I want to search for...

Permit #2025010603

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7023-00240-0120
Block: 00240
Subdivision: 7023 -
Job Phone: 386-216-9945
Location Address: 16 WHITTIER LN
Type: PO - POOL
Issue Date: 01/29/2025
NOC: RECORDED
Applicant name: CASEY C WATSON
Owner: KECHKIN ILYA VALERYEVICH & YANA SIVETS H&W

Address

16 WHITTIER LANE

PALM COAST, FL 32164

Lot: 0120
Contracted Stated Job Value: ¤91,103.00
Job Description: POOL WITH SCREEN ENCLOSURE
Type: CN

Contractor

EXQUISITE POOL & SPA INC
Status Location Address State License Number Phone
ACTIVE

3895 BRITTING DR

DELAND, FL 32724

CPC1457932 (Exp: 08/31/2026) 386-216-9945

Sub Contractors

JEFFREY ADAM MCGREGOR
Status Location Address State License Number Phone Fax
ACTIVE

1312 YORKTOWN STREET

DELAND , FL 32724

EC13005662 (Exp: 08/31/2026) 386-736-7475 386-785-1503
JOHN LEROY HODGINS
Status Location Address State License Number Phone Fax
ACTIVE

2020 COUNTRY FARMS RD

PORT ORANGE, FL 32128

CGC1507254 (Exp: 08/31/2026) 386-547-2998 386-788-4028

Inspection History

Type Request Date Result Inspector
POOL FINAL 07/01/2025 FINAL APPROVED MKRASKI
Note:
POOL FINAL 06/26/2025 Disapproved - NO FEE MKRASKI
Note: 1. Bond wire must be protected with in 3' of grade (near heater) NEC 250.64(A)(2) 2. 2x6s on cage (back corners) missing L brackets Per plans FBC (A)107.4 3. No screen engineering drawling onsite FBC 107.3.1 4. Pool chlorinator must be GFCI protected FBC 4501.16/NEC 680.21(C)/NEC 680.22
U -UTILITY RESIDENTIAL FINAL 06/25/2025 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 06/24/2025 APPROVED TPOLACEK
Note: CORRECTIONS MADE. UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED 6/18/2025 - PREVIOUS INSPECTION NOTES 06/18/25 TPOLACEK*** FINAL SURVEY AND FIELD DO NOT MATCH. PLEASE SEE ATTACHED PHOTO SHOWING A HIGH AREA ( BLACK) AND A LOW AREA (IN RED) THAT WILL NOT ALLOW DRAINAGE TO FUNCTION CORRECLTY. PLEASE MAKE CORRECTIONS AND REQUEST A NEW FIELD SURVEY.
ROW - FINAL INSPECTION 06/24/2025 APPROVED TPOLACEK
Note: . AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/18/2025 APPROVED TPOLACEK
Note: 6/9/2025 - PREVIOUS INSPECTION NOTES 06/09/25 TPOLACEK** REAR YARD DRAINAGE NEEDS TO HAVE MORE ELEVATION SHOTS TO PROPERLY DETERMINE IF DRAINAGE WILL WORK. DRAINAGE IS REQUIRED TO MOVE FROM THE REAR TO THE FRONT SWALE. PLEASE READ CODES BELOW TO ENSURE YOU MEET THE MINIMUM REQUIREMENTS BEFORE SUBMITTING NEW FINAL SURVEY. PLEASE SEE ATTACHED PHOTO SHOWING AREAS OF CONCERN. Finished Floor Elevations (FFE): Section 300.01 B(4) V-15 4) The elevations at 20-foot intervals along all property lines. There must be sufficient elevation shots to indicate the proposed drainage pattern. Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(5) V-17 5) The minimum fall from the rear property line to the front is 0.50 of a foot. Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(6) V-17 6) The top of slope of the swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/18/2025 Disapproved - NO FEE TPOLACEK
Note: 06/18/25 TPOLACEK*** FINAL SURVEY AND FIELD DO NOT MATCH. PLEASE SEE ATTACHED PHOTO SHOWING A HIGH AREA ( BLACK) AND A LOW AREA (IN RED) THAT WILL NOT ALLOW DRAINAGE TO FUNCTION CORRECLTY. PLEASE MAKE CORRECTIONS AND REQUEST A NEW FIELD SURVEY.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/09/2025 Disapproved - NO FEE TPOLACEK
Note: 06/09/25 TPOLACEK** REAR YARD DRAINAGE NEEDS TO HAVE MORE ELEVATION SHOTS TO PROPERLY DETERMINE IF DRAINAGE WILL WORK. DRAINAGE IS REQUIRED TO MOVE FROM THE REAR TO THE FRONT SWALE. PLEASE READ CODES BELOW TO ENSURE YOU MEET THE MINIMUM REQUIREMENTS BEFORE SUBMITTING NEW FINAL SURVEY. PLEASE SEE ATTACHED PHOTO SHOWING AREAS OF CONCERN. Finished Floor Elevations (FFE): Section 300.01 B(4) V-15 4) The elevations at 20-foot intervals along all property lines. There must be sufficient elevation shots to indicate the proposed drainage pattern. Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(5) V-17 5) The minimum fall from the rear property line to the front is 0.50 of a foot. Finished Floor Elevations (FFE):REAR YARD DRAINAGE Section 300.01 D(6) V-17 6) The top of slope of the swales along the property lines shall be a minimum of 0.30 of a foot higher than the toe of slope. The rear yard is required to drain to the front Sec 300.01 C-6 Sec 300.01 C-6=Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Draining onto adjacent properties will not be allowed outside of the platted 5’ drainage easement.
ELECTRIC AND ALARM 05/08/2025 APPROVED MCONTRYMAN
POOL DECK 04/10/2025 APPROVED MKRASKI
Note:
POOL DECK 04/09/2025 Disapproved - NO FEE MKRASKI
Note: 1. Missing 4th point of bonding of shell steel to perimeter surface bomnd wire NEC 680.26.4 2. All footing steel must have a min of 3'' clearence from soil FBC R404.1.3.3.7.4
STEEL AND GROUND 02/12/2025 APPROVED MKRASKI

Review History

Department Status Date In Date Out
ZON COMPLETE 01/23/2025 01/23/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 01/23/2025 01/29/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN INFORMATION 01/22/2025 01/22/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM plans missing digital seal
BFLOOD COMPLETE 01/15/2025 01/21/2025
Note: Released By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM
BLD HOLD 01/15/2025 01/21/2025
Note: Held By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM 1. Screen Enclosure plans missing. Pool plans attached instead.
ELEC COMPLETE 01/15/2025 01/22/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 01/15/2025 01/21/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 01/15/2025 01/21/2025
Note: Released By: TOM POLACEK - (386)346-8986 - 01/21/25 TPOLACEK*** THE REAR YARD IS REQUIRED TO DRAIN TO THE FRONT YARD SWALE.
ZON HOLD 01/15/2025 01/15/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Screen enclosure plans missing What is labeled as screen plans are pool plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤26.18) 01/29/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/29/2025
INSPECTION- POOL ¤160.00 01/29/2025
PLAN REVIEW - RESIDENTIAL ¤71.76 01/29/2025
SURCHARGE FS 533.721 ¤2.36 01/29/2025
SURCHARGE - FS 468.631 ¤3.53 01/29/2025
SW ENG INSPECTION 40 ¤40.00 01/29/2025
SW ENG - REVIEW 20 ¤20.00 01/29/2025
SITE PLAN 30 ¤30.00 01/29/2025
Fees Total Due: ¤0.00 Total Paid: ¤331.47