I want to search for...

Permit #2024120321

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7010-00040-0340
Block: 00040
Subdivision: 2137 - SECTION 10-FLORIDA PARK
Job Phone: 904-347-7837
Location Address: 30 FERNON LN
Type: BA - BUILDING ADDITION
Issue Date: 04/14/2025
NOC: RECORDED
Applicant name: ERIC PAUL PANNONE
Owner: PANNONE ERIC P & AMANDA PANNONE H&W

Address

30 FERNON LANE

PALM COAST, FL 32137

Lot: 0340
Contracted Stated Job Value: ¤85,000.00
Job Description: 2-STORY ADDITION
Type: CN
Original Permit #: 2022070530

Contractor

CASTAWAY CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

30 FERNON LANE

PALM COAST, FL 32137

CBC1266321 (Exp: 08/31/2026) 904-347-7837

Sub Contractors

JASON BIANCANIELLO
Status Location Address State License Number Phone
ACTIVE

2434 COUNTY RD 304

BUNNELL, FL 32110

EC13007497 (Exp: 08/31/2026) 386-597-3350
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
SHAWN R RAMNARINE SINGH
Status Location Address State License Number Phone
INACTIVE

4 SEASIDE CT

PALM COAST, FL 32164

CAC1818766 (Exp: 08/31/2026) 306-302-2179
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
JASON BIANCANIELLO
Status Location Address State License Number Phone
ACTIVE

2434 COUNTY RD 304

BUNNELL, FL 32110

EC13007497 (Exp: 08/31/2026) 386-597-3350
ANTONIO VINCENZO DAHM
Status Location Address State License Number Phone
ACTIVE

10 RYBAR LANE

PALM COAST, FL 32164

CFC1429951 (Exp: 08/31/2026) 386-237-5692
SHAWN R RAMNARINE SINGH
Status Location Address State License Number Phone
INACTIVE

4 SEASIDE CT

PALM COAST, FL 32164

CAC1818766 (Exp: 08/31/2026) 306-302-2179

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/01/2025 FINAL APPROVED HCAMACHO
ROW - FINAL INSPECTION 07/01/2025 APPROVED PFLANAGAN
Note: NO RIGHT OF WAY DAMAGE AT THIS TIME
U -UTILITY RESIDENTIAL FINAL 07/01/2025 FINAL APPROVED DHANEY
INSULATION 02/14/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2460 11-03-2022 1. Sheet 2/4 and 4/4 indicates lam beam. Lam beam not installed. Contractor rested trusses on CMU. Please submit a revision tot he building delartment. 2. Sheet 4/4 Continuous threaded rod detail not installed as per plan and missed on the first floor at outside wall. Please submit revision to nbuilding department or install as per plan. 3. Sheet 3/4 and 4/4 New cricket detail. Straps not visible. Please submit a revision to the building department that the work has been properly completed. 01-18-2023 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Grounds need to be connected. .All grounds need to be connected – NEC 110.14A 3. Mid point bracing. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL Check at insulation
ALL ROUGH 01/18/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2460 11-03-2022 1. Sheet 2/4 and 4/4 indicates lam beam. Lam beam not installed. Contractor rested trusses on CMU. Please submit a revision tot he building delartment. 2. Sheet 4/4 Continuous threaded rod detail not installed as per plan and missed on the first floor at outside wall. Please submit revision to nbuilding department or install as per plan. 3. Sheet 3/4 and 4/4 New cricket detail. Straps not visible. Please submit a revision to the building department that the work has been properly completed. 01-18-2023 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Grounds need to be connected. .All grounds need to be connected – NEC 110.14A 3. Mid point bracing. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL Check at insulation
GRAVITY SEWER TEST 12/15/2022 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 PIPE AT SEWER LOCATION NEEDS RELIEVING ARCH WITH FOOTER STEEL OR 2X DIAMETER AT SLAB INSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/03/2022 APPROVED - AS NOTED AGAETANO
Note: 11-03-2022 1. Sheet 2/4 and 4/4 indicates lam beam. Lam beam not installed. Contractor rested trusses on CMU. Please submit a revision tot he building delartment. 2. Sheet 4/4 Continuous threaded rod detail not installed as per plan and missed on the first floor at outside wall. Please submit revision to nbuilding department or install as per plan. 3. Sheet 3/4 and 4/4 New cricket detail. Straps not visible. Please submit a revision to the building department that the work has been properly completed.
ROOF SHEATHING 10/31/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2250 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION 09-07-2022 1. Center of slab is not minimum depth. 2. This will be a partial inspection as per contractor. The two columns on the left of the addition will need to be inspected. SLAB - R 506.1 Minimum slab depth requirements 3 1/2". Pulled test lines. Dig slab out and tap to maintain 4". 3. Compaction test not on site. Compaction report must be posted. R403.1.3.4 09-20-2022 1. Compaction test on site, contractor will upload the document and submit to the building department. 2. Two areas have soil that have collapsed into the footing. Spoke to contractor's wife and she will have it removed prior to pour.
WALL SHEATHING 10/31/2022 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2250 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION 09-07-2022 1. Center of slab is not minimum depth. 2. This will be a partial inspection as per contractor. The two columns on the left of the addition will need to be inspected. SLAB - R 506.1 Minimum slab depth requirements 3 1/2". Pulled test lines. Dig slab out and tap to maintain 4". 3. Compaction test not on site. Compaction report must be posted. R403.1.3.4 09-20-2022 1. Compaction test on site, contractor will upload the document and submit to the building department. 2. Two areas have soil that have collapsed into the footing. Spoke to contractor's wife and she will have it removed prior to pour.
MONOLITHIC SLAB 09/20/2022 APPROVED - AS NOTED AGAETANO
Note: 9/16/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION 09-07-2022 1. Center of slab is not minimum depth. 2. This will be a partial inspection as per contractor. The two columns on the left of the addition will need to be inspected. SLAB - R 506.1 Minimum slab depth requirements 3 1/2". Pulled test lines. Dig slab out and tap to maintain 4". 3. Compaction test not on site. Compaction report must be posted. R403.1.3.4 09-20-2022 1. Compaction test on site, contractor will upload the document and submit to the building department. 2. Two areas have soil that have collapsed into the footing. Spoke to contractor's wife and she will have it removed prior to pour.
MONOLITHIC SLAB 09/16/2022 CANCELLED BY APPLICANT AGAETANO
Note: THIS IS A REINSPECTION 09-07-2022 1. Center of slab is not minimum depth. 2. This will be a partial inspection as per contractor. The two columns on the left of the addition will need to be inspected. SLAB - R 506.1 Minimum slab depth requirements 3 1/2". Pulled test lines. Dig slab out and tap to maintain 4". 3. Compaction test not on site. Compaction report must be posted. R403.1.3.4
MONOLITHIC SLAB 09/07/2022 Disapproved - NO FEE AGAETANO
Note: 09-07-2022 1. Center of slab is not minimum depth. 2. This will be a partial inspection as per contractor. The two columns on the left of the addition will need to be inspected. SLAB - R 506.1 Minimum slab depth requirements 3 1/2". Pulled test lines. Dig slab out and tap to maintain 4". 3. Compaction test not on site. Compaction report must be posted. R403.1.3.4
PLUMBING 1ST ROUGH UNDERGROUND 08/31/2022 APPROVED - AS NOTED MGIBSON
Note: PIPE AT SEWER LOCATION NEEDS RELIEVING ARCH WITH FOOTER STEEL OR 2X DIAMETER AT SLAB INSPECTION

Review History

Department Status Date In Date Out
ZON COMPLETE 01/06/2023 01/06/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/06/2023 01/09/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 01/03/2023 01/05/2023
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Copies of plans are not accepted. Original plans submitted to the City of Palm Coast. Hard copies of the plans are required to be submitted for the revision.
ENGIN1 COMPLETE 11/02/2022 11/02/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 11/02/2022 11/02/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Foundation survey missing addition dimensions and rear setback for review
BLD COMPLETE 08/10/2022 08/10/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 08/10/2022 08/11/2022
Note: Released By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM
MECH COMPLETE 07/28/2022 07/28/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 07/28/2022 07/28/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 07/28/2022 07/29/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. OK 2. OK 3. Provide existing spaces along the proposed addition. 4. Follow comments are for the Proposed Balcony; Per R507 a. Provide size and spacing of proposed joist. Deck joist are called-out as 2 x 12 and 2 x 8. Revise to reflect the correct joist to be used. b. OK c. Provide decal ledger board and attachment to building. 5. OK
SW1 COMPLETE 07/28/2022 08/03/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
BLD HOLD 07/13/2022 07/18/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide Product Approval for Wood Anchors and Truss Plates. Per F.S. 471.025 and F.A.C. 61 G15-23.005. 2. Typical Section calls-out roof trusses. Roof Framing Plan calls-out conventionally framed roof. Revise drawing to reflect the correct construction of the roof. 3. Provide existing spaces along the proposed addition. 4. Follow comments are for the Proposed Balcony; Per R507 a. Provide size and spacing of proposed joist. b. Provide proposed decking materials c. Provide decal ledger board and attachment to building. 5. Proposed (2) 2 x 12 exceeds spans allowable per the prescriptive design table 2018 WFCM.
ELEC HOLD 07/13/2022 07/15/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to show size of existing service 2. Submit electric load calcs and prove the existing service can accommodate the new addition.
MECH HOLD 07/13/2022 07/13/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
PLUM COMPLETE 07/13/2022 07/18/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 HOLD 07/13/2022 07/18/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE FLPW ARROW TO SHOW DRAINAGE OF STORMWATER
ZON HOLD 07/13/2022 07/18/2022
Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Revise plan to remove double site and show as bar sink in the bar room area on the first floor. Provide an executed single family affidavit.
BADMIN HOLD 07/13/2022 07/13/2022
Note: Held By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM need to list Mechanical contractor on application
BADMIN INFORMATION 07/13/2022 07/14/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 06/30/2025
PLAN REVIEW - REVISION ¤32.50 06/30/2025
SURCHARGE FS 533.721 ¤8.94 04/14/2025
SURCHARGE - FS 468.631 ¤13.42 04/14/2025
SW ENG - INSPECTION 20 ¤20.00 04/14/2025
SW ENG - REVIEW 20 ¤20.00 04/14/2025
SITE PLAN 30 ¤30.00 04/14/2025
INSPECTION - RESIDENTIAL ¤750.75 04/14/2025
PLAN REVIEW - RESIDENTIAL ¤212.94 04/14/2025
ADJUSTMENT 10% (¤99.37) 04/14/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/14/2025
Fees Total Due: ¤0.00 Total Paid: ¤1,059.18