I want to search for...

Permit #2025020412

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00240-0190
CONDITIONED SPACE: 2680 sqft
GARAGE: 988 sqft
OPENED PORCH (WITH ROOF) : 290 sqft
Total Square Footage: 3958 sqft
Block: 00240
Subdivision: -
Job Phone: 386-931-5741
Location Address: 26 SEATON VALLEY PATH
Type: DU - DUPLEX
Issue Date: 03/06/2025
NOC: RECORDED
Applicant name: MICHAEL MARINO HANSEN
Owner: JM PROPERTIES X LLC

Address

PO BOX 1347

FLAGLER BEACH, FL 32136

Lot: 0190
Contracted Stated Job Value: ¤403,000.00
Job Description: Duplex
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
ACTIVE

PO BOX 1347

PALM COAST, FL 32137

RB29003877 (Exp: 08/31/2027) 386-585-4097

Sub Contractors

ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
REBECCA L CHAMBERS
Status Location Address State License Number Phone
INACTIVE

671 W CADILLAC DR

ALTAMONTE SPRINGS, FL 32714

CCC1332396 (Exp: 08/31/2026) 407-467-4904

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 02/10/2026 FINAL APPROVED BHAINES
Note: 2/9/2026 - PREVIOUS INSPECTION NOTES Pep Tank full, No power to rear pep tank
U -UTILITY RESIDENTIAL FINAL 02/09/2026 Disapproved - NO FEE BHAINES
Note: Pep Tank full, No power to rear pep tank
BLD - BUILDING FINAL 02/09/2026 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 02/09/2026 APPROVED - AS NOTED BHAINES
Note: No CC, IRR with potable water, IRR meter installed, PVB in place.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/06/2026 APPROVED FSLADISH
Note: 2/6/26 SWALE CORRECTION MADE AND ELEVATION NUMBERS NOW SHOW BETTER ALIGNMENT WITH ELEVATIONS BOTH UPSTREAM AND DOWNSTREAM AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. 2/3/2026 - PREVIOUS INSPECTION NOTES 2/3/26 YOUR SWALE IS TOO HIGH BASED ON ELEVATION SHOTS OFF OF BOTH THE LEFT AND RIGHT PROPERTY LINES. RUNNING A 23.45 FLAT TO 2:1 SLOPES INTO AND OUT OF THE CULVERT PIPES WITH A 23.35 FLAT FOR THE LAST RUN ON THE RIGHT SIDE TO PROPERTY LINE WILL GIVE YOU POSITIVE DRAINAGE FLOW BASED ON EXISTING ELEVATION SHOTS AND SWALE PLAN DIAGRAM RECOMMENDATION OF 23.50 SOD ELEVATION FROM INVERT ENDS. PLEASE SEE MARKED UP SURVEY FOR REFERENCE IN PHOTO SECTION.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/06/2026 APPROVED FSLADISH
Note: 2/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL INSPECTION 02/06/2026 APPROVED FSLADISH
Note: 2/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 02/06/2026 APPROVED FSLADISH
Note: 2/6/26 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/03/2026 Disapproved - NO FEE FSLADISH
Note: 2/3/26 YOUR SWALE IS TOO HIGH BASED ON ELEVATION SHOTS OFF OF BOTH THE LEFT AND RIGHT PROPERTY LINES. RUNNING A 23.45 FLAT TO 2:1 SLOPES INTO AND OUT OF THE CULVERT PIPES WITH A 23.35 FLAT FOR THE LAST RUN ON THE RIGHT SIDE TO PROPERTY LINE WILL GIVE YOU POSITIVE DRAINAGE FLOW BASED ON EXISTING ELEVATION SHOTS AND SWALE PLAN DIAGRAM RECOMMENDATION OF 23.50 SOD ELEVATION FROM INVERT ENDS. PLEASE SEE MARKED UP SURVEY FOR REFERENCE IN PHOTO SECTION.
ROW- PRE-APRON (PRE-POUR) 12/30/2025 APPROVED FSLADISH
Note: 12/30/25 PIPE INVERTS ARE WITHIN SWALE PLAN DIAGRAM TOLERANCES AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 12/26/2025 - PREVIOUS INSPECTION NOTES RRicks - Formboards needs to be back-filled to hold the concrete. - There needs to be visble rebar at each end of the culvert
ROW- PRE-APRON (PRE-POUR) 12/26/2025 Disapproved - NO FEE RRICKS
Note: RRicks - Formboards needs to be back-filled to hold the concrete. - There needs to be visble rebar at each end of the culvert
ELECTRIC - EARLY POWER 11/19/2025 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL @ 9:30am
ELECTRIC - EARLY POWER 11/17/2025 Disapproved -FEE REQUIRED CVANSTRAHLEN
Note: Please fix items before next inspection #1-Ground /Neutral wire coming front inside panel not connect per manufactured especifications ( Electric codes )( full connection required in main panel )
SEWER TIE IN 11/12/2025 APPROVED MGIBSON
Note: 11/6/2025 - PREVIOUS INSPECTION NOTES 11-6-25 1. Leaking at connection. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET
GRAVITY SEWER TEST 11/12/2025 APPROVED MGIBSON
Note: 11/6/2025 - PREVIOUS INSPECTION NOTES 11-6-25 1. Not holding pressure. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET
SEWER TIE IN 11/06/2025 Disapproved - NO FEE BTAYLOR
Note: 11-6-25 1. Leaking at connection. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET
GRAVITY SEWER TEST 11/06/2025 Disapproved - NO FEE BTAYLOR
Note: 11-6-25 1. Not holding pressure. Inspector Notes from Inspection 2060 WATER SERVICE NOT RAN YET
PEP TANK INSTALLATION REQUEST 09/05/2025 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 08/22/2025 APPROVED KSANDOE
INSULATION 08/19/2025 APPROVED KSANDOE
ALL ROUGH 08/15/2025 APPROVED - AS NOTED BTAYLOR
Note: 8-15-25 1. B unit no 5' head pressure. 2. A unit hole in electrical panel need steel plug. Check at insulation.
FIREWALL FINAL 08/15/2025 APPROVED BTAYLOR
FIREWALL FRAMING 07/21/2025 APPROVED BTAYLOR
FIREWALL DRYWALL NAILING 06/30/2025 APPROVED BTAYLOR
ROOF VALLEY & METAL 06/27/2025 APPROVED BTAYLOR
FIREWALL DRYWALL NAILING 06/27/2025 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/20/2025 APPROVED BTAYLOR
Note: 6/12/2025 - PREVIOUS INSPECTION NOTES 6/12/25 Approved plans, and truss packet, do not match what is installed. Truss packet from truss manufacturer matches. Please have revised and approved plans, and truss packet, before scheduling another inspection. --Engineering and sheathing are approved based on unapproved truss packet
WALL SHEATHING 06/12/2025 APPROVED MCONTRYMAN
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/12/2025 Disapproved - NO FEE MCONTRYMAN
Note: 6/12/25 Approved plans, and truss packet, do not match what is installed. Truss packet from truss manufacturer matches. Please have revised and approved plans, and truss packet, before scheduling another inspection. --Engineering and sheathing are approved based on unapproved truss packet
TIE BEAM / LINTEL 04/29/2025 APPROVED BTAYLOR
MONOLITHIC SLAB 04/16/2025 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 04/15/2025 APPROVED RRICKS
PLUMBING 1ST ROUGH UNDERGROUND 04/11/2025 APPROVED - AS NOTED MGIBSON
Note: WATER SERVICE NOT RAN YET
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 04/04/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 03/21/2025 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ZON COMPLETE 01/29/2026 01/29/2026
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 COMPLETE 01/27/2026 01/27/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Disregard previous comments - corrections will be can be corrected out in the field.
ZON HOLD 01/27/2026 01/27/2026
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Revise the landscape plan to match the site plan
ENGIN1 COMPLETE 01/27/2026 01/27/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 HOLD 01/27/2026 01/27/2026
Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM After further review the lot on the right is private property. Please revised drainage to ensure there is 0.3' fall from the property line or 10' shot beyond property line to the interior swale.
MECH COMPLETE 01/27/2026 01/28/2026
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/16/2026 01/27/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
SW1 COMPLETE 01/16/2026 01/20/2026
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 01/16/2026 01/16/2026
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM You have submitted a revised site plan showing a proposed patio. Please include the material to be used for the patio on the plan.
ZON COMPLETE 06/12/2025 06/12/2025
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes
BLD COMPLETE 06/12/2025 06/18/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/06/2025 06/09/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM
ZON HOLD 06/06/2025 06/06/2025
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Rear patio on the foundation survey does not match the proposed approved site plan
ZON HOLD 05/12/2025 05/12/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Mechanical equipment pad on right side is encroaching in 5' platted easement
ENGIN1 COMPLETE 05/12/2025 05/12/2025
Note: Released By: RODNEY RICKS - (386)986-2001 - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/05/2025 05/05/2025
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 05/05/2025 05/05/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Mechanical equipment pads are encroaching in 5' platted easements on both sides of the duplex.
ENGIN1 COMPLETE 04/14/2025 04/15/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 04/14/2025 04/14/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 04/04/2025 04/04/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 03/31/2025 04/03/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
ZON COMPLETE 02/25/2025 02/25/2025
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 02/25/2025 02/26/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/25/2025 02/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
ZON HOLD 02/20/2025 02/20/2025
Note: Held By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Scanned copy of site plan not legible.
SW1 HOLD 02/20/2025 02/20/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Uploaded site plan is still illegible.
BLD COMPLETE 02/20/2025 02/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BADMIN COMPLETE 02/20/2025 02/25/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SWALE COMPLETE 02/11/2025 02/24/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
BADMIN HOLD 02/10/2025 02/18/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Provide geotechnical investigation report in accordance with FBCB Section 1803.2.  Report to be conducted per Sections 1803.3 through 1803.5.  Completed report shall comply with Section 1803.6.  Report shall be signed and sealed by a Florida licensed professional engineer in accordance with F.S. 471.025 and Florida Administrative Code Sections 61G15-30.001 and 61G15-23.001 through .005. You can request a deferred submittal by providing a letter on company letterhead.
BLD HOLD 02/10/2025 02/18/2025
Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Roofing Worksheet 1. FL# 10626-R12 out of cycle. Product Approval 1. FL# 25464.3 not valid.
CUSVC COMPLETE 02/10/2025 02/11/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 02/10/2025 02/12/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/10/2025 02/11/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 02/10/2025 02/11/2025
LOCATE COMPLETE 02/10/2025 02/19/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 02/10/2025 02/12/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 02/10/2025 02/14/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Site plan elevations are illegible in many areas.
ZON HOLD 02/10/2025 02/11/2025
Note: Held By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM color sheet needs to indicate if you are having 1 or 2 accent colors

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 02/10/2026
REINSPECTION RESIDENTIAL ¤40.00 02/10/2026
CONNECTION FEES ¤2,374.52 03/06/2025
FC IMPACT FEE EMS ¤124.00 03/06/2025
IMPACT FEE FIRE ¤869.02 03/06/2025
FC IMPACT FEE LAW ENFORCEMENT ¤436.00 03/06/2025
FC IMPACT FEE LIBRARY ¤536.00 03/06/2025
IMPACT FEE PARKS ¤3,656.02 03/06/2025
IMPACT FEE SCHOOL ¤10,900.00 03/06/2025
IMPACT FEE TRANSPORTATION ¤2,974.00 03/06/2025
WATER -IRRIGATION INSPECTION ¤50.00 03/06/2025
WATER -IRRIGATION INSPECTION ¤25.00 03/06/2025
SURCHARGE FS 533.721 ¤17.17 03/06/2025
SURCHARGE - FS 468.631 ¤25.76 03/06/2025
SW ENG - FOUNDATION SURVEY ¤20.00 03/06/2025
SW ENG INSPECTION 80 ¤80.00 03/06/2025
SW ENG PRE APRON ¤30.00 03/06/2025
SW ENG - REVIEW 20 ¤20.00 03/06/2025
SW ENG RES REVIEW 200 ¤200.00 03/06/2025
SEWER CREDIT (¤2,016.00) 03/06/2025
SEWER INSPECTION ¤25.00 03/06/2025
SEWER CAPITAL FACILITY ¤12,241.04 03/06/2025
WATER CAPITAL FACILITY FEE ¤8,702.28 03/06/2025
SITE PLAN 30 ¤30.00 03/06/2025
WATER-METER ¤514.49 03/06/2025
WATER- TURN ON ¤25.00 03/06/2025
WATER- TURN ON ¤50.00 03/06/2025
ADJUSTMENT 10% (¤190.80) 03/06/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/06/2025
INSPECTION - RESIDENTIAL ¤1,463.00 03/06/2025
PLAN REVIEW - RESIDENTIAL ¤414.96 03/06/2025
Fees Total Due: ¤0.00 Total Paid: ¤43,698.96