Permit #2024120352

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00410-0040
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00410
Subdivision: -
Job Phone: 689-250-2429
Location Address: 7 RYBAR LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/20/2024
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

MAITLAND, FL 32751

Address

SUITE 207

MAITLAND, FL 32751

Lot: 0040
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 11/12/2025 APPROVED TPOLACEK
Note: 11-12-25 TPOLACEK*** BUILDER NEEDS TO SPREAD OUT DIRT THAT WAS REMOVED FROM CULVERT SO SEDIMENT DOES NOT RE-ENTER THE STROMWATER DRAIN. APPROVING AS NOTED AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 11/7/2025 - PREVIOUS INSPECTION NOTES **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. YOU WILL BE HELD UP ON THE ROW FINAL UNTIL YOU COMPLETE THE REQUIRED HOT PATCH REPAIR. **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE.
ROW - STORMWATER FINAL 11/07/2025 Disapproved -FEE REQUIRED FSLADISH
Note: **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. YOU WILL BE HELD UP ON THE ROW FINAL UNTIL YOU COMPLETE THE REQUIRED HOT PATCH REPAIR. **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE.
ROW - FINAL APRON (AFTER POUR) 11/07/2025 APPROVED - AS NOTED FSLADISH
Note: **INSPECTORS NOTE*** HOT PATCH IS DAMAGED AND DOES NOT MATCH GRADE OF DRIVEWAY. DUE TO THE HEIGHT OF THE APRON THE HOT PATCH WILL NEED TO EXTEND OUT 18" FROM EDGE OF CONCRETE. I AM APPROVING THIS INPECTION AS NOTED. YOU WILL BE HELD UP ON THE ROW FINAL UNTIL YOU COMPLETE THE REQUIRED HOT PATCH REPAIR.
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/05/2025 APPROVED TPOLACEK
ROW FIELD SURVEY /GRADING CERTIFICATION 11/05/2025 APPROVED TPOLACEK
Note: 11-05-25 TPOLACEK*** ALTHOUGH FINAL SURVEY DOES NOT MATCH SITE PLAN DRAINAGE WILL WORK AS INDICATED. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
BLD - BUILDING FINAL 10/28/2025 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 09/24/2025 APPROVED TPOLACEK
Note: 09-24-25 TPOLACEK*** REESTABLISHED BENCHMARK IS .50 DIFFERENT THAN THE ORIGINAL. INSPECTOR SHOT PIPEUSING ELEVATIONS PROVIDED AND PIPE STILL FALLS WITHIN THE REQUIRED .10=/- OF THE SWALE PLAN DIAGRAM. BUILDER SHOULD BE AWARE THE BM IS OFF. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 9/19/2025 - PREVIOUS INSPECTION NOTES 09-19-25 TPOLACEK*** PLEASE SEE PREVIOUS NOTES AND PHOTOS FROM TWO WEEKS AGO AND TODAY. BUILDER MUST REESTABLISH ORIGINAL BENCHMARK AND HAVE SURVEY COMPANY CONFIRM ELEVATION OR HAVE A NEW BENCHMARK RECORDED AND A NEW SWALE PLAN CREATED REFLECTING THE BM LOCATION. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/5/2025 - PREVIOUS INSPECTION NOTES 09-05-25 TPOLACEK*** THERE ARE MULTIPLE NAILS IN PP, INSPECTOR CAN NOT MATCH BM WITH CL CONTROL ELEVATION. BUILDER MUST HAVE BM RESET AND CONFIRMED BEFORE SUBMITTING FOR REINSPECTION. SEE ATTACHED PHOTO. 1 NAIL PER PP IS REQUIRED. THERE MAY NOT BE MULTIPLE NAILS. Finished Floor Elevations (FFE): Section 300.01 B(9) V-15 9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15. /29/2025 - PREVIOUS INSPECTION NOTES NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 09/19/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 09-19-25 TPOLACEK*** PLEASE SEE PREVIOUS NOTES AND PHOTOS FROM TWO WEEKS AGO AND TODAY. BUILDER MUST REESTABLISH ORIGINAL BENCHMARK AND HAVE SURVEY COMPANY CONFIRM ELEVATION OR HAVE A NEW BENCHMARK RECORDED AND A NEW SWALE PLAN CREATED REFLECTING THE BM LOCATION. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/5/2025 - PREVIOUS INSPECTION NOTES 09-05-25 TPOLACEK*** THERE ARE MULTIPLE NAILS IN PP, INSPECTOR CAN NOT MATCH BM WITH CL CONTROL ELEVATION. BUILDER MUST HAVE BM RESET AND CONFIRMED BEFORE SUBMITTING FOR REINSPECTION. SEE ATTACHED PHOTO. 1 NAIL PER PP IS REQUIRED. THERE MAY NOT BE MULTIPLE NAILS. Finished Floor Elevations (FFE): Section 300.01 B(9) V-15 9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15. /29/2025 - PREVIOUS INSPECTION NOTES NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 09/05/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 09-05-25 TPOLACEK*** THERE ARE MULTIPLE NAILS IN PP, INSPECTOR CAN NOT MATCH BM WITH CL CONTROL ELEVATION. BUILDER MUST HAVE BM RESET AND CONFIRMED BEFORE SUBMITTING FOR REINSPECTION. SEE ATTACHED PHOTO. 1 NAIL PER PP IS REQUIRED. THERE MAY NOT BE MULTIPLE NAILS. Finished Floor Elevations (FFE): Section 300.01 B(9) V-15 9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15. /29/2025 - PREVIOUS INSPECTION NOTES NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/29/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: NO CHANGES FROM YESTERDAYS INSPECTION WATER IN POURING AREA AND DIRT IS WAY TO SOFT AND HAS WASHED INTO MITER ENDS ---------------------------------------------------------------------- 8/26/2025 - PREVIOUS INSPECTION NOTES 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/26/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/26/25 TPOLACEK****** SITE REMAINS WASHED IN AND WILL NOT BE APPROVED UNTIL POUR AREA MEETS ALL COPC MINMUM STANDARDS. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/20/2025 - PREVIOUS INSPECTION NOTES 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/20/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/20/25 TPOLACEK** POUR AREA WASHED OUT INTO FOOTERS. THERE ARE 3 SETS OF NAILS IN OWER POLE COPC TECH MANUAL STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. New inspection due to canceled inspection 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/19/2025 CANCELLED BY APPLICANT WEB
Note: 8/11/2025 - PREVIOUS INSPECTION NOTES 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/11/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/11/25 TPOLACEK*** SITE IS STILL UNDER WATER AND WASHED OUT. 1 Not ready for inspection Sec. 900.09 F Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/08/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 8/8/25 SITE IS UNDERWATER AND TOO WET TO POUR AT THE TIME OF THIS INSPECTION. PHOTO FOR REFERENCE. _________________________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/06/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/06/25 TPOLACEK*** SITE IS UNDER WATER AND TOO SOFT NOT READY FOR INSPECTION/REINSPECTIONS FEES. Sec. 900.09 F V-67 Sec. 900.09-F Permittee shall be charged an additional fee for each re-inspection required should the permittee call for an inspection and NOT be prepared for the requested inspection.
ROW- PRE-APRON (PRE-POUR) 08/04/2025 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 07/15/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 07/15/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
GRAVITY SEWER TEST 07/15/2025 Approval - Private Provider PPROVIDER
ELECTRIC - EARLY POWER 07/11/2025 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 06/24/2025 APPROVED CBOWERMASTER
INSULATION 06/23/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 06/23/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ==++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/16/2025 - PREVIOUS INSPECTION NOTES 06/16/25 TPOLACEK*** BUILDER MUST REESTABLISH TEMPOARAY PIPE AND MOVE PORTA POTTY OUT OF THE ROW. NEXT INSPECTION MONDAY 06/23/25
ALL ROUGH 06/20/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 06/16/2025 Disapproved - NO FEE TPOLACEK
Note: 06/16/25 TPOLACEK*** BUILDER MUST REESTABLISH TEMPOARAY PIPE AND MOVE PORTA POTTY OUT OF THE ROW. NEXT INSPECTION MONDAY 06/23/25
WALL SHEATHING 06/11/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/11/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 06/11/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 06/06/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 06/06/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 06/06/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 06/06/2025 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/04/2025 APPROVED PKNAPIK
FOUND SURVEY APPROVED (OFFICE) 05/29/2025 APPROVED RRICKS
WATER METER INSTALLATION REQUEST 01/29/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 08/06/2025 08/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 07/30/2025 07/30/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
BADMIN HOLD 06/10/2025 06/10/2025
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INSPECTION NOT SCHEDULE FOR 2490 2. RESUBMIT INSPECTION REPORT FOR 2490, SCHEDULE INSPECTION
BADMIN INFORMATION 06/05/2025 06/05/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Inspections rejested as they are not scheduled please make sure you are scheduling them before submitting the results.
BLD COMPLETE 06/02/2025 06/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN INFORMATION 05/28/2025 05/28/2025
Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Inspections must be requested before the report is uploaded
ENGIN1 COMPLETE 04/10/2025 04/11/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/10/2025 04/10/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 12/30/2024 01/06/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 12/26/2024 12/26/2024
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM NOC needs to have recording stamp from Flagler Clerk Courts.
BADMIN INFORMATION 12/19/2024 12/19/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM the NOC is not a recorded copy.
SWALE COMPLETE 12/10/2024 12/18/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 12/09/2024 12/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 12/09/2024 12/12/2024
Note: Released By: PAMELA MILLER - -
ENGIN1 COMPLETE 12/09/2024 12/10/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 12/09/2024 12/09/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
SW1 COMPLETE 12/09/2024 12/19/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 12/09/2024 12/09/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
MECH COMPLETE 12/09/2024 12/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 11/12/2025
RSI REINSPECTION 1 ¤35.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG REINSPECTION 30 ¤30.00 11/12/2025
SW ENG - INSPECTION 20 ¤20.00 11/12/2025
SW ENG - INSPECTION 20 ¤20.00 11/12/2025
SW ENG INSPECTION 80 ¤80.00 12/20/2024
SW ENG PRE APRON ¤30.00 12/20/2024
SW ENG - REVIEW 20 ¤20.00 12/20/2024
SW ENG RES REVIEW 200 ¤200.00 12/20/2024
SEWER CREDIT (¤2,075.15) 12/20/2024
SEWER INSPECTION ¤25.00 12/20/2024
SEWER CAPITAL FACILITY ¤6,120.52 12/20/2024
WATER CREDIT (¤390.60) 12/20/2024
WATER CAPITAL FACILITY FEE ¤4,351.14 12/20/2024
SITE PLAN 30 ¤30.00 12/20/2024
SURCHARGE FS 533.721 ¤3.27 12/20/2024
SURCHARGE - FS 468.631 ¤4.90 12/20/2024
SW ENG - FOUNDATION SURVEY ¤20.00 12/20/2024
WATER- TURN ON ¤25.00 12/20/2024
ADJUSTMENT 10% (¤11.32) 12/20/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/20/2024
ADMINISTRATIVE - RESID PP ¤225.00 12/20/2024
PLAN REVIEW - APPROVED MASTER ¤83.20 12/20/2024
CONNECTION FEES ¤1,187.26 12/20/2024
CONTRACTOR CHANGE ¤20.00 12/20/2024
FC IMPACT FEE EMS ¤62.00 12/20/2024
IMPACT FEE FIRE ¤434.51 12/20/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 12/20/2024
FC IMPACT FEE LIBRARY ¤268.00 12/20/2024
IMPACT FEE TRANSPORTATION ¤1,862.00 12/20/2024
WATER -IRRIGATION INSPECTION ¤25.00 12/20/2024
Fees Total Due: ¤0.00 Total Paid: ¤13,195.23