I want to search for...
Permit #2025020158
Permit Details
Status: INSPECT
| Parcel Id: 06-12-31-0650-000B0-0011 |
| Block: 000B0 |
| Subdivision: - |
| Job Phone: 386-547-6093 |
| Location Address: 101 HAVEN BLVD |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 03/03/2025 |
| NOC: Unknown |
| Applicant name: JOSEPH D WEBER |
| Owner: TEG THE HAVEN AT PALM COAST LLC |
|
Address SUITE 110 AIRMONT, NY 10952 |
|
Address 365 ROUTE 59 AIRMONT, NY 10952 |
| Lot: 0011 |
| Job Description: SITE WORK: THE HAVEN STAGE 3 - MULTI-FAMILY, 2 UNIT TH AND SFR UNITS |
| Type: CN |
Contractor
JD WEBER CONSTRUCTION CO.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
150 BUSINESS CENTER DRIVE ORMOND BEACH, FL 32174 |
CUC1224075 (Exp: 08/31/2026) | (386)671-2727 | (386)671-2471 |
Inspection History
| Type | Request Date | Result | Inspector |
| UC-FINAL SITE INSPECTION | 06/09/2026 | LFITZGERALD | |
| Note: 6/1/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9111 TOP LIFT INSTALLED ONCE SIGNAGE AND ALL DRAINAGE CORRECTIONS ARE COMPLETED THEN CAN CLOSE THIS INSPECTION OUT | |||
| UROW - FINAL DRAINAGE | 06/09/2026 | JMYERS | |
| Note: 6/1/2026 12:15:03 PM- PREVIOUS INSPECTION NOTES 6/1/26 CLEAN AND REMOVE FORM BOARDS FOR QUAD 36" MES LOCATE YARD DRAINS: YD-86, YD-85, YD-90, YD-89, YD-95, YD-102, YD-111, AND YD-109. LOCATE MH-09, MES-09, AND MES CONNECTED TO STRUCTURE I-44. CLEAN STRUCTURES I-41, I-42, I-43, AND I-44. REMOVE ALL TRASH FROM PONDS ALL OTHER STRUCTURES CLEAN AND LOCATED. | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 06/09/2026 | LFITZGERALD | |
| Note: 6/1/2026 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9111 TOP LIFT INSTALLED PUNCH LIST:PEDESTRIAN WALK WAY SIGNS MISSING TURN DOWN ARROW/RECOMMEND-2 SPEED LIMIT SIGNS 100 FEET FROM EACH END IN THE CENTER MEDIAN/RECOMMEND 2-9 BUTTON SIGNS(LIKE AT THE END OF THE GARAGE ROADWAY) AT DEAD END OF ROAD AT EAST SIDE OF CUL CDE SAC(WHERE ASPAHALT ENDS AT PROPERTY LINE)/RECOMMEND INSTALLING 1 PANEL SIDEWALK EACH SIDE AT PROPERTY LINE AT RETREAT SUB-DIVISION INTERFACE | |||
| UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) | 06/01/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED PUNCH LIST:PEDESTRIAN WALK WAY SIGNS MISSING TURN DOWN ARROW/RECOMMEND-2 SPEED LIMIT SIGNS 100 FEET FROM EACH END IN THE CENTER MEDIAN/RECOMMEND 2-9 BUTTON SIGNS(LIKE AT THE END OF THE GARAGE ROADWAY) AT DEAD END OF ROAD AT EAST SIDE OF CUL CDE SAC(WHERE ASPAHALT ENDS AT PROPERTY LINE)/RECOMMEND INSTALLING 1 PANEL SIDEWALK EACH SIDE AT PROPERTY LINE AT RETREAT SUB-DIVISION INTERFACE | |||
| UROW - FINAL DRAINAGE | 06/01/2026 | PARTIALLY APPROVED | JMYERS |
| Note: 6/1/26 CLEAN AND REMOVE FORM BOARDS FOR QUAD 36" MES LOCATE YARD DRAINS: YD-86, YD-85, YD-90, YD-89, YD-95, YD-102, YD-111, AND YD-109. LOCATE MH-09, MES-09, AND MES CONNECTED TO STRUCTURE I-44. CLEAN STRUCTURES I-41, I-42, I-43, AND I-44. REMOVE ALL TRASH FROM PONDS ALL OTHER STRUCTURES CLEAN AND LOCATED. | |||
| UC-SUBSTANTIAL WALK-THRU | 06/01/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED PUNCH LIST:PEDESTRIAN WALK WAY SIGNS MISSING TURN DOWN ARROW/RECOMMEND-2 SPEED LIMIT SIGNS 100 FEET FROM EACH END IN THE CENTER MEDIAN/RECOMMEND 2-9 BUTTON SIGNS(LIKE AT THE END OF THE GARAGE ROADWAY) AT DEAD END OF ROAD AT EAST SIDE OF CUL CDE SAC(WHERE ASPAHALT ENDS AT PROPERTY LINE)/RECOMMEND INSTALLING 1 PANEL SIDEWALK EACH SIDE AT PROPERTY LINE AT RETREAT SUB-DIVISION INTERFACE | |||
| UC- PRELIMINARY AS-BUILTS | 06/01/2026 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED | |||
| UC-FINAL SITE INSPECTION | 06/01/2026 | PARTIALLY APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED ONCE SIGNAGE AND ALL DRAINAGE CORRECTIONS ARE COMPLETED THEN CAN CLOSE THIS INSPECTION OUT | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 05/29/2026 | APPROVED | RPICATAGI |
| Note: 4/2/2026 12:25:19 PM- PREVIOUS INSPECTION NOTES 1. Deficient Mulch - all beds reqired 3" depth of mulch 2. | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 05/29/2026 | APPROVED | BWRIGHT |
| Note: Inspector Notes from Inspection 9111 TOP LIFT INSTALLED | |||
| U-WATER METER INSTALLATION/VERIFICATION | 05/29/2026 | ||
| UC-ASPHALT PRE PLACEMENT | 05/27/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: TOP LIFT INSTALLED | |||
| UC-DRAINAGE STRUCT PLACMNT | 05/26/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: witnessed by prior inspector-will check inverts etc on as builts | |||
| UC-DRAINAGE PIPE PLACEMENT/LAMPING | 05/26/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9113 witnessed by prior inspector-will check inverts etc on as builts | |||
| UROW-RETENT/DETENT STABILI | 05/26/2026 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9114 Inspector Notes from Inspection 9113 witnessed by prior inspector-will check inverts etc on as builts | |||
| UROW -FINAL GRADE PRIOR SOD | 05/26/2026 | APPROVED - AS NOTED | LFITZGERALD |
| Note: most landscapeing installed | |||
| UROW- CURBING & GUTTER | 05/26/2026 | APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9230 most landscapeing installed | |||
| UC-CONSTRUCTION ENTRANCE | 05/26/2026 | APPROVED | LFITZGERALD |
| Note: all constructed-ready to final | |||
| UC-MOT MAINTENANCE OF TRAFFIC | 05/26/2026 | APPROVED | LFITZGERALD |
| Note: all work now completed | |||
| LDSC-IRRIGATION FINAL | 05/05/2026 | APPROVED | RPICATAGI |
| Note: 4/30/2026 2:52:05 PM- PREVIOUS INSPECTION NOTES EXCESS WEEDS IN BEDS AND INSUFFICIENT MULCH | |||
| LDSC-IRRIGATION FINAL | 04/30/2026 | Disapproved - NO FEE | RPICATAGI |
| Note: EXCESS WEEDS IN BEDS AND INSUFFICIENT MULCH | |||
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 04/02/2026 | Disapproved - NO FEE | RPICATAGI |
| Note: 1. Deficient Mulch - all beds reqired 3" depth of mulch 2. Screen large green transformer box near cul-de-sac 3. Some bed areas have excessive weed issues. remove weeds and treat beds as required | |||
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 10/23/2025 | APPROVED | BWRIGHT |
| U-SEWER FORCE MAIN INSTALL/TESTING | 10/23/2025 | APPROVED | BWRIGHT |
| U-WATER SERVICE INSTALLATION | 10/23/2025 | APPROVED | BWRIGHT |
| U-GRAVITY SEWER INSTALL/TESTING | 10/23/2025 | APPROVED | BWRIGHT |
| Note: 3/28/2023 - PREVIOUS INSPECTION NOTES Not ready | |||
| U-REUSE MAIN INSTALL/TESTING | 10/23/2025 | APPROVED | BWRIGHT |
| U-WATER MAIN DISINFECTION | 10/23/2025 | APPROVED | BWRIGHT |
| U-WATER MAIN DISINFECTION SAMPLING | 10/23/2025 | APPROVED | BWRIGHT |
| U-PUMP STATION START-UP | 10/23/2025 | APPROVED | BWRIGHT |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 08/14/2025 | APPROVED | KSANDOE |
| BLD- ADA PARKING | 08/14/2025 | APPROVED | KSANDOE |
| BLD - ADA COMPLIANT | 08/14/2025 | APPROVED | KSANDOE |
| BLD- ADA SIGNAGECONTROL | 08/14/2025 | APPROVED | KSANDOE |
| BLD- ADA VEHICULAR WAY | 08/14/2025 | APPROVED | KSANDOE |
| BLD - ADA SIGNAGE- INFOR/DIRECT | 08/14/2025 | APPROVED | KSANDOE |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 05/29/2025 | APPROVED | MKRASKI |
| BLD - SITE LIGHTING-PLACEMENT/FOUNDATION | 05/29/2025 | APPROVED | MKRASKI |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 05/29/2025 | APPROVED | MKRASKI |
| CLOSE OUT DOCUMENTS | |||
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | |||
| LDSC- LANDSCAPE FINAL | |||
| U - UTILITY COMMERCIAL FINAL |
Review History
| Department | Status | Date In | Date Out |
| DSD | COMPLETE | 02/27/2025 | 02/27/2025 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BLD | CANCEL | 02/04/2025 | 02/04/2025 |
| ELEC | CANCEL | 02/04/2025 | 02/04/2025 |
| PLENG | CANCEL | 02/04/2025 | 02/04/2025 |
| PLLA | CANCEL | 02/04/2025 | 02/04/2025 |
| UD1 | CANCEL | 02/04/2025 | 02/04/2025 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 10% | (¤48.50) | 03/03/2025 |
| ADMINISTRATIVE- SITE DEVELOP | ¤125.00 | 03/03/2025 |
| SITE INSPECTION | ¤920.00 | 03/03/2025 |
| SITE PLAN 30 | ¤30.00 | 03/03/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,026.50 |