I want to search for...

Permit #2025011255

Permit Details

Status: COED

Parcel Id: 05-12-31-2755-00000-0140
CONDITIONED SPACE: 1885 sqft
GARAGE: 658 sqft
OPENED PORCH (WITH ROOF) : 221 sqft
Total Square Footage: 2764 sqft
Subdivision: 2313 - THE GABLES SUBDIVISION AT TOWN CENTER
Job Phone: (386)756-0439
Location Address: 227 HAWTHORN AVE
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/11/2025
NOC: RECORDED
Applicant name: JAMES MICHAEL MATHER
Owner: PAYTAS HOMES INC

Address

PO BOX 290490

PORT ORANGE, FL 32127

Lot: 14
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

PAYTAS HOMES INC
Status Location Address State License Number Phone
ACTIVE

PO BOX 290490

PORT ORANGE, FL 32127

CBC1261873 (Exp: 08/31/2026) (386)756-0439

Sub Contractors

GERALD EDWARD MASTERS JR
Status Location Address State License Number Phone
ACTIVE

505 HERBERT STREET

PORT ORANGE, FL 32129

EC13003217 (Exp: 08/31/2026) (386)304-2600
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DANIEL P HUCKS
Status Location Address State License Number Phone Fax
ACTIVE

1345 N US HIGHWAY 1

Ormond Beach, 32174

CAC029376 (Exp: 08/31/2026) (386) 672-8494 386-673-7856
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 09/17/2025 APPROVED FSLADISH
Note: 9/17/25 REQUIRED RIGHT SIDE SWALE CORRECTION MADE AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. ________________________________________________________________________________________________________________________ 9/12/2025 - PREVIOUS INSPECTION NOTES 9/12/25 DRAINAGE CONVEYANCE NOT RESET AND FLOWING AT THE TIME OF THIS INSPECTION. ON THE RIGHT SIDE, FACING THE HOUSE, THE DRAINAGE CONVEYANCE IS HOLDING A LOT OF WATER BETWEEN THE TWO PROPERTIES. YOU NEED TO DIRECT THAT WATER TO THE FRONT.
U -UTILITY RESIDENTIAL FINAL 09/12/2025 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9035 reclaim irr-no cc
ROW - STORMWATER FINAL 09/12/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 9/12/25 DRAINAGE CONVEYANCE NOT RESET AND FLOWING AT THE TIME OF THIS INSPECTION. SEE PHOTO ON THE RIGHT SIDE, FACING THE HOUSE, THE DRAINAGE CONVEYANCE IS HOLDING A LOT OF WATER BETWEEN THE TWO PROPERTIES. YOU NEED TO DIRECT THAT WATER TO THE FRONT.
BLD - BUILDING FINAL 09/12/2025 Approval - Private Provider PPROVIDER
Note: 9/10/2025 3:09:14 PM- PREVIOUS INSPECTION NOTES
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/11/2025 APPROVED GBERTOLA
Note: 9/11/25= Inspector mistake the elevation are correct 9/10/2025 - PREVIOUS INSPECTION NOTES 9/10/25= ON THE LEFT SIDE, FACING THE HOUSES, ARE THE ELEVATIONS FROM 22.80 TO 22.82, ALMOST ALL THE WAY DOWN.The tolerance alongside lot lines is no more than 20 feet flat, with a positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet.Sec 300.01(4,5,6) 7/31/2025 - PREVIOUS INSPECTION NOTES 7/31/25 YOUR SURVEY ELEVATIONS SHOW THAT YOU DO NOT HAVE THE REQUIRED 6" FALL IN THE FIRST 10 FOOT OFF THE REAR OFF THE STRUCTURE AS REQUIRED. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" 7/23/2025 - PREVIOUS INSPECTION NOTES 7/23/24 YOUR FINAL SURVEY IS SHOWING FLAT TO UPHILL FROM CENTER REAR OF STRUCTURE TO AROUND RIGHT SIDE CORNER. YOUR LEFT SIDE PROPERTY LINE IS NOT SHOWING REQUIRED 1 TENTH EVERY 20 FT OF POSITIVE FORWARD FLOW. NEED ADDITIONAL ELEVATION SHOT ON LEFT SIDE CORNER 10 FT OFF STRUCTURE. SEE PHOTO FOR REFERENCE. Must have enough elevations to show drainage flow pattern Sec 300.01-B5 "Sec 300.01 B5 The interior elevations at no greater than a 20-foot grid. • Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid." Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 7/7/2025 - PREVIOUS INSPECTION NOTES 7/7/25 YOU FINAL SURVEY MUST BE COMPLETED WITH SOD LAID AND ALL FEATURES COMPLETED. YOU WILL NEED TO SUBMIT A NEW FINAL SURVEY WHEN COMPLETED. PHOTO ENCLOSED LGDC COMPLIANCE Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
ROW FIELD SURVEY /GRADING CERTIFICATION 09/11/2025 APPROVED - AS NOTED GBERTOLA
Note: ON THE RIGHT SIDE, FACING THE HOUSE, THE DRAINAGE CONVEYANCE IS HOLDING A LOT OF WATER BETWEEN THE TWO PROPERTIES. YOU NEED TO DIRECT THAT WATER TO THE FRONT.
ROW - FINAL APRON (AFTER POUR) 09/11/2025 APPROVED GBERTOLA
Note: Inspector Notes from Inspection 9465 ON THE RIGHT SIDE, FACING THE HOUSE, THE DRAINAGE CONVEYANCE IS HOLDING A LOT OF WATER BETWEEN THE TWO PROPERTIES. YOU NEED TO DIRECT THAT WATER TO THE FRONT. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
BLD - BUILDING FINAL 09/10/2025 Disapproved- Private Provider PPROVIDER
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/10/2025 Disapproved - NO FEE GBERTOLA
Note: 9/10/25= ON THE LEFT SIDE, FACING THE HOUSES, ARE THE ELEVATIONS FROM 22.80 TO 22.82, ALMOST ALL THE WAY DOWN.The tolerance alongside lot lines is no more than 20 feet flat, with a positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet.Sec 300.01(4,5,6) 7/31/2025 - PREVIOUS INSPECTION NOTES 7/31/25 YOUR SURVEY ELEVATIONS SHOW THAT YOU DO NOT HAVE THE REQUIRED 6" FALL IN THE FIRST 10 FOOT OFF THE REAR OFF THE STRUCTURE AS REQUIRED. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" 7/23/2025 - PREVIOUS INSPECTION NOTES 7/23/24 YOUR FINAL SURVEY IS SHOWING FLAT TO UPHILL FROM CENTER REAR OF STRUCTURE TO AROUND RIGHT SIDE CORNER. YOUR LEFT SIDE PROPERTY LINE IS NOT SHOWING REQUIRED 1 TENTH EVERY 20 FT OF POSITIVE FORWARD FLOW. NEED ADDITIONAL ELEVATION SHOT ON LEFT SIDE CORNER 10 FT OFF STRUCTURE. SEE PHOTO FOR REFERENCE. Must have enough elevations to show drainage flow pattern Sec 300.01-B5 "Sec 300.01 B5 The interior elevations at no greater than a 20-foot grid. • Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid." Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 7/7/2025 - PREVIOUS INSPECTION NOTES 7/7/25 YOU FINAL SURVEY MUST BE COMPLETED WITH SOD LAID AND ALL FEATURES COMPLETED. YOU WILL NEED TO SUBMIT A NEW FINAL SURVEY WHEN COMPLETED. PHOTO ENCLOSED LGDC COMPLIANCE Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/31/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/31/25 YOUR SURVEY ELEVATIONS SHOW THAT YOU DO NOT HAVE THE REQUIRED 6" FALL IN THE FIRST 10 FOOT OFF THE REAR OFF THE STRUCTURE AS REQUIRED. Drainage from the structure is to be a 6-inch (5%) Residential, Chapter 4, R401.3 "Drainage from the structure is to be a 6-inch (5%) minimum slope for the first 10 FT E.Florida Building Code, Residential, Chapter 4, R401.3" 7/23/2025 - PREVIOUS INSPECTION NOTES 7/23/24 YOUR FINAL SURVEY IS SHOWING FLAT TO UPHILL FROM CENTER REAR OF STRUCTURE TO AROUND RIGHT SIDE CORNER. YOUR LEFT SIDE PROPERTY LINE IS NOT SHOWING REQUIRED 1 TENTH EVERY 20 FT OF POSITIVE FORWARD FLOW. NEED ADDITIONAL ELEVATION SHOT ON LEFT SIDE CORNER 10 FT OFF STRUCTURE. SEE PHOTO FOR REFERENCE. Must have enough elevations to show drainage flow pattern Sec 300.01-B5 "Sec 300.01 B5 The interior elevations at no greater than a 20-foot grid. • Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid." Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 7/7/2025 - PREVIOUS INSPECTION NOTES 7/7/25 YOU FINAL SURVEY MUST BE COMPLETED WITH SOD LAID AND ALL FEATURES COMPLETED. YOU WILL NEED TO SUBMIT A NEW FINAL SURVEY WHEN COMPLETED. PHOTO ENCLOSED LGDC COMPLIANCE Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/23/2025 Disapproved -FEE REQUIRED FSLADISH
Note: 7/23/24 YOUR FINAL SURVEY IS SHOWING FLAT TO UPHILL FROM CENTER REAR OF STRUCTURE TO AROUND RIGHT SIDE CORNER. YOUR LEFT SIDE PROPERTY LINE IS NOT SHOWING REQUIRED 1 TENTH EVERY 20 FT OF POSITIVE FORWARD FLOW. NEED ADDITIONAL ELEVATION SHOT ON LEFT SIDE CORNER 10 FT OFF STRUCTURE. SEE PHOTO FOR REFERENCE. Must have enough elevations to show drainage flow pattern Sec 300.01-B5 "Sec 300.01 B5 The interior elevations at no greater than a 20-foot grid. • Shots at the corners, along the sides, rear of the building, and 10 feet off of the building are required in addition to the 20-foot grid." Rear Yard Drainage Sec 300.01(4,5,6) "Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet." 7/7/2025 - PREVIOUS INSPECTION NOTES 7/7/25 YOU FINAL SURVEY MUST BE COMPLETED WITH SOD LAID AND ALL FEATURES COMPLETED. YOU WILL NEED TO SUBMIT A NEW FINAL SURVEY WHEN COMPLETED. PHOTO ENCLOSED LGDC COMPLIANCE Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
U-CROSS CONNECTION 07/22/2025 APPROVED - AS NOTED LFITZGERALD
Note: reclaim irr-no cc
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/07/2025 Disapproved - NO FEE FSLADISH
Note: 7/7/25 YOU FINAL SURVEY MUST BE COMPLETED WITH SOD LAID AND ALL FEATURES COMPLETED. YOU WILL NEED TO SUBMIT A NEW FINAL SURVEY WHEN COMPLETED. PHOTO ENCLOSED LGDC COMPLIANCE Section 200.01.1.E.(5) "(5) Final Lot Grading & Drainage Certification shall comply with all of the following: (a) A complete Final Lot Grading & Drainage Certification form provided by the City and consisting of three parts. • The completed Final Lot Grading & Drainage Certification checklist • A blank page or pages as necessary to be completed by the professional engineer, describing discrepancies between the City approved Lot Grading & Drainage Plan and the Final Lot Grading & Drainage Plan along with an explanation of any modifications, improvements and/or other means incorporated to ensure properly functioning grading and drainage conditions are consistent with the intent of the approved Lot Grading & Drainage Plan to include engineering design of any physically constructed drainage conveyances such as trickle channels, retaining walls, pipelines, yard inlets and similar drainage structures. • The “as constructed” Final Lot Grading & Drainage Plan that graphically documents, illustrates and depicts the as constructed lot grading and drainage conditions at completion of the home after completion of all site improvements and landscaping including installation of sod."
ROW- PRE-APRON (PRE-POUR) 06/23/2025 APPROVED GBERTOLA
Note: 6/23/25= READY FOR PAVERS 6/17/2025 - PREVIOUS INSPECTION NOTES ** 06/17/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED __________________________________________________________________________________________________________________ 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25 SPOKE WITH KEVIN CM AND LET HIM KNOW THAT WE ARE FROM HERE FORWARD ENFORCING THE NO PAVERS THRU DRIVEWAYS WITH SIDEWALKS COPC STANDARD OUTLINED IN THE TECHNICAL MANUAL. SIDEWALKS MUST BE 6" POURED CONCRETE. APRON WINGS FROM HERE FOWARD ARE TO BE 36" WIDE AT A MAXIMUM OF 5' FROM CURB AND GUTTER. BOTH OF THESE COPC REQUIREMENTS ARE IN THE THE TECHNICAL MANUAL AND EVEN THOUGH THIS HAS SLIPPED THRU UP UNTIL NOW, MOVING FORWARD YOU WILL BE HELD TO THE AFOREMENTIONED COPC STANDARDS ALREADY IN PLACE. DISAPPROVING NO FEE, PLEASE MAKE REQUIRED CORRECTIONS BEFORE RESUBMITTING FOR INSPECTION.
ROW- PAVER RESTRAINTS 06/17/2025 APPROVED EMADISON
Note: ** 06/17/25 READY TO POUR PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE
ROW- PRE-APRON (PRE-POUR) 06/17/2025 PARTIALLY APPROVED EMADISON
Note: ** 06/17/25 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED __________________________________________________________________________________________________________________ 6/9/2025 - PREVIOUS INSPECTION NOTES 6/9/25 SPOKE WITH KEVIN CM AND LET HIM KNOW THAT WE ARE FROM HERE FORWARD ENFORCING THE NO PAVERS THRU DRIVEWAYS WITH SIDEWALKS COPC STANDARD OUTLINED IN THE TECHNICAL MANUAL. SIDEWALKS MUST BE 6" POURED CONCRETE. APRON WINGS FROM HERE FOWARD ARE TO BE 36" WIDE AT A MAXIMUM OF 5' FROM CURB AND GUTTER. BOTH OF THESE COPC REQUIREMENTS ARE IN THE THE TECHNICAL MANUAL AND EVEN THOUGH THIS HAS SLIPPED THRU UP UNTIL NOW, MOVING FORWARD YOU WILL BE HELD TO THE AFOREMENTIONED COPC STANDARDS ALREADY IN PLACE. DISAPPROVING NO FEE, PLEASE MAKE REQUIRED CORRECTIONS BEFORE RESUBMITTING FOR INSPECTION.
ROW- PRE-APRON (PRE-POUR) 06/09/2025 Disapproved - NO FEE FSLADISH
Note: 6/9/25 SPOKE WITH KEVIN CM AND LET HIM KNOW THAT WE ARE FROM HERE FORWARD ENFORCING THE NO PAVERS THRU DRIVEWAYS WITH SIDEWALKS COPC STANDARD OUTLINED IN THE TECHNICAL MANUAL. SIDEWALKS MUST BE 6" POURED CONCRETE. APRON WINGS FROM HERE FOWARD ARE TO BE 36" WIDE AT A MAXIMUM OF 5' FROM CURB AND GUTTER. BOTH OF THESE COPC REQUIREMENTS ARE IN THE THE TECHNICAL MANUAL AND EVEN THOUGH THIS HAS SLIPPED THRU UP UNTIL NOW, MOVING FORWARD YOU WILL BE HELD TO THE AFOREMENTIONED COPC STANDARDS ALREADY IN PLACE. DISAPPROVING NO FEE, PLEASE MAKE REQUIRED CORRECTIONS BEFORE RESUBMITTING FOR INSPECTION. SECTION 400.02 Sidewalks constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete.
ELECTRIC - EARLY POWER 06/05/2025 Approval - Private Provider PPROVIDER
LATH/BRICK/ WATER BARRIER 05/01/2025 Approval - Private Provider PPROVIDER
INSULATION 04/23/2025 Approval - Private Provider PPROVIDER
ALL ROUGH 04/21/2025 Approval - Private Provider PPROVIDER
GRAVITY SEWER TEST 04/07/2025 Approval - Private Provider PPROVIDER
SEWER TIE IN 04/07/2025 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROOF VALLEY & METAL 04/01/2025 Approval - Private Provider PPROVIDER
WALL SHEATHING 03/27/2025 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/27/2025 Approval - Private Provider PPROVIDER
ELECTRIC-TUG 03/27/2025 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 03/13/2025 Approval - Private Provider PPROVIDER
MONOLITHIC SLAB 03/03/2025 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 02/27/2025 APPROVED AMOBLEY
PLUMBING 1ST ROUGH UNDERGROUND 02/24/2025 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 02/13/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/03/2025 03/04/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 03/03/2025 03/03/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/27/2025 02/27/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/27/2025 02/27/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 02/04/2025 02/04/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
URB COMPLETE 01/31/2025 02/03/2025
Note: Released By: MATTHEW SIERRA - (386)286-2002 - MSIERRA@PALMCOASTGOV.COM
BADMIN COMPLETE 01/29/2025 02/04/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 01/29/2025 02/03/2025
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/29/2025 01/30/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 01/29/2025 01/31/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 01/29/2025 01/30/2025
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 01/29/2025 01/31/2025
Note: Held By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM PLEASE TURN IN THE ORGINAL PAPERWORK FOR THE R.O.W. AGREEMENT

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 09/17/2025
SW ENG - REVIEW 20 ¤20.00 02/11/2025
SW ENG RES REVIEW 200 ¤200.00 02/11/2025
SEWER INSPECTION ¤25.00 02/11/2025
SITE PLAN 30 ¤30.00 02/11/2025
WATER-METER ¤514.49 02/11/2025
WATER-METER ¤427.42 02/11/2025
ADJUSTMENT 10% (¤3.00) 02/11/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/11/2025
ADMINISTRATIVE - RESID PP ¤225.00 02/11/2025
CONNECTION FEES ¤25.00 02/11/2025
FC IMPACT FEE EMS ¤62.00 02/11/2025
IMPACT FEE FIRE ¤434.51 02/11/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/11/2025
FC IMPACT FEE LIBRARY ¤268.00 02/11/2025
IMPACT FEE PARKS ¤1,828.01 02/11/2025
IMPACT FEE SCHOOL ¤5,450.00 02/11/2025
RECORDING FEE REIMBURSE DOC ¤44.00 02/11/2025
IMPACT FEE TRANSPORTATION ¤3,502.00 02/11/2025
WATER -IRRIGATION INSPECTION ¤25.00 02/11/2025
SURCHARGE FS 533.721 ¤2.00 02/11/2025
SURCHARGE - FS 468.631 ¤2.00 02/11/2025
SW ENG - FOUNDATION SURVEY ¤20.00 02/11/2025
SW ENG INSPECTION 80 ¤80.00 02/11/2025
SW ENG PRE APRON ¤30.00 02/11/2025
Fees Total Due: ¤0.00 Total Paid: ¤13,479.43