I want to search for...
Permit #2024120715
Permit Details
Status: COED
| Parcel Id: 05-12-31-2755-00000-0310 |
| CONDITIONED SPACE: 1901 sqft |
| GARAGE: 522 sqft |
| OPENED PORCH (WITH ROOF) : 411 sqft |
| Total Square Footage: 2834 sqft |
| Subdivision: 2313 - THE GABLES SUBDIVISION AT TOWN CENTER |
| Job Phone: (386)756-0439 |
| Location Address: 7 JUNIPER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/09/2025 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: PAYTAS HOMES INC |
|
Address PO BOX 290490 PORT ORANGE, FL 32127 |
| Lot: 31 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1345 N US HIGHWAY 1 Ormond Beach, 32174 |
CAC029376 (Exp: 08/31/2026) | (386) 672-8494 | 386-673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/05/2025 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 05/30/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irr-no cc | |||
| ROW - FINAL APRON (AFTER POUR) | 05/30/2025 | APPROVED | FSLADISH |
| Note: 5/30/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 05/30/2025 | APPROVED | FSLADISH |
| Note: 5/30/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. _________________________________________________________________________________________________________________________ *** INSPECTORS NOTE BARE AREA IN REAR AND STRIP AT THE REAR LEFT PROPERTY LINE WILL NEED TO BE SODDED BEFORE ROW PASSAGE.*** | |||
| U -UTILITY RESIDENTIAL FINAL | 05/30/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: please have water meter pit lid accessible-not covered by mulch | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/21/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/21/2025 | APPROVED | FSLADISH |
| Note: 5/21/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. *** INSPECTORS NOTE BARE AREA IN REAR AND STRIP AT THE REAR LEFT PROPERTY LINE WILL NEED TO BE SODDED BEFORE ROW PASSAGE.*** | |||
| ELECTRIC - EARLY POWER | 05/08/2025 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 05/07/2025 | APPROVED | FSLADISH |
| Note: 5/7/25 READY TO LAY PAVERS AT THE TIME OF THIS INSPECTION. _______________________________________________________________________________________________________________________ 4/30/2025 - PREVIOUS INSPECTION NOTES ** 04/30/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 04/30/2025 | APPROVED | EMADISON |
| Note: ** 04/30/25 READY TO POUR PAVER RRSTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 04/30/2025 | PARTIALLY APPROVED | EMADISON |
| Note: ** 04/30/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| GRAVITY SEWER TEST | 04/07/2025 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 04/07/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 03/20/2025 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 03/19/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 03/18/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/26/2025 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 02/21/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/21/2025 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 02/13/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 02/07/2025 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 02/06/2025 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 01/30/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/27/2025 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 01/15/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/11/2025 | 04/15/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/11/2025 | 04/17/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/06/2025 | 02/06/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/06/2025 | 02/06/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/23/2024 | 12/23/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Bring in originals | |||
| BADMIN | COMPLETE | 12/23/2024 | 01/02/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/23/2024 | 12/26/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/23/2024 | 01/02/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/23/2024 | 12/23/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please do not put Alisha Mobley the department is Zoning | |||
| ZON | HOLD | 12/18/2024 | 12/18/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan Provide the width of the paver driveway Elevation page Side of home are labeled incorrectly. Bring in original cpoies of ROW | |||
| BADMIN | HOLD | 12/17/2024 | 12/23/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| CUSVC | COMPLETE | 12/17/2024 | 12/17/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/17/2024 | 12/17/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 12/17/2024 | 12/18/2024 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/17/2024 | 12/17/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/17/2024 | 12/17/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan Provide the width of the paver driveway Elevation page Side of home are labeled incorrectly. Bring in original cpoies of ROW |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤514.49 | 01/09/2025 |
| WATER-METER | ¤427.42 | 01/09/2025 |
| ADJUSTMENT 10% | (¤3.00) | 01/09/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/09/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 01/09/2025 |
| CONNECTION FEES | ¤25.00 | 01/09/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 01/09/2025 |
| IMPACT FEE FIRE | ¤434.51 | 01/09/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/09/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/09/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 01/09/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/09/2025 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 01/09/2025 |
| IMPACT FEE TRANSPORTATION | ¤3,502.00 | 01/09/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/09/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 01/09/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 01/09/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/09/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/09/2025 |
| SW ENG PRE APRON | ¤30.00 | 01/09/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/09/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/09/2025 |
| SEWER INSPECTION | ¤25.00 | 01/09/2025 |
| SITE PLAN 30 | ¤30.00 | 01/09/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,461.73 |