Status: FINAL
| Parcel Id: 27-11-30-0125-00000-0610 |
| SCREEN PORCH (SOLID ROOF) : 214 sqft |
| Total Square Footage: 214 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-237-9810 |
| Location Address: 67 ROLLINS LN |
| Type: BA - BUILDING ADDITION |
| Issue Date: 01/31/2025 |
| NOC: RECORDED |
| Applicant name: JEFFREY D KNAPP |
| Owner: DEMAYO SHARI JEAN |
|
Address 67 ROLLINS LANE PALM COAST, FL 32164 |
| Lot: 0610 |
| Contracted Stated Job Value: ¤17,397.00 |
| Job Description: Composite roof screen enclosure on new slab |
| Type: CN |
Contractor
ENCOMPASS ENCLOSURES LLC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
8 FLOYD CT PALM COAST, FL 32137 |
CBC1255103 (Exp: 08/31/2026) | 386-237-9810 | 888-828-9985 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/14/2025 | APPROVED | CVANSTRAHLEN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/14/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL INSPECTION | 04/14/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 04/14/2025 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/04/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ----------------------------------------------------------------- 3/4/2025 - PREVIOUS INSPECTION NOTES ** 03/04/25 THE FINAL SURVEY IS OUTDATED PER REQUIREMENTS FOUND IN THE COPC TECHNICAL MANUAL ** a. Signed, dated and sealed by an actively Licensed Florida Professional Surveyor - Mapper. ** b. The signature and date must be under a raised seal. The Lot Grading Plan may be superimposed on the Topographic Survey. Legible, clean, original signed and sealed residential building final surveys, less than twelve (12) months old, may be acceptable as a topographic survey for permitting purposes ** FINAL SURVEY MUST HAVE THE FFE OF THE ADDITION ** Chapter 4, R401.3- Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) ** "5) The interior elevations at no greater than a 20-foot grid. • Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/04/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 03/04/25 THE FINAL SURVEY IS OUTDATED PER REQUIREMENTS FOUND IN THE COPC TECHNICAL MANUAL ** a. Signed, dated and sealed by an actively Licensed Florida Professional Surveyor - Mapper. ** b. The signature and date must be under a raised seal. The Lot Grading Plan may be superimposed on the Topographic Survey. Legible, clean, original signed and sealed residential building final surveys, less than twelve (12) months old, may be acceptable as a topographic survey for permitting purposes ** FINAL SURVEY MUST HAVE THE FFE OF THE ADDITION ** Chapter 4, R401.3- Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) ** "5) The interior elevations at no greater than a 20-foot grid. • Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid. Section 300.01 B(5) V-15" ** "Final Survey. The Final Survey is used to verify compliance with the Topographic Survey, Lot Grading Plan and Swale Plan. (1) A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. If the field changes and/or the revised survey is accepted, a final inspection may be scheduled by the contractor. Section 300.01 F(1) V-17" | |||
| MONOLITHIC SLAB | 02/11/2025 | APPROVED | CVANSTRAHLEN |
| MONOLITHIC SLAB | 02/10/2025 | Disapproved - NO FEE | CVANSTRAHLEN |
| Note: Footer do not match what plans describe |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 01/31/2025 | 02/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/31/2025 | 02/04/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/31/2025 | 01/31/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/19/2024 | 12/27/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/19/2024 | 12/20/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 12/17/2024 | 12/17/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Engineering plans need to include slab details. | |||
| ENGIN1 | COMPLETE | 12/17/2024 | 12/17/2024 |
| Note: Released By: LEVI SALYERDS - - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/17/2024 | 12/19/2024 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/17/2024 | 12/17/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM there is no existing slab and i see that the description states new slab but that information for the slab was not included in the plans |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤15.50) | 01/31/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/31/2025 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 01/31/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 01/31/2025 |
| SURCHARGE FS 533.721 | ¤2.00 | 01/31/2025 |
| SURCHARGE - FS 468.631 | ¤2.09 | 01/31/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 01/31/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/31/2025 |
| SITE PLAN 30 | ¤30.00 | 01/31/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤213.59 |