Permit #2025010661

Permit Details

Status: INSPECT

Subdivision: -
Job Phone: 404-328-6417
Location Address: 240 PEAVY GRADE
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 01/27/2025
NOC: Unknown
Applicant name: PATRICK BRIAN STEED
Owner: CITY OF PALM COAST

Address

160 LAKE AVE

PALM COAST, FL 32164

Job Description: SITE WORK: PALM COAST MUNICIPAL OPERATIONS CENTER
Type: CN

Contractor

GILBANE BUILDING COMPANY
Status Location Address State License Number Phone
ACTIVE

1950 RINGLING BLVD STE. 301

SARASOTA, FL 34236

CGC1539889 (Exp: 08/31/2026) 941-758-6441

Inspection History

Type Request Date Result Inspector
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 04/28/2026 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 4/29/2026 1:49:56 PM *** WWM 1.6 being used for all sidewalks and WWM2.9 for generator pad 4/24/2026 - PREVIOUS INSPECTION NOTES 04-24-26 tpolacek*** area inspected matches Concrete Pavement Detail (As confirmed at the OAC on 5/7/25, the vehicular pavement for the site is to be modified to 7.5" of PCC (unreinforced) on 12" compacted subgrade. Areas that ONLY serve visitor parking/passenger vehicles can be paved with 6" PCC (unreinforced) on 12" compacted subgrade. ) Partial approval for area inspected Generator pad and sidewalks adjacent to poured slabs at center parking area
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 04/24/2026 PARTIALLY APPROVED TPOLACEK
Note: 04-24-26 tpolacek*** area inspected matches Concrete Pavement Detail (As confirmed at the OAC on 5/7/25, the vehicular pavement for the site is to be modified to 7.5" of PCC (unreinforced) on 12" compacted subgrade. Areas that ONLY serve visitor parking/passenger vehicles can be paved with 6" PCC (unreinforced) on 12" compacted subgrade. ) Partial approval for area inspected
UC-CONSTRUCTION ENTRANCE 04/23/2026 PARTIALLY APPROVED LFITZGERALD
Note: 3/5/2026 - PREVIOUS INSPECTION NOTES 3/26/2025 - PREVIOUS INSPECTION NOTES 20x 40ft of 1.5-2in rock now leading to mats from job site 3/6/2025 - PREVIOUS INSPECTION NOTES dimple mats with limerock base in front-please install some 2-3inch rock in front of the mats instead of the limerock mats still functioning mats full of soils but still barely functioning
UC-ASPHALT PRE PLACEMENT 04/23/2026 PARTIALLY APPROVED LFITZGERALD
Note: So 3 concrete slabs now poured with no notice given to me-1piece for main entrance roadway west of center area and center parking area and center part of divider roadway-revision now 7.5 in thick concrete with no reinforcement of any kind and limerock base eliminated-only 98% compacted stablized soils-Spoke with Peter-Gilbane and Austin-Phillips to schedule this activity-formed as well as sidewalks formed
UC-CONSTRUCTION ENTRANCE 03/05/2026 PARTIALLY APPROVED LFITZGERALD
Note: 3/26/2025 - PREVIOUS INSPECTION NOTES 20x 40ft of 1.5-2in rock now leading to mats from job site 3/6/2025 - PREVIOUS INSPECTION NOTES dimple mats with limerock base in front-please install some 2-3inch rock in front of the mats instead of the limerock mats still functioning
UROW- CURBING & GUTTER 03/05/2026 APPROVED LFITZGERALD
Note: 1/28/2026 - PREVIOUS INSPECTION NOTES 1/6/2026 - PREVIOUS INSPECTION NOTES now D curb installed thru out site here and there Dcurb continual along with tie in storm structures/E curb at misc radisuses
UROW- CURBING & GUTTER 01/28/2026 PARTIALLY APPROVED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 1/28/2026 4:20:27 PM *** A -curb not -E 1/6/2026 - PREVIOUS INSPECTION NOTES now D curb installed thru out site here and there Dcurb continual along with tie in storm structures/E curb at misc radisuses
BLD - UNDERGROUND SITE LIGHTING CONDUITS 01/08/2026 APPROVED RMARTIN
Note: 11/4/2025 - PREVIOUS INSPECTION NOTES 11/4/25 marked on print, underground conduits 10/21/2025 - PREVIOUS INSPECTION NOTES Marked on print, call back in when ready for additional inspection on underground
UROW- CURBING & GUTTER 01/06/2026 PARTIALLY APPROVED LFITZGERALD
Note: now D curb installed thru out site here and there
U-GRAVITY SEWER INSTALL/TESTING 12/02/2025 PARTIALLY APPROVED LFITZGERALD
Note: 11/25/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/7/2025 - PREVIOUS INSPECTION NOTES 8/5/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/25/2025 - PREVIOUS INSPECTION NOTES starting now at MH 6 2-3sticks from MH-2-btm is dry and firm/first 3 sticks out of MH1 WITH BEDDING ROCK due to unstable btm mh 6 to mh 7 setting mh-1heading to mh-2 now at mh 5 with bedding rock continually being used for all structures now starting low air presure testing-2 runs completed-finish up tomorrow(7-6 and 6-5) all manhole runs tested and passed
U-SEWER FORCE MAIN INSTALL/TESTING 12/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES 5/30/2025 - PREVIOUS INSPECTION NOTES 4in FM being installled along west property line to 45 fitting in preperation under existing WM 5/23/2025 - PREVIOUS INSPECTION NOTES 4in wet trap by Rangeline performed *** NOTES ADDED BY DHANEY 5/23/2025 2:37:36 PM *** This was a Preconstruction meeting for the 3 Hot taps , that will be Installed here . see comments on reclaim install inspection-same here-no tapping/pressure testing performed just sleeve/valve fastened to FM pressure test performed by Brice from north side Peavy Grade to end of project-pased-paperwork finished by me-still need to connect to wet tap
U-REUSE MAIN INSTALL/TESTING 12/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES wet tap not performed by mid afternoon-this was first time ever installing tapping sleeve/valve and work started late and moved real slow-tapping rep had to leave to another tap so only the sleeve/valve werer fastened to reclaim line(they werent prepared to pressurize these sleeves-tap rep was going to do), 8in wet tap performed by Rangeline rep installed portion along west side property now installing towards north end pressure test performed by Brice from north ide Peavy Grade to end of project phase-pased-paperwork finished by me-still need ti connect to wet tap across street
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 12/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 10/14/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road installed curb inlets along main road/pond MES'S center and weat side various MES'S for several ponds at ecenter aeas all now installed for this phase 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES pipe now installed for runs:57.58,59,60,61,62 runs at mes's at lake 1c/and pairs of cueb inlets along main roadway and connecting road installed along west ponds,center ponds and related curb inlets pipe runs for MES'S at center area ponds all now installed for this phase pressure test performed by Brice-pased-paperwork finished by me
U-GRAVITY SEWER INSTALL/TESTING 11/25/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 8/7/2025 - PREVIOUS INSPECTION NOTES 8/5/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/25/2025 - PREVIOUS INSPECTION NOTES starting now at MH 6 2-3sticks from MH-2-btm is dry and firm/first 3 sticks out of MH1 WITH BEDDING ROCK due to unstable btm mh 6 to mh 7 setting mh-1heading to mh-2 now at mh 5 with bedding rock continually being used for all structures now starting low air presure testing-2 runs completed-finish up tomorrow(7-6 and 6-5)
BLD - UNDERGROUND SITE LIGHTING CONDUITS 11/04/2025 PARTIALLY APPROVED RMARTIN
Note: 11/4/25 marked on print, underground conduits 10/21/2025 - PREVIOUS INSPECTION NOTES Marked on print, call back in when ready for additional inspection on underground
U-PUMP STATION PRE-INSTALLATION 11/03/2025 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9114 installing yd dr 2 to yd dr 3 to S-7
UC-DRAINAGE STRUCT PLACMNT 11/03/2025 APPROVED - AS NOTED LFITZGERALD
Note: now insatlling yard drain 2 and 3 into already set S-7
UC-DRAINAGE PIPE PLACEMENT/LAMPING 11/03/2025 APPROVED - AS NOTED LFITZGERALD
Note: installing yd dr 2 to yd dr 3 to S-7
BLD - UNDERGROUND SITE LIGHTING CONDUITS 10/21/2025 PARTIALLY APPROVED RMARTIN
Note: Marked on print, call back in when ready for additional inspection on underground
BLD - SITE LIGHTING-POLE SET/FIXTURE 10/21/2025 CANCELLED BY APPLICANT RMARTIN
ELECTRIC 1ST ROUGH 10/21/2025 CANCELLED BY INSPECTOR RMARTIN
Note: Need to schedule under site lighting conduit placement inspection, I will add the inspection for today. 9/15/2025 - PREVIOUS INSPECTION NOTES 9/15/25 Marked on plan underground site lighting conduit 5/7/2025 - PREVIOUS INSPECTION NOTES service conduits by road underground
BLD - SITE LIGHTING-POLE SET/FIXTURE 10/20/2025 CANCELLED BY APPLICANT WEB
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/14/2025 PARTIALLY APPROVED BHAINES
Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road installed curb inlets along main road/pond MES'S center and weat side various MES'S for several ponds at ecenter aeas all now installed for this phase 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES pipe now installed for runs:57.58,59,60,61,62 runs at mes's at lake 1c/and pairs of cueb inlets along main roadway and connecting road installed along west ponds,center ponds and related curb inlets pipe runs for MES'S at center area ponds all now installed for this phase
UC-DRAINAGE PIPE PLACEMENT/LAMPING 10/08/2025 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9113 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road installed curb inlets along main road/pond MES'S center and weat side various MES'S for several ponds at ecenter aeas all now installed for this phase 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES pipe now installed for runs:57.58,59,60,61,62 runs at mes's at lake 1c/and pairs of cueb inlets along main roadway and connecting road installed along west ponds,center ponds and related curb inlets pipe runs for MES'S at center area ponds all now installed for this phase
UC-DRAINAGE STRUCT PLACMNT 10/08/2025 APPROVED - AS NOTED LFITZGERALD
Note: 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road installed curb inlets along main road/pond MES'S center and weat side various MES'S for several ponds at ecenter aeas all now installed for this phase
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 10/07/2025 PARTIALLY APPROVED JMYERS
Note: 10/14/25 STAFF IS WORKING WITH CONTRACTOR TO FIND SOLUTION TO POND AND PERIMETER EROSION ISSUES. 6/11/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH.
ELECTRIC 1ST ROUGH 09/15/2025 PARTIALLY APPROVED RMARTIN
Note: 9/15/25 Marked on plan underground site lighting conduit 5/7/2025 - PREVIOUS INSPECTION NOTES service conduits by road underground
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/28/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/16/2025 - PREVIOUS INSPECTION NOTES 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES so 30 in DI pipe has conficts on both sides with a concrete FPL BANK VAULT and 2 6in conduit on top 5ft away from water- towards the site and sewer concentrate line 5 feet away on the other side so tap of any kind can not be performed-RFIto EOR-DRMP 12in wet tap by Rangeline performed as a side valve tap as approved by Steve F. ,it will be abandoned since it cant be utilized and a 22/5 with pipe will slide over with 6in clearence over FPL VAULT AND 2 6IN CONDUITS WITH ANOTHER VALVE WHICH WILL BE THE ONE THAT IS UTILIZED AS THE TAP VALVWE WOULD BE now over FPL stuff with new valve and preparing to contuinue to over or unde r storm pipe-waiting on EOR/ARCCHTEICT to evaluate if going over 13-14 storm runs is a possibilty or each will be a class B CONFLICT RESOLUTION continuing under storm runs along main roadway all conflicts with storm will be a B resolution(going under),currently now installing along cross road now towards east side of site-center area
U-REUSE MAIN INSTALL/TESTING 08/28/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES wet tap not performed by mid afternoon-this was first time ever installing tapping sleeve/valve and work started late and moved real slow-tapping rep had to leave to another tap so only the sleeve/valve werer fastened to reclaim line(they werent prepared to pressurize these sleeves-tap rep was going to do), 8in wet tap performed by Rangeline rep installed portion along west side property now installing towards north end
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/28/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES pipe now installed for runs:57.58,59,60,61,62 runs at mes's at lake 1c/and pairs of cueb inlets along main roadway and connecting road installed along west ponds,center ponds and related curb inlets pipe runs for MES'S at center area ponds
UC-DRAINAGE STRUCT PLACMNT 08/28/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road installed curb inlets along main road/pond MES'S center and weat side various MES'S for several ponds at ecenter aeas
BLD - GREASE INTERCEPTOR PRE-INSTALLATION 08/27/2025 APPROVED - AS NOTED MGIBSON
Note: GT-2 DAMAGED SLIGHTLY @BOTTOM OF PLATFORM 7/15/2025 - PREVIOUS INSPECTION NOTES THIS WAS A PRE-INSPECTION FOR GREASE INTERCEPTOR COATING ON INSIDE OF THE TWO TANKS IS DONE AND THE CONTRACTOR KNOWS THAT THEY NEED TO SEAL OUTSIDE TANK TO 12 MILL COATING AND WILL RESCHEDUAL FOR ANOTHER PRE-INSPECTION WHEN COATING IS COMPLETED ALONG WITH LIDS AND UNDER SIDE OF BOTH TANKS
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/19/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/1/2025 - PREVIOUS INSPECTION NOTES 7/16/2025 - PREVIOUS INSPECTION NOTES 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES so 30 in DI pipe has conficts on both sides with a concrete FPL BANK VAULT and 2 6in conduit on top 5ft away from water- towards the site and sewer concentrate line 5 feet away on the other side so tap of any kind can not be performed-RFIto EOR-DRMP 12in wet tap by Rangeline performed as a side valve tap as approved by Steve F. ,it will be abandoned since it cant be utilized and a 22/5 with pipe will slide over with 6in clearence over FPL VAULT AND 2 6IN CONDUITS WITH ANOTHER VALVE WHICH WILL BE THE ONE THAT IS UTILIZED AS THE TAP VALVWE WOULD BE now over FPL stuff with new valve and preparing to contuinue to over or unde r storm pipe-waiting on EOR/ARCCHTEICT to evaluate if going over 13-14 storm runs is a possibilty or each will be a class B CONFLICT RESOLUTION continuing under storm runs along main roadway all conflicts with storm will be a B resolution(going under),currently now installing along cross road
U-REUSE MAIN INSTALL/TESTING 08/19/2025 PARTIALLY APPROVED LFITZGERALD
Note: 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES wet tap not performed by mid afternoon-this was first time ever installing tapping sleeve/valve and work started late and moved real slow-tapping rep had to leave to another tap so only the sleeve/valve werer fastened to reclaim line(they werent prepared to pressurize these sleeves-tap rep was going to do), 8in wet tap performed by Rangeline rep installed portion along west side property
U-GRAVITY SEWER INSTALL/TESTING 08/19/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/7/2025 - PREVIOUS INSPECTION NOTES 8/5/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/25/2025 - PREVIOUS INSPECTION NOTES starting now at MH 6 2-3sticks from MH-2-btm is dry and firm/first 3 sticks out of MH1 WITH BEDDING ROCK due to unstable btm mh 6 to mh 7 setting mh-1heading to mh-2 now at mh 5 with bedding rock continually being used for all structures
UC-DRAINAGE STRUCT PLACMNT 08/19/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road installed curb inlets along main road/pond MES'S center and weat side
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/19/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES pipe now installed for runs:57.58,59,60,61,62 runs at mes's at lake 1c/and pairs of cueb inlets along main roadway and connecting road installed along west ponds,center ponds and related curb inlets
U-GRAVITY SEWER INSTALL/TESTING 08/07/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/5/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/25/2025 - PREVIOUS INSPECTION NOTES starting now at MH 6 2-3sticks from MH-2-btm is dry and firm/first 3 sticks out of MH1 WITH BEDDING ROCK due to unstable btm mh 6 to mh 7 setting mh-1heading to mh-2
U-GRAVITY SEWER INSTALL/TESTING 08/05/2025 PARTIALLY APPROVED LFITZGERALD
Note: 8/1/2025 - PREVIOUS INSPECTION NOTES 7/25/2025 - PREVIOUS INSPECTION NOTES starting now at MH 6 mh 6 to mh 7 setting mh-1heading to mh-2
U-GRAVITY SEWER INSTALL/TESTING 08/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 7/25/2025 - PREVIOUS INSPECTION NOTES starting now at MH 6 mh 6 to mh 7
UC-DRAINAGE STRUCT PLACMNT 08/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 08/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 7/16/2025 - PREVIOUS INSPECTION NOTES 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES so 30 in DI pipe has conficts on both sides with a concrete FPL BANK VAULT and 2 6in conduit on top 5ft away from water- towards the site and sewer concentrate line 5 feet away on the other side so tap of any kind can not be performed-RFIto EOR-DRMP 12in wet tap by Rangeline performed as a side valve tap as approved by Steve F. ,it will be abandoned since it cant be utilized and a 22/5 with pipe will slide over with 6in clearence over FPL VAULT AND 2 6IN CONDUITS WITH ANOTHER VALVE WHICH WILL BE THE ONE THAT IS UTILIZED AS THE TAP VALVWE WOULD BE now over FPL stuff with new valve and preparing to contuinue to over or unde r storm pipe-waiting on EOR/ARCCHTEICT to evaluate if going over 13-14 storm runs is a possibilty or each will be a class B CONFLICT RESOLUTION continuing under storm runs along main roadway
UC-DRAINAGE PIPE PLACEMENT/LAMPING 08/01/2025 PARTIALLY APPROVED LFITZGERALD
Note: 7/18/2025 - PREVIOUS INSPECTION NOTES pipe now installed for runs:57.58,59,60,61,62 runs at mes's at lake 1c/and pairs of cueb inlets along main roadway and connecting road
U-GRAVITY SEWER INSTALL/TESTING 07/25/2025 PARTIALLY APPROVED LFITZGERALD
Note: starting now at MH 6
UC-DRAINAGE STRUCT PLACMNT 07/18/2025 PARTIALLY APPROVED LFITZGERALD
Note: str's 57.58,59,6o,61,62 now installed
UC-DRAINAGE PIPE PLACEMENT/LAMPING 07/18/2025 PARTIALLY APPROVED LFITZGERALD
Note: pipe now installed for runs:57.58,59,60,61,62
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/16/2025 PARTIALLY APPROVED LFITZGERALD
Note: 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES so 30 in DI pipe has conficts on both sides with a concrete FPL BANK VAULT and 2 6in conduit on top 5ft away from water- towards the site and sewer concentrate line 5 feet away on the other side so tap of any kind can not be performed-RFIto EOR-DRMP 12in wet tap by Rangeline performed as a side valve tap as approved by Steve F. ,it will be abandoned since it cant be utilized and a 22/5 with pipe will slide over with 6in clearence over FPL VAULT AND 2 6IN CONDUITS WITH ANOTHER VALVE WHICH WILL BE THE ONE THAT IS UTILIZED AS THE TAP VALVWE WOULD BE now over FPL stuff with new valve and preparing to contuinue to over or unde r storm pipe-waiting on EOR/ARCCHTEICT to evaluate if going over 13-14 storm runs is a possibilty or each will be a class B CONFLICT RESOLUTION
BLD - GREASE INTERCEPTOR PRE-INSTALLATION 07/15/2025 PARTIALLY APPROVED MGIBSON
Note: THIS WAS A PRE-INSPECTION FOR GREASE INTERCEPTOR COATING ON INSIDE OF THE TWO TANKS IS DONE AND THE CONTRACTOR KNOWS THAT THEY NEED TO SEAL OUTSIDE TANK TO 12 MILL COATING AND WILL RESCHEDUAL FOR ANOTHER PRE-INSPECTION WHEN COATING IS COMPLETED ALONG WITH LIDS AND UNDER SIDE OF BOTH TANKS
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/25/2025 PARTIALLY APPROVED LFITZGERALD
Note: New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES so 30 in DI pipe has conficts on both sides with a concrete FPL BANK VAULT and 2 6in conduit on top 5ft away from water- towards the site and sewer concentrate line 5 feet away on the other side so tap of any kind can not be performed-RFIto EOR-DRMP 12in wet tap by Rangeline performed as a side valve tap as approved by Steve F. ,it will be abandoned since it cant be utilized and a 22/5 with pipe will slide over with 6in clearence over FPL VAULT AND 2 6IN CONDUITS WITH ANOTHER VALVE WHICH WILL BE THE ONE THAT IS UTILIZED AS THE TAP VALVWE WOULD BE
U-REUSE MAIN INSTALL/TESTING 06/25/2025 PARTIALLY APPROVED LFITZGERALD
Note: New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES wet tap not performed by mid afternoon-this was first time ever installing tapping sleeve/valve and work started late and moved real slow-tapping rep had to leave to another tap so only the sleeve/valve werer fastened to reclaim line(they werent prepared to pressurize these sleeves-tap rep was going to do), 8in wet tap performed by Rangeline rep
U-SEWER FORCE MAIN INSTALL/TESTING 06/25/2025 PARTIALLY APPROVED LFITZGERALD
Note: New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES 5/30/2025 - PREVIOUS INSPECTION NOTES 4in FM being installled along west property line to 45 fitting in preperation under existing WM 5/23/2025 - PREVIOUS INSPECTION NOTES 4in wet trap by Rangeline performed *** NOTES ADDED BY DHANEY 5/23/2025 2:37:36 PM *** This was a Preconstruction meeting for the 3 Hot taps , that will be Installed here . see comments on reclaim install inspection-same here-no tapping/pressure testing performed just sleeve/valve fastened to FM
U-SEWER FORCE MAIN INSTALL/TESTING 06/24/2025 CANCELLED BY APPLICANT WEB
Note: 6/17/2025 - PREVIOUS INSPECTION NOTES 5/30/2025 - PREVIOUS INSPECTION NOTES 4in FM being installled along west property line to 45 fitting in preperation under existing WM 5/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/23/2025 2:37:36 PM *** This was a Preconstruction meeting for the 3 Hot taps , that will be Installed here . see comments on reclaim install inspection-same here-no tapping/pressure testing performed just sleeve/valve fastened to FM
U-REUSE MAIN INSTALL/TESTING 06/24/2025 CANCELLED BY APPLICANT WEB
Note: 6/17/2025 - PREVIOUS INSPECTION NOTES wet tap not performed by mid afternoon-this was first time ever installing tapping sleeve/valve and work started late and moved real slow-tapping rep had to leave to another tap so only the sleeve/valve werer fastened to reclaim line(they werent prepared to pressurize these sleeves-tap rep was going to do),
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/24/2025 CANCELLED BY APPLICANT WEB
Note: 6/17/2025 - PREVIOUS INSPECTION NOTES so 30 in DI pipe has conficts on both sides with a concrete FPL BANK VAULT and 2 6in conduit on top 5ft away from water- towards the site and sewer concentrate line 5 feet away on the other side so tap of any kind can not be performed-RFIto EOR-DRMP
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/17/2025 Disapproved - NO FEE LFITZGERALD
Note: so 30 in DI pipe has conficts on both sides with a concrete FPL BANK VAULT and 2 6in conduit on top 5ft away from water- towards the site and sewer concentrate line 5 feet away on the other side so tap of any kind can not be performed-RFIto EOR-DRMP
U-SEWER FORCE MAIN INSTALL/TESTING 06/17/2025 PARTIALLY APPROVED LFITZGERALD
Note: 5/30/2025 - PREVIOUS INSPECTION NOTES 4in FM being installled along west property line to 45 fitting in preperation under existing WM 5/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/23/2025 2:37:36 PM *** This was a Preconstruction meeting for the 3 Hot taps , that will be Installed here . see comments on reclaim install inspection-same here-no tapping/pressure testing performed just sleeve/valve fastened to FM
U-WATER SERVICE INSTALLATION 06/17/2025 CANCELLED BY APPLICANT LFITZGERALD
Note: wrong inspection for this activity-i scheduled the correct one
U-REUSE MAIN INSTALL/TESTING 06/17/2025 PARTIALLY APPROVED LFITZGERALD
Note: wet tap not performed by mid afternoon-this was first time ever installing tapping sleeve/valve and work started late and moved real slow-tapping rep had to leave to another tap so only the sleeve/valve werer fastened to reclaim line(they werent prepared to pressurize these sleeves-tap rep was going to do),
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/10/2025 PARTIALLY APPROVED JMYERS
Note: 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 06/04/2025 CANCELLED BY INSPECTOR JMYERS
Note: 5/7/2025 - PREVIOUS INSPECTION NOTES 5/7/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH 3/6/2025 - PREVIOUS INSPECTION NOTES 3/6/25 SILT FENCE INSTALLATION HAS BEEN APPROVED. FOLLOW UP INSPECTION IN ONE MONTH
U-SEWER FORCE MAIN INSTALL/TESTING 05/30/2025 PARTIALLY APPROVED LFITZGERALD
Note: 4in FM being installled along west property line to 45 fitting in preperation under existing WM 5/23/2025 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY DHANEY 5/23/2025 2:37:36 PM *** This was a Preconstruction meeting for the 3 Hot taps , that will be Installed here .
U-SEWER FORCE MAIN INSTALL/TESTING 05/23/2025 PARTIALLY APPROVED DHANEY
Note: *** NOTES ADDED BY DHANEY 5/23/2025 2:37:36 PM *** This was a Preconstruction meeting for the 3 Hot taps , that will be Installed here .
ELECTRIC 1ST ROUGH 05/07/2025 PARTIALLY APPROVED RMARTIN
Note: service conduits by road underground
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/07/2025 PARTIALLY APPROVED JMYERS
Note: 5/7/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH 4/2/2025 - PREVIOUS INSPECTION NOTES 4/2/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH 3/6/2025 - PREVIOUS INSPECTION NOTES 3/6/25 SILT FENCE INSTALLATION HAS BEEN APPROVED. FOLLOW UP INSPECTION IN ONE MONTH
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 04/02/2025 PARTIALLY APPROVED JMYERS
Note: 4/2/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH 3/6/2025 - PREVIOUS INSPECTION NOTES 3/6/25 SILT FENCE INSTALLATION HAS BEEN APPROVED. FOLLOW UP INSPECTION IN ONE MONTH
UC-CONSTRUCTION ENTRANCE 03/26/2025 PARTIALLY APPROVED LFITZGERALD
Note: 20x 40ft of 1.5-2in rock now leading to mats from job site 3/6/2025 - PREVIOUS INSPECTION NOTES dimple mats with limerock base in front-please install some 2-3inch rock in front of the mats instead of the limerock
UC-CONSTRUCTION ENTRANCE 03/07/2025 PARTIALLY APPROVED LFITZGERALD
Note: dimple mats with limerock base in front-please install some 2-3inch rock in front of the mats instead of the limerock
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 03/06/2025 PARTIALLY APPROVED JMYERS
Note: 3/6/25 SILT FENCE INSTALLATION HAS BEEN APPROVED. FOLLOW UP INSPECTION IN ONE MONTH
PLAN - PRE-CON 386-986-3750 01/30/2025 APPROVED - AS NOTED LFITZGERALD
Note: site meeting with:city-ken,mark,eric/glbane-ty-patrick/phillips-jordan reps-jeffrey/legacy eng--discussed inspections and general project protocols
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY
LANDSCAPE PRE-CONSTRUCTION MEETING
IRRIGATION AFFIDAVIT
LDSC-IRRIGATION FINAL
LDSC- LANDSCAPE / IRRIGATION AS-BUILT
LDSC- LANDSCAPE FINAL
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR
Note: 12/2/2025 - PREVIOUS INSPECTION NOTES 10/14/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES str's 57.58,59,6o,61,62 now installed structures -pairs-along main roadway up to Lake1c, and connecting road installed curb inlets along main road/pond MES'S center and weat side various MES'S for several ponds at ecenter aeas all now installed for this phase 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/18/2025 - PREVIOUS INSPECTION NOTES pipe now installed for runs:57.58,59,60,61,62 runs at mes's at lake 1c/and pairs of cueb inlets along main roadway and connecting road installed along west ponds,center ponds and related curb inlets pipe runs for MES'S at center area ponds all now installed for this phase pressure test performed by Brice-pased-paperwork finished by me
CLOSE OUT DOCUMENTS
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION
BLD - SITE LIGHTING-POLE SET/FIXTURE
Note: 10/21/2025 - PREVIOUS INSPECTION NOTES
MAINT BOND ACCEPTANCE (OFFICE)
GEOTECH-SITE PREP ENG CERTIFICATIO (OFFICE USE ONLY)
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS
BLD- ADA PARKING
BLD - ADA COMPLIANT
BLD- ADA VEHICULAR WAY
U-REUSE MAIN INSTALL/TESTING
Note: 12/2/2025 - PREVIOUS INSPECTION NOTES 8/28/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES wet tap not performed by mid afternoon-this was first time ever installing tapping sleeve/valve and work started late and moved real slow-tapping rep had to leave to another tap so only the sleeve/valve werer fastened to reclaim line(they werent prepared to pressurize these sleeves-tap rep was going to do), 8in wet tap performed by Rangeline rep installed portion along west side property now installing towards north end pressure test performed by Brice from north ide Peavy Grade to end of project phase-pased-paperwork finished by me-still need ti connect to wet tap across street
UC-CONSTRUCTION ENTRANCE
Note: 4/23/2026 - PREVIOUS INSPECTION NOTES 3/5/2026 - PREVIOUS INSPECTION NOTES 3/26/2025 - PREVIOUS INSPECTION NOTES 20x 40ft of 1.5-2in rock now leading to mats from job site 3/6/2025 - PREVIOUS INSPECTION NOTES dimple mats with limerock base in front-please install some 2-3inch rock in front of the mats instead of the limerock mats still functioning mats full of soils but still barely functioning
UC-ASPHALT PRE PLACEMENT
Note: 4/23/2026 - PREVIOUS INSPECTION NOTES So 3 concrete slabs now poured with no notice given to me-1piece for main entrance roadway west of center area and center parking area and center part of divider roadway-revision now 7.5 in thick concrete with no reinforcement of any kind and limerock base eliminated-only 98% compacted stablized soils-Spoke with Peter-Gilbane and Austin-Phillips to schedule this activity-formed as well as sidewalks formed
U-SEWER FORCE MAIN INSTALL/TESTING
Note: 12/2/2025 - PREVIOUS INSPECTION NOTES 6/25/2025 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 6/17/2025 - PREVIOUS INSPECTION NOTES 5/30/2025 - PREVIOUS INSPECTION NOTES 4in FM being installled along west property line to 45 fitting in preperation under existing WM 5/23/2025 - PREVIOUS INSPECTION NOTES 4in wet trap by Rangeline performed *** NOTES ADDED BY DHANEY 5/23/2025 2:37:36 PM *** This was a Preconstruction meeting for the 3 Hot taps , that will be Installed here . see comments on reclaim install inspection-same here-no tapping/pressure testing performed just sleeve/valve fastened to FM pressure test performed by Brice from north side Peavy Grade to end of project-pased-paperwork finished by me-still need to connect to wet tap
U-GRAVITY SEWER INSTALL/TESTING
Note: 12/2/2025 - PREVIOUS INSPECTION NOTES 11/25/2025 - PREVIOUS INSPECTION NOTES 8/19/2025 - PREVIOUS INSPECTION NOTES 8/7/2025 - PREVIOUS INSPECTION NOTES 8/5/2025 - PREVIOUS INSPECTION NOTES 8/1/2025 - PREVIOUS INSPECTION NOTES 7/25/2025 - PREVIOUS INSPECTION NOTES starting now at MH 6 2-3sticks from MH-2-btm is dry and firm/first 3 sticks out of MH1 WITH BEDDING ROCK due to unstable btm mh 6 to mh 7 setting mh-1heading to mh-2 now at mh 5 with bedding rock continually being used for all structures now starting low air presure testing-2 runs completed-finish up tomorrow(7-6 and 6-5) all manhole runs tested and passed
PROJECT CLOSE OUT MEETING (386-986-3750)
UC-SUBSTANTIAL WALK-THRU
UC- PRELIMINARY AS-BUILTS
UC-FINAL SITE INSPECTION
U - UTILITY COMMERCIAL FINAL
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE
Note: 10/15/2025 - PREVIOUS INSPECTION NOTES 10/14/25 STAFF IS WORKING WITH CONTRACTOR TO FIND SOLUTION TO POND AND PERIMETER EROSION ISSUES. 6/11/2025 - PREVIOUS INSPECTION NOTES 6/10/25 EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING. FOLLOW UP INSPECTION IN ONE MONTH.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL)
Note: 4/28/2026 - PREVIOUS INSPECTION NOTES 4/24/2026 - PREVIOUS INSPECTION NOTES 04-24-26 tpolacek*** area inspected matches Concrete Pavement Detail (As confirmed at the OAC on 5/7/25, the vehicular pavement for the site is to be modified to 7.5" of PCC (unreinforced) on 12" compacted subgrade. Areas that ONLY serve visitor parking/passenger vehicles can be paved with 6" PCC (unreinforced) on 12" compacted subgrade. ) Partial approval for area inspected Generator pad and sidewalks adjacent to poured slabs at center parking area
U-ROW FINAL

Review History

Department Status Date In Date Out
ADM INFORMATION 07/11/2025 07/11/2025
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please submit a notarized manual application for the changes being requested
BADMIN INFORMATION 04/21/2025 04/21/2025
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Plans /revisions are not to be submitted on the site development permit. IF this is a modificiation to the site plan, please submit to the Planning Department. If this is a revision/correction to a permit, please submit to that permit. Upon subittal the file names should meet the file naming convention required in the 'document submittal requirements' on the permit portal page. The file name should be the plan sheet given name or what the document is (if no page name given). **nothing before that name, you may add anything after the intial required file name
BLD CANCEL 02/05/2025 02/05/2025
DSD COMPLETE 01/27/2025 01/27/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD COMPLETE 01/16/2025 01/16/2025
Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM
ELEC COMPLETE 01/16/2025 01/17/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENG COMPLETE 01/16/2025 01/16/2025
Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM
PLLA COMPLETE 01/16/2025 01/16/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
UD1 COMPLETE 01/16/2025 01/16/2025
Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM
DSD HOLD 01/16/2025 01/16/2025
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤40.50) 01/27/2025
ADMINISTRATIVE- SITE DEVELOP ¤125.00 01/27/2025
SITE INSPECTION ¤680.00 01/27/2025
SITE PLAN 30 ¤30.00 01/27/2025
Fees Total Due: ¤0.00 Total Paid: ¤794.50