I want to search for...
Permit #2024120354
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00290-0110 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2246 sqft |
| Block: 00290 |
| Subdivision: - |
| Job Phone: 689-250-2429 |
| Location Address: 61 PRICE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/08/2025 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 688 N ORLANDO AVENUE MAITLAND, FL 32751 |
|
Address SUITE 207 MAITLAND, FL 32751 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤208,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
| Original Permit #: 2024010999 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 08/27/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/27/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES NEED TO MOW LAWN SO WE CAN SEE DRAINAGE OF THE LOT. AT TODAYS INSPECTION CAN'T DETERMINE IF DRAINAGE WILL IMPACT ADJACENT LOTS TO THE RIGHT OR LEFT. | |||
| ROW - STORMWATER FINAL | 08/27/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/22/2025 | APPROVED | PFLANAGAN |
| Note: FINAL SURVEY MEETS CITY STANDARDS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/22/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO MOW LAWN SO WE CAN SEE DRAINAGE OF THE LOT. AT TODAYS INSPECTION CAN'T DETERMINE IF DRAINAGE WILL IMPACT ADJACENT LOTS TO THE RIGHT OR LEFT. | |||
| BLD - BUILDING FINAL | 08/20/2025 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 07/30/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 7/25/2025 - PREVIOUS INSPECTION NOTES 07/25/25 TPOLACEK*** THE POWER POLE LISTED ON SWALE PLAN HAS MULTIPLE NAILS AT DIFF ELEVATIONS. BELOW CODE STATES 1 NAIL PER POWER POLE. BOTH SETS OF NAILS ARE CURRENTLY LOOSE AND SETTING BM IS IMPOSSIBLE. PLEASE REESTABLISH SECURE BENCHMARK AND REMOVE OLD NAILS. "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" 12 Bench Mark Issues Sec 300.03 C2b4/ SWALE PLAN DETAIL (8) Sec 300.03 C2b4 If any changes have been made to the original BM the City must be notified of the changes before the Inspection is scheduled.. It is the BUILDER'S/OWNER'S RESPONSIBILITY to confirm elevations/locations for culvert placement and to ensure that obstructions do not exist upstream and/or downstream. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/25/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 07/25/25 TPOLACEK*** THE POWER POLE LISTED ON SWALE PLAN HAS MULTIPLE NAILS AT DIFF ELEVATIONS. BELOW CODE STATES 1 NAIL PER POWER POLE. BOTH SETS OF NAILS ARE CURRENTLY LOOSE AND SETTING BM IS IMPOSSIBLE. PLEASE REESTABLISH SECURE BENCHMARK AND REMOVE OLD NAILS. "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" 12 Bench Mark Issues Sec 300.03 C2b4/ SWALE PLAN DETAIL (8) Sec 300.03 C2b4 If any changes have been made to the original BM the City must be notified of the changes before the Inspection is scheduled.. It is the BUILDER'S/OWNER'S RESPONSIBILITY to confirm elevations/locations for culvert placement and to ensure that obstructions do not exist upstream and/or downstream. | |||
| ELECTRIC - EARLY POWER | 07/25/2025 | Approval - Private Provider | PPROVIDER |
| INSULATION | 07/23/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/18/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 07/17/2025 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 07/14/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cc | |||
| U - SEWER TIE IN | 07/14/2025 | APPROVED | MGIBSON |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/02/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/02/2025 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 06/12/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/06/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 06/06/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/06/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/04/2025 | APPROVED | PKNAPIK |
| FOUND SURVEY APPROVED (OFFICE) | 05/29/2025 | APPROVED | RRICKS |
| ROW - DRAINAGE | 05/06/2025 | APPROVED | TPOLACEK |
| Note: 05/06/25 TPOLACEK** TEMP PIPE IS INSTALLED AND SWALE IS OPEN. IT IS THE BUILDERS RESPONSIBILTY TO ENSURE THERE ARE NO CHANGES TO SWALE AND TO MAINTAIN SITE THROUGHOUT ENTIRE BUILD PROCESS. 5/1/2025 - PREVIOUS INSPECTION NOTES 05/01/25 TPOLACEK*** BUILDER HAS REMOVED CONCRETE, TEMPORARY PIPE IS STILL CLOGGED AND WILL NOT FLOW. BUILDER HAS 5 DAYS TO REESTABLISH PIPE AND OPEN SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/30/2025 - PREVIOUS INSPECTION NOTES 04/30/25 TPOLACEK*** BUILDER HAS 24 HOURS TO REMOVE ALL OVER POUR CONCRETE ON SITE AS THIS IS AN ILLICIT DISCHARGE AND MUST BE REMOVED ASAP. BUILDER MUST ALSO INSTALL A TEMPORARY PIPE AND OPEN SWALE FOR DRAINAGE. | |||
| ROW - DRAINAGE | 05/01/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 05/01/25 TPOLACEK*** BUILDER HAS REMOVED CONCRETE, TEMPORARY PIPE IS STILL CLOGGED AND WILL NOT FLOW. BUILDER HAS 5 DAYS TO REESTABLISH PIPE AND OPEN SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/30/2025 - PREVIOUS INSPECTION NOTES 04/30/25 TPOLACEK*** BUILDER HAS 24 HOURS TO REMOVE ALL OVER POUR CONCRETE ON SITE AS THIS IS AN ILLICIT DISCHARGE AND MUST BE REMOVED ASAP. BUILDER MUST ALSO INSTALL A TEMPORARY PIPE AND OPEN SWALE FOR DRAINAGE. | |||
| ROW - DRAINAGE | 04/30/2025 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/30/25 TPOLACEK*** BUILDER HAS 24 HOURS TO REMOVE ALL OVER POUR CONCRETE ON SITE AS THIS IS AN ILLICIT DISCHARGE AND MUST BE REMOVED ASAP. BUILDER MUST ALSO INSTALL A TEMPORARY PIPE AND OPEN SWALE FOR DRAINAGE. | |||
| WATER METER INSTALLATION REQUEST | 02/11/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 08/06/2025 | 08/06/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/11/2025 | 06/11/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INSPECTION NOT SCHEDULED (2490) 2. RESUBMIT INSPECTION REPORT FOR 2490 | |||
| BADMIN | INFORMATION | 06/05/2025 | 06/05/2025 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM 2420, 2460, 2467 rejected as the inspection was not schedule. | |||
| BLD | COMPLETE | 06/02/2025 | 06/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/23/2025 | 05/23/2025 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM inspection not scheduled | |||
| BADMIN | INFORMATION | 04/11/2025 | 04/11/2025 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please resubmit the formboard survey when the geo tech report has been submitted. This is required PRIOR to the 1st rough plumbing and survey being completed. If the concrete has not been poured, the survey you are submitting is a formboard survey, please upload under that document category upon resubmittal. The geo tech report is required for all infill / original ITT platted lots. | |||
| ENGIN1 | COMPLETE | 04/10/2025 | 04/11/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/10/2025 | 04/11/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/23/2024 | 01/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/23/2024 | 12/23/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes only stormwater | |||
| SWALE | COMPLETE | 12/10/2024 | 12/26/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/09/2024 | 12/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/09/2024 | 12/12/2024 |
| Note: Released By: PAMELA MILLER - - | |||
| ENGIN1 | COMPLETE | 12/09/2024 | 12/10/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/09/2024 | 12/09/2024 |
| Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/09/2024 | 12/19/2024 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM FFE is 6' +/- higher than center of road and 3' +/- higher than adjacent homes. Please show FFE to the nearest hundredth of a foot. Site plan shows two different lot numbers. | |||
| ZON | COMPLETE | 12/09/2024 | 12/09/2024 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/09/2024 | 12/13/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/27/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/27/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/27/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/27/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/08/2025 |
| SW ENG PRE APRON | ¤30.00 | 01/08/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/08/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/08/2025 |
| SEWER CREDIT | (¤874.48) | 01/08/2025 |
| SEWER INSPECTION | ¤25.00 | 01/08/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 01/08/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 01/08/2025 |
| SITE PLAN 30 | ¤30.00 | 01/08/2025 |
| CONNECTION FEES | ¤1,187.26 | 01/08/2025 |
| CONTRACTOR CHANGE | ¤20.00 | 01/08/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 01/08/2025 |
| IMPACT FEE FIRE | ¤434.51 | 01/08/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/08/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/08/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 01/08/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/08/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 01/08/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/08/2025 |
| SURCHARGE FS 533.721 | ¤3.27 | 01/08/2025 |
| SURCHARGE - FS 468.631 | ¤4.90 | 01/08/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/08/2025 |
| WATER- TURN ON | ¤25.00 | 01/08/2025 |
| ADJUSTMENT 10% | (¤11.32) | 01/08/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/08/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 01/08/2025 |
| PLAN REVIEW - APPROVED MASTER | ¤83.20 | 01/08/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,863.51 |