I want to search for...
Permit #2025010162
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00440-0050 |
| CONDITIONED SPACE: 1480 sqft |
| CONDITIONED SPACE: 1480 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| OPENED PORCH (WITH ROOF) : 60 sqft |
| GARAGE: 500 sqft |
| GARAGE: 500 sqft |
| Total Square Footage: 4080 sqft |
| Block: 00440 |
| Subdivision: - |
| Job Phone: 863-647-5815 |
| Location Address: 8 SQUIRE CT |
| Type: DU - DUPLEX |
| Issue Date: 01/24/2025 |
| NOC: RECORDED |
| Applicant name: MARK ALLAN HULBERT |
| Owner: HULBERT HOMES INC |
|
Address PO BOX 6254 LAKELAND, FL 33807 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤310,000.00 |
| Job Description: Opportunity II Duplex |
| Type: CN |
| Original Permit #: 2024050542 |
Contractor
HULBERT HOMES INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 6254 LAKELAND, FL 33813 |
CRC1331304 (Exp: 08/31/2026) | 863-647-5815 |
Sub Contractors
KYLE RODBOURN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1325 W HWY 100 BUNNELL, FL 32110 |
CAC1821358 (Exp: 08/31/2026) | 386-586-9039 |
ANTONIO VINCENZO DAHM
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 RYBAR LANE PALM COAST, FL 32164 |
CFC1429951 (Exp: 08/31/2026) | 386-237-5692 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/13/2025 | FINAL APPROVED | BTAYLOR |
| ROW - STORMWATER FINAL | 08/12/2025 | APPROVED | FSLADISH |
| Note: 8/12/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. _______________________________________________________________________________________________________________________ 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25 DUMPSTER STILL ON SITE. MIKE CM SAID HE WAS WAITING ON THEM TO COME REMOVE IT TODAY. I REMINDED HIM THAT ANY DAMAGE OR DEAD GRASS UNDER DUMPSTER WOULD NEED TO BE REPAIRED/RESODDED BEFORE ROW FINAL PASSAGE. __________________________________________________________________________________________________________________________ ***INSPECTORS NOTE. YOU ARE REQUIRED TO REMOVE THE DUMPSTER OUT OF THE COPC ROW AND YOU WILL BE REQUIRED TO REPAIR/RESOD ANY AREAS DETERMINED DISTURBED UPON INSPECTION.*** | |||
| ROW - STORMWATER FINAL | 08/08/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 8/8/25 DUMPSTER STILL ON SITE. MIKE CM SAID HE WAS WAITING ON THEM TO COME REMOVE IT TODAY. I REMINDED HIM THAT ANY DAMAGE OR DEAD GRASS UNDER DUMPSTER WOULD NEED TO BE REPAIRED/RESODDED BEFORE ROW FINAL PASSAGE. __________________________________________________________________________________________________________________________ ***INSPECTORS NOTE. YOU ARE REQUIRED TO REMOVE THE DUMPSTER OUT OF THE COPC ROW AND YOU WILL BE REQUIRED TO REPAIR/RESOD ANY AREAS DETERMINED DISTURBED UPON INSPECTION.*** | |||
| ROW - FINAL APRON (AFTER POUR) | 08/08/2025 | APPROVED | FSLADISH |
| Note: 8/8/25 PIPE ELEVATIONS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U-CROSS CONNECTION | 08/08/2025 | APPROVED | BWRIGHT |
| ALL ROUGH | 08/08/2025 | CANCELLED BY INSPECTOR | BTAYLOR |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/07/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/7/25 WALKED PROPERTY AFTER CONVERSATION WITH MIKE CM AND DETERMINED THE GRADE CORRECTION THEY MADE IN THE REAR LEFT CORNER WILL NOW MOVE DRAINAGE AROUND THE STRUCTURE CORNER AND FORWARD TO THE FRONT SWALE. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 7/29/2025 - PREVIOUS INSPECTION NOTES 7/29/25 YOUR REAR LEFT CORNER DOES NOT SHOW POSITIVE DRAINAGE FLOW. YO MUST SHOW A MINIMUM OF ONE TENTH OF FALL PER 20 FT AND IT MUST HAVE POSITIVE FORWARD FLOW TO THE FRONT SWALE. SEE PHOTO FOR REFERENCE. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/07/2025 | APPROVED | FSLADISH |
| Note: 8/7/25 WALKED PROPERTY AFTER CONVERSATION WITH MIKE CM AND DETERMINED THE GRADE CORRECTION THEY MADE IN THE REAR LEFT CORNER WILL NOW MOVE DRAINAGE AROUND THE STRUCTURE CORNER AND FORWARD TO THE FRONT SWALE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9463 8/7/25 WALKED PROPERTY AFTER CONVERSATION WITH MIKE CM AND DETERMINED THE GRADE CORRECTION THEY MADE IN THE REAR LEFT CORNER WILL NOW MOVE DRAINAGE AROUND THE STRUCTURE CORNER AND FORWARD TO THE FRONT SWALE. APPROVING THIS SURVEY AS NOTED. _______________________________________________________________________________________________________________________ 7/29/2025 - PREVIOUS INSPECTION NOTES 7/29/25 YOUR REAR LEFT CORNER DOES NOT SHOW POSITIVE DRAINAGE FLOW. YO MUST SHOW A MINIMUM OF ONE TENTH OF FALL PER 20 FT AND IT MUST HAVE POSITIVE FORWARD FLOW TO THE FRONT SWALE. SEE PHOTO FOR REFERENCE. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. | |||
| ROW- PROJECT STATUS | 08/04/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/7/25 MET WITH MIKE CM ABOUT REAR LEFT CORNER TO DISCUSS GETTING DRAINAGE AROUND THE CORNER AND TO THE FRONT SWALE. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/29/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 7/29/25 YOUR REAR LEFT CORNER DOES NOT SHOW POSITIVE DRAINAGE FLOW. YO MUST SHOW A MINIMUM OF ONE TENTH OF FALL PER 20 FT AND IT MUST HAVE POSITIVE FORWARD FLOW TO THE FRONT SWALE. SEE PHOTO FOR REFERENCE. Rear yard will be drained Sec 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. ***INSPECTORS NOTE. YOU ARE REQUIRED TO REMOVE THE DUMPSTER OUT OF THE COPC ROW AND YOU WILL BE REQUIRED TO REPAIR/RESOD ANY AREAS DETERMINED DISTURBED UPON INSPECTION.*** | |||
| ELECTRIC - EARLY POWER | 07/11/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7-11-25 1. Emailed FPL at 1:01. 7/10/2025 - PREVIOUS INSPECTION NOTES 7-10-25 1. Rear security lights need to have a weatherproof cover on them till the fixture is installed. NEC 406.9.2(E) 7/9/2025 - PREVIOUS INSPECTION NOTES House is locked. Need access for inspection FRC110.1 Inspector Notes from Inspection 2170 3-4-25 1. Emailed FPL at 2:12. | |||
| ELECTRIC - EARLY POWER | 07/10/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 7-10-25 1. Rear security lights need to have a weatherproof cover on them till the fixture is installed. NEC 406.9.2(E) 7/9/2025 - PREVIOUS INSPECTION NOTES House is locked. Need access for inspection FRC110.1 Inspector Notes from Inspection 2170 3-4-25 1. Emailed FPL at 2:12. | |||
| ELECTRIC - EARLY POWER | 07/09/2025 | Disapproved - NO FEE | KSANDOE |
| Note: House is locked. Need access for inspection FRC110.1 Inspector Notes from Inspection 2170 3-4-25 1. Emailed FPL at 2:12. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/03/2025 | APPROVED | FSLADISH |
| Note: 7/3/25 BOTH PIPE ELEVATIONS GOOD. BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS CLEAR OUT ANY WATER AND MAKE SURE CONCRETE IS 3000 PSI FIBER MESH. BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| U - SEWER TIE IN | 07/01/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 07/01/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 06/06/2025 | APPROVED | CBOWERMASTER |
| INSULATION | 05/22/2025 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 05/22/2025 | APPROVED | KSANDOE |
| Note: 5/20/2025 - PREVIOUS INSPECTION NOTES 5-20-25 1. Holes on right side need to have lath put over them. | |||
| LATH/BRICK/ WATER BARRIER | 05/20/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-20-25 1. Holes on right side need to have lath put over them. | |||
| ALL ROUGH | 05/08/2025 | APPROVED | BTAYLOR |
| FIREWALL FINAL | 05/07/2025 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 04/30/2025 | APPROVED | BTAYLOR |
| Note: 4/25/2025 - PREVIOUS INSPECTION NOTES 4-25-25 1. The firewall should continue out both the front and rear soffits. | |||
| FIREWALL DRYWALL NAILING | 04/25/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-25-25 1. The firewall should continue out both the front and rear soffits. | |||
| ROOF VALLEY & METAL | 04/21/2025 | APPROVED | MCONTRYMAN |
| Note: Inspector Notes from Inspection 2460 4-9-25 1. H10 clips are to be used to secure trusses to bearing wall. 2. Bearing wall calls for SP4's at the top of every bearing stud. 3. SP1 at the bottom of every bearing stud. 4. Need red heads 24" on center for bearing wall. Circled in plans. | |||
| WALL SHEATHING | 04/09/2025 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/09/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-9-25 1. H10 clips are to be used to secure trusses to bearing wall. 2. Bearing wall calls for SP4's at the top of every bearing stud. 3. SP1 at the bottom of every bearing stud. 4. Need red heads 24" on center for bearing wall. Circled in plans. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/02/2025 | APPROVED | RRICKS |
| TIE BEAM / LINTEL | 03/24/2025 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 03/10/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/06/2025 | APPROVED | MGIBSON |
| Note: FBC 3303.5 SWALE BLOCKED BY PORTABLE | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/05/2025 | APPROVED | JMUNSON |
| ELECTRIC TEMP POLE | 03/04/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-4-25 1. Emailed FPL at 2:12. | |||
| WATER METER INSTALLATION REQUEST | 02/26/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/03/2025 | 04/07/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/02/2025 | 04/02/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/02/2025 | 04/02/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/05/2025 | 03/05/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/27/2025 | 03/03/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/21/2025 | 01/21/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 01/13/2025 | 01/16/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/13/2025 | 01/16/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition | |||
| SWALE | COMPLETE | 01/08/2025 | 01/21/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/07/2025 | 01/13/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/07/2025 | 01/13/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload only for side A and B. Energy calcs were submitted | |||
| SW1 | COMPLETE | 01/07/2025 | 01/10/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/07/2025 | 01/07/2025 |
| Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM | |||
| BADMIN | CANCEL | 01/07/2025 | |
| CUSVC | COMPLETE | 01/07/2025 | 01/07/2025 |
| Note: Released By: PAMELA MILLER - - | |||
| ENGIN1 | COMPLETE | 01/07/2025 | 01/08/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/07/2025 | 01/13/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide geotech report |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONNECTION FEES | ¤1,187.26 | 08/13/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/13/2025 |
| WATER- TURN ON | ¤25.00 | 08/13/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 08/13/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 08/13/2025 |
| SITE PLAN 30 | ¤30.00 | 01/24/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 01/24/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 01/24/2025 |
| WATER-METER | ¤514.49 | 01/24/2025 |
| WATER- TURN ON | ¤25.00 | 01/24/2025 |
| WATER- TURN ON | ¤25.00 | 01/24/2025 |
| ADJUSTMENT 10% | (¤100.65) | 01/24/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/24/2025 |
| INSPECTION - RESIDENTIAL | ¤852.50 | 01/24/2025 |
| PLAN REVIEW - APPROVED MASTER | ¤124.00 | 01/24/2025 |
| CONNECTION FEES | ¤1,187.26 | 01/24/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/24/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/24/2025 |
| SURCHARGE FS 533.721 | ¤9.06 | 01/24/2025 |
| SURCHARGE - FS 468.631 | ¤13.59 | 01/24/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/24/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/24/2025 |
| SW ENG PRE APRON | ¤30.00 | 01/24/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/24/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/24/2025 |
| SEWER CREDIT | (¤2,465.75) | 01/24/2025 |
| SEWER INSPECTION | ¤25.00 | 01/24/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 01/24/2025 |
| IMPACT FEE FIRE | ¤869.02 | 01/24/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 01/24/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 01/24/2025 |
| IMPACT FEE PARKS | ¤3,656.02 | 01/24/2025 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 01/24/2025 |
| IMPACT FEE TRANSPORTATION | ¤2,974.00 | 01/24/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤42,345.12 |