Permit #2025010104
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00350-0070 |
| CONDITIONED SPACE: 1801 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 2299 sqft |
| Block: 00350 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 14 FENWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 04/28/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤165,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/09/2025 | FINAL APPROVED | HCAMACHO |
| U -UTILITY RESIDENTIAL FINAL | 12/09/2025 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 NO IRR/NO CC | |||
| ROW - STORMWATER FINAL | 12/05/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - FINAL APRON (AFTER POUR) | 12/05/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/05/2025 | APPROVED | TPOLACEK |
| Note: 11/26/2025 - PREVIOUS INSPECTION NOTES 11-26-25 TPOLACEK*** FINAL SURVEY STILL INDICATES THERE IS NOT ENOUGH OF A BERM TO STOP DRAINAGE FROM IMPACTING THE ADJACENT LOT IN THE REAR. SEE ATTACHED PHOTO 11/14/2025 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY STATES THAT YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE BERM OR THE 10' OFF SET ELEVATIONS ON THE ADJACENT LOTS. NEED TO HAVE A MINIMUM OF .30 SO WATER WILL NOT IMPACT THE ADJACENT LOTS SURROUND THIS PROPERTY. 2) THE 10' OFF ELEVATIONS ON THE ADJACENT LOT TO THE RIGHT ARE NOT CORRECT THEY ARE THE SAME ELEVATION AS THE SITE PLAN AND NOW THE ELEVATIONS HAS CHANGED DUE TO THE LOT IS IMPROVED NOW. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/05/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PROJECT STATUS | 12/03/2025 | Status Check | PFLANAGAN |
| Note: MEETING WITH INB TO DISCUSS FINAL SURVEY | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/26/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-26-25 TPOLACEK*** FINAL SURVEY STILL INDICATES THERE IS NOT ENOUGH OF A BERM TO STOP DRAINAGE FROM IMPACTING THE ADJACENT LOT IN THE REAR. SEE ATTACHED PHOTO 11/14/2025 - PREVIOUS INSPECTION NOTES 1) THE FINAL SURVEY STATES THAT YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE BERM OR THE 10' OFF SET ELEVATIONS ON THE ADJACENT LOTS. NEED TO HAVE A MINIMUM OF .30 SO WATER WILL NOT IMPACT THE ADJACENT LOTS SURROUND THIS PROPERTY. 2) THE 10' OFF ELEVATIONS ON THE ADJACENT LOT TO THE RIGHT ARE NOT CORRECT THEY ARE THE SAME ELEVATION AS THE SITE PLAN AND NOW THE ELEVATIONS HAS CHANGED DUE TO THE LOT IS IMPROVED NOW. | |||
| U-CROSS CONNECTION | 11/17/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: NO IRR/NO CC | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/14/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE FINAL SURVEY STATES THAT YOU DO NOT HAVE .30 FROM THE TOE OF THE DRAINAGE PATTERN TO THE BERM OR THE 10' OFF SET ELEVATIONS ON THE ADJACENT LOTS. NEED TO HAVE A MINIMUM OF .30 SO WATER WILL NOT IMPACT THE ADJACENT LOTS SURROUND THIS PROPERTY. 2) THE 10' OFF ELEVATIONS ON THE ADJACENT LOT TO THE RIGHT ARE NOT CORRECT THEY ARE THE SAME ELEVATION AS THE SITE PLAN AND NOW THE ELEVATIONS HAS CHANGED DUE TO THE LOT IS IMPROVED NOW. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/24/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/24/25 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300, E RESIDENTIAL CULVERT DETAIL ___________________________________________________________________________________________________________________ 9/22/2025 - PREVIOUS INSPECTION NOTES ** 09/22/25 AREA AROUND CULVERT IS TOO SOFT FOOT SUNK INTO MUD AND HOLE FILLED IMMEDIATELY WITH WATER ** CULVERT AND FOOTERS FILLED WITH WATER NEED TO LET WATER FLOW __________________________________________________________________________________________________________________ ** CULVERT AND FOOTERS FILLED WITH WATER 9/19/2025 - PREVIOUS INSPECTION NOTES ** 09/19/25 SITE TOO WET HOLD WATER CULVERT HAS WATER RUNNING THROUGH IT. ** FOOTERS ARE FILLED IN ** MATERIAL AROUND CULVERT TO SOFT FOOT SUNK ABOUT 5 INCHES IN MUD ** NEED TO BACK FILL AROUND FORMBOARDS TO CONTAIN CONCRETE WITHIN POUR AREA ** SEE ATTACHED PHOTOS _________________________________________________________________________________________________________________________ 9/18/2025 - PREVIOUS INSPECTION NOTES ** 09/18/25 CANCELLED BY BUILDER (FRANKIE) VIA TEXT MESSAGE | |||
| ROW - DRAINAGE | 09/22/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/22/25 CORRECTIONS MADE ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE DRAINAGE, SEDIMENT AND EROSION CONTROL OF THE JOB SITE THROUGH OUT THE PROJECT SO AS NOT TO HAVE A NEGATIVE IMPACT ON ANY ADJACENT PROPERTIES OR THE ROADWAY ______________________________________________________________________________________________________________________ 9/19/2025 - PREVIOUS INSPECTION NOTES ** 09/19/25 BUILDER IS REQUIRED TO REMOVE THE MUD AND DEBRIS FROM THE ROADWAY IT IS CREATING A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** FOLLOW UP INSPECTION ON 09/22/25 _______________________________________________________________________________________________________________ 8/27/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS AND PLACE IT IN A DUMPSTER. 3) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF LOT AND DOWN RIGHT SIDE TO ROAD SO SEDIMENT WILL NOT WASH INTO ADJACENT LOT. YOU WILL HAVE 5 DAY TO CORRECT ALL ISSUES OR THERE WILL BE INSPECTION HOLD ON THIS PERMIT. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/22/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/22/25 AREA AROUND CULVERT IS TOO SOFT FOOT SUNK INTO MUD AND HOLE FILLED IMMEDIATELY WITH WATER ** CULVERT AND FOOTERS FILLED WITH WATER NEED TO LET WATER FLOW __________________________________________________________________________________________________________________ ** CULVERT AND FOOTERS FILLED WITH WATER 9/19/2025 - PREVIOUS INSPECTION NOTES ** 09/19/25 SITE TOO WET HOLD WATER CULVERT HAS WATER RUNNING THROUGH IT. ** FOOTERS ARE FILLED IN ** MATERIAL AROUND CULVERT TO SOFT FOOT SUNK ABOUT 5 INCHES IN MUD ** NEED TO BACK FILL AROUND FORMBOARDS TO CONTAIN CONCRETE WITHIN POUR AREA ** SEE ATTACHED PHOTOS _________________________________________________________________________________________________________________________ 9/18/2025 - PREVIOUS INSPECTION NOTES ** 09/18/25 CANCELLED BY BUILDER (FRANKIE) VIA TEXT MESSAGE | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/19/25 SITE TOO WET HOLD WATER CULVERT HAS WATER RUNNING THROUGH IT. ** FOOTERS ARE FILLED IN ** MATERIAL AROUND CULVERT TO SOFT FOOT SUNK ABOUT 5 INCHES IN MUD ** NEED TO BACK FILL AROUND FORMBOARDS TO CONTAIN CONCRETE WITHIN POUR AREA ** SEE ATTACHED PHOTOS _________________________________________________________________________________________________________________________ 9/18/2025 - PREVIOUS INSPECTION NOTES ** 09/18/25 CANCELLED BY BUILDER (FRANKIE) VIA TEXT MESSAGE | |||
| ROW- PRE-APRON (PRE-POUR) | 09/18/2025 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 09/18/25 CANCELLED BY BUILDER (FRANKIE) VIA TEXT MESSAGE | |||
| ELECTRIC - EARLY POWER | 09/12/2025 | APPROVED | HCAMACHO |
| ROW - DRAINAGE | 08/27/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS AND PLACE IT IN A DUMPSTER. 3) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF LOT AND DOWN RIGHT SIDE TO ROAD SO SEDIMENT WILL NOT WASH INTO ADJACENT LOT. YOU WILL HAVE 5 DAY TO CORRECT ALL ISSUES OR THERE WILL BE INSPECTION HOLD ON THIS PERMIT. | |||
| INSULATION | 08/15/2025 | APPROVED | JSTEWART |
| Note: 8/14/2025 - PREVIOUS INSPECTION NOTES 1. All the plumbing and the drier stack are missing fire foam.FBC R302.11 Note-. All windows do not stay in the open position on their own. This needs to be addressed before Final Inspection. Inspector Notes from Inspection 2420 1. All windows do not stay in the open position on their own. This needs to be addressed before Final Inspection. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/11/25 1. Need a new set of plans on site as the plans are torn and missing pages FBC(A) 107.3.1 2. No energy calcs on site FBC(A) 107.3.1 3. No product approvals on site FBC(A) 107.3.1 4. All windows do not stay open on their own --Will need a complete inspection | |||
| INSULATION | 08/14/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. All the plumbing and the drier stack are missing fire foam.FBC R302.11 Note-. All windows do not stay in the open position on their own. This needs to be addressed before Final Inspection. Inspector Notes from Inspection 2420 1. All windows do not stay in the open position on their own. This needs to be addressed before Final Inspection. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/11/25 1. Need a new set of plans on site as the plans are torn and missing pages FBC(A) 107.3.1 2. No energy calcs on site FBC(A) 107.3.1 3. No product approvals on site FBC(A) 107.3.1 4. All windows do not stay open on their own --Will need a complete inspection | |||
| ALL ROUGH | 08/12/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. All windows do not stay in the open position on their own. This needs to be addressed before Final Inspection. 8/11/2025 - PREVIOUS INSPECTION NOTES 8/11/25 1. Need a new set of plans on site as the plans are torn and missing pages FBC(A) 107.3.1 2. No energy calcs on site FBC(A) 107.3.1 3. No product approvals on site FBC(A) 107.3.1 4. All windows do not stay open on their own --Will need a complete inspection | |||
| LATH/BRICK/ WATER BARRIER | 08/11/2025 | APPROVED | MCONTRYMAN |
| ALL ROUGH | 08/11/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 8/11/25 1. Need a new set of plans on site as the plans are torn and missing pages FBC(A) 107.3.1 2. No energy calcs on site FBC(A) 107.3.1 3. No product approvals on site FBC(A) 107.3.1 4. All windows do not stay open on their own --Will need a complete inspection | |||
| ELECTRIC-TUG | 08/11/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 8/11/25 Okay to send email to FPL | |||
| ROOF VALLEY & METAL | 08/07/2025 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/04/2025 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2465 1. Remove all shiners. There are several areas around the whole house that have shinners in the area of the overhang. 2. The garbage in the yard needs to be contained in the dumpster that's on site.FBC 3302.2 3. The swale needs to be maintained for proper water flow and there's garbage in the swale. FBC 3303.5 SWALE CLEAR *Will look at next inspection* | |||
| ROW - DRAINAGE | 08/02/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/19/25 BUILDER IS REQUIRED TO REMOVE THE MUD AND DEBRIS FROM THE ROADWAY IT IS CREATING A SAFETY HAZZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORISTS ** FOLLOW UP INSPECTION ON 09/22/25 _______________________________________________________________________________________________________________ 8/27/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO OPEN UP SWALE SO WATER CAN FLOW TO OUTFALL. 2) NEED TO CLEAN ALL TRASH AND CONSTRUCTION DEBRIS AND PLACE IT IN A DUMPSTER. 3) NEED TO INSTALL SILT FENCE ACROSSED THE FRONT OF LOT AND DOWN RIGHT SIDE TO ROAD SO SEDIMENT WILL NOT WASH INTO ADJACENT LOT. YOU WILL HAVE 5 DAY TO CORRECT ALL ISSUES OR THERE WILL BE INSPECTION HOLD ON THIS PERMIT. | |||
| GRAVITY SEWER TEST | 07/31/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 07/31/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROOF SHEATHING | 07/29/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Remove all shiners. There are several areas around the whole house that have shinners in the area of the overhang. 2. The garbage in the yard needs to be contained in the dumpster that's on site.FBC 3302.2 3. The swale needs to be maintained for proper water flow and there's garbage in the swale. FBC 3303.5 SWALE CLEAR *Will look at next inspection* | |||
| WALL SHEATHING | 07/29/2025 | APPROVED | HCAMACHO |
| TIE BEAM / LINTEL | 07/18/2025 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 07/10/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: *It is the responsibility of the contractor to make sure the footings are clear before pour, if there are any caveins with this rain after this inspection.* 7/9/2025 - PREVIOUS INSPECTION NOTES Canceled via text | |||
| MONOLITHIC SLAB | 07/09/2025 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: Canceled via text | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/03/2025 | APPROVED | HCAMACHO |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 07/02/2025 | APPROVED - AS NOTED | RRICKS |
| Note: This FFE was approved due to adjacent lot (vacant) being approved at 13.66'. Per City Engineer. | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 07/02/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 06/10/2025 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 01/13/2025 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/01/2025 | 07/02/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/01/2025 | 07/01/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/01/2025 | 07/02/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/23/2025 | 01/29/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Approved after discussions with Carmelo due to lot 12 (14 Fenwood) being approved at an FFE of 13.66' | |||
| ENGIN1 | COMPLETE | 01/23/2025 | 01/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/23/2025 | 01/23/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/07/2025 | 01/17/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 01/06/2025 | 01/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/06/2025 | 01/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 01/06/2025 | 01/06/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/06/2025 | 01/13/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/06/2025 | 01/13/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Due to the steep increase in elevation from the house approved on lot 6 and the existing house on lot 8, the city engineer recommends raising the FFE of this lot to be in-between its neighbors (14,70±). This will take it out of the 10" criteria with both neighbors but help to ensure a gradual slope between these lots. | |||
| GAS | CANCEL | 01/06/2025 | 01/10/2025 |
| LOCATE | COMPLETE | 01/06/2025 | 01/13/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/06/2025 | 01/13/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/06/2025 | 01/13/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Due to the steep increase in elevation from the house approved on lot 6 and the existing house on lot 8, the city engineer recommends raising the FFE of this lot to be in-between its neighbors (14,70±). This will take it out of the 10" criteria with both neighbors but help to ensure a gradual slope between these lots. | |||
| ZON | COMPLETE | 01/06/2025 | 01/06/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 01/06/2025 | 01/13/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 01/13/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI GENERAL INSPECTION 32.50 | ¤32.50 | 12/09/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 12/09/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/12/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/12/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 04/28/2025 |
| SW ENG PRE APRON | ¤30.00 | 04/28/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 04/28/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 04/28/2025 |
| SEWER CREDIT | (¤1,147.00) | 04/28/2025 |
| SEWER INSPECTION | ¤25.00 | 04/28/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 04/28/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 04/28/2025 |
| SITE PLAN 30 | ¤30.00 | 04/28/2025 |
| CONNECTION FEES | ¤1,187.26 | 04/28/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 04/28/2025 |
| IMPACT FEE FIRE | ¤434.51 | 04/28/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 04/28/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 04/28/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 04/28/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 04/28/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 04/28/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 04/28/2025 |
| SURCHARGE FS 533.721 | ¤10.88 | 04/28/2025 |
| SURCHARGE - FS 468.631 | ¤16.32 | 04/28/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 04/28/2025 |
| WATER- TURN ON | ¤25.00 | 04/28/2025 |
| ADJUSTMENT 10% | (¤120.90) | 04/28/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 04/28/2025 |
| INSPECTION - RESIDENTIAL | ¤918.50 | 04/28/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤260.52 | 04/28/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,486.26 |