Permit #2025010453
Permit Details
Status: FINAL
| Parcel Id: 04-11-30-5160-00000-2520 |
| PATIO/DECK (NO ROOF) : 1200 sqft |
| Total Square Footage: 1200 sqft |
| Subdivision: - |
| Job Phone: 386-236-9610 |
| Location Address: 77 REVERIE DR N |
| Type: PO - POOL |
| Issue Date: 01/21/2025 |
| NOC: RECORDED |
| Applicant name: SAMANTHA JESSICA ALEXANDER |
| Owner: GUY DAVID PRICE AND CHRISTIANE CONCRAD |
|
Address 77 REVERIE DRIVE N PALM COAST, FL 32137 |
| Lot: 252 |
| Contracted Stated Job Value: ¤70,000.00 |
| Job Description: swimming pool w/ screen enclosure |
| Type: CN |
Contractor
AGUA POOLS AND SPA INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3438 LONGLEAF ROAD , |
CPC1459907 (Exp: 08/31/2026) | 386-492-6910 |
Sub Contractors
WILLIAM CARL KLESS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
597 PLEASANT STREET LAKE HELEN, FL 32744 |
CBC1251835 (Exp: 08/31/2026) | 386-228-8933 |
CHRISTOPHER I HALL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 2413 Bunnell, FL 32110 |
EC13002161 (Exp: 08/31/2028) | (386) 437-2966 | 386-437-5042 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL FINAL | 11/04/2025 | FINAL APPROVED | JSTEWART |
| U -UTILITY RESIDENTIAL FINAL | 11/03/2025 | FINAL APPROVED | BWRIGHT |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/31/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED Inspector Notes from Inspection 9463 10/30/25=After the inspection the water for the area is going to the back 9/25/2025 - PREVIOUS INSPECTION NOTES ** 09/25/25 BUILDER IS REQUIRED TO BRING THE WATER TO FRONT AND NOT DRAIN ONTO THE CONSERVATION AREA IN THE REAR ** YOUR INSTALLALTION OF THE POOL HAS CHANGED THE DRAINAGE AS REQUIRED YOU PROPOSED TO BRING DRAINAGE TO THE FRONT FROM THE REAR WHICH AGAIN IS REQUIRED _______________________________________________________________________________________________________________________ 6/25/2025 - PREVIOUS INSPECTION NOTES ** 06/25/25 PROPOSED DRAINAGE IS TO BRING ALL WATER FROM THE REAR TO THE FRONT OF PROPERTY YOUR FINAL SURVEY SHOWS WATER AT PROPERTY LINE FLOWING TO REAR ON LEFT SIDE ** REAR SHOWS YOU ARE PUSHING WATER TO THE BACK INTO THE NATIONAL CONSERVATION AREA | |||
| ROW - FINAL INSPECTION | 10/31/2025 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/30/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: 10/30/25=After the inspection the water for the area is going to the back 9/25/2025 - PREVIOUS INSPECTION NOTES ** 09/25/25 BUILDER IS REQUIRED TO BRING THE WATER TO FRONT AND NOT DRAIN ONTO THE CONSERVATION AREA IN THE REAR ** YOUR INSTALLALTION OF THE POOL HAS CHANGED THE DRAINAGE AS REQUIRED YOU PROPOSED TO BRING DRAINAGE TO THE FRONT FROM THE REAR WHICH AGAIN IS REQUIRED _______________________________________________________________________________________________________________________ 6/25/2025 - PREVIOUS INSPECTION NOTES ** 06/25/25 PROPOSED DRAINAGE IS TO BRING ALL WATER FROM THE REAR TO THE FRONT OF PROPERTY YOUR FINAL SURVEY SHOWS WATER AT PROPERTY LINE FLOWING TO REAR ON LEFT SIDE ** REAR SHOWS YOU ARE PUSHING WATER TO THE BACK INTO THE NATIONAL CONSERVATION AREA | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/25/2025 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/25/25 BUILDER IS REQUIRED TO BRING THE WATER TO FRONT AND NOT DRAIN ONTO THE CONSERVATION AREA IN THE REAR ** YOUR INSTALLALTION OF THE POOL HAS CHANGED THE DRAINAGE AS REQUIRED YOU PROPOSED TO BRING DRAINAGE TO THE FRONT FROM THE REAR WHICH AGAIN IS REQUIRED _______________________________________________________________________________________________________________________ 6/25/2025 - PREVIOUS INSPECTION NOTES ** 06/25/25 PROPOSED DRAINAGE IS TO BRING ALL WATER FROM THE REAR TO THE FRONT OF PROPERTY YOUR FINAL SURVEY SHOWS WATER AT PROPERTY LINE FLOWING TO REAR ON LEFT SIDE ** REAR SHOWS YOU ARE PUSHING WATER TO THE BACK INTO THE NATIONAL CONSERVATION AREA | |||
| ROW- PROJECT STATUS | 07/18/2025 | APPROVED - AS NOTED | GBERTOLA |
| Note: ** 07/18/25 MEET POOL BUILDER REGARDING DRAINAGE 8:30 AM .THE PRIOR FINAL SURVEY INDICATED THAT A BERM IN THE BACK SHOULD HOLD WATER. NOW, WITH THE POOL, WE NO LONGER HAVE IT, AND ALL THE WATER IS GOING TO THE SJWM.M | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/25/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/25/25 PROPOSED DRAINAGE IS TO BRING ALL WATER FROM THE REAR TO THE FRONT OF PROPERTY YOUR FINAL SURVEY SHOWS WATER AT PROPERTY LINE FLOWING TO REAR ON LEFT SIDE ** REAR SHOWS YOU ARE PUSHING WATER TO THE BACK INTO THE NATIONAL CONSERVATION AREA | |||
| ELECTRIC AND ALARM | 04/21/2025 | APPROVED | JSTEWART |
| POOL DECK | 03/25/2025 | APPROVED | FWILLIS |
| FOOTER | 03/25/2025 | APPROVED | FWILLIS |
| STEEL AND GROUND | 02/28/2025 | APPROVED | FWILLIS |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 10/17/2025 | 10/17/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF | |||
| BADMIN | INFORMATION | 06/23/2025 | 06/23/2025 |
| Note: Marked INFORMATION By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| BFLOOD | COMPLETE | 01/13/2025 | 01/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/13/2025 | 01/17/2025 |
| Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/13/2025 | 01/21/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/13/2025 | 01/17/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/13/2025 | 01/15/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/13/2025 | 01/14/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤25.50) | 01/21/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/21/2025 |
| INSPECTION- POOL | ¤160.00 | 01/21/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 01/21/2025 |
| SURCHARGE FS 533.721 | ¤2.30 | 01/21/2025 |
| SURCHARGE - FS 468.631 | ¤3.44 | 01/21/2025 |
| SW ENG INSPECTION 40 | ¤40.00 | 01/21/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/21/2025 |
| SITE PLAN 30 | ¤30.00 | 01/21/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤325.24 |