I want to search for...
Permit #2025010633
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00300-0070 |
| CONDITIONED SPACE: 1856 sqft |
| GARAGE: 447 sqft |
| OPENED PORCH (WITH ROOF) : 178 sqft |
| Total Square Footage: 2481 sqft |
| Block: 00300 |
| Subdivision: - |
| Job Phone: 386-931-5741 |
| Location Address: 78 SLOGANEER TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/18/2025 |
| NOC: RECORDED |
| Applicant name: MICHAEL MARINO HANSEN |
| Owner: JM PROPERTIES X LLC |
|
Address PO BOX 1347 FLAGLER BEACH, FL 32136 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family |
| Type: CN |
Contractor
RBI HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 1347 PALM COAST, FL 32137 |
RB29003877 (Exp: 08/31/2027) | 386-585-4097 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
MICHAEL JON HOWES
| Status | Location Address | State License Number | Phone |
| CANCEL |
29 MALACOMPRA RD PALM COAST, FL 32137 |
RC29027794 (Exp: 08/31/2025) | 410-984-6787 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/21/2025 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 10/21/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR using potable water, PVB in place. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/21/2025 | FINAL APPROVED | BHAINES |
| ROW - STORMWATER FINAL | 10/17/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: Inspector Notes from Inspection 9272 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. APPROVING AS NOTED. Inspector Notes from Inspection 9465 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. APPROVING AS NOTED. Inspector Notes from Inspection 9463 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES 10/15/25 YOUR SURVEY SHOWS THAT YOUR FRONT SWALE WILL NOT HAVE POSITVE DRAINAGE FLOW. IT GOES FROM A 24.16 UPHILL TO A 24.70 AT THE PROPERTY LINE THAT IS 5.5 TENTHS UP HILL. THEN IT COMES OUT OF YOUR CULVERT PIPE AT 24.10 ON THE RIGHT (DOWNSTREAM SIDE UP TO A 24.75 ALMOST 6.75 TENTHS UPHILL. THIS WILL NOT FLOW FROM LEFT TO RIGHT AS REQUIRED. ***INSPECTORS NOTE. DUE TO THE SEVERAL DRAINAGE INSPECTIONS PLACED ON THIS PERMIT AND THE RESULTING SILT AND DIRT WASHING INTO YOUR PIPE AND THE RIGHT SIDE ADJOINING PIPE YOU WILL BE REQUIRED TO COMPLETELY CLEAN OUT BOTH CULVERT PIPES BEFORE ROW FINAL PASSAGE. *** 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. APPROVING AS NOTED. 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. CULVERT PIPES HAVE BEEN CLEANED OUT AT 78 AND 76 AS REQUIRED. APPROVING AS NOTED. ***INSPECTORS NOTE. DUE TO THE SEVERAL DRAINAGE INSPECTIONS PLACED ON THIS PERMIT AND THE RESULTING SILT AND DIRT WASHING INTO YOUR PIPE AND THE RIGHT SIDE ADJOINING PIPE YOU WILL BE REQUIRED TO COMPLETELY CLEAN OUT BOTH CULVERT PIPES BEFORE ROW FINAL PASSAGE. *** | |||
| ROW - FINAL APRON (AFTER POUR) | 10/17/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. APPROVING AS NOTED. Inspector Notes from Inspection 9465 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. APPROVING AS NOTED. Inspector Notes from Inspection 9463 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES 10/15/25 YOUR SURVEY SHOWS THAT YOUR FRONT SWALE WILL NOT HAVE POSITVE DRAINAGE FLOW. IT GOES FROM A 24.16 UPHILL TO A 24.70 AT THE PROPERTY LINE THAT IS 5.5 TENTHS UP HILL. THEN IT COMES OUT OF YOUR CULVERT PIPE AT 24.10 ON THE RIGHT (DOWNSTREAM SIDE UP TO A 24.75 ALMOST 6.75 TENTHS UPHILL. THIS WILL NOT FLOW FROM LEFT TO RIGHT AS REQUIRED. ***INSPECTORS NOTE. DUE TO THE SEVERAL DRAINAGE INSPECTIONS PLACED ON THIS PERMIT AND THE RESULTING SILT AND DIRT WASHING INTO YOUR PIPE AND THE RIGHT SIDE ADJOINING PIPE YOU WILL BE REQUIRED TO COMPLETELY CLEAN OUT BOTH CULVERT PIPES BEFORE ROW FINAL PASSAGE. *** 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. APPROVING AS NOTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/17/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES 10/15/25 YOUR SURVEY SHOWS THAT YOUR FRONT SWALE WILL NOT HAVE POSITVE DRAINAGE FLOW. IT GOES FROM A 24.16 UPHILL TO A 24.70 AT THE PROPERTY LINE THAT IS 5.5 TENTHS UP HILL. THEN IT COMES OUT OF YOUR CULVERT PIPE AT 24.10 ON THE RIGHT (DOWNSTREAM SIDE UP TO A 24.75 ALMOST 6.75 TENTHS UPHILL. THIS WILL NOT FLOW FROM LEFT TO RIGHT AS REQUIRED. ***INSPECTORS NOTE. DUE TO THE SEVERAL DRAINAGE INSPECTIONS PLACED ON THIS PERMIT AND THE RESULTING SILT AND DIRT WASHING INTO YOUR PIPE AND THE RIGHT SIDE ADJOINING PIPE YOU WILL BE REQUIRED TO COMPLETELY CLEAN OUT BOTH CULVERT PIPES BEFORE ROW FINAL PASSAGE. *** | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/17/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. THERE ARE 2 LARGE AT&T VAULTS IN THE MIDDLE AND OUTER EDGE OF SWALE THAT WE WILL BE REQUIRING THEM TO RELOCATE ONTO THE EDGE OF ROW. .AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. APPROVING AS NOTED. Inspector Notes from Inspection 9463 10/17/25 BUILDER JIM CM AND GRADER JAYME CORRECTED THE FRONT SWALE ELEVATION ON RIGHT SIDE OF CULVERT TO PROVIDE POSITIVE DRAINAGE FLOW. BEING THAT IT WAS A SMALL AREA I AM NOT REQUIRING THEM TO PROVIDE A NEW SURVEY. I HAVE VERIFIED IT IN THE FIELD. APPROVING AS NOTED. ________________________________________________________________________________________________________________________ 10/15/2025 - PREVIOUS INSPECTION NOTES 10/15/25 YOUR SURVEY SHOWS THAT YOUR FRONT SWALE WILL NOT HAVE POSITVE DRAINAGE FLOW. IT GOES FROM A 24.16 UPHILL TO A 24.70 AT THE PROPERTY LINE THAT IS 5.5 TENTHS UP HILL. THEN IT COMES OUT OF YOUR CULVERT PIPE AT 24.10 ON THE RIGHT (DOWNSTREAM SIDE UP TO A 24.75 ALMOST 6.75 TENTHS UPHILL. THIS WILL NOT FLOW FROM LEFT TO RIGHT AS REQUIRED. ***INSPECTORS NOTE. DUE TO THE SEVERAL DRAINAGE INSPECTIONS PLACED ON THIS PERMIT AND THE RESULTING SILT AND DIRT WASHING INTO YOUR PIPE AND THE RIGHT SIDE ADJOINING PIPE YOU WILL BE REQUIRED TO COMPLETELY CLEAN OUT BOTH CULVERT PIPES BEFORE ROW FINAL PASSAGE. *** | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/15/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 10/15/25 YOUR SURVEY SHOWS THAT YOUR FRONT SWALE WILL NOT HAVE POSITVE DRAINAGE FLOW. IT GOES FROM A 24.16 UPHILL TO A 24.70 AT THE PROPERTY LINE THAT IS 5.5 TENTHS UP HILL. THEN IT COMES OUT OF YOUR CULVERT PIPE AT 24.10 ON THE RIGHT (DOWNSTREAM SIDE UP TO A 24.75 ALMOST 6.75 TENTHS UPHILL. THIS WILL NOT FLOW FROM LEFT TO RIGHT AS REQUIRED. SEE PHOTO FOR REFERENCE ***INSPECTORS NOTE. DUE TO THE SEVERAL DRAINAGE INSPECTIONS PLACED ON THIS PERMIT AND THE RESULTING SILT AND DIRT WASHING INTO YOUR PIPE AND THE RIGHT SIDE ADJOINING PIPE YOU WILL BE REQUIRED TO COMPLETELY CLEAN OUT BOTH CULVERT PIPES BEFORE ROW FINAL PASSAGE. *** | |||
| ROW- PRE-APRON (PRE-POUR) | 10/02/2025 | APPROVED | FSLADISH |
| Note: 10/2/25 WHILE THE PIPE IS ENCASED WITH STONE AND IN TOLERANCE AT THE TIME OF THIS INSPECTION. WITH HEAVY RAIN PREDICTED IT IS YOUR RESPONSIBILY FORWARD TO DOUBLE CHECH PIPE ELEVATION AND MAKE SURE YOUR POUR AREA IS PUMPED OUT OF ANY STANDING WATER. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ELECTRIC - EARLY POWER | 09/03/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ELECTRIC - EARLY POWER | 08/29/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-29-25 1. Master bathroom lights not safed off. | |||
| GRAVITY SEWER TEST | 08/06/2025 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET, FBC 3303.5 SWALE ON AJACENT LOT PORTABLE BLOCKING SWALE | |||
| SEWER TIE IN | 08/06/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET, FBC 3303.5 SWALE ON AJACENT LOT PORTABLE BLOCKING SWALE ALARM WIRES WERE RIPPED OUT OF CONDUIT AND NEED TO BE REPAIRED BEFORE GRADING CAN BE STARTED FOR COVERING UP | |||
| ROW - DRAINAGE | 07/25/2025 | APPROVED | FSLADISH |
| Note: 7/25/25 ALL REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. BUILDER PLEASE MAKE SURE THIS SITE IS MAINTAINED WITH SWALE AND TEMPORARY PIPE CLEAR AND FLOWING THROUGHOUT CONSTRUCTION PROCESS. __________________________________________________________________________________________________________________________ 7/23/2025 - PREVIOUS INSPECTION NOTES 7/23/25 PLEASE MOVE THE PORTA JOHN ONTO YOUR SITE OUT OF THE COPC ROW. ALL OTHER CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. PARTIALLY APPOVING. COMPLIANCE REINSPECTION ON 7/25/25 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 NO CHANGES MADE AT THE TIME OF THIS INSPECTION. AN INSPECTION HOLD IS BEING PLACED ON THIS PERMIT DUE TO NON COMPLIANCE. 7/21/2025 - PREVIOUS INSPECTION NOTES 7/21/25 SILT FENCE STILL NOT REPAIRED OR RESET. PORTA JOHN STILL ACROSS STREET IN COPC SWALE AT THE TIME OF THIS INSPECTION.. COMPLIANCE REINSPECTION ON 7/22/25 AT WHICH TIME A PERMIT INSPECTION HOLD WILL BE INSTITUTED IF CORRECTIONS NOT COMPLETED. ______________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN TEMPORARY CULVERT AS IT IS MORE THAN 50% BLOCKED ** NEED RE-INSTALL YOUR SILT FENCE AROUND ENTIRE JOB SITE ** NEED TO REMOVE PORT-A-JOHN FROM ACROSS THE STREET AND PUT ONTO YOUR JOB SITE ** BUILDER WILL BE REQUIRED TO ENSURE CULVERT PIPE AT 76 SLOGANNEER TRL AND 80 SLOGANEER TRL ARE CLEAR OF ERODED SEDIMENT BEFORE THE ROW STORMWATER FINAL IS APPROVED ** YOU WILL HAVE 7 DAYS TO ENSURE ALL DEFICIENCIES ARE CORRECTED OR AN INSPECTION HOLD PRIORITY 1 STATUS WILL BE IMPOSED ON THIS PERMIT ** SEE ATTACHED PHOTOS ** FOLLOW UP INS[PECTION ON 07/21/25 | |||
| ROW - DRAINAGE | 07/23/2025 | PARTIALLY APPROVED | FSLADISH |
| Note: 7/23/25 PLEASE MOVE THE PORTA JOHN ONTO YOUR SITE OUT OF THE COPC ROW. ALL OTHER CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. PARTIALLY APPOVING. 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 NO CHANGES MADE AT THE TIME OF THIS INSPECTION. AN INSPECTION HOLD IS BEING PLACED ON THIS PERMIT DUE TO NON COMPLIANCE. 7/21/2025 - PREVIOUS INSPECTION NOTES 7/21/25 SILT FENCE STILL NOT REPAIRED OR RESET. PORTA JOHN STILL ACROSS STREET IN COPC SWALE AT THE TIME OF THIS INSPECTION.. COMPLIANCE REINSPECTION ON 7/22/25 AT WHICH TIME A PERMIT INSPECTION HOLD WILL BE INSTITUTED IF CORRECTIONS NOT COMPLETED. ______________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN TEMPORARY CULVERT AS IT IS MORE THAN 50% BLOCKED ** NEED RE-INSTALL YOUR SILT FENCE AROUND ENTIRE JOB SITE ** NEED TO REMOVE PORT-A-JOHN FROM ACROSS THE STREET AND PUT ONTO YOUR JOB SITE ** BUILDER WILL BE REQUIRED TO ENSURE CULVERT PIPE AT 76 SLOGANNEER TRL AND 80 SLOGANEER TRL ARE CLEAR OF ERODED SEDIMENT BEFORE THE ROW STORMWATER FINAL IS APPROVED ** YOU WILL HAVE 7 DAYS TO ENSURE ALL DEFICIENCIES ARE CORRECTED OR AN INSPECTION HOLD PRIORITY 1 STATUS WILL BE IMPOSED ON THIS PERMIT ** SEE ATTACHED PHOTOS ** FOLLOW UP INS[PECTION ON 07/21/25 | |||
| PEP TANK INSTALLATION REQUEST | 07/23/2025 | APPROVED | CBOWERMASTER |
| ROW - DRAINAGE | 07/22/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/22/25 NO CHANGES MADE AT THE TIME OF THIS INSPECTION. AN INSPECTION HOLD IS BEING PLACED ON THIS PERMIT DUE TO NON COMPLIANCE. NEXT INSPECTION FOR COMPLIANCE 7/23/25. 7/21/2025 - PREVIOUS INSPECTION NOTES 7/21/25 SILT FENCE STILL NOT REPAIRED OR RESET. PORTA JOHN STILL ACROSS STREET IN COPC SWALE AT THE TIME OF THIS INSPECTION.. COMPLIANCE REINSPECTION ON 7/22/25 AT WHICH TIME A PERMIT INSPECTION HOLD WILL BE INSTITUTED IF CORRECTIONS NOT COMPLETED. ______________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN TEMPORARY CULVERT AS IT IS MORE THAN 50% BLOCKED ** NEED RE-INSTALL YOUR SILT FENCE AROUND ENTIRE JOB SITE ** NEED TO REMOVE PORT-A-JOHN FROM ACROSS THE STREET AND PUT ONTO YOUR JOB SITE ** BUILDER WILL BE REQUIRED TO ENSURE CULVERT PIPE AT 76 SLOGANNEER TRL AND 80 SLOGANEER TRL ARE CLEAR OF ERODED SEDIMENT BEFORE THE ROW STORMWATER FINAL IS APPROVED ** YOU WILL HAVE 7 DAYS TO ENSURE ALL DEFICIENCIES ARE CORRECTED OR AN INSPECTION HOLD PRIORITY 1 STATUS WILL BE IMPOSED ON THIS PERMIT ** SEE ATTACHED PHOTOS ** FOLLOW UP INS[PECTION ON 07/21/25 | |||
| ROW - DRAINAGE | 07/21/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 7/21/25 SILT FENCE STILL NOT REPAIRED OR RESET. PORTA JOHN STILL ACROSS STREET IN COPC SWALE AT THE TIME OF THIS INSPECTION.. COMPLIANCE REINSPECTION ON 7/22/25 AT WHICH TIME A PERMIT INSPECTION HOLD WILL BE INSTITUTED IF CORRECTIONS NOT COMPLETED. ______________________________________________________________________________________________________________________ 7/14/2025 - PREVIOUS INSPECTION NOTES ** 07/14/25 BUILDER NEEDS TO OPEN TEMPORARY CULVERT AS IT IS MORE THAN 50% BLOCKED ** NEED RE-INSTALL YOUR SILT FENCE AROUND ENTIRE JOB SITE ** NEED TO REMOVE PORT-A-JOHN FROM ACROSS THE STREET AND PUT ONTO YOUR JOB SITE ** BUILDER WILL BE REQUIRED TO ENSURE CULVERT PIPE AT 76 SLOGANNEER TRL AND 80 SLOGANEER TRL ARE CLEAR OF ERODED SEDIMENT BEFORE THE ROW STORMWATER FINAL IS APPROVED ** YOU WILL HAVE 7 DAYS TO ENSURE ALL DEFICIENCIES ARE CORRECTED OR AN INSPECTION HOLD PRIORITY 1 STATUS WILL BE IMPOSED ON THIS PERMIT ** SEE ATTACHED PHOTOS ** FOLLOW UP INS[PECTION ON 07/21/25 | |||
| ROW - DRAINAGE | 07/14/2025 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/14/25 BUILDER NEEDS TO OPEN TEMPORARY CULVERT AS IT IS MORE THAN 50% BLOCKED ** NEED RE-INSTALL YOUR SILT FENCE AROUND ENTIRE JOB SITE ** NEED TO REMOVE PORT-A-JOHN FROM ACROSS THE STREET AND PUT ONTO YOUR JOB SITE ** BUILDER WILL BE REQUIRED TO ENSURE CULVERT PIPE AT 76 SLOGANNEER TRL AND 80 SLOGANEER TRL ARE CLEAR OF ERODED SEDIMENT BEFORE THE ROW STORMWATER FINAL IS APPROVED ** YOU WILL HAVE 7 DAYS TO ENSURE ALL DEFICIENCIES ARE CORRECTED OR AN INSPECTION HOLD PRIORITY 1 STATUS WILL BE IMPOSED ON THIS PERMIT ** SEE ATTACHED PHOTOS ** FOLLOW UP INS[PECTION ON 07/21/25 | |||
| LATH/BRICK/ WATER BARRIER | 07/01/2025 | APPROVED | BTAYLOR |
| INSULATION | 06/25/2025 | APPROVED | BTAYLOR |
| ALL ROUGH | 06/20/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2467 5-27-25 1. Mid span blocking in bearing walls still has not been put into place. Inspector Notes from Inspection 2460 5-14-25 1. Missing mid span blocking in bearing walls. | |||
| ROOF VALLEY & METAL | 05/27/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-27-25 1. Mid span blocking in bearing walls still has not been put into place. Inspector Notes from Inspection 2460 5-14-25 1. Missing mid span blocking in bearing walls. | |||
| WALL SHEATHING | 05/14/2025 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/14/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-14-25 1. Missing mid span blocking in bearing walls. | |||
| TIE BEAM / LINTEL | 04/08/2025 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2250 3-28-25 1. Need to have dumpster on site before next inspection. | |||
| MONOLITHIC SLAB | 03/28/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-28-25 1. Need to have dumpster on site before next inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/24/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WATER SERVICE NOT RAN YET, FBC 3303.5 SWALE ON AJACENT LOT PORTABLE BLOCKING SWALE | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/18/2025 | APPROVED | TDOAK |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 03/17/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/03/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/16/2025 | 10/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/18/2025 | 06/18/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/11/2025 | 06/18/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/07/2025 | 04/10/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/04/2025 | 04/04/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/04/2025 | 04/04/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/31/2025 | 04/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 03/24/2025 | 03/25/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 03/24/2025 | 03/25/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/14/2025 | 03/17/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/12/2025 | 02/12/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/11/2025 | 02/11/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/05/2025 | 02/11/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Geotech report not verifiable. 2nd Request | |||
| MECH | HOLD | 02/03/2025 | 02/05/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide updated state card | |||
| ELEC | COMPLETE | 01/27/2025 | 02/03/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/27/2025 | 01/30/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/27/2025 | 01/27/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 01/17/2025 | 01/21/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 01/16/2025 | 01/22/2025 |
| Note: Held By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM Geotech report not verifiable. | |||
| BLD | HOLD | 01/16/2025 | 01/22/2025 |
| Note: Held By: PETER KNAPIK - - PKNAPIK@PALMCOASTGOV.COM 1. FL# 25464.3 not valid | |||
| CUSVC | COMPLETE | 01/16/2025 | 01/17/2025 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 01/16/2025 | 01/23/2025 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 2,3,4 and master bedroom. NEC 2020 210.52 2. Electric load calcs need to be done to the living space. NEC 2020 220.80 | |||
| ENGIN1 | COMPLETE | 01/16/2025 | 01/17/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 01/16/2025 | 01/21/2025 |
| LOCATE | COMPLETE | 01/16/2025 | 01/22/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/16/2025 | 01/23/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show foam insulation R30 non vented. Energy Calcs show R38. vented. Revise to match | |||
| SW1 | COMPLETE | 01/16/2025 | 01/22/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/16/2025 | 01/16/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the garage door color on color sheet |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 10/20/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/18/2025 |
| SW ENG PRE APRON | ¤30.00 | 02/18/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/18/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/18/2025 |
| SEWER INSPECTION | ¤25.00 | 02/18/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 02/18/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 02/18/2025 |
| SITE PLAN 30 | ¤30.00 | 02/18/2025 |
| CONNECTION FEES | ¤1,187.26 | 02/18/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 02/18/2025 |
| IMPACT FEE FIRE | ¤434.51 | 02/18/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/18/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/18/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 02/18/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/18/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 02/18/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/18/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/18/2025 |
| SURCHARGE FS 533.721 | ¤11.45 | 02/18/2025 |
| SURCHARGE - FS 468.631 | ¤17.18 | 02/18/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/18/2025 |
| WATER-METER | ¤514.49 | 02/18/2025 |
| WATER- TURN ON | ¤25.00 | 02/18/2025 |
| WATER- TURN ON | ¤25.00 | 02/18/2025 |
| ADJUSTMENT 10% | (¤127.26) | 02/18/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/18/2025 |
| INSPECTION - RESIDENTIAL | ¤968.00 | 02/18/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤274.56 | 02/18/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤24,161.36 |