I want to search for...

Permit #2024120915

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01590-0020
CONDITIONED SPACE: 2821 sqft
GARAGE: 881 sqft
SCREEN PORCH (SOLID ROOF) : 547 sqft
OPENED PORCH (WITH ROOF) : 49 sqft
Total Square Footage: 4298 sqft
Block: 01590
Subdivision: -
Job Phone: 386-931-5741
Location Address: 15 EISENHOWER PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/30/2025
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: LIGEIRO JOAQUIM & EVONNE H&W

Address

53 ERIC DRIVE

PALM COAST, FL 32164

Lot: 0020
Contracted Stated Job Value: ¤450,000.00
Job Description: Single Family Residence
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
ACTIVE

PO BOX 1347

PALM COAST, FL 32137

RB29003877 (Exp: 08/31/2027) 386-585-4097

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
REBECCA L CHAMBERS
Status Location Address State License Number Phone
INACTIVE

671 W CADILLAC DR

ALTAMONTE SPRINGS, FL 32714

CCC1332396 (Exp: 08/31/2026) 407-467-4904

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/25/2026 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 2/25/2026 2:25:04 PM *** 2/19/2026 - PREVIOUS INSPECTION NOTES 2/19/26: Cancelled by applicant in person at @ 0950. Back ordered material did not arrive as expected. NOTE: I did check the roof and kitchen exhaust while there. > OK > RS. NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final)
ROW - STORMWATER FINAL 02/20/2026 APPROVED FSLADISH
Note: 2/20/26 ALL REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ___________________________________________________________________________________________________________________________ 2/19/2026 - PREVIOUS INSPECTION NOTES 2/19/26 I AM HOLDING YOUR ROW FINAL, AS I HAVE PREVIOUSLY NOTED, YOU HAVE A LOOSE PAVER ON THE LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND YOU ALSO NEED TO CLEAN OUT THE CULVERT PIPE BETTER, THERE IS STILL QUITE A BIT OF DIRT/DEBRIS PRESENT AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. ***INSPECTORS NOTE. MET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.***
U -UTILITY RESIDENTIAL FINAL 02/19/2026 FINAL APPROVED BHAINES
ROW - STORMWATER FINAL 02/19/2026 Disapproved -FEE REQUIRED FSLADISH
Note: 2/19/26 I AM HOLDING YOUR ROW FINAL, AS I HAVE PREVIOUSLY NOTED, YOU HAVE A LOOSE PAVER ON THE LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND YOU ALSO NEED TO CLEAN OUT THE CULVERT PIPE BETTER, THERE IS STILL QUITE A BIT OF DIRT/DEBRIS PRESENT AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. ***INSPECTORS NOTE. MET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.***
BLD - BUILDING FINAL 02/19/2026 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 2/19/2026 9:55:30 AM *** 2/19/26: Cancelled by applicant in person at @ 0950. Back ordered material did not arrive as expected. NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final)
U-CROSS CONNECTION 02/19/2026 APPROVED - AS NOTED BHAINES
Note: No CC, IRR with well
ROW - FINAL APRON (AFTER POUR) 02/19/2026 APPROVED FSLADISH
Note: 2/19/26 I AM GOING TO APPROVE THIS AFTER POUR INSPECTION BUT I AM HOLDING YOUR ROW FINAL AS I HAVE PREVIOUSLY NOTED YOU HAVE A LOOSE PAVER ON THE LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND YOU ALSO NEED TO CLEAN OUT THE CULVERT BETTER, THERE IS STILL QUITE A BIT OF DIRT/DEBRIS PRESENT AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/18/2026 APPROVED FSLADISH
Note: 2/18/26 WHOLE PROPERTY IS NOW GRADED AND SODDED AND MEETS THE COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. _______________________________________________________________________________________________________________________________ 1/26/2026 - PREVIOUS INSPECTION NOTES 1/26/26 Spoke with Jim cm and I am going to cancel this inspection via applicant until he finds out the status of the lot on the right side.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/18/2026 APPROVED FSLADISH
Note: 2/18/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ***INSPECTORS NOTE. YOU HAVE A LOOSE PAVER AT THE APRON WING ROAD EDGE ON THE LEFT SIDE.***
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/26/2026 CANCELLED BY APPLICANT FSLADISH
Note: 1/26/26 Spoke with Jim cm and I am going to cancel this inspection via applicant until he finds out the status of the lot on the right side.
ROW- PRE-APRON (PRE-POUR) 12/26/2025 APPROVED RRICKS
Note: 12/26/2025 RRicks At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 PAVER DETAIL SHEET AND REVISED SITE PLAN UPLOADED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 ***INSPECTORS NOTEMET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** Inspector Notes from Inspection 9470 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW- PAVER RESTRAINTS 12/22/2025 APPROVED FSLADISH
Note: 12/22/25 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
ROW- PRE-APRON (PRE-POUR) 12/22/2025 PARTIALLY APPROVED FSLADISH
Note: 12/22/25 PAVER DETAIL SHEET AND REVISED SITE PLAN UPLOADED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 ***INSPECTORS NOTEMET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** Inspector Notes from Inspection 9470 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW- PRE-APRON (PRE-POUR) 12/16/2025 Disapproved - NO FEE FSLADISH
Note: 12/16/25 ***INSPECTORS NOTEMET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** Inspector Notes from Inspection 9470 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
GRAVITY SEWER TEST 11/12/2025 APPROVED MGIBSON
SEWER TIE IN 11/12/2025 APPROVED MGIBSON
ELECTRIC - EARLY POWER 11/06/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/6/2025 2:55:56 PM *** 11/6/25: FPL emailed to release power.
ROW - DRAINAGE 11/03/2025 APPROVED - AS NOTED FSLADISH
Note: 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 10/30/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
PEP TANK INSTALLATION REQUEST 09/24/2025 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 09/09/2025 APPROVED MCONTRYMAN
INSULATION 09/05/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/5/2025 10:05:06 AM *** 9/3/2025 - PREVIOUS INSPECTION NOTES 9/3/25: 1). Top plate penetration for AHU feed is incomplete. FBC-R302.11 Also, check guest bathroom pipe penetrations. 2). Dryer exhaust has been relocated and is now missing nail plates. FBCR M1308.2 & FBCR M1502.5 3). Hole in top plate at previous dryer exhaust duct location needs to be repaired with solid 1.5" thick lumber as required. FBC-R302.11 4). Roof tile installation has dislodged bathroom exhaust at roof sheathing. Need to be resealed at a minimum. FBC-M1502.4.2 / FBCR M1601.4.1 NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final)
INSULATION 09/03/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 9/3/2025 2:43:44 PM *** 9/3/25: 1). Top plate penetration for AHU feed is incomplete. FBC-R302.11 Also, check guest bathroom pipe penetrations. 2). Dryer exhaust has been relocated and is now missing nail plates. FBCR M1308.2 & FBCR M1502.5 3). Hole in top plate at previous dryer exhaust duct location needs to be repaired with solid 1.5" thick lumber as required. FBC-R302.11 4). Roof tile installation has dislodged bathroom exhaust at roof sheathing. Need to be resealed at a minimum. FBC-M1502.4.2 / FBCR M1601.4.1 NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final)
ALL ROUGH 08/29/2025 APPROVED CVANSTRAHLEN
Note:
ALL ROUGH 08/28/2025 Disapproved -FEE REQUIRED MKRASKI
Note: 8/28/25 Both items not repaired, truss not repaired per letter and not letter has been uploaded showing PT sills Make ALL repairs before calling in for re-inspection Inspector Notes from Inspection 2467 #1-Please provide window silt plans for window framing installation #2 truss C4 is been fix but not fix by engineering details 1/2" gap between fix plate and brocken web Number 1 and 2 front previous inspections still pending Inspector Notes from Inspection 2460 Please provide the information required for 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection #2-Truss C4 is been repair for damage , summit for revision and approval ingeneering latter with seal, make the propper rapair by plans requirement Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening
ROW - DRAINAGE 07/21/2025 APPROVED - AS NOTED FSLADISH
Note: 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 07/18/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 07/17/2025 Disapproved -FEE REQUIRED TPOLACEK
Note: 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 07/16/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 07/15/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROW - DRAINAGE 07/08/2025 Disapproved - NO FEE PFLANAGAN
Note: NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT.
ROOF VALLEY & METAL 05/14/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: #1-Please provide window silt plans for window framing installation #2 truss C4 is been fix but not fix by engineering details 1/2" gap between fix plate and brocken web Number 1 and 2 front previous inspections still pending Inspector Notes from Inspection 2460 Please provide the information required for 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection #2-Truss C4 is been repair for damage , summit for revision and approval ingeneering latter with seal, make the propper rapair by plans requirement Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening
WALL SHEATHING 04/21/2025 APPROVED CVANSTRAHLEN
Note: Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2025 APPROVED - AS NOTED CVANSTRAHLEN
Note: Please provide the information required for 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection #2-Truss C4 is been repair for damage , summit for revision and approval ingeneering latter with seal, make the propper rapair by plans requirement Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening
TIE BEAM / LINTEL 03/25/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening
TIE BEAM / LINTEL 03/24/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening
FOUND SURVEY APPROVED (OFFICE) 03/18/2025 APPROVED LSALYERDS
MONOLITHIC SLAB 03/11/2025 APPROVED MCONTRYMAN
PLUMBING 1ST ROUGH UNDERGROUND 03/07/2025 APPROVED MGIBSON
GRAVITY SEWER TEST 03/07/2025 CANCELLED BY APPLICANT WEB
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/06/2025 APPROVED KSANDOE
WATER METER INSTALLATION REQUEST 02/11/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 02/26/2026 02/26/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/16/2025 12/19/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 12/10/2025 12/10/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/02/2025 12/03/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
SW1 COMPLETE 12/02/2025 12/10/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 12/02/2025 12/02/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM walk way can be greater than 6 ft wide
MECH COMPLETE 11/06/2025 11/07/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 08/20/2025 08/25/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 05/27/2025 05/28/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 04/21/2025 04/24/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/17/2025 03/18/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 03/17/2025 03/17/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/05/2025 03/05/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/05/2025 03/05/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/05/2025 03/06/2025
Note: Released By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM
ZON COMPLETE 01/28/2025 01/29/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 01/22/2025 01/28/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 01/22/2025 01/22/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide new landscape plan showing both lots. Since you are clearing both lots you will need 8 trees total. Please show at least 4 trees on the vacant lot that you are keeping or planting.
ENGIN1 COMPLETE 01/22/2025 01/28/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ELEC COMPLETE 01/03/2025 01/10/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 12/23/2024 01/22/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
BADMIN COMPLETE 12/20/2024 12/31/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 12/20/2024 12/31/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 12/20/2024 12/23/2024
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 12/20/2024 12/31/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and Dryer need to be GFCI protected. NEC 2020 210.8 2. Need correct outlet spacing in bed 4. NEC 2020 210.52 3. DW outlet can not be located behind the DW. NEC 2020 422.16 4. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85
ENGIN1 COMPLETE 12/20/2024 12/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 12/20/2024 12/23/2024
LOCATE COMPLETE 12/20/2024 01/02/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 12/20/2024 12/23/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 12/20/2024 12/31/2024
Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Culvert pipe is shown bending in the opposite direction of the edge of pavement. This opposite bend has the culvert out of the swale and into the property line. A straight culvert should function well in this location.
ZON HOLD 12/20/2024 12/20/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Lots 2 and three are bound together the survey only shows lot 2 are you planning on clearing lot 3? If so please provide a survey with both lots on it.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RSI REINSPECTION 1 ¤35.00 02/25/2026
RSI REINSPECTION 1 ¤35.00 02/18/2026
RSI REINSPECTION 1 ¤35.00 02/18/2026
SW ENG - INSPECTION 20 ¤20.00 02/18/2026
SW ENG - INSPECTION 20 ¤20.00 02/18/2026
SW ENG - INSPECTION 20 ¤20.00 02/18/2026
SW ENG - INSPECTION 20 ¤20.00 02/18/2026
SW ENG - INSPECTION 20 ¤20.00 02/18/2026
SW ENG - INSPECTION 20 ¤20.00 02/18/2026
PLAN REVIEW - REVISION ¤32.50 02/18/2026
REINSPECTION RESIDENTIAL ¤40.00 02/18/2026
REINSPECTION RESIDENTIAL ¤40.00 02/18/2026
CONTRACTOR CHANGE ¤20.00 02/18/2026
CONTRACTOR CHANGE ¤20.00 02/18/2026
FC IMPACT FEE EMS ¤62.00 01/30/2025
IMPACT FEE FIRE ¤434.51 01/30/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/30/2025
FC IMPACT FEE LIBRARY ¤268.00 01/30/2025
IMPACT FEE PARKS ¤1,828.01 01/30/2025
IMPACT FEE SCHOOL ¤5,450.00 01/30/2025
IMPACT FEE TRANSPORTATION ¤1,862.00 01/30/2025
WATER -IRRIGATION INSPECTION ¤25.00 01/30/2025
WATER -IRRIGATION INSPECTION ¤25.00 01/30/2025
CONNECTION FEES ¤1,187.26 01/30/2025
WATER-METER ¤514.49 01/30/2025
WATER- TURN ON ¤25.00 01/30/2025
WATER- TURN ON ¤25.00 01/30/2025
ADJUSTMENT 10% (¤203.50) 01/30/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/30/2025
INSPECTION - RESIDENTIAL ¤1,562.00 01/30/2025
PLAN REVIEW - RESIDENTIAL ¤443.04 01/30/2025
SW ENG INSPECTION 80 ¤80.00 01/30/2025
SW ENG PRE APRON ¤30.00 01/30/2025
SW ENG - REVIEW 20 ¤20.00 01/30/2025
SW ENG RES REVIEW 200 ¤200.00 01/30/2025
SEWER CREDIT (¤891.75) 01/30/2025
SEWER INSPECTION ¤25.00 01/30/2025
SEWER CAPITAL FACILITY ¤6,120.52 01/30/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 01/30/2025
SITE PLAN 30 ¤30.00 01/30/2025
SURCHARGE FS 533.721 ¤18.32 01/30/2025
SURCHARGE - FS 468.631 ¤27.47 01/30/2025
SW ENG - FOUNDATION SURVEY ¤20.00 01/30/2025
Fees Total Due: ¤0.00 Total Paid: ¤24,164.01