609.1-GAP AT WINDOW/DOOR REVEAL TOO LARGE > 1/4 " PER MANUFACTURERS SPECS ( mark with red sharpie market on windos )
ROOF VALLEY & METAL 04/17/2025 APPROVED CVANSTRAHLEN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/10/2025 APPROVED CVANSTRAHLEN
Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2450 Window inspection was done at the time of lath brick and water barrier , all good
LATH/BRICK/ WATER BARRIER 04/08/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Inspector Notes from Inspection 2450 Window inspection was done at the time of lath brick and water barrier , all good please fix items before next inspection #1-front entrance portch header , left and right side need to be flush with wall , nail propertly and install hangers , add hht 18 to heathers for front portch
WALL SHEATHING 03/06/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: please fix items before next inspection #1-front entrance portch header , left and right side need to be flush with wall , nail propertly and install hangers #2-main frame plate 2x4 for exterior and interior wall need ankers bold every 48" and every split need anker bold 4" to 6" by the end #3-Please provide a Eligible approved plans for next inspection FBC [A]107.3.1 -NEEDS APPROVED PLANS ON SITE #4-FBC 3307.1 -NEEDS SILT FENCE PROPERLY INSTALLED
FOUND SURVEY APPROVED (OFFICE) 03/05/2025 APPROVED RRICKS
MONOLITHIC SLAB 02/06/2025 APPROVED CVANSTRAHLEN
PLUMBING 1ST ROUGH UNDERGROUND 01/28/2025 APPROVED - AS NOTED MGIBSON
Note: FBC 3307.1 SILT FENCE NEEDS TO BE INSTALLED, PLANS SHOW GARAGE ON RIGHT, FORMED WITH GARAGE ON LEFT, FILE FOR REVISION TO SHOW CORRECT FLOOR PLAN FOR GARAGE, WATER SERVICE NOT RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 01/27/2025 APPROVED JMUNSON
ELECTRIC TEMP POLE 01/23/2025 APPROVED CVANSTRAHLEN
WATER METER INSTALLATION REQUEST 01/21/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 05/08/2025 05/12/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/04/2025 03/05/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/04/2025 03/04/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 02/14/2025 02/19/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/14/2025 02/18/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 02/14/2025 02/14/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 02/06/2025 02/06/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment not addressed: plans need to match please provide the correct landscape to match the left side garage
ENGIN1 COMPLETE 02/06/2025 02/06/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 02/06/2025 02/13/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Please show proposed elevations on the front property line where existing elevations are 26.50 and 26.30, which is lower than the edge of pavement.
ZON COMPLETE 02/06/2025 02/06/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 02/04/2025 02/04/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM plans need to match please provide the correct landscape to match the left side garage
BADMIN INFORMATION 02/04/2025 02/04/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. RENAME TO REVISTED SITE PLAN.PDF 2. SELECT 'REVISED SITE PLAN' FROM SELECTION DROP DOWN
ENGIN1 COMPLETE 02/04/2025 02/05/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 02/04/2025 02/06/2025
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
BLD COMPLETE 01/28/2025 01/30/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 01/28/2025 01/31/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/28/2025 01/29/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 01/28/2025 01/30/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/28/2025 02/04/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 01/28/2025 01/28/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan submitted doesn't match revised plans. Still showing garage right
BLD COMPLETE 01/27/2025 01/27/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 01/17/2025 01/17/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 01/17/2025 01/23/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/17/2025 01/21/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 01/15/2025 01/15/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please upload the site plan correctly as all the legal informations was cut off
ENGIN1 HOLD 01/15/2025 01/15/2025
Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Address comments made by zoning. Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please upload the site plan correctly as all the legal informations was cut off
SW1 HOLD 01/15/2025 01/15/2025
Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Address comments made by zoning. Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please upload the site plan correctly as all the legal informations was cut off
ELEC COMPLETE 12/19/2024 12/30/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 12/19/2024 12/27/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 12/04/2024 12/10/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 12/04/2024 12/10/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need shop drawing approval stamp on truss packet or truss layout.
CUSVC COMPLETE 12/04/2024 12/10/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 12/04/2024 12/10/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Electrical load calculations
ENGIN1 COMPLETE 12/04/2024 12/04/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/04/2024 12/09/2024
LOCATE COMPLETE 12/04/2024 12/09/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
MECH COMPLETE 12/04/2024 12/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 12/04/2024 12/19/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 12/04/2024 12/04/2024
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
SWALE COMPLETE 12/04/2024 12/17/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 30 ¤30.00 08/08/2025
SW ENG REINSPECTION 30 ¤30.00 08/08/2025
SW ENG - REVIEW 20 ¤20.00 01/06/2025
SW ENG RES REVIEW 200 ¤200.00 01/06/2025
SEWER CREDIT (¤1,342.00) 01/06/2025
SEWER INSPECTION ¤25.00 01/06/2025
SEWER CAPITAL FACILITY ¤6,120.52 01/06/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 01/06/2025
SITE PLAN 30 ¤30.00 01/06/2025
WATER- TURN ON ¤25.00 01/06/2025
ADJUSTMENT 10% (¤99.02) 01/06/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/06/2025
INSPECTION - RESIDENTIAL ¤748.00 01/06/2025
PLAN REVIEW - RESIDENTIAL ¤212.16 01/06/2025
CONNECTION FEES ¤1,187.26 01/06/2025
FC IMPACT FEE EMS ¤62.00 01/06/2025
IMPACT FEE FIRE ¤434.51 01/06/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/06/2025
FC IMPACT FEE LIBRARY ¤268.00 01/06/2025
IMPACT FEE PARKS ¤1,828.01 01/06/2025
IMPACT FEE TRANSPORTATION ¤1,862.00 01/06/2025
WATER -IRRIGATION INSPECTION ¤25.00 01/06/2025
SURCHARGE FS 533.721 ¤8.91 01/06/2025
SURCHARGE - FS 468.631 ¤13.37 01/06/2025
SW ENG - FOUNDATION SURVEY ¤20.00 01/06/2025
SW ENG INSPECTION 80 ¤80.00 01/06/2025
SW ENG PRE APRON ¤30.00 01/06/2025
Fees Total Due: ¤0.00 Total Paid: ¤16,417.86