I want to search for...

Permit #2024120978

Permit Details

Status: COED

Parcel Id: 07-11-31-7016-00040-1900
CONDITIONED SPACE: 3388 sqft
GARAGE: 687 sqft
OPENED PORCH (WITH ROOF) : 518 sqft
Total Square Footage: 4593 sqft
Block: 00040
Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE
Job Phone: 386-931-6577
Location Address: 10 COLORADO DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/20/2025
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: TENORIO MARCELO & KELLI LIMA H&W

Address

16 BUNKER HILL DR

PALM COAST, FL 32137

Lot: 1900
Contracted Stated Job Value: ¤350,000.00
Job Description: Single Family Residence
Type: CN
Original Permit #: 2021051755

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CRC1327024 (Exp: 08/31/2026) 386-263-2167

Sub Contractors

FERNANDO M FARIA
Status Location Address State License Number Phone
ACTIVE

23 FREELAND LANE

PALM COAST, FL 32137

RF11067823 (Exp: 08/31/2027) 386-569-4336
DANIEL GOULDNER
Status Location Address State License Number
ACTIVE

400 OLD HAW CREEK RD

BUNNELL, FL 32110

CAC1818907 (Exp: 08/31/2026)
GREGORY ALLEN HENRY
Status Location Address State License Number Phone
ACTIVE

1332 SUNSET BLVD

DAYTONA BEACH, FL 32117

EC13009193 (Exp: 08/31/2026) 386-679-6908

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/09/2026 FINAL APPROVED MCONTRYMAN
Note: 3/5/2026 - PREVIOUS INSPECTION NOTES 3/5/26 Previous notes not rectified 2. (2) outlets on the island needto be GFCI (only 1 not GFCi) NEC 210.8(7) 10. Energy calcs do not match Units installed FBC(A) 107.4 12. AHU in garage hanging is missing a drain pan with float switch FBC 307.2.3 13. EC R403.3.6(4) NOTICE TO OWNER UNIT IN ATTIC POSTED AT PANEL 1/7/2026 - PREVIOUS INSPECTION NOTES 1. Outlet in Laundry room needs to be GFCI 2. (2) outlets on the island needto be GFCI 3. (2) outlets on the counter bar in the kitchen do not work. 4. outlet in lanai under the Bay window need GFCI 5. Outlet in master bath toilet needs GFCI 6. Dryer needs GFCI 7. Wall Oven and Cooktop need locking breakers. 8. Breaker for smaller ODU is too big, It requires 20 amp max. 9. Recess lights in the garage are not Fire rated. 10. Energy calcs do not match Units installed. 11. No light or Service outlet in the attic for AHU that is installed in the attic. 12. AHU in garage hanging is missing a pan. 13. EC R403.3.6(4) NOTICE TO OWNER UNIT IN ATTIC POSTED AT PANEL 12/1/2025 - PREVIOUS INSPECTION NOTES Canceled via phone - Luis
BLD - BUILDING FINAL 03/05/2026 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 3/5/26 Previous notes not rectified 2. (2) outlets on the island needto be GFCI (only 1 not GFCi) NEC 210.8(7) 10. Energy calcs do not match Units installed FBC(A) 107.4 12. AHU in garage hanging is missing a drain pan with float switch FBC 307.2.3 13. EC R403.3.6(4) NOTICE TO OWNER UNIT IN ATTIC POSTED AT PANEL 1/7/2026 - PREVIOUS INSPECTION NOTES 1. Outlet in Laundry room needs to be GFCI 2. (2) outlets on the island needto be GFCI 3. (2) outlets on the counter bar in the kitchen do not work. 4. outlet in lanai under the Bay window need GFCI 5. Outlet in master bath toilet needs GFCI 6. Dryer needs GFCI 7. Wall Oven and Cooktop need locking breakers. 8. Breaker for smaller ODU is too big, It requires 20 amp max. 9. Recess lights in the garage are not Fire rated. 10. Energy calcs do not match Units installed. 11. No light or Service outlet in the attic for AHU that is installed in the attic. 12. AHU in garage hanging is missing a pan. 13. EC R403.3.6(4) NOTICE TO OWNER UNIT IN ATTIC POSTED AT PANEL 12/1/2025 - PREVIOUS INSPECTION NOTES Canceled via phone - Luis
U-CROSS CONNECTION 01/07/2026 APPROVED BWRIGHT
BLD - BUILDING FINAL 01/07/2026 Disapproved - NO FEE HCAMACHO
Note: 1. Outlet in Laundry room needs to be GFCI 2. (2) outlets on the island needto be GFCI 3. (2) outlets on the counter bar in the kitchen do not work. 4. outlet in lanai under the Bay window need GFCI 5. Outlet in master bath toilet needs GFCI 6. Dryer needs GFCI 7. Wall Oven and Cooktop need locking breakers. 8. Breaker for smaller ODU is too big, It requires 20 amp max. 9. Recess lights in the garage are not Fire rated. 10. Energy calcs do not match Units installed. 11. No light or Service outlet in the attic for AHU that is installed in the attic. 12. AHU in garage hanging is missing a pan. 13. EC R403.3.6(4) NOTICE TO OWNER UNIT IN ATTIC POSTED AT PANEL 12/1/2025 - PREVIOUS INSPECTION NOTES Canceled via phone - Luis
ROW - STORMWATER FINAL 12/17/2025 APPROVED TPOLACEK
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 12/1/2025 - PREVIOUS INSPECTION NOTES 12-1-256 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM BOTH CULVERTS AND CLEAN SEDIMENT. WILL APPROVE AFTER POUR AND HOLD ON FINAL ROW. FINAL SURVEY WAS ALREADY APPROVED ON 10-23-25 BUILDER MAY NOW SCHEDULE FINAL AFTER POUR AND FINAL ROW INSPECTIONS
U -UTILITY RESIDENTIAL FINAL 12/01/2025 FINAL APPROVED BWRIGHT
ROW - STORMWATER FINAL 12/01/2025 Disapproved - NO FEE TPOLACEK
Note: 12-1-256 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM BOTH CULVERTS AND CLEAN SEDIMENT. WILL APPROVE AFTER POUR AND HOLD ON FINAL ROW. FINAL SURVEY WAS ALREADY APPROVED ON 10-23-25 BUILDER MAY NOW SCHEDULE FINAL AFTER POUR AND FINAL ROW INSPECTIONS
ROW - FINAL APRON (AFTER POUR) 12/01/2025 APPROVED - AS NOTED TPOLACEK
Note: 12-1-256 TPOLACEK*** BUILDER MUST REMOVE ALL OVER POUR CONCRETE FROM BOTH CULVERTS AND CLEAN SEDIMENT. WILL APPROVE AFTER POUR AND HOLD ON FINAL ROW. * RESIDENTIAL CONCRETE DRIVEWAY CULVERT DETAIL. DRAWING 300. E 14. CONCRETE EXTENDING BEYOND THE FORMBOARDS, INTO THE SWALE, MUST BE REMOVED.Sec 300.E FINAL SURVEY WAS ALREADY APPROVED ON 10-23-25 BUILDER MAY NOW SCHEDULE FINAL AFTER POUR AND FINAL ROW INSPECTIONS
BLD - BUILDING FINAL 12/01/2025 CANCELLED BY APPLICANT HCAMACHO
Note: Canceled via phone - Luis
ELEVATION CERTIFICATE-FINAL APPROVAL 11/14/2025 APPROVED JMYERS
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/10/2025 APPROVED - AS NOTED TPOLACEK
Note: FINAL SURVEY WAS ALREADY APPROVED ON 10-23-25 BUILDER MAY NOW SCHEDULE FINAL AFTER POUR AND FINAL ROW INSPECTIONS
ROW FIELD SURVEY /GRADING CERTIFICATION 10/23/2025 APPROVED - AS NOTED EMADISON
Note: ** 10/23/25 BUILDER NEEDS TO LOWER SOD ELEVATION AT THE OUTLET END OF CULVERT ON COLORADO AS IT IS HOLDING BACK WATER ** CLEAN OUT ALL DEBRIS FROM BOTH CULVERTS
FINAL SURVEY (OFFICE USE ONLY) 10/23/2025 APPROVED EMADISON
ELECTRIC - EARLY POWER 10/08/2025 APPROVED HCAMACHO
Note: 10/3/2025 - PREVIOUS INSPECTION NOTES 1. Address required to be posted for Emergency services. FBCR 319.1 2. Missing Face plates at (1) Outside Kitchen receptacle, and (1) laundry room receptacle. 3. Sub Panel at AC condensors missing inside secured panel cover. NEC 110.27 Inspector Notes from Inspection 2200 9/30/25 Okay to send email to FPL
WILDLIFE CHECK - ENVIRONMENTAL 10/08/2025 APPROVED DRODRIGUEZ
ELECTRIC - EARLY POWER 10/03/2025 Disapproved - NO FEE JSTEWART
Note: 1. Address required to be posted for Emergency services. FBCR 319.1 2. Missing Face plates at (1) Outside Kitchen receptacle, and (1) laundry room receptacle. 3. Sub Panel at AC condensors missing inside secured panel cover. NEC 110.27 Inspector Notes from Inspection 2200 9/30/25 Okay to send email to FPL
ELECTRIC - EARLY POWER 09/30/2025 CANCELLED BY APPLICANT WEB
ELECTRIC-TUG 09/30/2025 APPROVED - AS NOTED MCONTRYMAN
Note: 9/30/25 Okay to send email to FPL
ELECTRIC-TUG 09/29/2025 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 09/29/2025 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 09/29/2025 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 08/20/2025 APPROVED KSANDOE
U - SEWER TIE IN 08/20/2025 APPROVED HCAMACHO
ELECTRIC - EARLY POWER 08/12/2025 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 07/24/2025 APPROVED - AS NOTED EMADISON
Note: ** 07/24/25 READY TO SET PAVERS ON COLLEGE CT DRIVEWAY ________________________________________________________________________________________________________________ 7/18/2025 - PREVIOUS INSPECTION NOTES tHE DRIVEWAY ON COLLEGE CT NEED THE PAVER BASE NOT READY FOR PAVERS tHE DRIVEWAY ON COLORADO IS READY FOR PAVERS. Correction made it.WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED. 7/17/2025 - PREVIOUS INSPECTION NOTES DO NOT LAY PAVERS ON THE DRIVEWAY ON COLORADO BASE WAS NOT DOWN AT THE TIME OF THIS INSPECTION IF PAVERS ARE LAID YOU WILL BE PULLING ALL PAVERS BEFORE PASSING NEXT INSPECTION. THIS INSPECTION WAS FOR THE DRIVEWAY IN FRONT OF THE HOUSE AND THERE ARE THINGS THAT NEED TO BE ADDRESS BEFORE PASSING. 1) RIGHT MITER END FORMS NEED TO BE FIX SO YOU HAVE MINIMUM OF 6" FROM SAW CUT OF CULVERT TO DRIVEWAY. 2) NEED TO DIG OUT MORE BASE TO GIVE YOU THE MINIMUM OF 4" OF CONCRETE BELOW PAVERS IN THE APRON. ---------------------------------------------------------------------- 7/11/2025 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS FOR DRIVEWAY ON COLORADO ONLY NEED TO CALL IN FOR CULVERT AND DRIVEWAY WHEN READY. READY TO APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------------------------- 7/10/2025 - PREVIOUS INSPECTION NOTES CANCELED IN PERSON CONTRACTOR ON SITE EXSPLAINED WHAT NEEDED TO BE DONE IN PERSON.
ROW- PRE-APRON (PRE-POUR) 07/18/2025 PARTIALLY APPROVED GBERTOLA
Note: tHE DRIVEWAY ON COLLEGE CT NEED THE PAVER BASE NOT READY FOR PAVERS tHE DRIVEWAY ON COLORADO IS READY FOR PAVERS. Correction made it.WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED. 7/17/2025 - PREVIOUS INSPECTION NOTES DO NOT LAY PAVERS ON THE DRIVEWAY ON COLORADO BASE WAS NOT DOWN AT THE TIME OF THIS INSPECTION IF PAVERS ARE LAID YOU WILL BE PULLING ALL PAVERS BEFORE PASSING NEXT INSPECTION. THIS INSPECTION WAS FOR THE DRIVEWAY IN FRONT OF THE HOUSE AND THERE ARE THINGS THAT NEED TO BE ADDRESS BEFORE PASSING. 1) RIGHT MITER END FORMS NEED TO BE FIX SO YOU HAVE MINIMUM OF 6" FROM SAW CUT OF CULVERT TO DRIVEWAY. 2) NEED TO DIG OUT MORE BASE TO GIVE YOU THE MINIMUM OF 4" OF CONCRETE BELOW PAVERS IN THE APRON. ---------------------------------------------------------------------- 7/11/2025 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS FOR DRIVEWAY ON COLORADO ONLY NEED TO CALL IN FOR CULVERT AND DRIVEWAY WHEN READY. READY TO APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------------------------- 7/10/2025 - PREVIOUS INSPECTION NOTES CANCELED IN PERSON CONTRACTOR ON SITE EXSPLAINED WHAT NEEDED TO BE DONE IN PERSON.
ROW- PRE-APRON (PRE-POUR) 07/17/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: DO NOT LAY PAVERS ON THE DRIVEWAY ON COLORADO BASE WAS NOT DOWN AT THE TIME OF THIS INSPECTION IF PAVERS ARE LAID YOU WILL BE PULLING ALL PAVERS BEFORE PASSING NEXT INSPECTION. THIS INSPECTION WAS FOR THE DRIVEWAY IN FRONT OF THE HOUSE AND THERE ARE THINGS THAT NEED TO BE ADDRESS BEFORE PASSING. 1) RIGHT MITER END FORMS NEED TO BE FIX SO YOU HAVE MINIMUM OF 6" FROM SAW CUT OF CULVERT TO DRIVEWAY. 2) NEED TO DIG OUT MORE BASE TO GIVE YOU THE MINIMUM OF 4" OF CONCRETE BELOW PAVERS IN THE APRON. ---------------------------------------------------------------------- 7/11/2025 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS FOR DRIVEWAY ON COLORADO ONLY NEED TO CALL IN FOR CULVERT AND DRIVEWAY WHEN READY. READY TO APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------------------------- 7/10/2025 - PREVIOUS INSPECTION NOTES CANCELED IN PERSON CONTRACTOR ON SITE EXSPLAINED WHAT NEEDED TO BE DONE IN PERSON.
ROW- PRE-APRON (PRE-POUR) 07/11/2025 PARTIALLY APPROVED PFLANAGAN
Note: THIS INSPECTION IS FOR DRIVEWAY ON COLORADO ONLY NEED TO CALL IN FOR CULVERT AND DRIVEWAY WHEN READY. READY TO APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR ALL PAVER BASE NEEDS TO SPREAD AND COMPACTED TO CITY'S STANDARDS WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. -------------------------------------------------------------------------------------------- 7/10/2025 - PREVIOUS INSPECTION NOTES CANCELED IN PERSON CONTRACTOR ON SITE EXSPLAINED WHAT NEEDED TO BE DONE IN PERSON.
ROW- PRE-APRON (PRE-POUR) 07/10/2025 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 07/10/2025 CANCELLED BY APPLICANT PFLANAGAN
Note: CANCELED IN PERSON CONTRACTOR ON SITE EXSPLAINED WHAT NEEDED TO BE DONE IN PERSON.
ROW- PRE-APRON (PRE-POUR) 07/08/2025 CANCELLED BY APPLICANT WEB
INSULATION 07/01/2025 APPROVED HCAMACHO
Note:
INSULATION 06/25/2025 CANCELLED BY APPLICANT WEB
Note: 6/18/2025 - PREVIOUS INSPECTION NOTES 1. Bath Fans exhaust piping are missing 2nd Mechanical attachemnt.FBCR M1604.4.1 *From previous inspection* 2. Missing fire foam in allot of holes through out the whole house on the top plates and where ceilings change heights. 3. Missing fire blocking in laundry room where dyer exhaust pipe was changed. 4. Energy Cals. show R6 on block walls and R5 is installed. Need Revision and submitted. Inspector Notes from Inspection 2420 1. Need Nail plate in Master bath on the water line for the toilet.Marked FBCR P2603.2.1 2. Need nail plate in master bath on the Electric wires at the entrance.Marked NEC 300.4 3. Need nail plate on wire in the pool bath on top plate. MarkedNEC 300.4 4. Missing outlet in back guest bedroom on closte wall, marked on plan.FBC [A]107.4 5. Bath Fans are missing 2 Mechanical attachemnt.FBCR M1604.4.1 6. Need access for water shutoff valve for the pot filler in the kitchen. *Will check at Insualtion.*
INSULATION 06/18/2025 Disapproved -FEE REQUIRED HCAMACHO
Note: 1. Bath Fans exhaust piping are missing 2nd Mechanical attachemnt.FBCR M1604.4.1 *From previous inspection* 2. Missing fire foam in allot of holes through out the whole house on the top plates and where ceilings change heights. 3. Missing fire blocking in laundry room where dyer exhaust pipe was changed. 4. Energy Cals. show R6 on block walls and R5 is installed. Need Revision and submitted. Inspector Notes from Inspection 2420 1. Need Nail plate in Master bath on the water line for the toilet.Marked FBCR P2603.2.1 2. Need nail plate in master bath on the Electric wires at the entrance.Marked NEC 300.4 3. Need nail plate on wire in the pool bath on top plate. MarkedNEC 300.4 4. Missing outlet in back guest bedroom on closte wall, marked on plan.FBC [A]107.4 5. Bath Fans are missing 2 Mechanical attachemnt.FBCR M1604.4.1 6. Need access for water shutoff valve for the pot filler in the kitchen. *Will check at Insualtion.*
ALL ROUGH 06/12/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. Need Nail plate in Master bath on the water line for the toilet.Marked FBCR P2603.2.1 2. Need nail plate in master bath on the Electric wires at the entrance.Marked NEC 300.4 3. Need nail plate on wire in the pool bath on top plate. MarkedNEC 300.4 4. Missing outlet in back guest bedroom on closte wall, marked on plan.FBC [A]107.4 5. Bath Fans are missing 2 Mechanical attachemnt.FBCR M1604.4.1 6. Need access for water shutoff valve for the pot filler in the kitchen. *Will check at Insualtion.*
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/06/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. - Dirt is running into the Canal in the rear and sides. The property needs still fence all around. This was mentioned on the last inspection. FBC 3307.1 NEEDS SILT FENCE PROPERLY INSTALLED 2. Several All thread rods are loose, please check all. 3. Wall in Laundry needs fireblocking. Inspector Notes from Inspection 2320 1. FBC 3307.1 NEEDS SILT FENCE PROPERLY INSTALLED 2. FBC 3302.2 NEEDS DUMPSTER GARBAGE IN FRONT YARD AND SIDE YARD NEEDS TO BE CONTAINED. *Will need to be done by next inspection.*
LATH/BRICK/ WATER BARRIER 04/23/2025 APPROVED - AS NOTED HCAMACHO
Note: 1. FBC 3307.1 NEEDS SILT FENCE PROPERLY INSTALLED 2. FBC 3302.2 NEEDS DUMPSTER GARBAGE IN FRONT YARD AND SIDE YARD NEEDS TO BE CONTAINED. *Will need to be done by next inspection.*
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Need a stamped and approved truss package intact, thats not all apart to do the inspection.Need to check Trusses. 2. All bearing walls are missing nuts and washers at bottom plate, per plan. 3. Missing bearing wall in laundry room, per truss plan. 4. Bearing walls in garage are missing rods, in several areas. 5. EJ03 Missing straps. 6. T24,T25,T26, T35 in laundry room missing straps on block wall. 7. TG6, TG10 missing LGT2 per plan. 8. Tripple truss in the rear missing LGT3, per plan. 9. No fondation plan in the package. 10. No framing detail on Bay window. Missing starps. 11. Several areas through out the house missing fire blocking. 4-9-24 1. Roof sheeting is the only thing approved. Will need to check braces and ties.
ROOF VALLEY & METAL 04/10/2024 APPROVED FWILLIS
Note: 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24- Approval of roof Sheathing/ braces /ties/ and down cells needed prior to Roof valley.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/09/2024 PARTIALLY APPROVED BTAYLOR
Note: 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 Multiple sets of prints in the job box missing pages not stamped.. Please have 1 complete set of approved prints in order. Stopped inspection. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24- No complete set of Plans that are approved onsite. R106.3.1 Aproval of Construction documents....by a stamp that states "REVIEWED FOR CODE COMPLIANCE" 3/15/2024 - PREVIOUS INSPECTION NOTES 4-9-24 1. Roof sheeting is the only thing approved. Will need to check braces and ties.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/28/2024 Disapproved -FEE REQUIRED JWALKER
Note: 3/28/24 Multiple sets of prints in the job box missing pages not stamped.. Please have 1 complete set of approved prints in order. Stopped inspection. 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24- No complete set of Plans that are approved onsite. R106.3.1 Aproval of Construction documents....by a stamp that states "REVIEWED FOR CODE COMPLIANCE" 3/15/2024 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/27/2024 Disapproved - NO FEE JSTEWART
Note: 3/27/24- No complete set of Plans that are approved onsite. R106.3.1 Aproval of Construction documents....by a stamp that states "REVIEWED FOR CODE COMPLIANCE" 3/15/2024 - PREVIOUS INSPECTION NOTES
ROOF VALLEY & METAL 03/27/2024 Disapproved - NO FEE JSTEWART
Note: 3/27/24- Approval of roof Sheathing/ braces /ties/ and down cells needed prior to Roof valley.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/15/2024 CANCELLED BY APPLICANT AGAETANO
ELEV CERT-FOUNDATION APPROVAL 03/14/2024 APPROVED JMYERS
Note: The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
TIE BEAM / LINTEL 11/14/2023 APPROVED AGAETANO
Note: 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23: Detail page for approved revisions is not in with any of the plans. (ex. numbers in triangles have no associated details). 10/16/2023 - PREVIOUS INSPECTION NOTES 10/13/2023 - PREVIOUS INSPECTION NOTES 10-13-2023 Approved documents on site. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 10-16-2033 1. Drying Garden area CMU is installed. No description of CMU wall on drawings. 2. Entry door at garage noted on drawings. Door is not installed. Please submit revisions to the building department and have onsite for inspection. 3. Please have a full set of approved drawings on site for all inspection. 4. Please remove high grass prior to next inspection.
TIE BEAM / LINTEL 11/03/2023 Disapproved -FEE REQUIRED RSIMS
Note: 11/3/23: Detail page for approved revisions is not in with any of the plans. (ex. numbers in triangles have no associated details). 10/16/2023 - PREVIOUS INSPECTION NOTES 10/13/2023 - PREVIOUS INSPECTION NOTES 10-13-2023 Approved documents on site. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 10-16-2033 1. Drying Garden area CMU is installed. No description of CMU wall on drawings. 2. Entry door at garage noted on drawings. Door is not installed. Please submit revisions to the building department and have onsite for inspection. 3. Please have a full set of approved drawings on site for all inspection. 4. Please remove high grass prior to next inspection.
TIE BEAM / LINTEL 10/16/2023 Disapproved - NO FEE AGAETANO
Note: 10/13/2023 - PREVIOUS INSPECTION NOTES 10-13-2023 Approved documents on site. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 10-16-2033 1. Drying Garden area CMU is installed. No description of CMU wall on drawings. 2. Entry door at garage noted on drawings. Door is not installed. Please submit revisions to the building department and have onsite for inspection. 3. Please have a full set of approved drawings on site for all inspection. 4. Please remove high grass prior to next inspection.
TIE BEAM / LINTEL 10/13/2023 Disapproved - NO FEE AGAETANO
Note: 10-13-2023 Approved documents on site. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
FOUND SURVEY APPROVED (OFFICE) 10/12/2023 APPROVED TBAKER
MONOLITHIC SLAB 06/16/2023 APPROVED RMARTIN
Note: 6/14/2023 - PREVIOUS INSPECTION NOTES 6/8/2023 - PREVIOUS INSPECTION NOTES 5/26/2023 - PREVIOUS INSPECTION NOTES 05-26-2023 1. Approved drawings not on site. 2. Compaction test not posted. 06-14-2023 1. Organic in slab area. Check all. 2. Tamp areas, check all. 3. Back left area of foundation not on foundation plan. Please provide stem wall foundation details and have approved drawings on site for inspection. Submit new area to building department. 4. Plans are not large enogh to read. Please have a full set of approved draings on site for inspections. 5. Termite bond not posted.
MONOLITHIC SLAB 06/14/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 6/8/2023 - PREVIOUS INSPECTION NOTES 5/26/2023 - PREVIOUS INSPECTION NOTES 05-26-2023 1. Approved drawings not on site. 2. Compaction test not posted. 06-14-2023 1. Organic in slab area. Check all. 2. Tamp areas, check all. 3. Back left area of foundation not on foundation plan. Please provide stem wall foundation details and have approved drawings on site for inspection. Submit new area to building department. 4. Plans are not large enogh to read. Please have a full set of approved draings on site for inspections. 5. Termite bond not posted.
MONOLITHIC SLAB 06/08/2023 CANCELLED BY APPLICANT AGAETANO
Note: 5/26/2023 - PREVIOUS INSPECTION NOTES 05-26-2023 1. Approved drawings not on site. 2. Compaction test not posted.
MONOLITHIC SLAB 05/26/2023 Disapproved - NO FEE AGAETANO
Note: 05-26-2023 1. Approved drawings not on site. 2. Compaction test not posted.
PLUMBING 1ST ROUGH UNDERGROUND 04/27/2023 APPROVED MGIBSON
FOOTER 12/21/2022 APPROVED RMARTIN
RETAINING WALL 06/21/2022 APPROVED RMARTIN
Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Please provide apparoved details for the retaining wall. Please provide locatons for retaining wall. 6/17/22 NEED REVISION AND OR CLARIFICATION ON WALL, LOOKS LIKE THERE IS MORE WALL THAN IS ON APPROVED PLAN
RETAINING WALL 06/17/2022 Disapproved - NO FEE RMARTIN
Note: THIS IS A REINSPECTION Please provide apparoved details for the retaining wall. Please provide locatons for retaining wall. 6/17/22 NEED REVISION AND OR CLARIFICATION ON WALL, LOOKS LIKE THERE IS MORE WALL THAN IS ON APPROVED PLAN
RETAINING WALL 04/01/2022 Disapproved - NO FEE AGAETANO
Note: Please provide apparoved details for the retaining wall. Please provide locatons for retaining wall.
ROW DAMAGE 02/17/2022 Disapproved - NO FEE KRUTH
Note: pipe has been damaged on the site and will need to be fixed
FOOTER 01/31/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION Please have approved drawings on site foer inspection.
FOOTER 01/28/2022 Disapproved - NO FEE AGAETANO
Note: Please have approved drawings on site foer inspection.
WATER METER INSTALLATION REQUEST 11/03/2021 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 06/22/2021 CANCELLED BY APPLICANT WEB

Review History

Department Status Date In Date Out
MECH COMPLETE 01/28/2026 01/29/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLFM COMPLETE 11/14/2025 11/14/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 11/06/2025 11/07/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Awaiting revised EC and Survey per discussion with survey company.
BLD COMPLETE 07/14/2025 07/17/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 07/11/2025 07/14/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/11/2025 07/14/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 07/11/2025 07/14/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
SW1 HOLD 07/09/2025 07/09/2025
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After further review based on the information provided this lot is negatively impacting lot 191. There shall be a minimum fall of 0.3' to the proposed common swale in relation to the 10' shots beyond the property line. Please submit a revised site plan depicting proposed elevations not impacting adjacent lot 191.
ZON COMPLETE 07/08/2025 07/08/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 06/30/2025 07/02/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/30/2025 07/09/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 06/30/2025 06/30/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM A fully completed, signed and notiarized RIght of Way Utilization Agreement for Paver Driveway is required. Please have all owners on deed sign the agreement and both signatures must be notarized. Once complete, please submit an electronic copy for staff review and once it has been reviewed we will request the original.
MECH COMPLETE 06/24/2025 06/25/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 06/24/2025 06/30/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/02/2025 06/02/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 05/29/2025 06/02/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Fill out Florida Product approval sheet.
ELEC COMPLETE 05/29/2025 06/02/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 02/20/2025 02/20/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
MECH COMPLETE 02/11/2025 02/12/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 02/11/2025 02/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/11/2025 02/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
SW1 HOLD 02/11/2025 02/18/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Please add drainage flow arrows
ZON COMPLETE 02/11/2025 02/11/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC HOLD 01/23/2025 01/29/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 2. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85
MECH HOLD 01/23/2025 01/28/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Design location on heatload needs to be St. augustine to match the Energy calcs
ZON COMPLETE 01/23/2025 01/23/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 01/23/2025 02/06/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLFM COMPLETE 12/30/2024 12/30/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction and Foundation were previously approved under permit #2021051755. Final is required prior to receiving CO.
BADMIN COMPLETE 12/26/2024 01/03/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 12/26/2024 01/03/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 12/26/2024 01/02/2025
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. DW outlet can not be located behind the DW. NEC 2020 422.16 2. Submit a riser diagram that includes all wire sizes and breaker sizes. Also must include the surge protectors and outside disconnects. NEC 2020 230.67, 230.85 3. Need correct outlet spacing in nook area. NEC 2020 210.52 4. Need outlet on wall by french doors in the living room. NEC 2020 210.52 5. Electrical plan needs to reference the 2020 NEC
MECH HOLD 12/26/2024 01/07/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide updated energy calcs and state card from 2023 code cycle
PLFM COMPLETE 03/14/2024 03/14/2024
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
BLD COMPLETE 10/31/2023 11/02/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 10/18/2023 10/19/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plan pages need to be uploaded separately and digitally signed sealed and verifiable. Review not complete
BADMIN INFORMATION 10/17/2023 10/17/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM Doc name and file name must match - please rename
ZON COMPLETE 10/10/2023 10/10/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/10/2023 10/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/21/2023 09/22/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/21/2023 09/22/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Right front corner of garage does not meet the minimum required setback of 20'.
PLENV COMPLETE 09/21/2023 09/25/2023
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 9/25/23 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.
BLD COMPLETE 05/31/2022 06/01/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD INFORMATION 05/26/2022 05/26/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM PLANS UPLOADED MUST HAVE DIGITAL SIGNATURE, NOT RAISED OR WET
ZON COMPLETE 01/04/2022 01/04/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 12/07/2021 12/08/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 12/07/2021 12/08/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 12/07/2021 12/08/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
PLUM COMPLETE 12/07/2021 12/08/2021
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 12/07/2021 12/07/2021
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 11/23/2021 11/23/2021
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 11/23/2021 11/23/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Building PLAN REVIEW COMMENTS: Repeat Comments 1. Digital signature on plans could not be verified.
ZON HOLD 11/23/2021 11/23/2021
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Windows and doors in rear facing public right of way (canal) must have banding. This lot requires 8 trees. Foundation shrubs required on rear of home facing canal.
BLD HOLD 11/10/2021 11/12/2021
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code-Residential REVIEW COMMENTS: 1. Digital signature could not be verified.
ENGIN1 COMPLETE 11/10/2021 11/10/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ELEC HOLD 11/10/2021 11/10/2021
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need outlets in garage. NEC 2017 210.52
MECH COMPLETE 11/10/2021 11/17/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
LOCATE COMPLETE 11/10/2021 11/12/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
SW1 COMPLETE 11/10/2021 11/17/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM
PLFM COMPLETE 11/10/2021 11/12/2021
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Structure still falls within a flood zone with the Site Plan change. Please provide foundation and final elevation certificate prior to receiving CO.
SW1 COMPLETE 06/16/2021 06/16/2021
Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM
PLFM COMPLETE 06/16/2021 06/16/2021
Note: Released By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO.
ZON COMPLETE 06/16/2021 06/17/2021
Note: Released By: ESTELLE LENS - (386)986-3751 -
ZON HOLD 06/11/2021 06/14/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Repeat comments: Site Plan: - Need to provide the dimensions of the turnaround. (The Land Development Code allows for turnarounds. The City recognizes turnarounds as parking space size, which is 9’ wide by 18’ long) REVISED PLAN SHOWS 18' WIDTH. Landscape Plan: - 8 credit trees are required for this site including one shade tree. ROBELLINI PALMS ARE NON CREDIT TREES.
PLFM HOLD 06/11/2021 06/11/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM Comments not addressed. According to the Site Plan submitted on 5/12/21 and 6/11/21, the structure will fall inside the Special Flood Hazard Area. Elevation certificates will be required at construction, foundation, and final.
ENGIN1 COMPLETE 06/11/2021 06/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM HOLD 06/07/2021 06/08/2021
Note: Held By: JORDAN MYERS, C.F.M - (904)562-0045 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted on 5/12/21, the structure will fall inside the Special Flood Hazard Area. Elevation certificates will be required at construction, foundation, and final.
SWALE COMPLETE 05/28/2021 08/11/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 05/27/2021 06/01/2021
Note: Released By: JPI
CUSVC COMPLETE 05/27/2021 06/02/2021
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 05/27/2021 05/28/2021
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/27/2021 06/01/2021
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/27/2021 06/02/2021
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 05/27/2021 05/28/2021
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 05/27/2021 06/02/2021
Note: Released By: KALEN RUTH - (386)566-1273 - KKRUTH@PALMCOASTGOV.COM
ZON HOLD 05/27/2021 06/07/2021
Note: Held By: ESTELLE LENS - (386)986-3751 - Site Plan: - Need to add the second FEMA map panel number. (...0129E) - Need to provide the dimensions of the turnaround. (The Land Development Code allows for turnarounds. The City recognizes turnarounds as parking space size, which is 9’ wide by 18’ long) - Need to show the A/C pad(s) on the site plan. Landscape Plan: - 4 foundation plantings are required on the right side. - 8 foundation plantings are required in the front within 8' of the foundation. - 8 credit trees are required for this site including one shade tree. - Landscape plan needs to show the A/C pad(s) screened with 7 gallon shrubs. Elevations: - All windows and doors (including the garage doors) must be banded in the front and the left sides facing the public rights of way.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/09/2026
REINSPECTION RESIDENTIAL ¤40.00 03/09/2026
REINSPECTION RESIDENTIAL ¤40.00 03/09/2026
CONTRACTOR CHANGE ¤20.00 03/09/2026
RECORDING FEE REIMBURSE DOC ¤44.00 03/09/2026
SW ENG REINSPECTION 30 ¤30.00 03/09/2026
ADDITIONAL FEE ¤205.00 02/20/2025
ADJUSTMENT 10% (¤153.03) 02/20/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/20/2025
INSPECTION - RESIDENTIAL ¤1,168.75 02/20/2025
PLAN REVIEW - RESIDENTIAL ¤331.50 02/20/2025
PLAN REVIEW - REVISION ¤32.50 02/20/2025
PLAN REVIEW - REVISION ¤32.50 02/20/2025
REINSPECTION RESIDENTIAL ¤40.00 02/20/2025
REINSPECTION RESIDENTIAL ¤40.00 02/20/2025
REINSPECTION RESIDENTIAL ¤40.00 02/20/2025
CONTRACTOR CHANGE ¤20.00 02/20/2025
CONTRACTOR CHANGE ¤20.00 02/20/2025
CONTRACTOR CHANGE ¤20.00 02/20/2025
Fees Total Due: ¤0.00 Total Paid: ¤2,033.72