Permit #2025010250
Permit Details
Status: INSPECT
| Parcel Id: 29-10-31-5540-00000-1050 |
| GARAGE: 775 sqft |
| CONDITIONED SPACE: 2967 sqft |
| OPENED PORCH (WITH ROOF) : 507 sqft |
| OPENED PORCH (WITH ROOF) : 78 sqft |
| Total Square Footage: 4327 sqft |
| Block: 00000 |
| Subdivision: - |
| Job Phone: 386-931-6577 |
| Location Address: 13 OLD OAK DR N |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/03/2025 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: SCHMIDT LAWRENCE |
|
Address 183 BROADLEAF LANE ST JOHNS, FL 32259 |
| Lot: 1050 |
| Contracted Stated Job Value: ¤475,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
LUIS JORGE MEDEIROS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CCC1335446 (Exp: 08/31/2026) | 386-931-6577 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
FRANCISCO HOMS GOMEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
8424 TOCOI PATH , 0 |
EC13007380 (Exp: 08/31/2026) | 863-521-9984 |
MIGUEL ANGEL GALLARDO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
315 PACER CT SANFORD, FL 32773 |
CAC1813826 (Exp: 08/31/2026) | 407-202-0953 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 06/01/2026 | APPROVED - AS NOTED | BVEIGA |
| Note: NO/CC IRR POTABLE WATER | |||
| ROW - FINAL APRON (AFTER POUR) | 06/01/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 06/01/2026 | APPROVED | EMADISON |
| Note: ** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/20/2026 | CANCELLED BY INSPECTOR | TPOLACEK |
| Note: Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/18/2026 | APPROVED | TPOLACEK |
| Note: BASED ON THE ENGINEERS SIGNED AND SEALED LGDC MEETING THE COPC MINIMUM REQUIREMENTS AT THE TIME OF THIS INSPECTION, I AM APPROVING THIS DOCUMENT. Effective 03-25-26, the ROW Field Survey requirement is no longer in effect for Final Lot Grading and Drainage Certificates for new construction on subdivision and infill lots. All Final Lot Grading and Drainage Certificates for these projects will now be reviewed and approved only in the office. Field verification for the ROW-FIELD SURVEY will no longer be required as part of the standard approval process for these permit types | |||
| ELECTRIC - EARLY POWER | 12/16/2025 | APPROVED | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 12/16/2025 3:10:22 PM *** 12/16/25: FPL emailed to release power. 12/8/2025 - PREVIOUS INSPECTION NOTES 1. The power line for the Airhandler in the garage has not been safety off. NEC 110.27(A) 2. The outlets installed outside in the Lanay need to be "WR" rated. NEC 406.9 3. Need house number. FBCR 319.1 ADDRESS POSTED – 4” 4. Needs SPD installed. NEC 230.67(B) SPD MUST BE LOCATED IN OR ADJACENT TO THE SERVICE EQUIPMENT OUTSIDE | |||
| ELECTRIC - EARLY POWER | 12/08/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. The power line for the Airhandler in the garage has not been safety off. NEC 110.27(A) 2. The outlets installed outside in the Lanay need to be "WR" rated. NEC 406.9 3. Need house number. FBCR 319.1 ADDRESS POSTED – 4” 4. Needs SPD installed. NEC 230.67(B) SPD MUST BE LOCATED IN OR ADJACENT TO THE SERVICE EQUIPMENT OUTSIDE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/15/2025 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/15/25 READY TO SET PAVERS ___________________________________________________________________________________________________________________ 8/12/2025 - PREVIOUS INSPECTION NOTES ** 08/12/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 08/12/2025 | APPROVED | EMADISON |
| Note: ** 08/12/25 READY TO POUR PAVER RESTRAINTS AND APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/12/2025 | PARTIALLY APPROVED | EMADISON |
| Note: ** 08/12/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED | |||
| GRAVITY SEWER TEST | 07/18/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ALL VEGITATION BEFORE BACKFILLING ONTO ''DWV & WATER DISTRIBUTION'' FBC R-318.6.2 | |||
| SEWER TIE IN | 07/18/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ALL VEGITATION BEFORE BACKFILLING ONTO ''DWV & WATER DISTRIBUTION'' FBC R-318.6.2 | |||
| INSULATION | 07/17/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 7/16/2025 - PREVIOUS INSPECTION NOTES Items from previous inspection not been fix 7/15/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A]107.3.1-NEEDS APPROVED PLANS, INCLUDING ENERGY CALCULATIONS, ON SITE #2-FBC R302.11 FBC -FIRESTOPPING INSTALLED Mark with red sharpie market places need to removed white foam and install fire rate foam , need to block area that are market with red sharpie market | |||
| INSULATION | 07/17/2025 | APPROVED | MKRASKI |
| Note: | |||
| INSULATION | 07/16/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Items from previous inspection not been fix 7/15/2025 - PREVIOUS INSPECTION NOTES Please fix items before next inspection #1-FBC [A]107.3.1-NEEDS APPROVED PLANS, INCLUDING ENERGY CALCULATIONS, ON SITE #2-FBC R302.11 FBC -FIRESTOPPING INSTALLED Mark with red sharpie market places need to removed white foam and install fire rate foam , need to block area that are market with red sharpie market | |||
| INSULATION | 07/15/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: *** NOTES ADDED BY CVANSTRAHLEN 7/15/2025 10:52:33 AM *** Concreted slab is been cut in leaving room area and pantry room entrance , not plans on side to verified the modification of the concreted or electrcial plans . please provide plans and modifications Please fix items before next inspection #1-FBC [A]107.3.1-NEEDS APPROVED PLANS, INCLUDING ENERGY CALCULATIONS, ON SITE #2-FBC R302.11 FBC -FIRESTOPPING INSTALLED Mark with red sharpie market places need to removed white foam and install fire rate foam , need to block area that are market with red sharpie market | |||
| ELECTRIC-TUG | 07/08/2025 | APPROVED | HCAMACHO |
| ALL ROUGH | 07/08/2025 | APPROVED | HCAMACHO |
| Note: | |||
| LATH/BRICK/ WATER BARRIER | 07/03/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: Inspector Notes from Inspection 2460 1. Two Straps in rear bedroom ceiling are missing nails. Note- Electrical Panel framing need to have a solid top plate of 2x for holes to be bored out for the wires to go through. This is for fire blocking, 2" of foam is not allowed. NEC 302.11(4) & 302.11.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/01/2025 | APPROVED - AS NOTED | HCAMACHO |
| Note: 1. Two Straps in rear bedroom ceiling are missing nails. Note- Electrical Panel framing need to have a solid top plate of 2x for holes to be bored out for the wires to go through. This is for fire blocking, 2" of foam is not allowed. NEC 302.11(4) & 302.11.1 | |||
| ELECTRIC-TUG | 07/01/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Need Sch 80 PVC conduit for Entrance service conductors. 2.Breaker Panel service wires must be disconnected in order to prevent the panel from being energized. | |||
| ROOF VALLEY & METAL | 06/16/2025 | APPROVED | HCAMACHO |
| WALL SHEATHING | 06/12/2025 | APPROVED | HCAMACHO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/12/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Several bearing points are missing tie downs per plan. Marked on plan 2. Two bearing poins are missing 2x4's. One is in between guest bedrooms and the other in the master bedroom. See plan 3. T07,T12,T26,T29 are missing enginerring, marked. 4. Please Provide a full set of plans. What is in the box is not complete. Note - Roof sheathing is ok , and Down cells also. | |||
| TIE BEAM / LINTEL | 04/23/2025 | APPROVED | HCAMACHO |
| MONOLITHIC SLAB | 04/07/2025 | APPROVED | HCAMACHO |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/27/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ALL VEGITATION BEFORE BACKFILLING ONTO ''DWV & WATER DISTRIBUTION'' FBC R-318.6.2 | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/26/2025 | APPROVED | RRICKS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/26/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 02/20/2025 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 01/09/2025 | APPROVED | DRODRIGUEZ |
| BLD - BUILDING FINAL | |||
| U -UTILITY RESIDENTIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/04/2026 | 06/05/2026 |
| Note: Released By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/29/2026 | 06/04/2026 |
| Note: Held By: KENNETH SANDOE - - KSANDOE@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition Second request | |||
| BADMIN | INFORMATION | 05/15/2026 | 05/15/2026 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Rename your file correctly (see document submittal requirements on the permit portal for instructions) | |||
| BADMIN | INFORMATION | 05/05/2026 | 05/05/2026 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The NOC submitted is expired. | |||
| MECH | HOLD | 04/28/2026 | 04/29/2026 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| BADMIN | INFORMATION | 03/24/2026 | 03/24/2026 |
| Note: Marked INFORMATION By: JAZMIN ROSARIO - - JROSARIO@PALMCOASTGOV.COM NOC ON FILE EXPIRED. NEED NEW NOC BEFORE ANY INSPECTIONS CAN BE SCHEDULED | |||
| BLD | COMPLETE | 07/10/2025 | 07/14/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/24/2025 | 04/24/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/24/2025 | 04/24/2025 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 03/27/2025 | 03/27/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/26/2025 | 03/26/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/26/2025 | 03/26/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/26/2025 | 03/26/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 03/24/2025 | 03/25/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech Certification not complete, missing first page. Also, it is not digitally verifiable. | |||
| MECH | COMPLETE | 01/29/2025 | 01/30/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/29/2025 | 01/30/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/23/2025 | 01/23/2025 |
| Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/23/2025 | 01/29/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/23/2025 | 01/29/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/23/2025 | 01/28/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide updated state card | |||
| BLD | HOLD | 01/23/2025 | 01/29/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM 1. FL# 13265 R7 does not correspond to manufacturer or product listed. | |||
| BADMIN | COMPLETE | 01/23/2025 | 01/29/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/23/2025 | 01/29/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/09/2025 | 01/21/2025 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Please address previous comments Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Driveway is shown to pass through the curb and gutter to connect to the E/P. Please show the driveway ending at the BOC. | |||
| BADMIN | HOLD | 01/08/2025 | 01/15/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| BLD | HOLD | 01/08/2025 | 01/14/2025 |
| Note: Held By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM Product Approval 1. FL# needed for mullion. 2. Soffit manufacturer listed in product approval does not correspond to the FL# 13265.1R1 liosted. Also, FL# 13265.1R1 is out of code cycle. We are in the 2023 code cycle. Please revise. | |||
| CUSVC | COMPLETE | 01/08/2025 | 01/09/2025 |
| Note: Released By: PAMELA MILLER - - | |||
| ELEC | HOLD | 01/08/2025 | 01/13/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit Electrical load calculations | |||
| ENGIN1 | HOLD | 01/08/2025 | 01/09/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Driveway is shown to pass through the curb and gutter to connect to the E/P. Please show the driveway ending at the BOC. | |||
| GAS | CANCEL | 01/08/2025 | 01/13/2025 |
| LOCATE | COMPLETE | 01/08/2025 | 01/14/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/08/2025 | 01/14/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R38 insulation in attic. Energy Calcs say R30. Revise to match. 107.2.1 2. Design location on heatload needs to be St. Augustine to match the Energy calcs 107.2.1 3. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition | |||
| SW1 | HOLD | 01/08/2025 | 01/14/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM This property should have a "B" type drainage. Driveway is shown to pass through the curb and gutter to connect to the E/P. Please show the driveway ending at the BOC. | |||
| ZON | HOLD | 01/08/2025 | 01/09/2025 |
| Note: Held By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM 1. SITE PLAN, LANDSCAPE PLAN, FLOOR PLANS ECT ALL NEED TO HAVE THE SAME INFORMATION. SOME SHOW THE GARAGE ON THE LEFT SIDE SOME SHOW IT ON THE RIGHT SIDE. AS WELL AS THE A/C PAD. THIS MUST BE THE SAME SIDE ON ALL PLANS. 2. THE WIDTH OF THE DRIVEWAY IS MISSING ON THE SITE PLAN. PLEASE INCLUDE ALL DIMENTIONS FOR THE DRIVEWAY INCLUDING THE WIDTH AT THE GARAGE AREA. | |||
| PLENV | COMPLETE | 01/08/2025 | 01/09/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM After action report was submitted and accepted by FWC meeting the requirements for 10.04.01 of the LDC. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| ENGIN1 | PENDING |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| FC IMPACT FEE EMS | ¤62.00 | 02/03/2025 |
| IMPACT FEE FIRE | ¤434.51 | 02/03/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/03/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/03/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 02/03/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/03/2025 |
| IMPACT FEE TRANSPORTATION | ¤3,502.00 | 02/03/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/03/2025 |
| SURCHARGE FS 533.721 | ¤18.86 | 02/03/2025 |
| SURCHARGE - FS 468.631 | ¤28.28 | 02/03/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/03/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/03/2025 |
| SW ENG PRE APRON | ¤30.00 | 02/03/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/03/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/03/2025 |
| SEWER INSPECTION | ¤25.00 | 02/03/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 02/03/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 02/03/2025 |
| SITE PLAN 30 | ¤30.00 | 02/03/2025 |
| WATER-METER | ¤514.49 | 02/03/2025 |
| WATER-METER | ¤514.49 | 02/03/2025 |
| WATER- TURN ON | ¤25.00 | 02/03/2025 |
| ADJUSTMENT 10% | (¤209.51) | 02/03/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/03/2025 |
| INSPECTION - RESIDENTIAL | ¤1,608.75 | 02/03/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤456.30 | 02/03/2025 |
| CONNECTION FEES | ¤25.00 | 02/03/2025 |
| CONTRACTOR CHANGE | ¤20.00 | |
| CONTRACTOR CHANGE | ¤20.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| REINSPECTION RESIDENTIAL | ¤40.00 | |
| Fees | Total Due: ¤120.00 | Total Paid: ¤25,675.84 |