Permit #2025020493
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00430-0050 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 434 sqft |
| OPENED PORCH (WITH ROOF) : 108 sqft |
| OPENED PORCH (WITH ROOF) : 132 sqft |
| Total Square Footage: 2474 sqft |
| Block: 00430 |
| Subdivision: - |
| Job Phone: 832-726-2202 |
| Location Address: 2 SEAMANSHIP TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/11/2025 |
| NOC: RECORDED |
| Applicant name: JONATHON AMBAR |
| Owner: CASPIAN INVESTMENTS 1 LLC |
|
Address 1802 N ALAFAYA TRL ORLANDO, FL 32826 |
|
Address SUITE 164 ORLANDO, FL 32826 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤140,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
CASPIAN HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1802 N ALAFAYA TRAIL ORLANDO, FL 32826 |
SUITE 162 ORLANDO, FL 32826 |
CBC1264918 (Exp: 08/31/2026) | 832-726-2202 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/20/2026 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 12/17/2025 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR | |||
| U -UTILITY RESIDENTIAL FINAL | 12/17/2025 | FINAL APPROVED | BHAINES |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/23/2025 | APPROVED | FSLADISH |
| Note: 9/15/2025 - PREVIOUS INSPECTION NOTES 9/15/25 YOUR SURVEY SHOWS THAT YOU WILL NOT HAVE POSITIVE DRAINAGE IN YOUR COPC SWALE ROW. YOU ARE ALSO SHOWING A FLAT AREA OFF THE LEFT REAR STRUCTURE CORNER THAT WILL POOL DRAINAGE. PLEASE SEE PHOTO FOR REFERENCE. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. ROADSIDE SWALE AND CULVERT Section 300.01 C(1) V-17 1) The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 of a foot and must demonstrate positive fall in the direction described in the swale plan | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/23/2025 | APPROVED | FSLADISH |
| Note: 9/23/25 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 09/23/2025 | APPROVED | FSLADISH |
| Note: 9/23/25 AT THE TIME OF THIS INSPECTIONS ALL COPC REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ROW - FINAL APRON (AFTER POUR) | 09/23/2025 | APPROVED | FSLADISH |
| Note: 9/23/25 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/15/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 9/15/25 YOUR SURVEY SHOWS THAT YOU WILL NOT HAVE POSITIVE DRAINAGE IN YOUR COPC SWALE ROW. YOU ARE ALSO SHOWING A FLAT AREA OFF THE LEFT REAR STRUCTURE CORNER THAT WILL POOL DRAINAGE. PLEASE SEE PHOTO FOR REFERENCE. POSITIVE FALL .10 EVERY 20 FT. Section 300.01 D(4) V-17 4) Positive fall is considered to be 0.10 of a foot every 20 feet. ROADSIDE SWALE AND CULVERT Section 300.01 C(1) V-17 1) The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 of a foot and must demonstrate positive fall in the direction described in the swale plan | |||
| ROW- PRE-APRON (PRE-POUR) | 08/13/2025 | APPROVED | FSLADISH |
| Note: 8/13/25 MAKE SURE ALL GROUNDWATER IS OUT OF MITERED ENDS AND COPC STANDARD 6"X6" MITERED END FOOTERS ARE MAINTAINED PRIOR TO POURING CONCRETE. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. | |||
| ELECTRIC - EARLY POWER | 08/08/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 07/30/2025 | Approval - Private Provider | PPROVIDER |
| SEWER TIE IN | 07/30/2025 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 07/08/2025 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 07/07/2025 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 06/10/2025 | Approval - Private Provider | PPROVIDER |
| INSULATION | 06/03/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 05/20/2025 | Approval - Private Provider | PPROVIDER |
| TUB SET | 05/20/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 05/06/2025 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 05/05/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/05/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 04/24/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 04/14/2025 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 04/11/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/10/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/09/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/25/2025 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 02/20/2025 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/11/2025 | 04/11/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/09/2025 | 04/09/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/26/2025 | 02/26/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/26/2025 | 02/27/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/26/2025 | 03/05/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/26/2025 | 02/27/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/12/2025 | 02/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 02/12/2025 | 02/20/2025 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 02/20/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary. | |||
| ZON | HOLD | 02/12/2025 | 02/12/2025 |
| Note: Held By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM 1. On street side of house, banding is required around windows. | |||
| BADMIN | HOLD | 02/11/2025 | 02/19/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM State Card need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| CUSVC | COMPLETE | 02/11/2025 | 02/12/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 02/11/2025 | 02/12/2025 |
| Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Please show adjacent improved or vacant notes and their FFEs (if applicable). | |||
| LOCATE | COMPLETE | 02/11/2025 | 02/18/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/11/2025 | 02/19/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM 1- Please depict adjacent lots 4 and 6 as improved/vacant with FFEs if applicable. 2- Grades shall be shown on a 20' grid 3- Please depict a 6" fall within 10' of house in the front. 4- Rght side propertly line needs to be even with or higher than edge of pavement | |||
| ZON | COMPLETE | 02/11/2025 | 02/12/2025 |
| Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 03/11/2025 |
| ADJUSTMENT 10% | (¤3.00) | 03/11/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 03/11/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 03/11/2025 |
| CONNECTION FEES | ¤1,187.26 | 03/11/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 03/11/2025 |
| IMPACT FEE FIRE | ¤434.51 | 03/11/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 03/11/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 03/11/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 03/11/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 03/11/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 03/11/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 03/11/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 03/11/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 03/11/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 03/11/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 03/11/2025 |
| SW ENG PRE APRON | ¤30.00 | 03/11/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 03/11/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 03/11/2025 |
| SEWER CREDIT | (¤1,147.00) | 03/11/2025 |
| SEWER INSPECTION | ¤25.00 | 03/11/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 03/11/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 03/11/2025 |
| SITE PLAN 30 | ¤30.00 | 03/11/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,401.74 |