Permit #2024120915
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01590-0020 |
| CONDITIONED SPACE: 2821 sqft |
| GARAGE: 881 sqft |
| SCREEN PORCH (SOLID ROOF) : 547 sqft |
| OPENED PORCH (WITH ROOF) : 49 sqft |
| Total Square Footage: 4298 sqft |
| Block: 01590 |
| Subdivision: - |
| Job Phone: 386-931-5741 |
| Location Address: 15 EISENHOWER PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/30/2025 |
| NOC: RECORDED |
| Applicant name: MICHAEL MARINO HANSEN |
| Owner: LIGEIRO JOAQUIM & EVONNE H&W |
|
Address 53 ERIC DRIVE PALM COAST, FL 32164 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤450,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
RBI HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 1347 PALM COAST, FL 32137 |
RB29003877 (Exp: 08/31/2027) | 386-585-4097 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
REBECCA L CHAMBERS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
671 W CADILLAC DR ALTAMONTE SPRINGS, FL 32714 |
CCC1332396 (Exp: 08/31/2026) | 407-467-4904 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/25/2026 | FINAL APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/25/2026 2:25:04 PM *** 2/19/2026 - PREVIOUS INSPECTION NOTES 2/19/26: Cancelled by applicant in person at @ 0950. Back ordered material did not arrive as expected. NOTE: I did check the roof and kitchen exhaust while there. > OK > RS. NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final) | |||
| ROW - STORMWATER FINAL | 02/20/2026 | APPROVED | FSLADISH |
| Note: 2/20/26 ALL REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ___________________________________________________________________________________________________________________________ 2/19/2026 - PREVIOUS INSPECTION NOTES 2/19/26 I AM HOLDING YOUR ROW FINAL, AS I HAVE PREVIOUSLY NOTED, YOU HAVE A LOOSE PAVER ON THE LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND YOU ALSO NEED TO CLEAN OUT THE CULVERT PIPE BETTER, THERE IS STILL QUITE A BIT OF DIRT/DEBRIS PRESENT AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. ***INSPECTORS NOTE. MET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** | |||
| U -UTILITY RESIDENTIAL FINAL | 02/19/2026 | FINAL APPROVED | BHAINES |
| ROW - STORMWATER FINAL | 02/19/2026 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 2/19/26 I AM HOLDING YOUR ROW FINAL, AS I HAVE PREVIOUSLY NOTED, YOU HAVE A LOOSE PAVER ON THE LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND YOU ALSO NEED TO CLEAN OUT THE CULVERT PIPE BETTER, THERE IS STILL QUITE A BIT OF DIRT/DEBRIS PRESENT AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. ***INSPECTORS NOTE. MET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** | |||
| BLD - BUILDING FINAL | 02/19/2026 | CANCELLED BY APPLICANT | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 2/19/2026 9:55:30 AM *** 2/19/26: Cancelled by applicant in person at @ 0950. Back ordered material did not arrive as expected. NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final) | |||
| U-CROSS CONNECTION | 02/19/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR with well | |||
| ROW - FINAL APRON (AFTER POUR) | 02/19/2026 | APPROVED | FSLADISH |
| Note: 2/19/26 I AM GOING TO APPROVE THIS AFTER POUR INSPECTION BUT I AM HOLDING YOUR ROW FINAL AS I HAVE PREVIOUSLY NOTED YOU HAVE A LOOSE PAVER ON THE LEFT SIDE DRIVEWAY APRON WING AT ROAD EDGE AND YOU ALSO NEED TO CLEAN OUT THE CULVERT BETTER, THERE IS STILL QUITE A BIT OF DIRT/DEBRIS PRESENT AT THE TIME OF THIS INSPECTION. SEE PHOTO FOR REFERENCE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/18/2026 | APPROVED | FSLADISH |
| Note: 2/18/26 WHOLE PROPERTY IS NOW GRADED AND SODDED AND MEETS THE COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. _______________________________________________________________________________________________________________________________ 1/26/2026 - PREVIOUS INSPECTION NOTES 1/26/26 Spoke with Jim cm and I am going to cancel this inspection via applicant until he finds out the status of the lot on the right side. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/18/2026 | APPROVED | FSLADISH |
| Note: 2/18/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S AND/OR HOMEOWNER’S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ***INSPECTORS NOTE. YOU HAVE A LOOSE PAVER AT THE APRON WING ROAD EDGE ON THE LEFT SIDE.*** | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/26/2026 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 1/26/26 Spoke with Jim cm and I am going to cancel this inspection via applicant until he finds out the status of the lot on the right side. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/26/2025 | APPROVED | RRICKS |
| Note: 12/26/2025 RRicks At the time of the inspection, all minimum city requirements were met. The builder's responsible for ensuring that nothing changes after this Inspection is approved. 12/22/2025 - PREVIOUS INSPECTION NOTES 12/22/25 PAVER DETAIL SHEET AND REVISED SITE PLAN UPLOADED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 ***INSPECTORS NOTEMET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** Inspector Notes from Inspection 9470 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW- PAVER RESTRAINTS | 12/22/2025 | APPROVED | FSLADISH |
| Note: 12/22/25 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR DRIVEWAY PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 12/22/2025 | PARTIALLY APPROVED | FSLADISH |
| Note: 12/22/25 PAVER DETAIL SHEET AND REVISED SITE PLAN UPLOADED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS 12/16/2025 - PREVIOUS INSPECTION NOTES 12/16/25 ***INSPECTORS NOTEMET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** Inspector Notes from Inspection 9470 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/16/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 12/16/25 ***INSPECTORS NOTEMET ONSITE WITH JIM CM AND WENT OVER THE PAVER PREPOUR INSPECTIONS. HE HAS A COUPLE MINOR CORRECTIONS TO MAKE AND NEEDS TO UPLOAD A PAVER DETAIL SHEET OPTION. DUE TO SITE SPECIFIC CONDITION, (THE CURVATURE OF THE ROAD EDGE) I AM ALLOWING THE CULVERT PIPE TO BE 8 FT ON THE LEFT SIDE AND 5 FT ON THE RIGHT SIDE WHICH WILL BETTER ALIGN WITH THE SWALE TO THE RIGHT AS IT IS AT 5 FEET AS WELL. ANY QUESTIONS CONTACT INSPECTOR SLADISH.*** Inspector Notes from Inspection 9470 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| GRAVITY SEWER TEST | 11/12/2025 | APPROVED | MGIBSON |
| SEWER TIE IN | 11/12/2025 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 11/06/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/6/2025 2:55:56 PM *** 11/6/25: FPL emailed to release power. | |||
| ROW - DRAINAGE | 11/03/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/3/25 CORRECTIONS HAVE BEEN COMPLETED AT THE TIME OF THIS INSPECTION SWALE IS OPEN, SILT FENCE RE-ESTABLISHED TRASH PICKED UP. APPROVING AS NOTED THAT THE SITE MUST BE MAINTAINED TO COPC MINIMUM STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. ______________________________________________________________________________________________________________________ 10/30/2025 - PREVIOUS INSPECTION NOTES 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 10/30/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 10/30/25 YOU ARE REQUIRED TO REPAIR/REPLACE/RESET SILT FENCE AROUND PERIMETER OF CONSTRUCTION SITE TO INCLUDE THE FRONT. IT IS DOWN AND BROKEN/BREACHED IN SEVERAL AREAS CAUSING EROSION INTO DITCH/WETLAND AREA. IF YOU DO NOT CONTAIN THIS IMMEDIATELY YOU WILL BE REQUIRED TO ADD AN ADDITION SILT FENCE IN THE REAR AGAINST DITCH WETLAND AREA. PLEASE MADE CORRECTIONS IMMEDIATELY. I WILL BE BACK FOR A COMPLIANCE REINSPECTION ON 11/3/25. PHOTO FOR REFERENCE. Inspector Notes from Inspection 9470 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| PEP TANK INSTALLATION REQUEST | 09/24/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 09/09/2025 | APPROVED | MCONTRYMAN |
| INSULATION | 09/05/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/5/2025 10:05:06 AM *** 9/3/2025 - PREVIOUS INSPECTION NOTES 9/3/25: 1). Top plate penetration for AHU feed is incomplete. FBC-R302.11 Also, check guest bathroom pipe penetrations. 2). Dryer exhaust has been relocated and is now missing nail plates. FBCR M1308.2 & FBCR M1502.5 3). Hole in top plate at previous dryer exhaust duct location needs to be repaired with solid 1.5" thick lumber as required. FBC-R302.11 4). Roof tile installation has dislodged bathroom exhaust at roof sheathing. Need to be resealed at a minimum. FBC-M1502.4.2 / FBCR M1601.4.1 NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final) | |||
| INSULATION | 09/03/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 9/3/2025 2:43:44 PM *** 9/3/25: 1). Top plate penetration for AHU feed is incomplete. FBC-R302.11 Also, check guest bathroom pipe penetrations. 2). Dryer exhaust has been relocated and is now missing nail plates. FBCR M1308.2 & FBCR M1502.5 3). Hole in top plate at previous dryer exhaust duct location needs to be repaired with solid 1.5" thick lumber as required. FBC-R302.11 4). Roof tile installation has dislodged bathroom exhaust at roof sheathing. Need to be resealed at a minimum. FBC-M1502.4.2 / FBCR M1601.4.1 NOTE: Kitchen exhaust is missing three (evenly spaced) screws at each connection. M1601.4.1 (will need before final) | |||
| ALL ROUGH | 08/29/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ALL ROUGH | 08/28/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 8/28/25 Both items not repaired, truss not repaired per letter and not letter has been uploaded showing PT sills Make ALL repairs before calling in for re-inspection Inspector Notes from Inspection 2467 #1-Please provide window silt plans for window framing installation #2 truss C4 is been fix but not fix by engineering details 1/2" gap between fix plate and brocken web Number 1 and 2 front previous inspections still pending Inspector Notes from Inspection 2460 Please provide the information required for 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection #2-Truss C4 is been repair for damage , summit for revision and approval ingeneering latter with seal, make the propper rapair by plans requirement Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening | |||
| ROW - DRAINAGE | 07/21/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/21/25 CORRECTION MADE AT THE TIME OF THIS INSPECTION. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. APPROVING AS NOTED. 7/18/2025 - PREVIOUS INSPECTION NOTES 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 07/18/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/18/25 NO CHANGES. YOU WILL HAVE A PERMIT HOLD PLACED ON THIS PERMIT UNTIL ALL REQUIRED CORRECTIONS COMPLETED. NEXT COMPLIANCE INSPECTION 7/21/25 ________________________________________________________________________________________________________________________ 7/17/2025 - PREVIOUS INSPECTION NOTES 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 07/17/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 07/17/25 TPOLACEK*** CONDITIONS REMAIN THE SAME AS PREVIOUS INSPECTION. NEXT INSPECTION 07/18/25 IF NOT CORRECTED A STOP WORK ORDER WILL BE POSTED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/16/2025 - PREVIOUS INSPECTION NOTES YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 07/16/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: YOU STILL NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL AND CLEAN ALL DIRT AND SEDIMENT IN FRONT OF TEMP. CULVERT. ------------------------------------------------------------------------- 7/15/2025 - PREVIOUS INSPECTION NOTES 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 07/15/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/15/25 NOTHING HAS CHANGED. YOU ARE REQUIRED TO CLAE OUT YOUR SWALE AND FULLY CLEAN OUT THE DIRT/SILT FROM THE TEMPORARY PIPE TO ALLOW THE COPC SWALE TO DRAINAND NOT CAUSE ADVERSE DRAINAGE ONTO ROAD/NEIGHBORING PROPERTIES. AN INSPECTION HOLD WILL BE PLACED ON THIS PERMIT UNTIL REQUIRED CORRECTIONS ARE COMPLETED. SEE PHOTO FOR REFERENCE. 7/8/2025 - PREVIOUS INSPECTION NOTES NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW - DRAINAGE | 07/08/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO OPEN ALL ROADSIDE SWALE SO WATER CAN FLOW TO OUTFALL YOU WILL HAVE 7DAYS TO FIX ALL OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROOF VALLEY & METAL | 05/14/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: #1-Please provide window silt plans for window framing installation #2 truss C4 is been fix but not fix by engineering details 1/2" gap between fix plate and brocken web Number 1 and 2 front previous inspections still pending Inspector Notes from Inspection 2460 Please provide the information required for 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection #2-Truss C4 is been repair for damage , summit for revision and approval ingeneering latter with seal, make the propper rapair by plans requirement Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening | |||
| WALL SHEATHING | 04/21/2025 | APPROVED | CVANSTRAHLEN |
| Note: Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/21/2025 | APPROVED - AS NOTED | CVANSTRAHLEN |
| Note: Please provide the information required for 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection #2-Truss C4 is been repair for damage , summit for revision and approval ingeneering latter with seal, make the propper rapair by plans requirement Inspector Notes from Inspection 2340 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening | |||
| TIE BEAM / LINTEL | 03/25/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 3/25/25 1. Sills are gonng to be PT wood. Please have stamped and city approved engineered letter stating this by next inspection --moving forward, please have engineer notate wood sills on the plans-- 3/24/2025 - PREVIOUS INSPECTION NOTES please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening | |||
| TIE BEAM / LINTEL | 03/24/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: please fix items for next inspection #1- rebar is to closer to block cell wall ( mark with green sharpie market on foundation plans #2- missing window silk in all windows opening | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/18/2025 | APPROVED | LSALYERDS |
| MONOLITHIC SLAB | 03/11/2025 | APPROVED | MCONTRYMAN |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/07/2025 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 03/07/2025 | CANCELLED BY APPLICANT | WEB |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/06/2025 | APPROVED | KSANDOE |
| WATER METER INSTALLATION REQUEST | 02/11/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/26/2026 | 02/26/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/16/2025 | 12/19/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/10/2025 | 12/10/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/02/2025 | 12/03/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/02/2025 | 12/10/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/02/2025 | 12/02/2025 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM walk way can be greater than 6 ft wide | |||
| MECH | COMPLETE | 11/06/2025 | 11/07/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/20/2025 | 08/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/27/2025 | 05/28/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/21/2025 | 04/24/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/17/2025 | 03/18/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/17/2025 | 03/17/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/05/2025 | 03/05/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/05/2025 | 03/05/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/05/2025 | 03/06/2025 |
| Note: Released By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/28/2025 | 01/29/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/22/2025 | 01/28/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/22/2025 | 01/22/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide new landscape plan showing both lots. Since you are clearing both lots you will need 8 trees total. Please show at least 4 trees on the vacant lot that you are keeping or planting. | |||
| ENGIN1 | COMPLETE | 01/22/2025 | 01/28/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/03/2025 | 01/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 12/23/2024 | 01/22/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 12/20/2024 | 12/31/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/20/2024 | 12/31/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 12/20/2024 | 12/23/2024 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 12/20/2024 | 12/31/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Range and Dryer need to be GFCI protected. NEC 2020 210.8 2. Need correct outlet spacing in bed 4. NEC 2020 210.52 3. DW outlet can not be located behind the DW. NEC 2020 422.16 4. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 | |||
| ENGIN1 | COMPLETE | 12/20/2024 | 12/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 12/20/2024 | 12/23/2024 |
| LOCATE | COMPLETE | 12/20/2024 | 01/02/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/20/2024 | 12/23/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 12/20/2024 | 12/31/2024 |
| Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Culvert pipe is shown bending in the opposite direction of the edge of pavement. This opposite bend has the culvert out of the swale and into the property line. A straight culvert should function well in this location. | |||
| ZON | HOLD | 12/20/2024 | 12/20/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Lots 2 and three are bound together the survey only shows lot 2 are you planning on clearing lot 3? If so please provide a survey with both lots on it. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 02/25/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 02/18/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 02/18/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/18/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/18/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/18/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/18/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/18/2026 |
| SW ENG - INSPECTION 20 | ¤20.00 | 02/18/2026 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/18/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/18/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/18/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 02/18/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 02/18/2026 |
| FC IMPACT FEE EMS | ¤62.00 | 01/30/2025 |
| IMPACT FEE FIRE | ¤434.51 | 01/30/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/30/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/30/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 01/30/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/30/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,862.00 | 01/30/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/30/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/30/2025 |
| CONNECTION FEES | ¤1,187.26 | 01/30/2025 |
| WATER-METER | ¤514.49 | 01/30/2025 |
| WATER- TURN ON | ¤25.00 | 01/30/2025 |
| WATER- TURN ON | ¤25.00 | 01/30/2025 |
| ADJUSTMENT 10% | (¤203.50) | 01/30/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/30/2025 |
| INSPECTION - RESIDENTIAL | ¤1,562.00 | 01/30/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤443.04 | 01/30/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/30/2025 |
| SW ENG PRE APRON | ¤30.00 | 01/30/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/30/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/30/2025 |
| SEWER CREDIT | (¤891.75) | 01/30/2025 |
| SEWER INSPECTION | ¤25.00 | 01/30/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 01/30/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 01/30/2025 |
| SITE PLAN 30 | ¤30.00 | 01/30/2025 |
| SURCHARGE FS 533.721 | ¤18.32 | 01/30/2025 |
| SURCHARGE - FS 468.631 | ¤27.47 | 01/30/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/30/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,164.01 |