Permit #2024120912

Permit Details

Status: COED

Parcel Id: 07-11-31-7021-00200-0150
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00200
Subdivision: -
Job Phone: 689-250-2429
Location Address: 50 WELLWATER DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/16/2025
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

MAITLAND, FL 32751

Address

SUITE 207

MAITLAND, FL 32751

Lot: 0150
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997

Inspection History

Type Request Date Result Inspector
ROW ILLICIT DISCHARGE 09/10/2025 CANCELLED BY INSPECTOR PFLANAGAN
Note: YOU CAN NOT REQUEST THIS INSPECTION
BLD - BUILDING FINAL 09/05/2025 Approval - Private Provider PPROVIDER
ROW - STORMWATER FINAL 09/04/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 9/3/2025 - PREVIOUS INSPECTION NOTES 09-03-25 TPOLACEK*** HOT PATCH STILL NOT COMPLETED. 9/2/2025 - PREVIOUS INSPECTION NOTES 09/02/25 TPOLACEK*** THERE IS SEDIEMNT IN CULVERT FROM WASHOUT ALONG RIGHT SIDE OF PIPE. THE HOT PATCH IS NOT COMPLETED AT THIS TIME. I WILL APPROVE AS NOTED AND DISAPPROVE THE FINAL ROW SEE PHOTOS 09/02/25 TPOLACEK*** THERE IS SEDIEMNT IN CULVERT FROM WASHOUT ALONG RIGHT SIDE OF PIPE. THE HOT PATCH IS NOT COMPLETED AT THIS TIME. I WILL APPROVE AS NOTED AND DISAPPROVE THE FINAL ROW
ROW - STORMWATER FINAL 09/03/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 09-03-25 TPOLACEK*** HOT PATCH STILL NOT COMPLETED. 9/2/2025 - PREVIOUS INSPECTION NOTES 09/02/25 TPOLACEK*** THERE IS SEDIEMNT IN CULVERT FROM WASHOUT ALONG RIGHT SIDE OF PIPE. THE HOT PATCH IS NOT COMPLETED AT THIS TIME. I WILL APPROVE AS NOTED AND DISAPPROVE THE FINAL ROW SEE PHOTOS 09/02/25 TPOLACEK*** THERE IS SEDIEMNT IN CULVERT FROM WASHOUT ALONG RIGHT SIDE OF PIPE. THE HOT PATCH IS NOT COMPLETED AT THIS TIME. I WILL APPROVE AS NOTED AND DISAPPROVE THE FINAL ROW
ROW - STORMWATER FINAL 09/02/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 09/02/25 TPOLACEK*** THERE IS SEDIEMNT IN CULVERT FROM WASHOUT ALONG RIGHT SIDE OF PIPE. THE HOT PATCH IS NOT COMPLETED AT THIS TIME. I WILL APPROVE AS NOTED AND DISAPPROVE THE FINAL ROW SEE PHOTOS 09/02/25 TPOLACEK*** THERE IS SEDIEMNT IN CULVERT FROM WASHOUT ALONG RIGHT SIDE OF PIPE. THE HOT PATCH IS NOT COMPLETED AT THIS TIME. I WILL APPROVE AS NOTED AND DISAPPROVE THE FINAL ROW
ROW - FINAL APRON (AFTER POUR) 09/02/2025 APPROVED - AS NOTED TPOLACEK
Note: 09/02/25 TPOLACEK*** THERE IS SEDIEMNT IN CULVERT FROM WASHOUT ALONG RIGHT SIDE OF PIPE. THE HOT PATCH IS NOT COMPLETED AT THIS TIME. I WILL APPROVE AS NOTED AND DISAPPROVE THE FINAL ROW
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/29/2025 APPROVED TPOLACEK
Note: ***INSPECTOR NOTE T POLACEK*** ANY ISSUES WITH CULVERT ELEVATIONS PLEASE SEE NOTES IN PRE POUR.****
ROW FIELD SURVEY /GRADING CERTIFICATION 08/29/2025 APPROVED TPOLACEK
Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- PRE-APRON (PRE-POUR) 08/11/2025 APPROVED - AS NOTED TPOLACEK
Note: 08/11/25 TPOLACEK*** SURVEY CREW WENT OUT TO VERIFY BM. BM IS STILL OFF BUT USING NUMBERS PROVIDED BY CREW WE SHOT PIPE AND IT IS SET CORRECTLY. APPROVING BUILDER TO POUR DRIVEWEAY AND SURVEY CREW WILL UPLOAD A NEW SWALE PLAN DIAGRAM REFELCTING CORRECTED BM AND CENTERLINE ELEVATIONS. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. CONTRACTORS WILL BE NOTIFIED WHEN TICKETS WILL BE REQUIRED WITH AN EMAIL BLAST.THE FOLLOWING IS CURRENTLY FOR INFORMATION ONLY: TICKET OF CONCRETE MIX DESIGN SHALL BE UPLOADED INTO PERMIT PORTAL. 8.a. IF FIBERGLASS OPTION IS USED, DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/8/2025 - PREVIOUS INSPECTION NOTES 08/08/25 TPOLACEK*** NEW NAIL IN PP IS SHOWING .16 OFF THE CENTERLINE ELEVATION ON SWALE PLAN DIAGRAM. INSPECTOR WILL HAVE COPC SURVEY CREW CONFIRM NEW NAIL BM. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/5/2025 - PREVIOUS INSPECTION NOTES 08/05/25 TPOLACEK*** SWALE PLAN INDICATES BM NAIL IN UTILITY POLE ACROSS STREET. POLE HAS MULTIPLE NAILS AND CODE STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov.
ROW- PRE-APRON (PRE-POUR) 08/08/2025 Disapproved - NO FEE TPOLACEK
Note: 08/08/25 TPOLACEK*** NEW NAIL IN PP IS SHOWING .16 OFF THE CENTERLINE ELEVATION ON SWALE PLAN DIAGRAM. INSPECTOR WILL HAVE COPC SURVEY CREW CONFIRM NEW NAIL BM. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 8/5/2025 - PREVIOUS INSPECTION NOTES 08/05/25 TPOLACEK*** SWALE PLAN INDICATES BM NAIL IN UTILITY POLE ACROSS STREET. POLE HAS MULTIPLE NAILS AND CODE STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov.
ROW- PRE-APRON (PRE-POUR) 08/05/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 08/05/25 TPOLACEK*** SWALE PLAN INDICATES BM NAIL IN UTILITY POLE ACROSS STREET. POLE HAS MULTIPLE NAILS AND CODE STATES 1 NAIL PER POLE. The Initial Application for Building Permit shall be accompanied by: Section 200.01.1.b(9) (9) An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will not be accepted unless none of the above locations are available on site (nails in pavement should not be set inside a road cut). (The benchmark must be maintained throughout the construction cycle by the contractor and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov.
ALL ROUGH 08/05/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/05/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 08/05/2025 Approval - Private Provider PPROVIDER
INSULATION 08/05/2025 Approval - Private Provider PPROVIDER
ELECTRIC - EARLY POWER 07/28/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 07/15/2025 Approval - Private Provider PPROVIDER
U-CROSS CONNECTION 07/15/2025 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 7/15/2025 11:56:07 AM *** no irr-no cc
U - SEWER TIE IN 07/15/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
FOUND SURVEY APPROVED (OFFICE) 07/09/2025 APPROVED RRICKS
ROW - DRAINAGE 06/30/2025 APPROVED TPOLACEK
Note: 06/30/25 TPOLACEK*** CORRECTIONS MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/26/2025 - PREVIOUS INSPECTION NOTES 06/26/25 TPOLACEK*** BUILDER MUST REESTABLISH TEMP PIPE AS IT IS CLOGGED AND WILL NOT FLOW. WILL REINSPECT ON MONDAY 06/30 Inspector Notes from Inspection 9470 05/23/25 TPOLACEK*** BUILDER NEEDS TO KEEP AN EYE ON THE TEMP CULVERT AS IT IS GETTING FULL APPROVING AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/19/2025 - PREVIOUS INSPECTION NOTES 05/19/25 TPOLACEK*** THE BUILDER MUST REMOVE ALL LOOSE TRASH AND DEBRIS FROM BUILD SITE AND PLACE IN DUMPSTER OR REMOVE FROM SITE. WILL RETURN ON 05/23/25 (a)Accumulation of rubbish or garbage. All exterior property and premises, and the interior of every structure, whether vacant or occupied, shall be free from any accumulation of rubbish or garbage.
ROW - DRAINAGE 06/26/2025 Disapproved - NO FEE TPOLACEK
Note: 06/26/25 TPOLACEK*** BUILDER MUST REESTABLISH TEMP PIPE AS IT IS CLOGGED AND WILL NOT FLOW. WILL REINSPECT ON MONDAY 06/30 Inspector Notes from Inspection 9470 05/23/25 TPOLACEK*** BUILDER NEEDS TO KEEP AN EYE ON THE TEMP CULVERT AS IT IS GETTING FULL APPROVING AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/19/2025 - PREVIOUS INSPECTION NOTES 05/19/25 TPOLACEK*** THE BUILDER MUST REMOVE ALL LOOSE TRASH AND DEBRIS FROM BUILD SITE AND PLACE IN DUMPSTER OR REMOVE FROM SITE. WILL RETURN ON 05/23/25 (a)Accumulation of rubbish or garbage. All exterior property and premises, and the interior of every structure, whether vacant or occupied, shall be free from any accumulation of rubbish or garbage.
LATH/BRICK/ WATER BARRIER 06/17/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 06/12/2025 Approval - Private Provider PPROVIDER
Note: 4/30/2025 - PREVIOUS INSPECTION NOTES 1. Tie beam/lintel inspection was missed, contractor will need to schdule for x-ray inspection.
ROW - DRAINAGE 05/23/2025 APPROVED - AS NOTED TPOLACEK
Note: 05/23/25 TPOLACEK*** BUILDER NEEDS TO KEEP AN EYE ON THE TEMP CULVERT AS IT IS GETTING FULL APPROVING AS NOTED. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 5/19/2025 - PREVIOUS INSPECTION NOTES 05/19/25 TPOLACEK*** THE BUILDER MUST REMOVE ALL LOOSE TRASH AND DEBRIS FROM BUILD SITE AND PLACE IN DUMPSTER OR REMOVE FROM SITE. WILL RETURN ON 05/23/25 (a)Accumulation of rubbish or garbage. All exterior property and premises, and the interior of every structure, whether vacant or occupied, shall be free from any accumulation of rubbish or garbage.
ROW - DRAINAGE 05/19/2025 Disapproved - NO FEE TPOLACEK
Note: 05/19/25 TPOLACEK*** THE BUILDER MUST REMOVE ALL LOOSE TRASH AND DEBRIS FROM BUILD SITE AND PLACE IN DUMPSTER OR REMOVE FROM SITE. WILL RETURN ON 05/23/25 (a)Accumulation of rubbish or garbage. All exterior property and premises, and the interior of every structure, whether vacant or occupied, shall be free from any accumulation of rubbish or garbage.
TIE BEAM / LINTEL 04/30/2025 Disapproved -FEE REQUIRED MKRASKI
Note: *** NOTES ADDED BY MKRASKI 5/2/2025 11:31:52 AM *** x-ray inspection will need to be done with inspector on site 1. Tie beam/lintel inspection was missed, contractor will need to schdule for x-ray inspection.
MONOLITHIC SLAB 04/28/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 04/28/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 04/15/2025 APPROVED TPOLACEK
Note: 04/15/25 TPOLACEK**** CONCRETE HAS BEEN REMOVED AND PORTA POTTY IS BEHIND THE ROW. 4/14/2025 - PREVIOUS INSPECTION NOTES 04/14/25 TPOLACEK*** BUILDER MUST REMOVE CONCRETE FORM SLAB OUR ASAP FROM ROW. THIS IS AN ILLICIT DISCHARGE, BUILDER MUST ALSO REMOVE PORTA POTTY FROM ROW. NEXT INSPECTION TUESDAY 04/15/25
ROW - DRAINAGE 04/14/2025 Disapproved - NO FEE TPOLACEK
Note: 04/14/25 TPOLACEK*** BUILDER MUST REMOVE CONCRETE FORM SLAB OUR ASAP FROM ROW. THIS IS AN ILLICIT DISCHARGE, BUILDER MUST ALSO REMOVE PORTA POTTY FROM ROW. NEXT INSPECTION TUESDAY 04/15/25
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/04/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 01/29/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 08/06/2025 08/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 07/08/2025 07/08/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/08/2025 07/08/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/08/2025 07/08/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN HOLD 06/11/2025 06/11/2025
Note: Held By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INSPECTIONS NOT SCHEDULED 2. RESUBMIT INSPECTION REPORT
BADMIN INFORMATION 03/31/2025 03/31/2025
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM FInal survey submitted is for incorrect address.
BLD COMPLETE 03/03/2025 03/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 01/14/2025 01/14/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 01/08/2025 01/14/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM The following previous comments have not been addressed: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The proposed FFE is very close to the 22" maximum over the crown of the road, when pouring the foundation if the 22" is exceeded the 0.2' tolerance will no longer apply. Benchmark shown is on edge of pavement, please relocate benchmark as there are available telephone poles in close proximity. Nails in road are to be used as a last resort when other locations are not available.
ENGIN1 COMPLETE 01/08/2025 01/09/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 01/08/2025 01/08/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 HOLD 12/31/2024 01/08/2025
Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Please submit a proper revised site plan that addresses the previous remarks.
ENGIN1 COMPLETE 12/31/2024 01/02/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 12/31/2024 01/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 12/23/2024 01/13/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 12/20/2024 12/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 12/20/2024 12/23/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/20/2024 12/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 12/20/2024 12/30/2024
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 12/20/2024 12/27/2024
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The proposed FFE is very close to the 22" maximum over the crown of the road, when pouring the foundation if the 22" is exceeded the 0.2' tolerance will no longer apply. Benchmark shown is on edge of pavement, please relocate benchmark as there are available telephone poles in close proximity. Nails in road are to be used as a last resort when other locations are not available. The rear property line elevations indicate that water will pond in that area, please review and revise accordingly.
ZON COMPLETE 12/20/2024 12/20/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 12/20/2024 12/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 09/10/2025
REINSPECTION RESIDENTIAL ¤40.00 09/10/2025
SW ENG - INSPECTION 20 ¤20.00 09/10/2025
SW ENG - INSPECTION 20 ¤20.00 09/10/2025
SW ENG - INSPECTION 20 ¤20.00 09/10/2025
SW ENG - INSPECTION 20 ¤20.00 09/10/2025
SW ENG - INSPECTION 20 ¤20.00 09/10/2025
SW ENG - INSPECTION 20 ¤20.00 09/10/2025
SW ENG - INSPECTION 20 ¤20.00 09/10/2025
SW ENG REINSPECTION 20 ¤20.00 09/10/2025
SW ENG REINSPECTION 20 ¤20.00 09/10/2025
SW ENG REINSPECTION 30 ¤30.00 09/10/2025
SW ENG - REVIEW 20 ¤20.00 01/16/2025
SW ENG RES REVIEW 200 ¤200.00 01/16/2025
SEWER CREDIT (¤850.00) 01/16/2025
SEWER INSPECTION ¤25.00 01/16/2025
SEWER CAPITAL FACILITY ¤6,120.52 01/16/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 01/16/2025
SITE PLAN 30 ¤30.00 01/16/2025
WATER- TURN ON ¤25.00 01/16/2025
ADJUSTMENT 10% (¤68.52) 01/16/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/16/2025
INSPECTION - RESIDENTIAL ¤572.00 01/16/2025
PLAN REVIEW - APPROVED MASTER ¤83.20 01/16/2025
SW ENG INSPECTION 80 ¤80.00 01/16/2025
SW ENG PRE APRON ¤30.00 01/16/2025
CONNECTION FEES ¤1,187.26 01/16/2025
FC IMPACT FEE EMS ¤62.00 01/16/2025
IMPACT FEE FIRE ¤434.51 01/16/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/16/2025
FC IMPACT FEE LIBRARY ¤268.00 01/16/2025
IMPACT FEE PARKS ¤1,828.01 01/16/2025
IMPACT FEE SCHOOL ¤5,450.00 01/16/2025
IMPACT FEE TRANSPORTATION ¤1,862.00 01/16/2025
WATER -IRRIGATION INSPECTION ¤25.00 01/16/2025
SURCHARGE FS 533.721 ¤6.17 01/16/2025
SURCHARGE - FS 468.631 ¤9.25 01/16/2025
SW ENG - FOUNDATION SURVEY ¤20.00 01/16/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,301.04