I want to search for...

Permit #2024120354

Permit Details

Status: COED

Parcel Id: 07-11-31-7024-00290-0110
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00290
Subdivision: -
Job Phone: 689-250-2429
Location Address: 61 PRICE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/08/2025
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

MAITLAND, FL 32751

Address

SUITE 207

MAITLAND, FL 32751

Lot: 0110
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 08/27/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW FIELD SURVEY /GRADING CERTIFICATION 08/27/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/22/2025 - PREVIOUS INSPECTION NOTES NEED TO MOW LAWN SO WE CAN SEE DRAINAGE OF THE LOT. AT TODAYS INSPECTION CAN'T DETERMINE IF DRAINAGE WILL IMPACT ADJACENT LOTS TO THE RIGHT OR LEFT.
ROW - STORMWATER FINAL 08/27/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/22/2025 APPROVED PFLANAGAN
Note: FINAL SURVEY MEETS CITY STANDARDS
ROW FIELD SURVEY /GRADING CERTIFICATION 08/22/2025 Disapproved - NO FEE PFLANAGAN
Note: NEED TO MOW LAWN SO WE CAN SEE DRAINAGE OF THE LOT. AT TODAYS INSPECTION CAN'T DETERMINE IF DRAINAGE WILL IMPACT ADJACENT LOTS TO THE RIGHT OR LEFT.
BLD - BUILDING FINAL 08/20/2025 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 07/30/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR. 7/25/2025 - PREVIOUS INSPECTION NOTES 07/25/25 TPOLACEK*** THE POWER POLE LISTED ON SWALE PLAN HAS MULTIPLE NAILS AT DIFF ELEVATIONS. BELOW CODE STATES 1 NAIL PER POWER POLE. BOTH SETS OF NAILS ARE CURRENTLY LOOSE AND SETTING BM IS IMPOSSIBLE. PLEASE REESTABLISH SECURE BENCHMARK AND REMOVE OLD NAILS. "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" 12 Bench Mark Issues Sec 300.03 C2b4/ SWALE PLAN DETAIL (8) Sec 300.03 C2b4 If any changes have been made to the original BM the City must be notified of the changes before the Inspection is scheduled.. It is the BUILDER'S/OWNER'S RESPONSIBILITY to confirm elevations/locations for culvert placement and to ensure that obstructions do not exist upstream and/or downstream.
ROW- PRE-APRON (PRE-POUR) 07/25/2025 Disapproved - NO FEE TPOLACEK
Note: 07/25/25 TPOLACEK*** THE POWER POLE LISTED ON SWALE PLAN HAS MULTIPLE NAILS AT DIFF ELEVATIONS. BELOW CODE STATES 1 NAIL PER POWER POLE. BOTH SETS OF NAILS ARE CURRENTLY LOOSE AND SETTING BM IS IMPOSSIBLE. PLEASE REESTABLISH SECURE BENCHMARK AND REMOVE OLD NAILS. "9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov" 12 Bench Mark Issues Sec 300.03 C2b4/ SWALE PLAN DETAIL (8) Sec 300.03 C2b4 If any changes have been made to the original BM the City must be notified of the changes before the Inspection is scheduled.. It is the BUILDER'S/OWNER'S RESPONSIBILITY to confirm elevations/locations for culvert placement and to ensure that obstructions do not exist upstream and/or downstream.
ELECTRIC - EARLY POWER 07/25/2025 Approval - Private Provider PPROVIDER
INSULATION 07/23/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 07/18/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 07/17/2025 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 07/14/2025 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cc
U - SEWER TIE IN 07/14/2025 APPROVED MGIBSON
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/02/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 07/02/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 06/12/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 06/06/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 06/06/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 06/06/2025 Approval - Private Provider PPROVIDER
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 06/04/2025 APPROVED PKNAPIK
FOUND SURVEY APPROVED (OFFICE) 05/29/2025 APPROVED RRICKS
ROW - DRAINAGE 05/06/2025 APPROVED TPOLACEK
Note: 05/06/25 TPOLACEK** TEMP PIPE IS INSTALLED AND SWALE IS OPEN. IT IS THE BUILDERS RESPONSIBILTY TO ENSURE THERE ARE NO CHANGES TO SWALE AND TO MAINTAIN SITE THROUGHOUT ENTIRE BUILD PROCESS. 5/1/2025 - PREVIOUS INSPECTION NOTES 05/01/25 TPOLACEK*** BUILDER HAS REMOVED CONCRETE, TEMPORARY PIPE IS STILL CLOGGED AND WILL NOT FLOW. BUILDER HAS 5 DAYS TO REESTABLISH PIPE AND OPEN SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/30/2025 - PREVIOUS INSPECTION NOTES 04/30/25 TPOLACEK*** BUILDER HAS 24 HOURS TO REMOVE ALL OVER POUR CONCRETE ON SITE AS THIS IS AN ILLICIT DISCHARGE AND MUST BE REMOVED ASAP. BUILDER MUST ALSO INSTALL A TEMPORARY PIPE AND OPEN SWALE FOR DRAINAGE.
ROW - DRAINAGE 05/01/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 05/01/25 TPOLACEK*** BUILDER HAS REMOVED CONCRETE, TEMPORARY PIPE IS STILL CLOGGED AND WILL NOT FLOW. BUILDER HAS 5 DAYS TO REESTABLISH PIPE AND OPEN SWALE. +++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/30/2025 - PREVIOUS INSPECTION NOTES 04/30/25 TPOLACEK*** BUILDER HAS 24 HOURS TO REMOVE ALL OVER POUR CONCRETE ON SITE AS THIS IS AN ILLICIT DISCHARGE AND MUST BE REMOVED ASAP. BUILDER MUST ALSO INSTALL A TEMPORARY PIPE AND OPEN SWALE FOR DRAINAGE.
ROW - DRAINAGE 04/30/2025 Disapproved - NO FEE TPOLACEK
Note: 04/30/25 TPOLACEK*** BUILDER HAS 24 HOURS TO REMOVE ALL OVER POUR CONCRETE ON SITE AS THIS IS AN ILLICIT DISCHARGE AND MUST BE REMOVED ASAP. BUILDER MUST ALSO INSTALL A TEMPORARY PIPE AND OPEN SWALE FOR DRAINAGE.
WATER METER INSTALLATION REQUEST 02/11/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 08/06/2025 08/06/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 06/11/2025 06/11/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INSPECTION NOT SCHEDULED (2490) 2. RESUBMIT INSPECTION REPORT FOR 2490
BADMIN INFORMATION 06/05/2025 06/05/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM 2420, 2460, 2467 rejected as the inspection was not schedule.
BLD COMPLETE 06/02/2025 06/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN INFORMATION 05/23/2025 05/23/2025
Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM inspection not scheduled
BADMIN INFORMATION 04/11/2025 04/11/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please resubmit the formboard survey when the geo tech report has been submitted. This is required PRIOR to the 1st rough plumbing and survey being completed. If the concrete has not been poured, the survey you are submitting is a formboard survey, please upload under that document category upon resubmittal. The geo tech report is required for all infill / original ITT platted lots.
ENGIN1 COMPLETE 04/10/2025 04/11/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/10/2025 04/11/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 COMPLETE 12/23/2024 01/02/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 12/23/2024 12/23/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes only stormwater
SWALE COMPLETE 12/10/2024 12/26/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 12/09/2024 12/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 12/09/2024 12/12/2024
Note: Released By: PAMELA MILLER - -
ENGIN1 COMPLETE 12/09/2024 12/10/2024
Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 12/09/2024 12/09/2024
Note: Released By: TONI CHURCHILL - - TCHURCHILL@PALMCOASTGOV.COM
SW1 HOLD 12/09/2024 12/19/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM FFE is 6' +/- higher than center of road and 3' +/- higher than adjacent homes. Please show FFE to the nearest hundredth of a foot. Site plan shows two different lot numbers.
ZON COMPLETE 12/09/2024 12/09/2024
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
MECH COMPLETE 12/09/2024 12/13/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 08/27/2025
SW ENG - INSPECTION 20 ¤20.00 08/27/2025
SW ENG - INSPECTION 20 ¤20.00 08/27/2025
SW ENG - INSPECTION 20 ¤20.00 08/27/2025
SW ENG INSPECTION 80 ¤80.00 01/08/2025
SW ENG PRE APRON ¤30.00 01/08/2025
SW ENG - REVIEW 20 ¤20.00 01/08/2025
SW ENG RES REVIEW 200 ¤200.00 01/08/2025
SEWER CREDIT (¤874.48) 01/08/2025
SEWER INSPECTION ¤25.00 01/08/2025
SEWER CAPITAL FACILITY ¤6,120.52 01/08/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 01/08/2025
SITE PLAN 30 ¤30.00 01/08/2025
CONNECTION FEES ¤1,187.26 01/08/2025
CONTRACTOR CHANGE ¤20.00 01/08/2025
FC IMPACT FEE EMS ¤62.00 01/08/2025
IMPACT FEE FIRE ¤434.51 01/08/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/08/2025
FC IMPACT FEE LIBRARY ¤268.00 01/08/2025
IMPACT FEE PARKS ¤1,828.01 01/08/2025
IMPACT FEE SCHOOL ¤5,450.00 01/08/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 01/08/2025
WATER -IRRIGATION INSPECTION ¤25.00 01/08/2025
SURCHARGE FS 533.721 ¤3.27 01/08/2025
SURCHARGE - FS 468.631 ¤4.90 01/08/2025
SW ENG - FOUNDATION SURVEY ¤20.00 01/08/2025
WATER- TURN ON ¤25.00 01/08/2025
ADJUSTMENT 10% (¤11.32) 01/08/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/08/2025
ADMINISTRATIVE - RESID PP ¤225.00 01/08/2025
PLAN REVIEW - APPROVED MASTER ¤83.20 01/08/2025
Fees Total Due: ¤0.00 Total Paid: ¤21,863.51