Permit #2025020452
Permit Details
Status: INSPECT
| Subdivision: 2161 - RIGHT OF WAY/STREETS/PATHS |
| Job Phone: 386-257-7912 |
| Location Address: 10000 ZEBULON PL |
| Type: ROW - RIGHT OF WAY |
| Issue Date: 02/26/2025 |
| NOC: Unknown |
| Applicant name: ATT |
| Owner: CITY OF PALM COAST |
|
Address 160 LAKE AVENUE PALM COAST, FL 32164 |
| Job Description: 10000 ZEBULON PL - 14,321' BURIED FOC, 72 BORES, 157 HH, 5092' INNERDUCT. |
| Type: CN |
Contractor
AT&T
| Status | Location Address | State License Number | Phone |
| ACTIVE |
268 N RIDGEWOOD AVE ROOM 232 DAYTONA BEACH, FL 32114 |
ATT | 386-257-7912 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 04/30/2026 | Disapproved - NO FEE | FSLADISH |
| Note: 4/30/26 YOU WILL NEED TO RELOCATE BOX IN SWALE INBETWEEN 97-99 ZEBULAH'S TRAIL AND 6 ZEBULON TO 1 FT OFF THE REAR ROW AND OUT OF THE SWALE . SEE PHOTO FOR REFERENCE. ______________________________________________________________________________________________________________________________ 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 RRicks There is unburied cable at 15 Zebulon Pl. Additionally, cable is not allowed to run through the culvert pipe 59 Zebulah's Trail, flags will need to be removed. See Pictures | |||
| ROW - FINAL INSPECTION | 04/06/2026 | Disapproved - NO FEE | RRICKS |
| Note: 4/6/26 RRicks There is unburied cable at 15 Zebulon Pl. Additionally, cable is not allowed to run through the culvert pipe 59 Zebulah's Trail, flags will need to be removed. See Pictures | |||
| ROW CABLE PROJECT STATUS | 07/31/2025 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/31/25 RECEIVED A CALL FROM KYLE ON 7/25/25 REGARDING THIS PROJECT STATUS. HE INDICATED HIS CREW DROVE THE AREA IN QUESTION AND THAT THE CABLE LAYING IN TE SWALE WAS ACTUALLY METRONET. I WENT OUT TODAY TO INVESTIGATE AND DETERMINED EVEN THOUGH THE CABLE GOES INTO THE GROUND IN BETWEEN THE ATT AND METRONET BOXES THAT IT ACTUALLY LEADS TO THE METRO NET BOX. I AM APPROVING THIS PROJECT STATUS AS NOTED AND WIIL INSPECT ENTIRE PROJECT AREA WHEN THE ROW FINAL IS CALLED IN. ______________________________________________________________________________________________________________________ 7/25/2025 - PREVIOUS INSPECTION NOTES 7/25/25 NOTHING HAS CHANGED CABLE STILL LAYING ON TOP OF GROUND AND COILED UP ACROSS STREET. 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED CABLE STILL LYING ON GROUND THRU CULVERT AND COILED UP ACROSS THE STREET. PERMIT STILL OPEN. 7/18/2025 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED CABLE STILL LYING ON GROUND THRU CULVERT AND COILED UP ACROSS THE STREET. PERMIT STILL OPEN. | |||
| ROW CABLE PROJECT STATUS | 07/25/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 7/25/25 NOTHING HAS CHANGED CABLE STILL LAYING ON TOP OF GROUND AND COILED UP ACROSS STREET. 7/22/2025 - PREVIOUS INSPECTION NOTES 7/22/25 PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED CABLE STILL LYING ON GROUND THRU CULVERT AND COILED UP ACROSS THE STREET. PERMIT STILL OPEN. 7/18/2025 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED CABLE STILL LYING ON GROUND THRU CULVERT AND COILED UP ACROSS THE STREET. PERMIT STILL OPEN. | |||
| ROW CABLE PROJECT STATUS | 07/22/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 7/22/25 PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED CABLE STILL LYING ON GROUND THRU CULVERT AND COILED UP ACROSS THE STREET. PERMIT STILL OPEN. 7/18/2025 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED CABLE STILL LYING ON GROUND THRU CULVERT AND COILED UP ACROSS THE STREET. PERMIT STILL OPEN. | |||
| ROW CABLE PROJECT STATUS | 07/18/2025 | Disapproved - NO FEE | FSLADISH |
| Note: NOTHING HAS CHANGED CABLE STILL LYING ON GROUND THRU CULVERT AND COILED UP ACROSS THE STREET. PERMIT STILL OPEN. | |||
| ROW CABLE PROJECT STATUS | 07/11/2025 | Status Check | FSLADISH |
| Note: 7/11/25 NOTHING HAS CHANGED. CABLE NOT BURIED, PERMIT STILL OPEN AT THE TIME OF THIS INSPECTION. CALL TO PHILIP (CONTRACTOR) HAS BEEN PLACED. REINSPECTION 7/18/25. _____________________________________________________________________________________________________________________ 7/7/2025 - PREVIOUS INSPECTION NOTES 7/7/25 NOTHING HAS CHANGED AT THE TIME OF THIS INSPECTION. CABLE STILL NOT BURIED AT 12-16 AND STILL WIRE COILED BETWEEN 13-15 ZEPHYR LILY PL. PLACED CALL TO PHILLIP CONTRACTOR SUPERVISIOR AND LEFT MESSAGE ASKING WHY THIS CABLE HAS NOT BEEN BURIED. NO RESPONSE AS OF THIS SECONDARY INSPECTION. __________________________________________________________________________________________________________________________ CHECK FOR EXPOSED CABLE AT 12-16 ZEPHYR LILY PL AND ACROSS ST AT 13-15 TO SEE IF IT HAS BEEN BURIED. | |||
| ROW CABLE PROJECT STATUS | 07/07/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 7/7/25 NOTHING HAS CHANGED AT THE TIME OF THIS INSPECTION. CABLE STILL NOT BURIED AT 12-16 AND STILL WIRE COILED BETWEEN 13-15 ZEPHYR LILY PL. PLACED CALL TO PHILLIP CONTRACTOR SUPERVISIOR AND LEFT MESSAGE ASKING WHY THIS CABLE HAS NOT BEEN BURIED. NO RESPONSE AS OF THIS SECONDARY INSPECTION. __________________________________________________________________________________________________________________________ CHECK FOR EXPOSED CABLE AT 12-16 ZEPHYR LILY PL AND ACROSS ST AT 13-15 TO SEE IF IT HAS BEEN BURIED. | |||
| ROW CABLE PROJECT STATUS | 07/01/2025 | Status Check | FSLADISH |
| Note: 7/1/25 RODE ON ZEPHYR LILY PL AND NOTICED THER IS CABLE EXPOSED IN FRONT OF 12-16 THAT WILL NEED TO BE BURIED. PERMIT IS STILL OPEN WILL MONITOR. PUTTING IN ANOTHER CABLE PROJECT STATUS FOR 7/7/25. | |||
| ROW - FINAL INSPECTION | |||
| Note: 4/30/2026 - PREVIOUS INSPECTION NOTES 4/30/26 YOU WILL NEED TO RELOCATE BOX IN SWALE INBETWEEN 97-99 ZEBULAH'S TRAIL AND 6 ZEBULON TO 1 FT OFF THE REAR ROW AND OUT OF THE SWALE . SEE PHOTO FOR REFERENCE. ______________________________________________________________________________________________________________________________ 4/6/2026 - PREVIOUS INSPECTION NOTES 4/6/26 RRicks There is unburied cable at 15 Zebulon Pl. Additionally, cable is not allowed to run through the culvert pipe 59 Zebulah's Trail, flags will need to be removed. See Pictures |
Review History
| Department | Status | Date In | Date Out |
| UD1 | COMPLETE | 02/21/2025 | 02/24/2025 |
| Note: Released By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM | |||
| TRENG | COMPLETE | 02/21/2025 | 02/26/2025 |
| Note: Released By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/11/2025 | 02/19/2025 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| TRENG | HOLD | 02/11/2025 | 02/21/2025 |
| Note: Held By: VINEESH CRAWFORD - (386)986-3789 - VCRAWFORD@PALMCOASTGOV.COM Pending plan revision based on comments from Utility Department. | |||
| UD1 | HOLD | 02/11/2025 | 02/12/2025 |
| Note: Held By: GREG DEGLER - (386)986-2384 - GDEGLER@PALMCOASTGOV.COM 1. DWG 1 of 41: Add Zebra Finch Pl to map and change the name of the cul-de-sac south of Zebra Finch Pl to Zelda Ct. The cul-de sac north of Zebra Finch Pl is indeed Zebrawood Ct as you have indicated. 2. DWG 30, 31, & 32 of 41: The cul-de-sac south of Zebra Finch Pl is Zelda Ct, not Zebrawood Ct. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| DUMMY FEE | ¤1.00 | 02/26/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1.00 |