I want to search for...

Permit #2025020158

Permit Details

Status: INSPECT

Parcel Id: 06-12-31-0650-000B0-0011
Block: 000B0
Subdivision: -
Job Phone: 386-547-6093
Location Address: 101 HAVEN BLVD
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 03/03/2025
NOC: Unknown
Applicant name: JOSEPH D WEBER
Owner: TEG THE HAVEN AT PALM COAST LLC

Address

SUITE 110

AIRMONT, NY 10952

Address

365 ROUTE 59

AIRMONT, NY 10952

Lot: 0011
Job Description: SITE WORK: THE HAVEN STAGE 3 - MULTI-FAMILY, 2 UNIT TH AND SFR UNITS
Type: CN

Contractor

JD WEBER CONSTRUCTION CO.
Status Location Address State License Number Phone Fax
ACTIVE

150 BUSINESS CENTER DRIVE

ORMOND BEACH, FL 32174

CUC1224075 (Exp: 08/31/2026) (386)671-2727 (386)671-2471

Inspection History

Type Request Date Result Inspector
UC-FINAL SITE INSPECTION 06/09/2026 LFITZGERALD
Note: 6/1/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9111 TOP LIFT INSTALLED ONCE SIGNAGE AND ALL DRAINAGE CORRECTIONS ARE COMPLETED THEN CAN CLOSE THIS INSPECTION OUT
UROW - FINAL DRAINAGE 06/09/2026 JMYERS
Note: 6/1/2026 12:15:03 PM- PREVIOUS INSPECTION NOTES 6/1/26 CLEAN AND REMOVE FORM BOARDS FOR QUAD 36" MES LOCATE YARD DRAINS: YD-86, YD-85, YD-90, YD-89, YD-95, YD-102, YD-111, AND YD-109. LOCATE MH-09, MES-09, AND MES CONNECTED TO STRUCTURE I-44. CLEAN STRUCTURES I-41, I-42, I-43, AND I-44. REMOVE ALL TRASH FROM PONDS ALL OTHER STRUCTURES CLEAN AND LOCATED.
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 06/09/2026 LFITZGERALD
Note: 6/1/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9111 TOP LIFT INSTALLED PUNCH LIST:PEDESTRIAN WALK WAY SIGNS MISSING TURN DOWN ARROW/RECOMMEND-2 SPEED LIMIT SIGNS 100 FEET FROM EACH END IN THE CENTER MEDIAN/RECOMMEND 2-9 BUTTON SIGNS(LIKE AT THE END OF THE GARAGE ROADWAY) AT DEAD END OF ROAD AT EAST SIDE OF CUL CDE SAC(WHERE ASPAHALT ENDS AT PROPERTY LINE)/RECOMMEND INSTALLING 1 PANEL SIDEWALK EACH SIDE AT PROPERTY LINE AT RETREAT SUB-DIVISION INTERFACE
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 06/01/2026 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED PUNCH LIST:PEDESTRIAN WALK WAY SIGNS MISSING TURN DOWN ARROW/RECOMMEND-2 SPEED LIMIT SIGNS 100 FEET FROM EACH END IN THE CENTER MEDIAN/RECOMMEND 2-9 BUTTON SIGNS(LIKE AT THE END OF THE GARAGE ROADWAY) AT DEAD END OF ROAD AT EAST SIDE OF CUL CDE SAC(WHERE ASPAHALT ENDS AT PROPERTY LINE)/RECOMMEND INSTALLING 1 PANEL SIDEWALK EACH SIDE AT PROPERTY LINE AT RETREAT SUB-DIVISION INTERFACE
UROW - FINAL DRAINAGE 06/01/2026 PARTIALLY APPROVED JMYERS
Note: 6/1/26 CLEAN AND REMOVE FORM BOARDS FOR QUAD 36" MES LOCATE YARD DRAINS: YD-86, YD-85, YD-90, YD-89, YD-95, YD-102, YD-111, AND YD-109. LOCATE MH-09, MES-09, AND MES CONNECTED TO STRUCTURE I-44. CLEAN STRUCTURES I-41, I-42, I-43, AND I-44. REMOVE ALL TRASH FROM PONDS ALL OTHER STRUCTURES CLEAN AND LOCATED.
UC-SUBSTANTIAL WALK-THRU 06/01/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED PUNCH LIST:PEDESTRIAN WALK WAY SIGNS MISSING TURN DOWN ARROW/RECOMMEND-2 SPEED LIMIT SIGNS 100 FEET FROM EACH END IN THE CENTER MEDIAN/RECOMMEND 2-9 BUTTON SIGNS(LIKE AT THE END OF THE GARAGE ROADWAY) AT DEAD END OF ROAD AT EAST SIDE OF CUL CDE SAC(WHERE ASPAHALT ENDS AT PROPERTY LINE)/RECOMMEND INSTALLING 1 PANEL SIDEWALK EACH SIDE AT PROPERTY LINE AT RETREAT SUB-DIVISION INTERFACE
UC- PRELIMINARY AS-BUILTS 06/01/2026 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED
UC-FINAL SITE INSPECTION 06/01/2026 PARTIALLY APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED ONCE SIGNAGE AND ALL DRAINAGE CORRECTIONS ARE COMPLETED THEN CAN CLOSE THIS INSPECTION OUT
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 05/29/2026 APPROVED RPICATAGI
Note: 4/2/2026 12:25:19 PM- PREVIOUS INSPECTION NOTES 1. Deficient Mulch - all beds reqired 3" depth of mulch 2.
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 05/29/2026 APPROVED BWRIGHT
Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED
U-WATER METER INSTALLATION/VERIFICATION 05/29/2026
UC-ASPHALT PRE PLACEMENT 05/27/2026 APPROVED - AS NOTED LFITZGERALD
Note: TOP LIFT INSTALLED
UC-DRAINAGE STRUCT PLACMNT 05/26/2026 APPROVED - AS NOTED LFITZGERALD
Note: witnessed by prior inspector-will check inverts etc on as builts
UC-DRAINAGE PIPE PLACEMENT/LAMPING 05/26/2026 APPROVED - AS NOTED LFITZGERALD
Note: Inspector Notes from Inspection 9113 witnessed by prior inspector-will check inverts etc on as builts
UROW-RETENT/DETENT STABILI 05/26/2026 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 witnessed by prior inspector-will check inverts etc on as builts
UROW -FINAL GRADE PRIOR SOD 05/26/2026 APPROVED - AS NOTED LFITZGERALD
Note: most landscapeing installed
UROW- CURBING & GUTTER 05/26/2026 APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9230 most landscapeing installed
UC-CONSTRUCTION ENTRANCE 05/26/2026 APPROVED LFITZGERALD
Note: all constructed-ready to final
UC-MOT MAINTENANCE OF TRAFFIC 05/26/2026 APPROVED LFITZGERALD
Note: all work now completed
LDSC-IRRIGATION FINAL 05/05/2026 APPROVED RPICATAGI
Note: 4/30/2026 2:52:05 PM- PREVIOUS INSPECTION NOTES EXCESS WEEDS IN BEDS AND INSUFFICIENT MULCH
LDSC-IRRIGATION FINAL 04/30/2026 Disapproved - NO FEE RPICATAGI
Note: EXCESS WEEDS IN BEDS AND INSUFFICIENT MULCH
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 04/02/2026 Disapproved - NO FEE RPICATAGI
Note: 1. Deficient Mulch - all beds reqired 3" depth of mulch 2. Screen large green transformer box near cul-de-sac 3. Some bed areas have excessive weed issues. remove weeds and treat beds as required
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 10/23/2025 APPROVED BWRIGHT
U-SEWER FORCE MAIN INSTALL/TESTING 10/23/2025 APPROVED BWRIGHT
U-WATER SERVICE INSTALLATION 10/23/2025 APPROVED BWRIGHT
U-GRAVITY SEWER INSTALL/TESTING 10/23/2025 APPROVED BWRIGHT
Note: 3/28/2023 - PREVIOUS INSPECTION NOTES Not ready
U-REUSE MAIN INSTALL/TESTING 10/23/2025 APPROVED BWRIGHT
U-WATER MAIN DISINFECTION 10/23/2025 APPROVED BWRIGHT
U-WATER MAIN DISINFECTION SAMPLING 10/23/2025 APPROVED BWRIGHT
U-PUMP STATION START-UP 10/23/2025 APPROVED BWRIGHT
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 08/14/2025 APPROVED KSANDOE
BLD- ADA PARKING 08/14/2025 APPROVED KSANDOE
BLD - ADA COMPLIANT 08/14/2025 APPROVED KSANDOE
BLD- ADA SIGNAGECONTROL 08/14/2025 APPROVED KSANDOE
BLD- ADA VEHICULAR WAY 08/14/2025 APPROVED KSANDOE
BLD - ADA SIGNAGE- INFOR/DIRECT 08/14/2025 APPROVED KSANDOE
BLD - UNDERGROUND SITE LIGHTING CONDUITS 05/29/2025 APPROVED MKRASKI
BLD - SITE LIGHTING-PLACEMENT/FOUNDATION 05/29/2025 APPROVED MKRASKI
BLD - SITE LIGHTING-POLE SET/FIXTURE 05/29/2025 APPROVED MKRASKI
CLOSE OUT DOCUMENTS
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY
LDSC- LANDSCAPE FINAL
U - UTILITY COMMERCIAL FINAL

Review History

Department Status Date In Date Out
DSD COMPLETE 02/27/2025 02/27/2025
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
BLD CANCEL 02/04/2025 02/04/2025
ELEC CANCEL 02/04/2025 02/04/2025
PLENG CANCEL 02/04/2025 02/04/2025
PLLA CANCEL 02/04/2025 02/04/2025
UD1 CANCEL 02/04/2025 02/04/2025

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADJUSTMENT 10% (¤48.50) 03/03/2025
ADMINISTRATIVE- SITE DEVELOP ¤125.00 03/03/2025
SITE INSPECTION ¤920.00 03/03/2025
SITE PLAN 30 ¤30.00 03/03/2025
Fees Total Due: ¤0.00 Total Paid: ¤1,026.50