I want to search for...
Permit #2024120352
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00410-0040 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2246 sqft |
| Block: 00410 |
| Subdivision: - |
| Job Phone: 689-250-2429 |
| Location Address: 7 RYBAR LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/20/2024 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 688 N ORLANDO AVENUE MAITLAND, FL 32751 |
|
Address SUITE 207 MAITLAND, FL 32751 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤208,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
| Original Permit #: 2024010999 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/12/2025 | APPROVED | TPOLACEK |
| Note: 11-12-25 TPOLACEK*** BUILDER NEEDS TO SPREAD OUT DIRT THAT WAS REMOVED FROM CULVERT SO SEDIMENT DOES NOT RE-ENTER THE STROMWATER DRAIN. APPROVING AS NOTED AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/7/2025 - PREVIOUS INSPECTION NOTES **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. YOU WILL BE HELD UP ON THE ROW FINAL UNTIL YOU COMPLETE THE REQUIRED HOT PATCH REPAIR. **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. | |||
| ROW - STORMWATER FINAL | 11/07/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. YOU WILL BE HELD UP ON THE ROW FINAL UNTIL YOU COMPLETE THE REQUIRED HOT PATCH REPAIR. **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/07/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. I AM APPROVING THIS INPECTION AS NOTED. YOU WILL BE HELD UP ON THE ROW FINAL UNTIL YOU COMPLETE THE REQUIRED HOT PATCH REPAIR. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/05/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/05/2025 | APPROVED | TPOLACEK |
| Note: 11-05-25 TPOLACEK*** ALTHOUGH FINAL SURVEY DOES NOT MATCH SITE PLAN DRAINAGE WILL WORK AS INDICATED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| BLD - BUILDING FINAL | 10/28/2025 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/24/2025 | APPROVED | TPOLACEK |
| Note: 09-24-25 TPOLACEK*** REESTABLISHED BENCHMARK IS .50 DIFFERENT THAN THE ORIGINAL. INSPECTOR SHOT PIPEUSING ELEVATIONS PROVIDED AND PIPE STILL FALLS WITHIN THE REQUIRED .10=/- OF THE SWALE PLAN DIAGRAM. BUILDER SHOULD BE AWARE THE BM IS OFF. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 9/19/2025 - PREVIOUS INSPECTION NOTES 09-19-25 TPOLACEK*** PLEASE SEE PREVIOUS NOTES AND PHOTOS FROM TWO WEEKS AGO AND TODAY. BUILDER MUST REESTABLISH ORIGINAL BENCHMARK AND HAVE SURVEY COMPANY CONFIRM ELEVATION OR HAVE A NEW BENCHMARK RECORDED AND A NEW SWALE PLAN CREATED REFLECTING THE BM LOCATION. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/5/2025 - PREVIOUS INSPECTION NOTES 09-05-25 TPOLACEK*** THERE ARE MULTIPLE NAILS IN PP, INSPECTOR CAN NOT MATCH BM WITH CL CONTROL ELEVATION. BUILDER MUST HAVE BM RESET AND CONFIRMED BEFORE SUBMITTING FOR REINSPECTION. SEE ATTACHED PHOTO. 1 NAIL PER PP IS REQUIRED. THERE MAY NOT BE MULTIPLE NAILS. Finished Floor Elevations (FFE): Section 300.01 B(9) V-15 9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15. /29/2025 - PREVIOUS INSPECTION NOTES NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 09-19-25 TPOLACEK*** PLEASE SEE PREVIOUS NOTES AND PHOTOS FROM TWO WEEKS AGO AND TODAY. BUILDER MUST REESTABLISH ORIGINAL BENCHMARK AND HAVE SURVEY COMPANY CONFIRM ELEVATION OR HAVE A NEW BENCHMARK RECORDED AND A NEW SWALE PLAN CREATED REFLECTING THE BM LOCATION. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/5/2025 - PREVIOUS INSPECTION NOTES 09-05-25 TPOLACEK*** THERE ARE MULTIPLE NAILS IN PP, INSPECTOR CAN NOT MATCH BM WITH CL CONTROL ELEVATION. BUILDER MUST HAVE BM RESET AND CONFIRMED BEFORE SUBMITTING FOR REINSPECTION. SEE ATTACHED PHOTO. 1 NAIL PER PP IS REQUIRED. THERE MAY NOT BE MULTIPLE NAILS. Finished Floor Elevations (FFE): Section 300.01 B(9) V-15 9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15. /29/2025 - PREVIOUS INSPECTION NOTES NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/05/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 09-05-25 TPOLACEK*** THERE ARE MULTIPLE NAILS IN PP, INSPECTOR CAN NOT MATCH BM WITH CL CONTROL ELEVATION. BUILDER MUST HAVE BM RESET AND CONFIRMED BEFORE SUBMITTING FOR REINSPECTION. SEE ATTACHED PHOTO. 1 NAIL PER PP IS REQUIRED. THERE MAY NOT BE MULTIPLE NAILS. Finished Floor Elevations (FFE): Section 300.01 B(9) V-15 9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15. /29/2025 - PREVIOUS INSPECTION NOTES NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/29/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/26/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/20/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/19/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/11/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/08/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/06/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/04/2025 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 07/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 07/15/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| GRAVITY SEWER TEST | 07/15/2025 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 07/11/2025 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 06/24/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 06/23/2025 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 06/23/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ==++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/16/2025 - PREVIOUS INSPECTION NOTES 06/16/25 TPOLACEK*** BUILDER MUST REESTABLISH TEMPOARAY PIPE AND MOVE PORTA POTTY OUT OF THE ROW. NEXT INSPECTION MONDAY 06/23/25 | |||
| ALL ROUGH | 06/20/2025 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 06/16/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 06/16/25 TPOLACEK*** BUILDER MUST REESTABLISH TEMPOARAY PIPE AND MOVE PORTA POTTY OUT OF THE ROW. NEXT INSPECTION MONDAY 06/23/25 | |||
| WALL SHEATHING | 06/11/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/11/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 06/11/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 06/06/2025 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 06/06/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/06/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/06/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/04/2025 | APPROVED | PKNAPIK |
| FOUND SURVEY APPROVED (OFFICE) | 05/29/2025 | APPROVED | RRICKS |
| WATER METER INSTALLATION REQUEST | 01/29/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/06/2025 | 08/07/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 07/30/2025 | 07/30/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 06/10/2025 | 06/10/2025 |
| Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INSPECTION NOT SCHEDULE FOR 2490 2. RESUBMIT INSPECTION REPORT FOR 2490, SCHEDULE INSPECTION | |||
| BADMIN | INFORMATION | 06/05/2025 | 06/05/2025 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Inspections rejested as they are not scheduled please make sure you are scheduling them before submitting the results. | |||
| BLD | COMPLETE | 06/02/2025 | 06/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/28/2025 | 05/28/2025 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Inspections must be requested before the report is uploaded | |||
| ENGIN1 | COMPLETE | 04/10/2025 | 04/11/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/10/2025 | 04/10/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/30/2024 | 01/06/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 12/26/2024 | 12/26/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC needs to have recording stamp from Flagler Clerk Courts. | |||
| BADMIN | INFORMATION | 12/19/2024 | 12/19/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM the NOC is not a recorded copy. | |||
| SWALE | COMPLETE | 12/10/2024 | 12/18/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/09/2024 | 12/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/09/2024 | 12/12/2024 |
| Note: Released By: PAMELA MILLER - - | |||
| ENGIN1 | COMPLETE | 12/09/2024 | 12/10/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/09/2024 | 12/09/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/09/2024 | 12/19/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/09/2024 | 12/09/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/09/2024 | 12/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 11/12/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/12/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 12/20/2024 |
| SW ENG PRE APRON | ¤30.00 | 12/20/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 12/20/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 12/20/2024 |
| SEWER CREDIT | (¤2,075.15) | 12/20/2024 |
| SEWER INSPECTION | ¤25.00 | 12/20/2024 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 12/20/2024 |
| WATER CREDIT | (¤390.60) | 12/20/2024 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 12/20/2024 |
| SITE PLAN 30 | ¤30.00 | 12/20/2024 |
| SURCHARGE FS 533.721 | ¤3.27 | 12/20/2024 |
| SURCHARGE - FS 468.631 | ¤4.90 | 12/20/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 12/20/2024 |
| WATER- TURN ON | ¤25.00 | 12/20/2024 |
| ADJUSTMENT 10% | (¤11.32) | 12/20/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 12/20/2024 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 12/20/2024 |
| PLAN REVIEW - APPROVED MASTER | ¤83.20 | 12/20/2024 |
| CONNECTION FEES | ¤1,187.26 | 12/20/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 12/20/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 12/20/2024 |
| IMPACT FEE FIRE | ¤434.51 | 12/20/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 12/20/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 12/20/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 12/20/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 12/20/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,195.23 |