Permit #2025010256
Permit Details
Status: COED
| Parcel Id: 06-12-31-5815-00000-06B0 |
| Total Square Footage: 12555 sqft |
| Block: 00000 |
| Subdivision: 5815 - |
| Job Phone: 904-305-7055 |
| Location Address: 15 MARKET AVE |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 03/20/2025 |
| NOC: RECORDED |
| Applicant name: TIMOTHY WAYNE YOUNG |
| Owner: GHM PROPERTY SOLUTIONS LLC |
|
Address 8411 SOUTHSIDE BLVD JACKSONVILLE, FL 32256 |
|
Address SUITE 100 JACKSONVILLE, FL 32256 |
| Lot: 06B0 |
| Contracted Stated Job Value: ¤4,311,680.00 |
| Job Description: Pre-school Building THE LEARNING EXPERIENCE |
| Type: CN |
Contractor
TIM YOUNG CONSTRUCTION INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9310 OLD KINGS RDS SUITE 1702 , |
CGC055192 (Exp: 08/31/2026) | 904-305-7055 |
Sub Contractors
BRANDON P HAMMOND
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3412 GALILEE ROAD JACKSONVILLE, FL 32207 |
CAC1816450 (Exp: 08/31/2026) | 904-398-6488 |
RANDY E WHIDDEN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4 WOOD ARBOR LANE PALM COAST, FL 32164 |
EC13009295 (Exp: 08/31/2026) | 386-302-8861 |
JERAMIE A ERWIN
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
6195 LAKE GRAY BLVD JACKSONVILLE , FL 32244 |
SUITE 5 JACKSONVILLE , FL 32244 |
FPC23-000095 (Exp: 06/30/2026) | 904-302-9022 |
GLENN EUGENE BUCHMAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 422 ORANGE PARK, FL 32073 |
CFC033873 (Exp: 08/31/2026) | 904-264-6171 |
ROBERT EDWARD BARBER
| Status | Location Address | State License Number | Phone |
| INACTIVE |
7254 GOLDEN WINGS ROAD UNIT 9 , 0 |
CCC1328293 (Exp: 08/31/2026) | 904-990-1075 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 03/31/2026 | FINAL APPROVED | BWRIGHT |
| Note: 3/11/2026 - PREVIOUS INSPECTION NOTES 3/9/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9100 Daniel myself and GC- mike performed testing/inspecting and all approved receptacles did flow to the grease interceptor-NOTE 1 FLOOR DRAIN IN KITCHEN AREA WAS APPROVED TO NOT GO TO GREASE UNIT BUT REGULAR SANITARY-THIS SHOULDN'T BE A PROBLEM SINCE THE AMOUT OF GREASE RESIDUAL IN THIS BUISNESS IS VERY LOW Met with Jay on site, A walk through is still required. | |||
| BUILDING FINAL | 03/12/2026 | FINAL APPROVED | KSANDOE |
| FIRE FINAL | 03/11/2026 | APPROVED | RMARTIN |
| Note: 3/2/2026 - PREVIOUS INSPECTION NOTES Need address posted on monument sign and building, need signage on Fire Alarm And Riser room door, need room numbers on rooms inside building. All MEP's need to be passed prior to Fire Final inspection. | |||
| U - UTILITY COMMERCIAL FINAL | 03/11/2026 | CANCELLED BY APPLICANT | BWRIGHT |
| Note: 3/9/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9100 Daniel myself and GC- mike performed testing/inspecting and all approved receptacles did flow to the grease interceptor-NOTE 1 FLOOR DRAIN IN KITCHEN AREA WAS APPROVED TO NOT GO TO GREASE UNIT BUT REGULAR SANITARY-THIS SHOULDN'T BE A PROBLEM SINCE THE AMOUT OF GREASE RESIDUAL IN THIS BUISNESS IS VERY LOW Met with Jay on site, A walk through is still required. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 03/11/2026 | APPROVED | KSANDOE |
| Note: Inspected on 7/23/25 with 1st roof in progress inspection | |||
| U - UTILITY COMMERCIAL FINAL | 03/09/2026 | Disapproved -FEE REQUIRED | BWRIGHT |
| Note: Inspector Notes from Inspection 9100 Daniel myself and GC- mike performed testing/inspecting and all approved receptacles did flow to the grease interceptor-NOTE 1 FLOOR DRAIN IN KITCHEN AREA WAS APPROVED TO NOT GO TO GREASE UNIT BUT REGULAR SANITARY-THIS SHOULDN'T BE A PROBLEM SINCE THE AMOUT OF GREASE RESIDUAL IN THIS BUISNESS IS VERY LOW Met with Jay on site, A walk through is still required. | |||
| FIREWALL FINAL | 03/06/2026 | APPROVED | KSANDOE |
| Note: 3/2/2026 - PREVIOUS INSPECTION NOTES Above room 114 there are new holes in the wall that need to be sealed, and the chases piping needs to be sealed on the ends. | |||
| ELECTRIC FINAL | 03/06/2026 | APPROVED | RMARTIN |
| Note: 3/2/2026 - PREVIOUS INSPECTION NOTES All electrical must be completed for inspection, Irrigation power is not terminated, wire hanging out on the ground, all exit lights boxes need to be secured NEC 314.23 , All boxes need to be safed off with covers on them, Need working clearance on the Electrical Disconnect at the water heater. NEC 110.26, Need to have GFCI protection on outlets installed in areas specified in 210.8 B 1-12 Specifically 11-12 | |||
| HVAC FINAL | 03/05/2026 | APPROVED | HCAMACHO |
| Note: 1. Need Test & Balance by Final Building. 3/2/2026 - PREVIOUS INSPECTION NOTES 1. RTU 1 did not pass smoke test. 2. RTU 5 did not pass smoke test. 3. They were doing the test and balance. Please submitt via email or in person when finished. 2/20/2026 - PREVIOUS INSPECTION NOTES 1. Need to test Duck Smoke detectors 2. Need Test & Balance 3. Mark Heat breaker sizes on RTU's and need to check brreakers in the panel. 4. Silicone screws on Exhaust Fans on the roof. 2/6/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection 9/11/2025 - PREVIOUS INSPECTION NOTES Inspected all metal duct. Need balancing dampers in all exhaust and need to install fire dampers. No flex installed at this time. | |||
| HVAC FINAL | 03/02/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. RTU 1 did not pass smoke test. 2. RTU 5 did not pass smoke test. 3. They were doing the test and balance. Please submitt via email or in person when finished. 2/20/2026 - PREVIOUS INSPECTION NOTES 1. Need to test Duck Smoke detectors 2. Need Test & Balance 3. Mark Heat breaker sizes on RTU's and need to check brreakers in the panel. 4. Silicone screws on Exhaust Fans on the roof. 2/6/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection 9/11/2025 - PREVIOUS INSPECTION NOTES Inspected all metal duct. Need balancing dampers in all exhaust and need to install fire dampers. No flex installed at this time. | |||
| ELECTRIC FINAL | 03/02/2026 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: All electrical must be completed for inspection, Irrigation power is not terminated, wire hanging out on the ground, all exit lights boxes need to be secured NEC 314.23 , All boxes need to be safed off with covers on them, Need working clearance on the Electrical Disconnect at the water heater. NEC 110.26, Need to have GFCI protection on outlets installed in areas specified in 210.8 B 1-12 Specifically 11-12 | |||
| FIREWALL FINAL | 03/02/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: Above room 114 there are new holes in the wall that need to be sealed, and the chases piping needs to be sealed on the ends. | |||
| FIRE FINAL | 03/02/2026 | Disapproved - NO FEE | RMARTIN |
| Note: Need address posted on monument sign and building, need signage on Fire Alarm And Riser room door, need room numbers on rooms inside building. All MEP's need to be passed prior to Fire Final inspection. | |||
| EXTERIOR ARCHITECTURAL FEATURES | 02/27/2026 | APPROVED | RPICATAGI |
| FIREWALL FINAL | 02/27/2026 | CANCELLED BY APPLICANT | WEB |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 02/27/2026 | APPROVED | KSANDOE |
| Note: 2/19/2026 - PREVIOUS INSPECTION NOTES Not ready 11/21/2025 - PREVIOUS INSPECTION NOTES Entry and front left 11/20/2025 - PREVIOUS INSPECTION NOTES 11/19/2025 - PREVIOUS INSPECTION NOTES 11/18/2025 - PREVIOUS INSPECTION NOTES Entry and right front New inspection due to canceled inspection 10/23/2025 - PREVIOUS INSPECTION NOTES Right side and rear | |||
| HVAC FINAL | 02/20/2026 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Need to test Duck Smoke detectors 2. Need Test & Balance 3. Mark Heat breaker sizes on RTU's and need to check brreakers in the panel. 4. Silicone screws on Exhaust Fans on the roof. 2/6/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection 9/11/2025 - PREVIOUS INSPECTION NOTES Inspected all metal duct. Need balancing dampers in all exhaust and need to install fire dampers. No flex installed at this time. | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 02/19/2026 | Disapproved - NO FEE | KSANDOE |
| Note: Not ready 11/21/2025 - PREVIOUS INSPECTION NOTES Entry and front left 11/20/2025 - PREVIOUS INSPECTION NOTES 11/19/2025 - PREVIOUS INSPECTION NOTES 11/18/2025 - PREVIOUS INSPECTION NOTES Entry and right front New inspection due to canceled inspection 10/23/2025 - PREVIOUS INSPECTION NOTES Right side and rear | |||
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 02/11/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Daniel myself and GC- mike performed testing/inspecting and all approved receptacles did flow to the grease interceptor-NOTE 1 FLOOR DRAIN IN KITCHEN AREA WAS APPROVED TO NOT GO TO GREASE UNIT BUT REGULAR SANITARY-THIS SHOULDN'T BE A PROBLEM SINCE THE AMOUT OF GREASE RESIDUAL IN THIS BUISNESS IS VERY LOW | |||
| PLUMBING FINAL | 02/10/2026 | APPROVED | HCAMACHO |
| Note: 2/9/2026 - PREVIOUS INSPECTION NOTES Canceled via phone Inspector Notes from Inspection 3080 Inspector Notes from Inspection 3100 MEET WITH PLUMBING CONTRACTOR WALKED THE PROJECT WITH HIM AND ALL ITEMS FROM PREVIOUS INSPECTION HAVE BEEN COMPLETED. GREASE AND SEWER ARE DONE. P/M NEEDS TO SCHEDUAL GRAVITY SEWER WHEN READY AND TEST IS ON | |||
| PLUMBING FINAL | 02/09/2026 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: Canceled via phone Inspector Notes from Inspection 3080 Inspector Notes from Inspection 3100 MEET WITH PLUMBING CONTRACTOR WALKED THE PROJECT WITH HIM AND ALL ITEMS FROM PREVIOUS INSPECTION HAVE BEEN COMPLETED. GREASE AND SEWER ARE DONE. P/M NEEDS TO SCHEDUAL GRAVITY SEWER WHEN READY AND TEST IS ON | |||
| HVAC FINAL | 02/06/2026 | CANCELLED BY APPLICANT | HCAMACHO |
| Note: Inspector Notes from Inspection 3140 will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection 9/11/2025 - PREVIOUS INSPECTION NOTES Inspected all metal duct. Need balancing dampers in all exhaust and need to install fire dampers. No flex installed at this time. | |||
| ROOF IN PROGRESS | 02/04/2026 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 3470 12/23/25: PLUMBING: All MEP met on site. Room 109 (Preschool #2A): Left Wall -- 1-1/4" horizontal line and 1/2" water line needs where it drops into wall need support. (Showed CM). 12/19/2025 - PREVIOUS INSPECTION NOTES Need to remove temp. lighting from ceiling, need to have all electrical above ceiling completed this is all lighting and RTU feeders. Check electrical room, small bathroom, and mirrored rooms at final. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PLUMBING: RS Room 109: 1/2" water line needs support where it drops into wall. Bathroom between Rooms 121 & 125 need ceiling opened up more to see plumbing lines into wall. Bathroom between rooms 129 & 131 need ceiling opened up more to see plumbing lines into wall. Room 108: water line needs support where it drops into wall. Room 112: water line needs support where it drops into wall. Mechanical. will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection | |||
| ABOVE CEILING | 12/23/2025 | APPROVED - AS NOTED | RMARTIN |
| Note: 12/23/25: PLUMBING: All MEP met on site. Room 109 (Preschool #2A): Left Wall -- 1-1/4" horizontal line and 1/2" water line needs where it drops into wall need support. (Showed CM). 12/19/2025 - PREVIOUS INSPECTION NOTES Need to remove temp. lighting from ceiling, need to have all electrical above ceiling completed this is all lighting and RTU feeders. Check electrical room, small bathroom, and mirrored rooms at final. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PLUMBING: RS Room 109: 1/2" water line needs support where it drops into wall. Bathroom between Rooms 121 & 125 need ceiling opened up more to see plumbing lines into wall. Bathroom between rooms 129 & 131 need ceiling opened up more to see plumbing lines into wall. Room 108: water line needs support where it drops into wall. Room 112: water line needs support where it drops into wall. Mechanical. will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection | |||
| ABOVE CEILING | 12/19/2025 | Disapproved - NO FEE | RMARTIN |
| Note: Need to remove temp. lighting from ceiling, need to have all electrical above ceiling completed this is all lighting and RTU feeders. Check electrical room, small bathroom, and mirrored rooms at final. 12/16/2025 - PREVIOUS INSPECTION NOTES 12/19/25: PLUMBING: RS Room 109: 1/2" water line needs support where it drops into wall. Bathroom between Rooms 121 & 125 need ceiling opened up more to see plumbing lines into wall. Bathroom between rooms 129 & 131 need ceiling opened up more to see plumbing lines into wall. Room 108: water line needs support where it drops into wall. Room 112: water line needs support where it drops into wall. Mechanical. will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection | |||
| FIREWALL PENETRATIONS | 12/18/2025 | APPROVED - AS NOTED | KSANDOE |
| Note: Check electrical room, small bathroom, and mirrored rooms at final. 12/16/2025 - PREVIOUS INSPECTION NOTES | |||
| FIREWALL PENETRATIONS | 12/16/2025 | CANCELLED BY APPLICANT | KSANDOE |
| ELECTRIC - EARLY POWER | 12/08/2025 | PARTIALLY APPROVED | RMARTIN |
| Note: 12/8/25 Power to Disconnect only, need to keep locked out at all times. Will need to re-schedule the early power prior to powering the rest of the building. 4/22/2025 - PREVIOUS INSPECTION NOTES wanted a temp pole, I added it | |||
| ELECTRIC - EARLY POWER | 12/05/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 4/22/2025 - PREVIOUS INSPECTION NOTES wanted a temp pole, I added it | |||
| FOOTER | 12/05/2025 | APPROVED | KSANDOE |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 11/21/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Entry and front left 11/20/2025 - PREVIOUS INSPECTION NOTES 11/19/2025 - PREVIOUS INSPECTION NOTES 11/18/2025 - PREVIOUS INSPECTION NOTES Entry and right front New inspection due to canceled inspection 10/23/2025 - PREVIOUS INSPECTION NOTES Right side and rear | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 11/20/2025 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 11/19/2025 - PREVIOUS INSPECTION NOTES 11/18/2025 - PREVIOUS INSPECTION NOTES Entry and right front New inspection due to canceled inspection 10/23/2025 - PREVIOUS INSPECTION NOTES Right side and rear | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 11/19/2025 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 11/18/2025 - PREVIOUS INSPECTION NOTES Entry and right front New inspection due to canceled inspection 10/23/2025 - PREVIOUS INSPECTION NOTES Right side and rear | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 11/18/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Entry and right front New inspection due to canceled inspection 10/23/2025 - PREVIOUS INSPECTION NOTES Right side and rear | |||
| ELECTRIC 2ND ROUGH | 11/18/2025 | APPROVED | RMARTIN |
| Note: 9/9/2025 - PREVIOUS INSPECTION NOTES Two missed outlets marked on print, also need to check to see that all metalic boxes are bonded properly, call 2nd rough back in once repairs are made | |||
| HVAC ROUGH | 11/13/2025 | APPROVED - AS NOTED | CPISCITELLI |
| Note: will look at tape on trunk line in back left corner and will inspect bathrooms and flex drops on above ceiling inspection 9/11/2025 - PREVIOUS INSPECTION NOTES Inspected all metal duct. Need balancing dampers in all exhaust and need to install fire dampers. No flex installed at this time. | |||
| FOOTER | 11/10/2025 | APPROVED | KSANDOE |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 11/07/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 10/23/2025 - PREVIOUS INSPECTION NOTES Right side and rear | |||
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 10/23/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Right side and rear | |||
| FIREWALL PENETRATIONS | 10/10/2025 | CANCELLED BY APPLICANT | WEB |
| FIREWALL DRYWALL NAILING | 10/02/2025 | APPROVED | HCAMACHO |
| Note: 10/1/2025 - PREVIOUS INSPECTION NOTES Still working on the hall ways. | |||
| FIREWALL DRYWALL NAILING | 10/01/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: Still working on the hall ways. | |||
| INSULATION | 09/26/2025 | APPROVED | HCAMACHO |
| Note: 9/25/2025 - PREVIOUS INSPECTION NOTES 1. All exterior walls done. Some Interior walls need to be finished up. *Ok to start sheetrock on exterior walls.* | |||
| INSULATION | 09/25/2025 | PARTIALLY APPROVED | HCAMACHO |
| Note: 1. All exterior walls done. Some Interior walls need to be finished up. *Ok to start sheetrock on exterior walls.* | |||
| FIREWALL FRAMING | 09/23/2025 | APPROVED | HCAMACHO |
| Note: 8/7/2025 - PREVIOUS INSPECTION NOTES Partial for 1st layer topout | |||
| FRAMING | 09/23/2025 | APPROVED | HCAMACHO |
| Note: 8/29/2025 - PREVIOUS INSPECTION NOTES Ok to hang one side | |||
| PLUMBING 2ND ROUGH | 09/18/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 3100 MEET WITH PLUMBING CONTRACTOR WALKED THE PROJECT WITH HIM AND ALL ITEMS FROM PREVIOUS INSPECTION HAVE BEEN COMPLETED. GREASE AND SEWER ARE DONE. P/M NEEDS TO SCHEDUAL GRAVITY SEWER WHEN READY AND TEST IS ON | |||
| GRAVITY SEWER | 09/18/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 3100 GREASE AND SEWER ARE DONE. P/M NEEDS TO SCHEDUAL GRAVITY SEWER WHEN READY AND TEST IS ON | |||
| PLUMBING 2ND ROUGH | 09/15/2025 | PARTIALLY APPROVED | MGIBSON |
| Note: NO TEST ON LEFT SIDE OF BUILDING IN TWO SEPERATE AREAS, NEED VERTICAL SUPPRT ON WATER DISTRIBUTION LINES IN MULTIPLE AREAS, NEED TO CHECK PLANS FOR LOCATION OF ANY AND ALL SHOCK ARRESSTORS, NEED SHUT OFF VALVES IN CEILING WHERE ALL EXTERIOR HOSE BIBS ARE LOCATED OR WALL HYDRYANTS IN AREAS ABOVE CEILING AND LABELED AT PLUMBING FINAL | |||
| BLD - SEWER TIE IN | 09/15/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: GREASE AND SEWER ARE DONE. P/M NEEDS TO SCHEDUAL GRAVITY SEWER WHEN READY AND TEST IS ON | |||
| BLD - SEWER TIE IN | 09/12/2025 | CANCELLED BY APPLICANT | WEB |
| HVAC ROUGH | 09/11/2025 | PARTIALLY APPROVED | CPISCITELLI |
| Note: Inspected all metal duct. Need balancing dampers in all exhaust and need to install fire dampers. No flex installed at this time. | |||
| LATH/BRICK/WATER BARRIER | 09/09/2025 | APPROVED | FWILLIS |
| Note: 9/3/2025 - PREVIOUS INSPECTION NOTES 8/26/2025 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC 2ND ROUGH | 09/09/2025 | PARTIALLY APPROVED | MKRASKI |
| Note: Two missed outlets marked on print, also need to check to see that all metalic boxes are bonded properly, call 2nd rough back in once repairs are made | |||
| LATH/BRICK/WATER BARRIER | 09/03/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: 8/26/2025 - PREVIOUS INSPECTION NOTES | |||
| FRAMING | 08/29/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Ok to hang one side | |||
| LATH/BRICK/WATER BARRIER | 08/26/2025 | PARTIALLY APPROVED | KSANDOE |
| HVAC OTHER | 08/21/2025 | CANCELLED BY INSPECTOR | CPISCITELLI |
| HVAC ROUGH | 08/21/2025 | PARTIALLY APPROVED | CPISCITELLI |
| Note: back half/ left side of building beyond hallway metal seams to be able to wrap | |||
| BLD - GREASE INTERCEPTOR PRE-INSTALLATION | 08/21/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 3070 ALL SANITARY AND GREASE LINE INSTALLED | |||
| FIREWALL FRAMING | 08/07/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Partial for 1st layer topout | |||
| ROOF IN PROGRESS | 08/07/2025 | CANCELLED BY APPLICANT | WEB |
| Note: 7/23/2025 - PREVIOUS INSPECTION NOTES Front half insulation | |||
| WALL SHEATHING | 08/07/2025 | APPROVED | KSANDOE |
| STOREFRONT | 08/01/2025 | APPROVED | KSANDOE |
| Note: 7/23/2025 - PREVIOUS INSPECTION NOTES | |||
| BUILDING OTHER | 08/01/2025 | APPROVED | KSANDOE |
| ROOF IN PROGRESS | 07/23/2025 | PARTIALLY APPROVED | KSANDOE |
| Note: Front half insulation | |||
| STOREFRONT | 07/23/2025 | PARTIALLY APPROVED | KSANDOE |
| WALL SHEATHING | 07/22/2025 | APPROVED | KSANDOE |
| BUILDING OTHER | 07/17/2025 | APPROVED | KSANDOE |
| LINTEL | 06/16/2025 | APPROVED | KSANDOE |
| FOUNDATION SURVEY - OFFICE USE ONLY | 06/11/2025 | APPROVED | DLEAP |
| LINTEL | 06/10/2025 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 06/04/2025 | APPROVED | KSANDOE |
| LINTEL | 05/30/2025 | APPROVED | PKNAPIK |
| Note: 5/19/2025 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC 1ST ROUGH | 05/29/2025 | APPROVED | MKRASKI |
| ELECTRIC 1ST ROUGH | 05/27/2025 | CANCELLED BY APPLICANT | CPISCITELLI |
| LINTEL | 05/19/2025 | PARTIALLY APPROVED | FWILLIS |
| Note: FIRST LIFT | |||
| LINTEL | 05/06/2025 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH | 05/06/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: ALL SANITARY AND GREASE LINE INSTALLED | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 05/05/2025 | APPROVED | CPISCITELLI |
| Note: 4/11/2025 11:43:32 AM- PREVIOUS INSPECTION NOTES After speaking with the geotecnical engineer about this project I have given partial approval of the geotechnical report approval inspecton to allow construction and inspection of the buildings footings. The full geotechnical certification report will be provided by the geotechnciacl engineer prior to placement and inspection of the concrete slab after completion of fill and fill compaction testing. Patrick Buckley | |||
| ELECTRIC TEMP POLE | 04/22/2025 | APPROVED - AS NOTED | RMARTIN |
| Note: Emailed Fpl | |||
| ELECTRIC - EARLY POWER | 04/22/2025 | CANCELLED BY APPLICANT | RMARTIN |
| Note: wanted a temp pole, I added it | |||
| DOWN CELL | 04/22/2025 | APPROVED | FWILLIS |
| Note: Stem Wall | |||
| FOOTER | 04/14/2025 | APPROVED | FWILLIS |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/11/2025 | PARTIALLY APPROVED | PBUCKLEY |
| Note: After speaking with the geotecnical engineer about this project I have given partial approval of the geotechnical report approval inspecton to allow construction and inspection of the buildings footings. The full geotechnical certification report will be provided by the geotechnciacl engineer prior to placement and inspection of the concrete slab after completion of fill and fill compaction testing. Patrick Buckley |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 12/23/2025 | 12/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/09/2025 | 12/15/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All plan pages need to be digitally signed, sealed, and verifiable. F.S.471.025 (Thired Request) | |||
| MECH | HOLD | 11/21/2025 | 12/01/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All plan pages need to be uploaded separately and have a verifiable digital signature. F.S. 471.025 (second request) | |||
| BLD | INFORMATION | 11/21/2025 | 12/01/2025 |
| Note: Marked INFORMATION By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM This plan sheet C4 needs to uploaded and approved on the CSD permit. Not the building permit | |||
| MECH | HOLD | 11/13/2025 | 11/20/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM All plan pages need to be uploaded separately and have a verifiable digital signature. F.S. 471.025 | |||
| BLD | COMPLETE | 09/10/2025 | 09/24/2025 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/01/2025 | 05/05/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 05/01/2025 | 05/01/2025 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 04/11/2025 | 04/11/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM upload all doccuments | |||
| BLD | HOLD | 04/11/2025 | 04/11/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM upload all documents | |||
| BLD | HOLD | 04/11/2025 | 04/11/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM THE GEOTECHNICAL ENGINEER SHALL PERFORM THE FOLLOWING: 1. OBSERVATION AND VERIFICATION OF THE REMOVAL OF UNSUITABLE SOIL FROM BENEATH ALL FUTURE BUILDING FOOTPRINTS AND THE REQUIRED DISTANCE BEYOND ALL BUILDING FOOTPRINTS HAS OCCURRED. 2. OBSERVATION AND VERIFICATION THE REMOVAL OF UNSUITABLE SOILS IS SUFFICIENT AND COMPLETE AND THE REMOVAL PROCESS HAS REACHED ACCEPTABLE SOILS. 3. OBSERVATION AND VERIFICATION OF ANY OTHER PROSCRIBED METHODOLOGIES TO ACHIEVE SUITABLE SUB-GRADE CONDITIONS HAS OCCURRED. 4. OBSERVATION AND VERIFICATION THE PLACEMENT OF FILL USING THE APPROVED DESIGNATED FILL MATERIALS HAS OCCURRED. 5. OBSERVATION AND VERIFICATION THE PLACEMENT OF FILL IN THE REQUIRED LIFT THICKNESSES HAS OCCURRED. 6. VERIFICATION THE REQUIRED NUMBER AND LOCATION OF COMPACTION TEST REPORTS HAVE BEEN TAKEN AND VERIFICATION THAT ALL COMPACTION TESTS HAVE DETERMINED REQUIRED MAXIMUM DRY DENSITY. 7. ALL COMPACTION TEST REPORTS SHALL BE SIGNED AND SEALED BY THE GEOTECHNICAL ENGINEER OF RECORD AND SUBMITTED TO THE CITY. 8. UPON COMPLETION OF THE SOIL REMEDIATION PROCESS, AND THE ITEMS LISTED IN THESE CONDITIONS, THE CONTRACTOR SHALL SUBMIT A FINAL CERTIFICATION LETTER SIGNED AND SEALED BY THE GEOTECHNICAL ENGINEER OF RECORD CERTIFYING THE ABOVE PROCESSES WERE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF THE GEOTECHNICAL INVESTIGATION REPORT. FINAL CERTIFICATION LETTER SHALL CONTAIN AN ENGINEER'S CERTIFICATION STATEMENT IN ACCORDANCE WITH FLORIDA ADMINISTRATIVE CODE 61G15-18.011 (4) AND 61G15-29.001. LETTER NEEDS TO BE DIGITALLY SIGNED SEALED AND VERIFIABLE QUESTIONS REGARDING THESE CONDITIONS SHOULD BE DIRECTED TO PATRICK BUCKLEY, PALM COAST CHIEF BUILDING OFFICIAL, 386-986-3786, PBUCKLEY@PALMCOASTGOV.COM | |||
| PLENG | HOLD | 04/11/2025 | 04/11/2025 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Add design FFE to the plan. | |||
| PLENG | HOLD | 04/10/2025 | 04/11/2025 |
| Note: Held By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM 1. Add design FFE to the plan. | |||
| MECH | COMPLETE | 02/27/2025 | 02/27/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 02/18/2025 | 03/04/2025 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/11/2025 | 02/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/11/2025 | 02/25/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM repeat comment: 2. Energy calcs submitted and on plans need to be from comcheck Ashrae 90.1 107.2.1 FBC 8Th edition (Energy calcs need to be from Ashrae 90.1 and the envelope needs to be 100% addressed in comcheck | |||
| FI1 | COMPLETE | 02/11/2025 | 02/25/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/11/2025 | 02/26/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 02/11/2025 | 02/18/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ARCHR | COMPLETE | 01/08/2025 | 01/23/2025 |
| Note: Released By: RICHARD PICATAGI - (386)986-3760 - RPICATAGI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/08/2025 | 01/30/2025 |
| Note: Held By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM COMMENTS BELOW PER THE 2023 FLORIDA BUILDING CODE-BUILDING (FBCB), FLORIDA BUILDING CODE-ACCESSIBILITY (FBCA), FLORIDA STATUTES (FS), FLORIDA ADMINISTRATIVE CODE (FAC) AND AUTHORITY HAVING JURISDICTION (AHJ). PLEASE PROVIDE RESPONSE LETTER TO THE ITEMS LISTED BELOW. Permit Application 1. Sheet T-100 indicates a provided floor area of 12,500 square feet and a calculated areas of 12,169 and 12,568 square feet. Which is correct? Please reconcile - these areas must all agree. See definition of building area. Section 202. Permit Submittal 1. At time of permit submittal, all plan sheets shall be uploaded as individual files. AHJ. This means all plan sheets require a verifiable digital seal in accordance with Florida Administrative Code. Sheets FA100, FA200, FP100, FP200,and FP300. Plan Sheet T-100 5. Permit application indicates a 10,000 square foot day care facility. Provided area indicates 12,500 square feet and calculated area indicates 12,169 square feet and another chart indicates 12,568. All three of these areas must agree with each other. AHJ. 6. This is a mixed occupancy building per Section 302.1 and therefore must comply with Section 508. Determine one (1) main occupancy classification of the building. Classify ALL other occupancies as accessory occupancies. Determine allowable building height and number of stories based on the main occupancy of the building per Section 504 as required by Section 508.2.2. Determine allowable area of building based on the main occupancy per Section 506 as required by Section 508.2.3. 7. Aggregate floor areas of all accessory occupancies cannot occupy more than 10 percent of the floor area and shall not exceed tabular values in Table 506.2 for non-sprinkled building for each accessory occupancy. Section 506.2.3. If accessory occupancies exceed 10% of the floor area skip this calculation and exercise and proceed to either Section 508.3 or 508.4 as necessary. 8. If intending to consider this mixed occupancy building as anon-separated occupancy building then perform allowable building area, height and number of storied based on the most restrictive allowances and prove it meets Section 503.1. See Section 508.3.2. If you cannot show the building meets Section 508.3.2 you will have to separate occupancies per Section 508.4. Show your work. If building is required to comply with Section 508.43 then show location and all details of fire-restive separations per Section 508.4.4, Table 508.4 and Chapter 7. NOTE: IT IS NECESSARY YOU SOLVE THE ISSUES MENTIONED IN No. 6 and 8 above to provide for unseparated occupancies. This has not been accomplished based on the information and code analysis provided. 9. In the Occupancy section revise the table by removing the reference to IBC (top of right column) and remove the term "gender neutral". Revise fixture calculations to reflect required number of fixtures for males and females. Section 2902. See also Florida Statute 553. 865. It is preferred that you remove the Plumbing Fixture Count at the bottom of the page and roll the other fixture types (lavatories, drinking fountain, service sink, shower / bathtub) into the table. If you are substituting water closets for urinals (Section 424.2), provide notation. 12. In Plumbing Fixture Count section, provide shower/bathtub for the Institutional (Group I) occupancy per Section 2902.1, Table 2902.1 and Florida Building Code-Plumbing Section 403.1 and Table 403.1. Remove note referring to portable wash basins. Required plumbing fixtures must be provided and must be provided with tempered or hot water and a connection to the sanitary drainage system. Shower / bathtub must be accessible to persons with disabilities per Section 201.2, 213.3.6, 607 or 608. Revise floor plan, plumbing floor plan, plumbing fixtures schedules and plumbing water distribution and drain, waste and vent diagrams accordingly. Plan Sheet SP-1-1 4. Provide complete accessibility details for children’s playgrounds including accessible routes, maneuverability clearances at gates, landings and entrances to playground areas and Sections 206.2.17.1, 240, and 1008 Florida Building Code-Accessibility. Plan Sheet A 151. 5. Provide specifications for ground surfaces showing compliance with ASTM F 1951 and ASTM F 1292. FBC-Accessibility Section 1008.2.6.1, 1008.2.6.2 Show Accessible route and dimenshions to trash recepticale. Plan Sheet A-041 1. Submit evidence that manufacturer’s specifications for sheet vinyl flooring proposed for use in toilet rooms is equal to a smooth, hard, non-absorbent surface in accordance with Section 1210.2.1. Evidence means manufacturer’s specifications indicating it is suitable for use in non-residential bathrooms. Plan Sheet A-081 1. Provide manufacturer’s specifications for liquid applied moisture barrier. Provide evidence stucco manufacturer accepts this product for use. Plan Sheet A-152 2. Provide complete accessibility details for children’s playgrounds including accessible routes, maneuverability clearances at gates, landings and entrances to playground areas and Sections 206.2.17.1, 240, and 1008 Florida Building Code-Accessibility. Show accessible route and dimenshions to trash recepticle. | |||
| DSD | COMPLETE | 01/08/2025 | 01/09/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/08/2025 | 01/21/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. . Energy calcs submitted and on plans need to be from the FBC 2023. or Ashrae 90 107.2.1 FBC 8Th edition | |||
| FI1 | HOLD | 01/08/2025 | 01/23/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Please select FLAGLER COUNTY DEPT. of EMERGENCY MANAGEMENT, for jurisdiction or agency even though it is going in the city. This way it will get it keyed correctly. https://www.knoxbox.com/Products/Commercial-KnoxBoxes. THIS NEEDS TO BE ON PAGE T100. Please call Fire Marshal, Randy Holmes at: 386-986-2303 for proper placement and verification of proper design and notification for the Fire Fighters Safety Building Marking System prior to placement. | |||
| GAS | CANCEL | 01/08/2025 | 01/21/2025 |
| MECH | HOLD | 01/08/2025 | 01/23/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plan page M600 update code year for ventilation rate statement. Update Ventilation calculation to current ASHRAE standard 107.2.1 FBC 2023 8Th edition 2. Energy calcs submitted and on plans need to be from the FBC 2023. or Ashrae 90.1 107.2.1 FBC 8Th edition 3. Provide manufacturers specs on plasma tube to be able reduce ventilation rates 107.2.1 | |||
| PLUM | COMPLETE | 01/08/2025 | 01/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| UD1 | COMPLETE | 01/08/2025 | 01/16/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION - COMMERCIAL | ¤60.00 | 03/05/2026 |
| CONTRACTOR CHANGE | ¤20.00 | 03/20/2025 |
| FC IMPACT FEE EMS | ¤376.65 | 03/20/2025 |
| IMPACT FEE FIRE | ¤8,788.50 | 03/20/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤1,468.94 | 03/20/2025 |
| IMPACT FEE TRANSPORTATION | ¤71,701.61 | 03/20/2025 |
| SURCHARGE FS 533.721 | ¤336.36 | 03/20/2025 |
| SURCHARGE - FS 468.631 | ¤504.55 | 03/20/2025 |
| SITE PLAN 30 | ¤30.00 | 03/20/2025 |
| ADJUSTMENT 10% | (¤3,737.38) | 03/20/2025 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 03/20/2025 |
| INSPECTION COMMERCIAL | ¤30,184.00 | 03/20/2025 |
| INSPECTION - FIRE COMMERCIAL | ¤1,078.00 | 03/20/2025 |
| PLAN REVIEW - COMMERCIAL | ¤6,036.80 | 03/20/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤116,923.03 |