Status: COED

Parcel Id: 07-11-31-7035-00180-0100
CONDITIONED SPACE: 1800 sqft
GARAGE: 410 sqft
OPENED PORCH (WITH ROOF) : 36 sqft
Total Square Footage: 2246 sqft
Block: 00180
Subdivision: -
Job Phone: 689-250-2429
Location Address: 11 BURNELL DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/22/2025
NOC: RECORDED
Applicant name: RYAN M COURECH
Owner: A AND R MERIDIAN REAL ESTATE DEVELOPMENT LLC

Address

688 N ORLANDO AVENUE

ORLANDO, FL 32801

Address

SUITE 207

ORLANDO, FL 32801

Lot: 0100
Contracted Stated Job Value: ¤208,000.00
Job Description: SINGLE FAMILY DWELLING
Type: CN
Original Permit #: 2024010999

Contractor

MCH CONSTRUCTION LLC
Status Location Address State License Number Phone
INACTIVE

668 N ORLANDO AVE, STE 207

MAITLAND, FL 32751

CBC1262898 (Exp: 08/31/2026) 407-602-8257

Sub Contractors

JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
DUSTIN ARCHER
Status Location Address State License Number Phone
ACTIVE

2785 WRIGHTS ROAD SUITE 1133

OVIEDO, FL 32765

CMC1251099 (Exp: 08/31/2026) 407-391-1145
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 09/11/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 09/11/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW - STORMWATER FINAL 09/10/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/10/25 LEFT REAR AND DOWN LEFT SIDE IS HOLDING WATER NEED TO HAVE POSITIVE FALL TO THE FRONT ** 4) Positive fall is considered to be 0.10 of a foot every 20 feet. Section 300.01 D(4) V-17 ** AS NOTED IN PREVIOUS INSPECTION BUILDER STILL REQUIRED TO MAKE CORRECTIONS NOTED ** RIGHT REAR CORNER OF PROPERTY NEED TO SOD SLOPE THAT WAS LEFT BARE EARTH ** SEED AND STRAW ACROSS REAR PROPERTY LINE OR SOD ** SOD LEFT SIDE NEAR PEP TANK FILL IN LEFT SIDE WHERE SOD MISSING ** CLEAN CULVERT PIPE ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 09/05/25 BEFORE THE ROW STORMWATER FINAL ** RIGHT REAR CORNER OF PROPERTY NEED TO SOD SLOPE THAT WAS LEFT BARE EARTH ** SEED AND STRAW ACROSS REAR PROPERTY LINE OR SOD ** SOD LEFT SIDE NEAR PEP TANK AND FILL IN SWALE LEFT SIDE WHERE SOD MISSING ** CLEAN CULVERT PIPE
ROW - FINAL APRON (AFTER POUR) 09/10/2025 APPROVED EMADISON
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/05/2025 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 09/05/2025 APPROVED - AS NOTED EMADISON
Note: ** 09/05/25 BEFORE THE ROW STORMWATER FINAL ** RIGHT REAR CORNER OF PROPERTY NEED TO SOD SLOPE THAT WAS LEFT BARE EARTH ** SEED AND STRAW ACROSS REAR PROPERTY LINE OR SOD ** SOD LEFT SIDE NEAR PEP TANK AND FILL IN SWALE LEFT SIDE WHERE SOD MISSING ** CLEAN CULVERT PIPE
BLD - BUILDING FINAL 09/05/2025 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 08/18/2025 APPROVED - AS NOTED EMADISON
Note: ** 08/18/25CORRECTIONS MADE BENCH MARK RE-ESTABLISHED ** ENSURE YOU BACK FILL ALONG FORM BOARDS TO CONTAIN CONCRETE WITHIN THE POUR AREA ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES ** 08/15/25 THIS INSPECTOR SHOT THE ELEVATION FROM THE NAIL IN POWER POLE THAT WAS LEFT AS BENCH MARK AFTER BUILDER REMOVED (1) OF THE (2) NALS THAT WAS IN POWER POLE FROM PREVIOUS INSPECTION CULVERT ELEVATION IS NOW SHOWING TO BE .65 OUT OF TOLERANCE AND DOES NOT CROSS REFERENCE WITH THE NAIL AND DISK AT CENTER LINE ELEVATION OF (28.05). ** SEE ATTACHED PHOTO OF NAIL LEFT IN POWER AS BENCH MARK. ** BACK FILL OR EXTEND FORM BOARDS TO CONTAIN CONCRETE WITHIN THE POUR AREA ** SEE ALL ATTACHED PHOTOS ________________________________________________________________________________________________________________________ 8/13/2025 - PREVIOUS INSPECTION NOTES ** 08/13/25 BUILDER NEEDS TO IDENTIFY CORRECT BENCH MARK AS THERE ARE (2) NAILS IN POWER POLE ** An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15."
ROW- PRE-APRON (PRE-POUR) 08/15/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/15/25 THIS INSPECTOR SHOT THE ELEVATION FROM THE NAIL IN POWER POLE THAT WAS LEFT AS BENCH MARK AFTER BUILDER REMOVED (1) OF THE (2) NALS THAT WAS IN POWER POLE FROM PREVIOUS INSPECTION CULVERT ELEVATION IS NOW SHOWING TO BE .65 OUT OF TOLERANCE AND DOES NOT CROSS REFERENCE WITH THE NAIL AND DISK AT CENTER LINE ELEVATION OF (28.05). ** SEE ATTACHED PHOTO OF NAIL LEFT IN POWER AS BENCH MARK. ** BACK FILL OR EXTEND FORM BOARDS TO CONTAIN CONCRETE WITHIN THE POUR AREA ** SEE ALL ATTACHED PHOTOS ________________________________________________________________________________________________________________________ 8/13/2025 - PREVIOUS INSPECTION NOTES ** 08/13/25 BUILDER NEEDS TO IDENTIFY CORRECT BENCH MARK AS THERE ARE (2) NAILS IN POWER POLE ** An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15."
ROW - DRAINAGE 08/13/2025 APPROVED EMADISON
Note: ** 08/13 CORRECTIONS MADE BUILDER PREPARING FOR FINAL GRADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ______________________________________________________________________________________________________________ 8/6/2025 - PREVIOUS INSPECTION NOTES ** 08/06/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE TEMPORARY CULVERT AS IT IS COMPLETELY BLOCKED. ** CLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM PROPERTY AND THE RIGHT OF WAY (ROW) ** YOU WILL HAVE 7 DAYS TO MAKE ALL CORRECTIONS IF CORRECTIONS HAVE NOT BEEN COMPLETED IN THIS TIME YOUR PERMIT WILL BE PUT ON A PRIORITY 1 STATUS INSPECTION HOLD UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/25
ROW- PRE-APRON (PRE-POUR) 08/13/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/13/25 BUILDER NEEDS TO IDENTIFY CORRECT BENCH MARK AS THERE ARE (2) NAILS IN POWER POLE ** An on-site, easily identifiable benchmark referenced to NAVD 1988 (e.g., fire hydrant, nail in power pole [1 nail per power pole], and manhole covers). Pavement nails will be accepted if the above locations are not available on site. (The benchmark must be maintained throughout the construction cycle and will be used in the swale plan and Final Survey). NAVD 1988 data sheets are available http://www.ngs.noaa.gov. Section 300.01 B(9) V-15."
U-CROSS CONNECTION 08/06/2025 APPROVED BWRIGHT
GRAVITY SEWER TEST 08/06/2025 Approval - Private Provider PPROVIDER
ROW - DRAINAGE 08/06/2025 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/06/25 BUILDER IS REQUIRED TO OPEN THE ROADSIDE SWALE TEMPORARY CULVERT AS IT IS COMPLETELY BLOCKED. ** CLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM PROPERTY AND THE RIGHT OF WAY (ROW) ** YOU WILL HAVE 7 DAYS TO MAKE ALL CORRECTIONS IF CORRECTIONS HAVE NOT BEEN COMPLETED IN THIS TIME YOUR PERMIT WILL BE PUT ON A PRIORITY 1 STATUS INSPECTION HOLD UNTIL ALL CORRECTIONS HAVE BEEN MADE ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/13/25
U - SEWER TIE IN 08/06/2025 APPROVED MGIBSON
ELECTRIC - EARLY POWER 07/24/2025 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 07/15/2025 APPROVED CBOWERMASTER
INSULATION 06/26/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 06/20/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 06/16/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 06/12/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 05/30/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/30/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 04/25/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 04/25/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 04/25/2025 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 04/15/2025 APPROVED RRICKS
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 03/04/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 02/11/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 06/13/2025 06/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 06/12/2025 06/12/2025
Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM 1. INSPECTIONS NOT SCHEDULED
ENGIN1 COMPLETE 04/14/2025 04/15/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/14/2025 04/14/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/03/2025 03/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 01/14/2025 01/15/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 01/14/2025 01/17/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/14/2025 01/15/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 01/14/2025 01/14/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SWALE COMPLETE 01/08/2025 01/16/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/07/2025 01/08/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
LOCATE COMPLETE 01/07/2025 01/13/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 01/07/2025 01/10/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please indicate FFE to the nearest hundredth of a foot.
ZON COMPLETE 01/07/2025 01/07/2025
Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM
MECH HOLD 01/07/2025 01/13/2025
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Indoor design temp on heatload must be a minimum of 75 degrees per R302.1 FBC Energy Conservation 2023 8Th edition
BADMIN COMPLETE 01/07/2025 01/14/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 01/07/2025 01/07/2025
Note: Released By: PAMELA MILLER - -

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 09/11/2025
SW ENG REINSPECTION 30 ¤30.00 09/11/2025
SW ENG REINSPECTION 30 ¤30.00 09/11/2025
SW ENG - INSPECTION 20 ¤20.00 09/11/2025
SW ENG - INSPECTION 20 ¤20.00 09/11/2025
SW ENG INSPECTION 80 ¤80.00 01/22/2025
SW ENG PRE APRON ¤30.00 01/22/2025
SW ENG - REVIEW 20 ¤20.00 01/22/2025
SW ENG RES REVIEW 200 ¤200.00 01/22/2025
SEWER CREDIT (¤850.00) 01/22/2025
SEWER INSPECTION ¤25.00 01/22/2025
SEWER CAPITAL FACILITY ¤6,120.52 01/22/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 01/22/2025
SITE PLAN 30 ¤30.00 01/22/2025
WATER- TURN ON ¤25.00 01/22/2025
ADJUSTMENT 10% (¤11.32) 01/22/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/22/2025
ADMINISTRATIVE - RESID PP ¤225.00 01/22/2025
PLAN REVIEW - APPROVED MASTER ¤83.20 01/22/2025
CONNECTION FEES ¤1,187.26 01/22/2025
FC IMPACT FEE EMS ¤62.00 01/22/2025
IMPACT FEE FIRE ¤434.51 01/22/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/22/2025
FC IMPACT FEE LIBRARY ¤268.00 01/22/2025
IMPACT FEE PARKS ¤1,828.01 01/22/2025
IMPACT FEE SCHOOL ¤5,450.00 01/22/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 01/22/2025
WATER -IRRIGATION INSPECTION ¤25.00 01/22/2025
SURCHARGE FS 533.721 ¤3.27 01/22/2025
SURCHARGE - FS 468.631 ¤4.90 01/22/2025
SW ENG - FOUNDATION SURVEY ¤20.00 01/22/2025
Fees Total Due: ¤0.00 Total Paid: ¤21,895.49