I want to search for...
Permit #2025020412
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00240-0190 |
| CONDITIONED SPACE: 2680 sqft |
| GARAGE: 988 sqft |
| OPENED PORCH (WITH ROOF) : 290 sqft |
| Total Square Footage: 3958 sqft |
| Block: 00240 |
| Subdivision: - |
| Job Phone: 386-931-5741 |
| Location Address: 26 SEATON VALLEY PATH |
| Type: DU - DUPLEX |
| Issue Date: 03/06/2025 |
| NOC: RECORDED |
| Applicant name: MICHAEL MARINO HANSEN |
| Owner: JM PROPERTIES X LLC |
|
Address PO BOX 1347 FLAGLER BEACH, FL 32136 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤403,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
RBI HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 1347 PALM COAST, FL 32137 |
RB29003877 (Exp: 08/31/2027) | 386-585-4097 |
Sub Contractors
ARTHUR J PASCOE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 730007 ORMOND BEACH, FL 32174 |
EC13007168 (Exp: 08/31/2026) | 386-547-6439 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
REBECCA L CHAMBERS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
671 W CADILLAC DR ALTAMONTE SPRINGS, FL 32714 |
CCC1332396 (Exp: 08/31/2026) | 407-467-4904 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/10/2026 | FINAL APPROVED | BHAINES |
| Note: 2/9/2026 - PREVIOUS INSPECTION NOTES Pep Tank full, No power to rear pep tank | |||
| U -UTILITY RESIDENTIAL FINAL | 02/09/2026 | Disapproved - NO FEE | BHAINES |
| Note: Pep Tank full, No power to rear pep tank | |||
| BLD - BUILDING FINAL | 02/09/2026 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 02/09/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, IRR with potable water, IRR meter installed, PVB in place. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/06/2026 | APPROVED | FSLADISH |
| Note: 2/6/26 SWALE CORRECTION MADE AND ELEVATION NUMBERS NOW SHOW BETTER ALIGNMENT WITH ELEVATIONS BOTH UPSTREAM AND DOWNSTREAM AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 2/3/2026 - PREVIOUS INSPECTION NOTES 2/3/26 YOUR SWALE IS TOO HIGH BASED ON ELEVATION SHOTS OFF OF BOTH THE LEFT AND RIGHT PROPERTY LINES. RUNNING A 23.45 FLAT TO 2:1 SLOPES INTO AND OUT OF THE CULVERT PIPES WITH A 23.35 FLAT FOR THE LAST RUN ON THE RIGHT SIDE TO PROPERTY LINE WILL GIVE YOU POSITIVE DRAINAGE FLOW BASED ON EXISTING ELEVATION SHOTS AND SWALE PLAN DIAGRAM RECOMMENDATION OF 23.50 SOD ELEVATION FROM INVERT ENDS. PLEASE SEE MARKED UP SURVEY FOR REFERENCE IN PHOTO SECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/06/2026 | APPROVED | FSLADISH |
| Note: 2/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL INSPECTION | 02/06/2026 | APPROVED | FSLADISH |
| Note: 2/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/06/2026 | APPROVED | FSLADISH |
| Note: 2/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/03/2026 | Disapproved - NO FEE | FSLADISH |
| Note: 2/3/26 YOUR SWALE IS TOO HIGH BASED ON ELEVATION SHOTS OFF OF BOTH THE LEFT AND RIGHT PROPERTY LINES. RUNNING A 23.45 FLAT TO 2:1 SLOPES INTO AND OUT OF THE CULVERT PIPES WITH A 23.35 FLAT FOR THE LAST RUN ON THE RIGHT SIDE TO PROPERTY LINE WILL GIVE YOU POSITIVE DRAINAGE FLOW BASED ON EXISTING ELEVATION SHOTS AND SWALE PLAN DIAGRAM RECOMMENDATION OF 23.50 SOD ELEVATION FROM INVERT ENDS. PLEASE SEE MARKED UP SURVEY FOR REFERENCE IN PHOTO SECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/30/2025 | APPROVED | FSLADISH |
| Note: 12/30/25 PIPE INVERTS ARE WITHIN SWALE PLAN DIAGRAM TOLERANCES AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 12/26/2025 - PREVIOUS INSPECTION NOTES RRicks - Formboards needs to be back-filled to hold the concrete. - There needs to be visble rebar at each end of the culvert | |||
| ROW- PRE-APRON (PRE-POUR) | 12/26/2025 | Disapproved - NO FEE | RRICKS |
| Note: RRicks - Formboards needs to be back-filled to hold the concrete. - There needs to be visble rebar at each end of the culvert | |||
| ELECTRIC - EARLY POWER | 11/19/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 9:30am | |||
| ELECTRIC - EARLY POWER | 11/17/2025 | Disapproved -FEE REQUIRED | CVANSTRAHLEN |
| Note: Please fix items before next inspection #1-Ground /Neutral wire coming front inside panel not connect per manufactured especifications ( Electric codes )( full connection required in main panel ) | |||
| SEWER TIE IN | 11/12/2025 | APPROVED | MGIBSON |
| Note: 11/6/2025 - PREVIOUS INSPECTION NOTES 11-6-25 1. Leaking at connection. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| GRAVITY SEWER TEST | 11/12/2025 | APPROVED | MGIBSON |
| Note: 11/6/2025 - PREVIOUS INSPECTION NOTES 11-6-25 1. Not holding pressure. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| SEWER TIE IN | 11/06/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 11-6-25 1. Leaking at connection. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| GRAVITY SEWER TEST | 11/06/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 11-6-25 1. Not holding pressure. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET | |||
| PEP TANK INSTALLATION REQUEST | 09/05/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 08/22/2025 | APPROVED | KSANDOE |
| INSULATION | 08/19/2025 | APPROVED | KSANDOE |
| ALL ROUGH | 08/15/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-15-25 1. B unit no 5' head pressure. 2. A unit hole in electrical panel need steel plug. Check at insulation. | |||
| FIREWALL FINAL | 08/15/2025 | APPROVED | BTAYLOR |
| FIREWALL FRAMING | 07/21/2025 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 06/30/2025 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 06/27/2025 | APPROVED | BTAYLOR |
| FIREWALL DRYWALL NAILING | 06/27/2025 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/20/2025 | APPROVED | BTAYLOR |
| Note: 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 Approved plans, and truss packet, do not match what is installed. Truss packet from truss manufacturer matches. Please have revised and approved plans, and truss packet, before scheduling another inspection. --Engineering and sheathing are approved based on unapproved truss packet | |||
| WALL SHEATHING | 06/12/2025 | APPROVED | MCONTRYMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/12/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 6/12/25 Approved plans, and truss packet, do not match what is installed. Truss packet from truss manufacturer matches. Please have revised and approved plans, and truss packet, before scheduling another inspection. --Engineering and sheathing are approved based on unapproved truss packet | |||
| TIE BEAM / LINTEL | 04/29/2025 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 04/16/2025 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 04/15/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/11/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: WATER SERVICE NOT RAN YET | |||
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/04/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/21/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/29/2026 | 01/29/2026 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/27/2026 | 01/27/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Disregard previous comments - corrections will be can be corrected out in the field. | |||
| ZON | HOLD | 01/27/2026 | 01/27/2026 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Revise the landscape plan to match the site plan | |||
| ENGIN1 | COMPLETE | 01/27/2026 | 01/27/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 01/27/2026 | 01/27/2026 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After further review the lot on the right is private property. Please revised drainage to ensure there is 0.3' fall from the property line or 10' shot beyond property line to the interior swale. | |||
| MECH | COMPLETE | 01/27/2026 | 01/28/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/16/2026 | 01/27/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/16/2026 | 01/20/2026 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 01/16/2026 | 01/16/2026 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM You have submitted a revised site plan showing a proposed patio. Please include the material to be used for the patio on the plan. | |||
| ZON | COMPLETE | 06/12/2025 | 06/12/2025 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes | |||
| BLD | COMPLETE | 06/12/2025 | 06/18/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/06/2025 | 06/09/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/06/2025 | 06/06/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Rear patio on the foundation survey does not match the proposed approved site plan | |||
| ZON | HOLD | 05/12/2025 | 05/12/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Mechanical equipment pad on right side is encroaching in 5' platted easement | |||
| ENGIN1 | COMPLETE | 05/12/2025 | 05/12/2025 |
| Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/05/2025 | 05/05/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/05/2025 | 05/05/2025 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Mechanical equipment pads are encroaching in 5' platted easements on both sides of the duplex. | |||
| ENGIN1 | COMPLETE | 04/14/2025 | 04/15/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/14/2025 | 04/14/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/04/2025 | 04/04/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/31/2025 | 04/03/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/25/2025 | 02/25/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/25/2025 | 02/26/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/25/2025 | 02/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/20/2025 | 02/20/2025 |
| Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Scanned copy of site plan not legible. | |||
| SW1 | HOLD | 02/20/2025 | 02/20/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Uploaded site plan is still illegible. | |||
| BLD | COMPLETE | 02/20/2025 | 02/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/20/2025 | 02/25/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/11/2025 | 02/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 02/10/2025 | 02/18/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2. Report to be conducted per Sections 1803.3 through 1803.5. Completed report shall comply with Section 1803.6. Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead. | |||
| BLD | HOLD | 02/10/2025 | 02/18/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Roofing Worksheet 1. FL# 10626-R12 out of cycle. Product Approval 1. FL# 25464.3 not valid. | |||
| CUSVC | COMPLETE | 02/10/2025 | 02/11/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/10/2025 | 02/12/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/10/2025 | 02/11/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/10/2025 | 02/11/2025 |
| LOCATE | COMPLETE | 02/10/2025 | 02/19/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/10/2025 | 02/12/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/10/2025 | 02/14/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Site plan elevations are illegible in many areas. | |||
| ZON | HOLD | 02/10/2025 | 02/11/2025 |
| Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM color sheet needs to indicate if you are having 1 or 2 accent colors |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/10/2026 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/10/2026 |
| CONNECTION FEES | ¤2,374.52 | 03/06/2025 |
| FC IMPACT FEE EMS | ¤124.00 | 03/06/2025 |
| IMPACT FEE FIRE | ¤869.02 | 03/06/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 03/06/2025 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 03/06/2025 |
| IMPACT FEE PARKS | ¤3,656.02 | 03/06/2025 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 03/06/2025 |
| IMPACT FEE TRANSPORTATION | ¤2,974.00 | 03/06/2025 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 03/06/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/06/2025 |
| SURCHARGE FS 533.721 | ¤17.17 | 03/06/2025 |
| SURCHARGE - FS 468.631 | ¤25.76 | 03/06/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/06/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/06/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/06/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/06/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/06/2025 |
| SEWER CREDIT | (¤2,016.00) | 03/06/2025 |
| SEWER INSPECTION | ¤25.00 | 03/06/2025 |
| SEWER CAPITAL FACILITY | ¤12,241.04 | 03/06/2025 |
| WATER CAPITAL FACILITY FEE | ¤8,702.28 | 03/06/2025 |
| SITE PLAN 30 | ¤30.00 | 03/06/2025 |
| WATER-METER | ¤514.49 | 03/06/2025 |
| WATER- TURN ON | ¤25.00 | 03/06/2025 |
| WATER- TURN ON | ¤50.00 | 03/06/2025 |
| ADJUSTMENT 10% | (¤190.80) | 03/06/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/06/2025 |
| INSPECTION - RESIDENTIAL | ¤1,463.00 | 03/06/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤414.96 | 03/06/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤43,698.96 |