I want to search for...

Permit #2025010576

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0210
CONDITIONED SPACE: 3217 sqft
GARAGE: 825 sqft
OPENED PORCH (WITH ROOF) : 776 sqft
Total Square Footage: 4818 sqft
Block: 00000
Subdivision: -
Job Phone: (386)566-3290
Location Address: 218 WILLOW OAK WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 03/07/2025
NOC: RECORDED
Applicant name: ERIC CHRISTOPHER OLSEN
Owner: LIVERMORE DERECK & JULIE H&W

Address

355 WEXFORD WAY APT 727

SAINT AUGUSTINE, FL 32095

Lot: 0210
Contracted Stated Job Value: ¤450,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

OLSEN CUSTOM HOMES AND CONSULTING INC
Status Location Address State License Number Phone Fax
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

CGC1508852 (Exp: 08/31/2026) 386-947-4481 (386)947-4484

Sub Contractors

BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
DANIEL J FERRARA
Status Location Address State License Number Phone
ACTIVE

400 N US 1

ORMOND BEACH, FL 32174

LQ34256 (Exp: 08/28/2027) 386-944-0848

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 12/19/2025 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 IRR WITH REUSE WATER. NO CC
ELEVATION CERTIFICATE-FINAL APPROVAL 12/18/2025 APPROVED JMYERS
ROW - FINAL APRON (AFTER POUR) 12/18/2025 APPROVED FSLADISH
Note: 12/18/25 PAVERS GLUED, REQUIRED REPAIR AT RIGHT APRON WING COMPLETED. NO CRACKED OR BROKEN PAVERS OBSERVED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/18/2025 APPROVED FSLADISH
Note: 12/15/2025 - PREVIOUS INSPECTION NOTES 12/15/25 WE REQUIRE THE FFE OF THE POOL AND SHOTS ALONG THE OUTSIDE OF SLAB AS WELL AS REAR MIDDLE TO DETERMINE IF DRAINAGE CONFORMS TO COPC STANDARDS. SEE PHOTO FOR REFERENCE. A Final Survey must be submitted Sec.300.01 F-1 "Sec.300.01 F-1=A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, or does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. Propose Drainage Pattern Sec 300.01c(5) Sec 300.01c(5).The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. There must be sufficient elevation shots to indicate the proposed drainage pattern.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/18/2025 APPROVED FSLADISH
Note: 12/18/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 12/18/2025 APPROVED FSLADISH
Note: 12/18/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U-CROSS CONNECTION 12/17/2025 APPROVED - AS NOTED BWRIGHT
Note: IRR WITH REUSE WATER. NO CC
BLD - BUILDING FINAL 12/15/2025 Approval - Private Provider PPROVIDER
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/15/2025 Disapproved - NO FEE FSLADISH
Note: 12/15/25 WE REQUIRE THE FFE OF THE POOL AND SHOTS ALONG THE OUTSIDE OF SLAB AS WELL AS REAR MIDDLE TO DETERMINE IF DRAINAGE CONFORMS TO COPC STANDARDS. SEE PHOTO FOR REFERENCE. A Final Survey must be submitted Sec.300.01 F-1 "Sec.300.01 F-1=A Final Survey must be submitted in person or uploaded online. If the survey is incomplete, unclear, or does not adequately show the drainage patterns, or if the constructed drainage is incorrect, it will be disapproved until corrections are made and resubmitted for review and approval. Once any required field changes have been made and the survey has been revised, the contractor shall submit one (1) signed and sealed revised survey for review. Propose Drainage Pattern Sec 300.01c(5) Sec 300.01c(5).The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. There must be sufficient elevation shots to indicate the proposed drainage pattern.
PLUMBING FINAL 12/15/2025 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 2095 Inspector Notes from Inspection 2095 THIS WAS APPROVED ALREADY THIS WAS A VIRTUAL INSPECTION
HVAC FINAL 12/15/2025 Approval - Private Provider PPROVIDER
ELECTRIC FINAL 12/15/2025 Approval - Private Provider PPROVIDER
GAS FINAL 12/15/2025 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 11/18/2025 APPROVED FSLADISH
Note: 11/18/25 THIS IS A PREPOUR INSPECTION FOR THE SIDEWALK. AT THE TIME OF THIS INSPECTION IT MEETS THE COPC MINIMUM STANDARDS. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 11/12/25 This is a secondary prepour inspection for spread and compaction as the pavers were pulled to determine if driveway meets COPC standars. derrick homeowner was present and I informed him of our standards and answered his quetions on site. I am approving builder to re-lay pavers and repair right driveway apron corner edge at the time of this inspection. Approving as noted. ________________________________________________________________________________________________________________________ 10/29/2025 - PREVIOUS INSPECTION NOTES 10/29/25=The builder must remove all pavers from the driveways, and the inspector needs to check the entire area for compaction, per G. Bertola 10/28/25 MET WITH PAUL CM IT IS HIS PAVER CREW'S FIRST PAVER DRIVEWAY AND THEY LAID PAVERS BEFORE A SECONDARY PREPOUR WAS PASSED.. WE DISCUSSED WHAT I AM GOING TO REQUIRE HIM TO DO TO FOR ME TO INSPECT FOR SPREAD AND COMPACTION. THIS IS A ONE TIME COURTESY. I LET PAUL KNOW THAT ANY FUTURE SITUATIONS LIKE THIS MAY REQUIRE MORE DRASTIC CONSEQUENCES. I AM HAVING HIM PULL SEVERSL AREAS OF PAVERS TO VERIFY SPREAD AND COMPACTION MEETS COPC STANDARDS.
SEWER TIE IN 11/17/2025 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2095 THIS WAS APPROVED ALREADY THIS WAS A VIRTUAL INSPECTION
SEWER TIE IN 11/13/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 11/12/2025 APPROVED - AS NOTED FSLADISH
Note: 11/12/25 This is a secondary prepour inspection for spread and compaction as the pavers were pulled to determine if driveway meets COPC standars. derrick homeowner was present and I informed him of our standards and answered his quetions on site. I am approving builder to re-lay pavers and repair right driveway apron corner edge at the time of this inspection. Approving as noted. ________________________________________________________________________________________________________________________ 10/29/2025 - PREVIOUS INSPECTION NOTES 10/29/25=The builder must remove all pavers from the driveways, and the inspector needs to check the entire area for compaction, per G. Bertola 10/28/25 MET WITH PAUL CM IT IS HIS PAVER CREW'S FIRST PAVER DRIVEWAY AND THEY LAID PAVERS BEFORE A SECONDARY PREPOUR WAS PASSED.. WE DISCUSSED WHAT I AM GOING TO REQUIRE HIM TO DO TO FOR ME TO INSPECT FOR SPREAD AND COMPACTION. THIS IS A ONE TIME COURTESY. I LET PAUL KNOW THAT ANY FUTURE SITUATIONS LIKE THIS MAY REQUIRE MORE DRASTIC CONSEQUENCES. I AM HAVING HIM PULL SEVERSL AREAS OF PAVERS TO VERIFY SPREAD AND COMPACTION MEETS COPC STANDARDS.
ROW- PRE-APRON (PRE-POUR) 10/29/2025 Disapproved - NO FEE GBERTOLA
Note: 10/29/25=The builder must remove all pavers from the driveways, and the inspector needs to check the entire area for compaction, per G. Bertola 10/28/25 MET WITH PAUL CM IT IS HIS PAVER CREW'S FIRST PAVER DRIVEWAY AND THEY LAID PAVERS BEFORE A SECONDARY PREPOUR WAS PASSED.. WE DISCUSSED WHAT I AM GOING TO REQUIRE HIM TO DO TO FOR ME TO INSPECT FOR SPREAD AND COMPACTION. THIS IS A ONE TIME COURTESY. I LET PAUL KNOW THAT ANY FUTURE SITUATIONS LIKE THIS MAY REQUIRE MORE DRASTIC CONSEQUENCES. I AM HAVING HIM PULL SEVERSL AREAS OF PAVERS TO VERIFY SPREAD AND COMPACTION MEETS COPC STANDARDS.
ROW- PROJECT STATUS 10/28/2025 APPROVED - AS NOTED FSLADISH
Note: 10/28/25 MET WITH PAUL CM IT IS HIS PAVER CREW'S FIRST PAVER DRIVEWAY AND THEY LAID PAVERS BEFORE A SECONDARY PREPOUR WAS PASSED.. WE DISCUSSED WHAT I AM GOING TO REQUIRE HIM TO DO TO FOR ME TO INSPECT FOR SPREAD AND COMPACTION. THIS IS A ONE TIME COURTESY. I LET PAUL KNOW THAT ANY FUTURE SITUATIONS LIKE THIS MAY REQUIRE MORE DRASTIC CONSEQUENCES. I AM HAVING HIM PULL SEVERSL AREAS OF PAVERS TO VERIFY SPREAD AND COMPACTION MEETS COPC STANDARDS.
ELECTRIC - EARLY POWER 10/15/2025 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 09/17/2025 PARTIALLY APPROVED FSLADISH
Note: 9/17/25 AT THE TIME OF THIS INSPECTION YOU ARE PARTIALLY APPROVED TO POUR YOUR DRIVEWAY APRON, SIDEWALK AND PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS DUE TO ONGOING CONSTRUCTION ACCESS SIDEWALK WILL BE POURED SEPERATELY WITH AN ADDITIONAL PREPOUR INSPECTION REQUIRED.
ROW- PAVER RESTRAINTS 09/17/2025 APPROVED FSLADISH
Note: 9/17/25 AT THE TIME OF THIS INSPECTION YOU ARE APPROVED TO POUR YOUR PAVER RESTRAINTS. **** DO NOT LAY ANY PAVERS UNTIL AFTER A SECONDARY SPREAD AND COMPACTION INSPECTION HAS BEEN SCHEDULED AND PASSED**** BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS
GRAVITY SEWER TEST 07/09/2025 Approval - Private Provider PPROVIDER
DRYWALL NAILING 07/01/2025 Approval - Private Provider PPROVIDER
INSULATION 06/24/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 06/20/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 06/17/2025 Approval - Private Provider PPROVIDER
GAS ROUGH 06/12/2025 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 05/29/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 05/27/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/27/2025 Approval - Private Provider PPROVIDER
ELEV CERT-FOUNDATION APPROVAL 05/23/2025 APPROVED JMYERS
ELECTRIC-TUG 05/01/2025 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 04/30/2025 APPROVED RRICKS
TIE BEAM / LINTEL 04/23/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 04/07/2025 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 04/04/2025 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 03/11/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
PLFM COMPLETE 12/17/2025 12/18/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
PLFM HOLD 12/12/2025 12/15/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM C2d should be rounded up based on the survey elevation for the garage. C2f, there is no 11.6' elevation shown adjacent to the structure on the final survey, please revise. C2g, there are higher elevations than 12.2' shown on the final survey, please revise.
PLFM COMPLETE 05/22/2025 05/23/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to CO.
ENGIN1 COMPLETE 05/22/2025 05/23/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/22/2025 05/22/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 05/21/2025 05/21/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Date Signed on survey is still 9/12/24, how can the survey be signed prior to the work being done. C2d garage elevation is listed as 12.48' on foundation survey which should be rounded to 12.5' not 12.4'.
ENGIN1 COMPLETE 05/21/2025 05/21/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 05/21/2025 05/21/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM HOLD 05/15/2025 05/16/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Field Date and Date Signed on the Foundation survey are prior to the Foundation being constructed, please provide updated Foundation survey with corrected dates. Garage elevation cannot be confirmed as it is not shown on the Foundation survey. C2a and C2d need to be to the tenth not the hundredth. C2f, there is no elevation of 12.3' shown on the Site Plan adjacent to the building, please either revise Foundation survey or Elevation Certificate. A2, address is Willow Oak Way not Willow Oaks Way.
ENGIN1 COMPLETE 04/30/2025 04/30/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 04/30/2025 04/30/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM No revised drainage plan submitted.
ZON COMPLETE 04/30/2025 04/30/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM COMPLETE 03/05/2025 03/05/2025
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been approved. Please provide Foundation and Final.
PLFM HOLD 02/25/2025 03/04/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Repeat comment: C2f, there is no elevation of 12.3' shown on the Site Plan adjacent to the building, please either revise Site Plan or Elevation Certificate.
SW1 COMPLETE 02/25/2025 02/26/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/25/2025 02/26/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 02/25/2025 02/25/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM HOLD 02/21/2025 02/21/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Comments not addressed: FFE of garage in C2d cannot be confirmed as it is missing from the Site Plan. C2f, there is no elevation of 12.3' shown on the Site Plan adjacent to the building, please either revise Site Plan or Elevation Certificate. C2f and C2g should also be Finished Grade not Natural as what is listed under C2g is a proposed grade. Section D, please specify which A/C that elevation is for as there are two proposed.
SW1 HOLD 02/21/2025 02/24/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1) No proposed grades adjacent (4 corners) to home 4"(.33') for block and 6"(.5') for wood frame. This should include a propopsed elevation with an additional 6" drop within the first 10' of the home. 2) Proposed grades shall be shown every 20' to clearly illustrate the drainage flow and features.This lot's drainage should not negatively impact any adjacent property.
ENGIN1 COMPLETE 02/21/2025 02/21/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 02/21/2025 02/24/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 01/28/2025 02/06/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1) 1/2" Iron Rod is not an acceptable benchmark - Nail in disk in centerline is acceptable if there is no PP, manhole, or hydrant. 2) FFEs and other elevations do not match the City's elevations. Please revise with aprroved benchmark. 3) Proposed FFE is more than 10" higher than adjacent house on the left based on City's elevations. 4) Please depict hard elevations to the .01' 5) Grades shall be shown on a 20' grid with 10' shots outside the property. This should include the grades adjacent to house 4"(.33') for block or 6"(.5') for wood frame homes with additional 6"(.5) fall in the fist 10' from the house.
ZON COMPLETE 01/28/2025 01/29/2025
Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM
PLFM HOLD 01/28/2025 01/29/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM FFE of garage in C2d cannot be confirmed as it is missing from the Site Plan. C2f, there is no elevation of 12.3' shown on the Site Plan adjacent to the building, please either revise Site Plan or Elevation Certificate. Section D comments are still missing the type of machinery referenced in C2e.
BADMIN COMPLETE 01/28/2025 01/30/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN HOLD 01/15/2025 01/22/2025
Note: Held By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM Goetech Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005.
CUSVC COMPLETE 01/15/2025 01/17/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 HOLD 01/15/2025 01/16/2025
Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM See comments made on swale plan review. Proposed FFE is too low in relationship to adjacent properties, Must be within 10". Ground elevation at perimeter of house are too high - must be .33' lower than slab for a concrete block house and .5' lower for wood framed house. Site elevations do not agree with original master grading plan.
LOCATE COMPLETE 01/15/2025 01/16/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 HOLD 01/15/2025 01/15/2025
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Proposed FFE is too low in relationship to adjacent properties, Must be within 10". Ground elevation at perimeter of house are too high - must be .33' lower than slab for a concrete block house and .5' lower for wood framed house. Site elevations do not agree with original master grading plan.
ZON HOLD 01/15/2025 01/15/2025
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM landscape needs to state that st augustine Sod will have irrigation Elevation and floor plan need to be uploaded indiviually as zoning needs to approve those. Elevation : Small windows in the front are missing banding. Elevations are labeled incorrectly Left side is labeled Right
ENGIN1 COMPLETE 01/15/2025 01/16/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM HOLD 01/15/2025 01/16/2025
Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Base flood elevation is missing from the Site Plan, please revise. A1 please list owner of property, Olsen Homes does not own the property. A4 please remove VACANT LOT from the description. A7 is missing a building diagram. A8a should not be 0 it should be N/A. A9a there is a proposed garage so there should be square footage. A9b should be No not N/A. A9c-e should be 0 not N/A. B10 with a precise BFE as 7.6' it is most likely the information was gathered from the Flood Insurance Study (FIS) not the FIRM. C1 should be Construction Drawings not Final as the building has not been built yet. Elevations in C2 a-h need to be the proposed elevations for the structure. Section D comments will need to note the type of machinery that will need to be referenced in C2e. Please remove information added to Section I. Page 8 is missing.
URB COMPLETE 01/15/2025 01/16/2025
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM 1/16/25 (JB) COMPLETE PENDING ZONING HOLD NEEDING IRRIGATION SYSTEM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/18/2025
FC IMPACT FEE EMS ¤62.00 03/07/2025
IMPACT FEE FIRE ¤434.51 03/07/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 03/07/2025
FC IMPACT FEE LIBRARY ¤268.00 03/07/2025
IMPACT FEE PARKS ¤1,828.01 03/07/2025
IMPACT FEE SCHOOL ¤5,450.00 03/07/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 03/07/2025
SURCHARGE FS 533.721 ¤2.52 03/07/2025
SURCHARGE - FS 468.631 ¤3.78 03/07/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/07/2025
SW ENG INSPECTION 80 ¤80.00 03/07/2025
SW ENG PRE APRON ¤30.00 03/07/2025
SW ENG - REVIEW 20 ¤20.00 03/07/2025
SW ENG RES REVIEW 200 ¤200.00 03/07/2025
SEWER INSPECTION ¤25.00 03/07/2025
SITE PLAN 30 ¤30.00 03/07/2025
WATER-METER ¤514.49 03/07/2025
WATER-METER ¤427.42 03/07/2025
ADJUSTMENT 10% (¤3.00) 03/07/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/07/2025
ADMINISTRATIVE - RESID PP ¤225.00 03/07/2025
CONNECTION FEES ¤25.00 03/07/2025
Fees Total Due: ¤0.00 Total Paid: ¤13,412.73