I want to search for...
Permit #2025011124
Permit Details
Status: COED
| Parcel Id: 06-12-31-5180-00000-0490 |
| CONDITIONED SPACE: 2394 sqft |
| GARAGE: 463 sqft |
| OPENED PORCH (WITH ROOF) : 155 sqft |
| Total Square Footage: 3012 sqft |
| Subdivision: 2322 - RETREAT AT TOWN CENTER PHASE 1 |
| Job Phone: 904-669-7000 |
| Location Address: 18 MAHOGANY WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/11/2025 |
| NOC: RECORDED |
| Applicant name: PAUL GILBERT AXTELL |
| Owner: TOLL SOUTHEAST LP CO INC |
|
Address 1140 VIRGINIA DRIVE FORT WASHINGTON, PA 19034 |
| Lot: 49 |
| Contracted Stated Job Value: ¤440,761.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
TOLL BROS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
40 EVEREST LN, STE 5 ST JOHNS, FL 32259 |
CGC60445 (Exp: 08/31/2026) | 904-217-3852 |
Sub Contractors
JAMES F QUINN III
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3210 SW 40TH BLVD STE F GAINESVILLE, FL 32608 |
EC13010994 (Exp: 08/31/2026) | 352-378-9274 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
HARLEY M BRYAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
5223 EDGEWOOD CT ORMOND BEACH, FL 32174 |
LI26657 (Exp: 08/31/2028) | 386-463-2700 |
JAMES MICHAEL WATSON
| Status | Location Address | State License Number | Phone |
| INACTIVE |
38115 YALE CIRCLE LEESBURG, FL 34748 |
SCC131152841 (Exp: 08/31/2026) | 352-434-0115 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/23/2025 | FINAL APPROVED | MCONTRYMAN |
| Note: 7/22/2025 - PREVIOUS INSPECTION NOTES 1. Wall oven breaker needs lock out. NEC 422.31 &110.25 | |||
| BLD - BUILDING FINAL | 07/22/2025 | Disapproved - NO FEE | HCAMACHO |
| Note: 1. Wall oven breaker needs lock out. NEC 422.31 &110.25 | |||
| ROW - FINAL APRON (AFTER POUR) | 07/16/2025 | APPROVED | FSLADISH |
| Note: 7/16/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 7/7/25 UPON WALKING PROPERTY OBSERVED ON THE LEFT SIDE PROPERTY LINE TOWARD THE FRONT CORNER OF THE STRUCTURE THAT THERE WAS SIGNIFIGANT WASHOUT. THIS WILL NEED TO BE REPAIRED, COMPACTED, SLOPED AND SOD RESET. ADDITIONALLY AS PREVIOUSLY DISCUSSED YOU ARE REQUIRED TO EITHER PUT THE SILT FENCE ON THE PROPERTY LINE OR SOD BARE AREA BETWEEN HOME AND SILT PASS. I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS BUT YOU HAVE CORRECTIONS TO MAKE BEFORE ROW FINAL PASSAGE. | |||
| ROW - STORMWATER FINAL | 07/16/2025 | APPROVED | FSLADISH |
| Note: 7/16/25 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 7/7/25 UPON WALKING PROPERTY OBSERVED ON THE LEFT SIDE PROPERTY LINE TOWARD THE FRONT CORNER OF THE STRUCTURE THAT THERE WAS SIGNIFIGANT WASHOUT. THIS WILL NEED TO BE REPAIRED, COMPACTED, SLOPED AND SOD RESET. ADDITIONALLY AS PREVIOUSLY DISCUSSED YOU ARE REQUIRED TO EITHER PUT THE SILT FENCE ON THE PROPERTY LINE OR SOD BARE AREA BETWEEN HOME AND SILT PASS. I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS BUT YOU HAVE CORRECTIONS TO MAKE BEFORE ROW FINAL PASSAGE. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/16/2025 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 reclaim rr-no cc | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/07/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/07/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/7/25 UPON WALKING PROPERTY OBSERVED ON THE LEFT SIDE PROPERTY LINE TOWARD THE FRONT CORNER OF THE STRUCTURE THAT THERE WAS SIGNIFIGANT WASHOUT. THIS WILL NEED TO BE REPAIRED, COMPACTED, SLOPED AND SOD RESET. ADDITIONALLY AS PREVIOUSLY DISCUSSED YOU ARE REQUIRED TO EITHER PUT THE SILT FENCE ON THE PROPERTY LINE OR SOD BARE AREA BETWEEN HOME AND SILT PASS. I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED SO THAT YOU MAY MOVE FORWARD WITH INSPECTIONS BUT YOU HAVE CORRECTIONS TO MAKE BEFORE ROW FINAL PASSAGE. | |||
| ELECTRIC - EARLY POWER | 06/25/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 3:15pm | |||
| ELECTRIC - EARLY POWER | 06/24/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: *** NOTES ADDED BY MCONTRYMAN 6/24/2025 10:53:10 AM *** Switch below kitchen sink is not secured and has screws rattling in box 6/24/25 1. Front upstairs bedroom has closet switch that is not safed off NEC 440.14 2. Pleass revise energy calcs to match HVAC units installed by final Inspector Notes from Inspection 2200 5/12/25 Okay to release e-mail to FPL Don't forget to install whole home sure protection in meter/main only NEC 230.67 (A) 4/29/2025 - PREVIOUS INSPECTION NOTES 4/29/25 1. Service wire conduit needs to be secured NEC 352.3 2. GFCi outlet under meter/main needs to be secured to building NEC 350.30(A) | |||
| U-CROSS CONNECTION | 06/24/2025 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim rr-no cc | |||
| ROW- PRE-APRON (PRE-POUR) | 06/12/2025 | APPROVED | FSLADISH |
| Note: 6/12/25 BUILDER TO USE MINIMUM 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK ELEVATIONS MAKE SURE CONCRETE IS 3000 PSI BUILDER RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| GRAVITY SEWER TEST | 05/20/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| SEWER TIE IN | 05/20/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC-TUG | 05/12/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 5/12/25 Okay to release e-mail to FPL Don't forget to install whole home sure protection in meter/main only NEC 230.67 (A) 4/29/2025 - PREVIOUS INSPECTION NOTES 4/29/25 1. Service wire conduit needs to be secured NEC 352.3 2. GFCi outlet under meter/main needs to be secured to building NEC 350.30(A) | |||
| INSULATION | 05/07/2025 | APPROVED | MCONTRYMAN |
| Note: 5/6/2025 - PREVIOUS INSPECTION NOTES 5/5/2025 - PREVIOUS INSPECTION NOTES FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE ( water level too low ) 5/2/2025 - PREVIOUS INSPECTION NOTES 5/2/25 1. Need 5' Head test still FBCR P2503.7 Inspector Notes from Inspection 2420 *** NOTES ADDED BY MCONTRYMAN 4/25/2025 1:29:02 PM *** 4/25/25 Will check at insulation 2. Attach bonding wire to gas pipe FBCR G2411 3. Need 5' Head test FBCR P2503.7 4. No water pressure FBCR P2503.5 5. Need nail plate for thermostat wire upstairs E3906.10 4/25/25 Will check at insulation 1. Slider door bottom track needs to be replaced. It is on order Inspector Notes from Inspection 2320 4/22/25 Water barrier only Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| INSULATION | 05/06/2025 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 5/5/2025 - PREVIOUS INSPECTION NOTES FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE ( water level too low ) 5/2/2025 - PREVIOUS INSPECTION NOTES 5/2/25 1. Need 5' Head test still FBCR P2503.7 Inspector Notes from Inspection 2420 *** NOTES ADDED BY MCONTRYMAN 4/25/2025 1:29:02 PM *** 4/25/25 Will check at insulation 2. Attach bonding wire to gas pipe FBCR G2411 3. Need 5' Head test FBCR P2503.7 4. No water pressure FBCR P2503.5 5. Need nail plate for thermostat wire upstairs E3906.10 4/25/25 Will check at insulation 1. Slider door bottom track needs to be replaced. It is on order Inspector Notes from Inspection 2320 4/22/25 Water barrier only Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| INSULATION | 05/05/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: FBCR P2503.7-NEEDS WATER TEST ON DWV - 5 FT HEAD PRESSURE ABOVE HIGHEST FIXTURE ( water level too low ) 5/2/2025 - PREVIOUS INSPECTION NOTES 5/2/25 1. Need 5' Head test still FBCR P2503.7 Inspector Notes from Inspection 2420 *** NOTES ADDED BY MCONTRYMAN 4/25/2025 1:29:02 PM *** 4/25/25 Will check at insulation 2. Attach bonding wire to gas pipe FBCR G2411 3. Need 5' Head test FBCR P2503.7 4. No water pressure FBCR P2503.5 5. Need nail plate for thermostat wire upstairs E3906.10 4/25/25 Will check at insulation 1. Slider door bottom track needs to be replaced. It is on order Inspector Notes from Inspection 2320 4/22/25 Water barrier only Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| INSULATION | 05/02/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 5/2/25 1. Need 5' Head test still FBCR P2503.7 2. Missing fire foam around front bedroom window on 2nd floor FBCR 302.11 3. Missing fire foam around SGD FBCR 302.11 Inspector Notes from Inspection 2420 *** NOTES ADDED BY MCONTRYMAN 4/25/2025 1:29:02 PM *** 4/25/25 Will check at insulation 2. Attach bonding wire to gas pipe FBCR G2411 3. Need 5' Head test FBCR P2503.7 4. No water pressure FBCR P2503.5 5. Need nail plate for thermostat wire upstairs E3906.10 4/25/25 Will check at insulation 1. Slider door bottom track needs to be replaced. It is on order Inspector Notes from Inspection 2320 4/22/25 Water barrier only Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| ELECTRIC-TUG | 04/29/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 4/29/25 1. Service wire conduit needs to be secured NEC 352.3 2. GFCi outlet under meter/main needs to be secured to building NEC 350.30(A) | |||
| ALL ROUGH | 04/25/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: *** NOTES ADDED BY MCONTRYMAN 4/25/2025 1:29:02 PM *** 4/25/25 Will check at insulation 2. Attach bonding wire to gas pipe FBCR G2411 3. Need 5' Head test FBCR P2503.7 4. No water pressure FBCR P2503.5 5. Need nail plate for thermostat wire upstairs E3906.10 4/25/25 Will check at insulation 1. Slider door bottom track needs to be replaced. It is on order Inspector Notes from Inspection 2320 4/22/25 Water barrier only Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| LATH/BRICK/ WATER BARRIER | 04/22/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 4/22/25 Water barrier only Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 Inspector Notes from Inspection 2467 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| WATER METER INSTALLATION REQUEST | 04/22/2025 | APPROVED | BVITALE |
| ROOF VALLEY & METAL | 03/26/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/20/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 3/20/25 Passed to keep job moving along. Will check at next inspection 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 --Mary is looking to get engineered letter for garage door header-- Inspector Notes from Inspection 2450 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| WALL SHEATHING | 03/14/2025 | Disapproved - NO FEE | MKRASKI |
| Note: No plans on site, unable to do inspection FBC 107.3.1 | |||
| WALL SHEATHING | 03/14/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/14/2025 | Disapproved - NO FEE | MKRASKI |
| Note: No plans on site, unable to do inspection FBC 107.3.1 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/14/2025 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Both Porches missing straps per detail S0.1-2 2. Garage ceiling blocking missing per S0.2-11 3. SGD missing MSTA 24s per plans FBC (A) 107.4 4. Garage door header note "header must always be to rough opening" per plans FBC (A)107.4 5. Master bathroom missing anchor with in 12'' of sole plate splice per plans FBC (A)107.4 6. Front outlooks not per detail S0.2-8 7. Gable bracing H2.5s missing nails per detail FBC (A)107.4 8. Gable bracing missing T-brace per detail FBC 107.4 | |||
| MONOLITHIC SLAB | 02/25/2025 | APPROVED | CVANSTRAHLEN |
| FOUND SURVEY APPROVED (OFFICE) | 02/24/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/20/2025 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/24/2025 | 06/25/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/21/2025 | 04/23/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/24/2025 | 03/26/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/24/2025 | 02/24/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/24/2025 | 02/24/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/04/2025 | 02/04/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/04/2025 | 02/10/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/04/2025 | 02/06/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/04/2025 | 02/04/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 01/28/2025 | 01/31/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/28/2025 | 01/31/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Product Approval Under roofing products - f. other FL# 15211-R11 is a garage door. The manufacturer listed on sheet does not correspond to the approval number. Please revise. | |||
| CUSVC | COMPLETE | 01/28/2025 | 01/29/2025 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 01/28/2025 | 02/04/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 01/28/2025 | 01/29/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM No on site benchmark shown on site plan. | |||
| GAS | COMPLETE | 01/28/2025 | 01/31/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 01/28/2025 | 01/30/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/28/2025 | 01/31/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/28/2025 | 02/03/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/28/2025 | 01/29/2025 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 01/28/2025 | 01/29/2025 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 06/27/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/05/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/14/2025 |
| SITE PLAN 30 | ¤30.00 | 02/11/2025 |
| ADJUSTMENT 10% | (¤158.67) | 02/11/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/11/2025 |
| INSPECTION - RESIDENTIAL | ¤1,212.75 | 02/11/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤343.98 | 02/11/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 02/11/2025 |
| IMPACT FEE FIRE | ¤434.51 | 02/11/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/11/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/11/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 02/11/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/11/2025 |
| IMPACT FEE TRANSPORTATION | ¤3,502.00 | 02/11/2025 |
| SURCHARGE FS 533.721 | ¤14.28 | 02/11/2025 |
| SURCHARGE - FS 468.631 | ¤21.42 | 02/11/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/11/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/11/2025 |
| SW ENG PRE APRON | ¤30.00 | 02/11/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/11/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/11/2025 |
| SEWER INSPECTION | ¤25.00 | 01/31/2025 |
| CONNECTION FEES | ¤25.00 | 01/31/2025 |
| WATER-METER | ¤514.49 | 01/31/2025 |
| WATER-METER | ¤427.42 | 01/31/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,698.19 |