Permit #2025020538

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00680-0110
CONDITIONED SPACE: 1754 sqft
GARAGE: 437 sqft
OPENED PORCH (WITH ROOF) : 89 sqft
OPENED PORCH (WITH ROOF) : 182 sqft
Total Square Footage: 2462 sqft
Block: 00680
Subdivision: -
Job Phone: 407-476-8195
Location Address: 34 PIN OAK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/28/2025
NOC: RECORDED
Applicant name: CARLETTE RENE WITTE
Owner: INB BFS LLC

Address

3670 MAGUIRE BOULEVARD

ORLANDO, FL 32803

Address

SUITE 220

ORLANDO, FL 32803

Lot: 0110
Contracted Stated Job Value: ¤165,000.00
Job Description: single family residence
Type: CN

Contractor

INNOVATIVE NATIONWIDE BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD #220

,

CRC1330026 (Exp: 08/31/2026) 855-694-6634

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733

Inspection History

Type Request Date Result Inspector
FINAL LOT GRADING/DRAINAGE CERTIFICATE 12/30/2025 APPROVED FSLADISH
Note: 12/30/30 THIS IS A DUPLICATE INSPECTION. PROPERTY CLOSED OUT. APPROVING AS NOTED.
BLD - BUILDING FINAL 12/30/2025 FINAL APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 12/30/2025 2:28:12 PM *** 12/23/2025 - PREVIOUS INSPECTION NOTES 12/23/25: HOUSE IS LOCKED UP TIGHT WITH NO KEY OR LOCKBOX CODE PROVIDED. Checked Roof and Exterior only. A full inspection will be required (except roof). 1). ODU needs to be 3" above Finished Grade. FBCR M1305.1.4.1 2). Remove construction material (pipe) from left side yard area.
ROW - FINAL APRON (AFTER POUR) 12/23/2025 APPROVED FSLADISH
Note: 12/23/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9465 12/22/25 UPON WALKING PROPERTY DETERMINED OVERALL DRAINAGE MEETS COPC STANDARDS. AS INDICATED ON YOUR LOT GRADING CERTIFICATE THE RIGHT SIDE FRONT SWALE IS UPHILL 2 TENTHS FROM CULVERT LEFT SIDE SOD ELEVATION. BUILDER WILL NEED TO LOWER RIGHT SIDE SWALE TO 23.30 FROM THAT ELEVATION SHOT COMING OUT OF LEFT CULVERT PIPE RUNNING A FLAT 23.30 TO RIGHT SIDE PROPERTY LINE BEFORE ROW FINAL PASSAGE. ROADSIDE SWALE AND CULVERT Section 300.01 C(1) V-17 1) The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 of a foot and must demonstrate positive fall in the direction described in the swale plan Inspector Notes from Inspection 9463 12/22/25 EXCEPT FOR FRONT SWALE ELEVATION GOING 2 TENTHS UPHILL SURVEY MEETS COPC MINIMUM STANDARDS. I WILL VERIFY ON FIELD SURVEY CONDITIONS. APPROVING AS NOTED.
ROW - STORMWATER FINAL 12/23/2025 APPROVED FSLADISH
Note: 12/23/25 CORRECTION COMPLETED AT TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL COPC MINIMUM REQUIREMENTS WERE MET, NEITHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE FOR ANY CHANGES THAT MAY OCCUR AFTER THIS INSPECTION. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. ______________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 12/22/25 UPON WALKING PROPERTY DETERMINED OVERALL DRAINAGE MEETS COPC STANDARDS. AS INDICATED ON YOUR LOT GRADING CERTIFICATE THE RIGHT SIDE FRONT SWALE IS UPHILL 2 TENTHS FROM CULVERT LEFT SIDE SOD ELEVATION. BUILDER WILL NEED TO LOWER RIGHT SIDE SWALE TO 23.30 FROM THAT ELEVATION SHOT COMING OUT OF LEFT CULVERT PIPE RUNNING A FLAT 23.30 TO RIGHT SIDE PROPERTY LINE BEFORE ROW FINAL PASSAGE. ROADSIDE SWALE AND CULVERT Section 300.01 C(1) V-17 1) The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 of a foot and must demonstrate positive fall in the direction described in the swale plan Inspector Notes from Inspection 9463 12/22/25 EXCEPT FOR FRONT SWALE ELEVATION GOING 2 TENTHS UPHILL SURVEY MEETS COPC MINIMUM STANDARDS. I WILL VERIFY ON FIELD SURVEY CONDITIONS. APPROVING AS NOTED.
U -UTILITY RESIDENTIAL FINAL 12/23/2025 FINAL APPROVED BHAINES
Note: Inspector Notes from Inspection 9035 No CC, No IRR.
BLD - BUILDING FINAL 12/23/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 12/23/2025 2:51:27 PM *** 12/23/25: HOUSE IS LOCKED UP TIGHT WITH NO KEY OR LOCKBOX CODE PROVIDED. Checked Roof and Exterior only. A full inspection will be required (except roof). 1). ODU needs to be 3" above Finished Grade. FBCR M1305.1.4.1 2). Remove construction material (pipe) from left side yard area.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/22/2025 APPROVED - AS NOTED FSLADISH
Note: 12/22/25 EXCEPT FOR FRONT SWALE ELEVATION GOING 2 TENTHS UPHILL SURVEY MEETS COPC MINIMUM STANDARDS. I WILL VERIFY ON FIELD SURVEY CONDITIONS. APPROVING AS NOTED.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/22/2025 APPROVED - AS NOTED FSLADISH
Note: 12/22/25 UPON WALKING PROPERTY DETERMINED OVERALL DRAINAGE MEETS COPC STANDARDS. AS INDICATED ON YOUR LOT GRADING CERTIFICATE THE RIGHT SIDE FRONT SWALE IS UPHILL 2 TENTHS FROM CULVERT LEFT SIDE SOD ELEVATION. BUILDER WILL NEED TO LOWER RIGHT SIDE SWALE TO 23.30 FROM THAT ELEVATION SHOT COMING OUT OF LEFT CULVERT PIPE RUNNING A FLAT 23.30 TO RIGHT SIDE PROPERTY LINE BEFORE ROW FINAL PASSAGE. ROADSIDE SWALE AND CULVERT Section 300.01 C(1) V-17 1) The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 of a foot and must demonstrate positive fall in the direction described in the swale plan Inspector Notes from Inspection 9463 12/22/25 EXCEPT FOR FRONT SWALE ELEVATION GOING 2 TENTHS UPHILL SURVEY MEETS COPC MINIMUM STANDARDS. I WILL VERIFY ON FIELD SURVEY CONDITIONS. APPROVING AS NOTED.
U-CROSS CONNECTION 12/15/2025 APPROVED - AS NOTED BHAINES
Note: No CC, No IRR.
ROW- PRE-APRON (PRE-POUR) 11/18/2025 APPROVED - AS NOTED FSLADISH
Note: 11/18/25 DUE TO SITE SPECIFIC CONDITIONS AND DRIVEWAYS SIMILAR IN SLOPE NEARBY I AM GOING TO APPROVE THIS PREPOUR AS NOTED THAT LEFT SIDE UPPER DRIVEWAY SLOPE IS 8.45% AND RIGHT SIDE UPPER DRIVEWAY SLOPE IS 9.10%. LOWER DRIVEWAY APRON SLOPE ON BOTH SIDE MEETS COPC MINIMUM REQUIREMENTS. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 11/12/2025 - PREVIOUS INSPECTION NOTES 11-12-25 TPOLACEK** RECIEVED TEXT ASKING TO CANCEL INSPECTION Inspector Notes from Inspection 9470 09-18-25 TPOLACEK*** BUILDER MUST REMOVE PORTA POTTY FROM ROW. APPROVING AS NOTED 8/29/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
ROW- PRE-APRON (PRE-POUR) 11/12/2025 CANCELLED BY APPLICANT TPOLACEK
Note: 11-12-25 TPOLACEK** RECIEVED TEXT ASKING TO CANCEL INSPECTION Inspector Notes from Inspection 9470 09-18-25 TPOLACEK*** BUILDER MUST REMOVE PORTA POTTY FROM ROW. APPROVING AS NOTED 8/29/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
GRAVITY SEWER TEST 11/06/2025 APPROVED MCONTRYMAN
SEWER TIE IN 11/06/2025 APPROVED MCONTRYMAN
ELECTRIC - EARLY POWER 11/03/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 11/3/2025 12:23:43 PM *** 11/3/25: FPL emailed to release power. 10/29/2025 - PREVIOUS INSPECTION NOTES 10/29/25: 1). Attic light is not safed off as required. NEC-110.27 2). Feed to Outdoor Unit is not safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 9/18/2025 12:46:41 PM *** 9/18/25: FPL emailed > approved for TUG. 9/16/2025 - PREVIOUS INSPECTION NOTES 9/16/25: 1). No ufer ground, ground to steel or ground rods installed. NEC 250.24(A)(1) & 250.52(A)(3) 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25: NOT READY. SCHEDULED TOO EARLY WORK NOT COMPLETE YET.
ELECTRIC - EARLY POWER 10/29/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 10/29/2025 11:04:31 AM *** 10/29/25: 1). Attic light is not safed off as required. NEC-110.27 2). Feed to Outdoor Unit is not safed off. NEC-110.27 Inspector Notes from Inspection 2200 *** NOTES ADDED BY RSIMS 9/18/2025 12:46:41 PM *** 9/18/25: FPL emailed > approved for TUG. 9/16/2025 - PREVIOUS INSPECTION NOTES 9/16/25: 1). No ufer ground, ground to steel or ground rods installed. NEC 250.24(A)(1) & 250.52(A)(3) 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25: NOT READY. SCHEDULED TOO EARLY WORK NOT COMPLETE YET.
LATH/BRICK/ WATER BARRIER 10/15/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/15/2025 11:10:51 AM *** 10/10/2025 - PREVIOUS INSPECTION NOTES 10/10/25: 1). Temporary swale pipe needs to be cleared on both ends to allow free flow of water through the swale. The pipe is completely buried causing extreme flooding through the swales. FBC 3303.5 2). Silt fence needs to be repaired in multiple areas particulary along entire front and back. FBC 3307.1
LATH/BRICK/ WATER BARRIER 10/10/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 10/10/2025 12:44:48 PM *** 10/10/25: 1). Temporary swale pipe needs to be cleared on both ends to allow free flow of water through the swale. The pipe is completely buried causing extreme flooding through the swales. FBC 3303.5 2). Silt fence needs to be repaired in multiple areas particulary along entire front and back. FBC 3307.1
INSULATION 10/09/2025 APPROVED MCONTRYMAN
Note: 10/8/2025 - PREVIOUS INSPECTION NOTES 10/8/25 Previous note still not rectified 1). No gauge or pressure on water piping. FBCR P2503.7 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 Previous note not rectified 1). No gauge or pressure on water piping. FBCR P2503.7 Also: Both bath vents need to be re-sealed at roof penetration FBCR 402.4.1.1 10/6/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 10/1/2025 12:29:53 PM *** 10/6/25: Cancelled by Applicant in person at @ 1340. Stated not ready. 10/1/25: Check at Insulation Inspection. 1). No gauge or pressure on water piping. FBCR P2503.7 2). Left side bathtub : slab needs to be repaired fully with cement product to meet minimum thickness and provide termite prevention. FBC R506.1 (dirt in hole will need to be removed before patching) / FBCR 318 3). SGD was in the process of being installed. Could not inspect at the time of this inspection. FBC[A]-110.1
PEP TANK INSTALLATION REQUEST 10/09/2025 APPROVED CBOWERMASTER
INSULATION 10/08/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 10/8/25 Previous note still not rectified 1). No gauge or pressure on water piping. FBCR P2503.7 10/7/2025 - PREVIOUS INSPECTION NOTES 10/7/25 Previous note not rectified 1). No gauge or pressure on water piping. FBCR P2503.7 Also: Both bath vents need to be re-sealed at roof penetration FBCR 402.4.1.1 10/6/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 10/1/2025 12:29:53 PM *** 10/6/25: Cancelled by Applicant in person at @ 1340. Stated not ready. 10/1/25: Check at Insulation Inspection. 1). No gauge or pressure on water piping. FBCR P2503.7 2). Left side bathtub : slab needs to be repaired fully with cement product to meet minimum thickness and provide termite prevention. FBC R506.1 (dirt in hole will need to be removed before patching) / FBCR 318 3). SGD was in the process of being installed. Could not inspect at the time of this inspection. FBC[A]-110.1
INSULATION 10/07/2025 Disapproved -FEE REQUIRED MCONTRYMAN
Note: 10/7/25 Previous note not rectified 1). No gauge or pressure on water piping. FBCR P2503.7 Also: Both bath vents need to be re-sealed at roof penetration FBCR 402.4.1.1 10/6/2025 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 10/1/2025 12:29:53 PM *** 10/6/25: Cancelled by Applicant in person at @ 1340. Stated not ready. 10/1/25: Check at Insulation Inspection. 1). No gauge or pressure on water piping. FBCR P2503.7 2). Left side bathtub : slab needs to be repaired fully with cement product to meet minimum thickness and provide termite prevention. FBC R506.1 (dirt in hole will need to be removed before patching) / FBCR 318 3). SGD was in the process of being installed. Could not inspect at the time of this inspection. FBC[A]-110.1
INSULATION 10/06/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 10/6/2025 1:41:18 PM *** Inspector Notes from Inspection 2420 *** NOTES ADDED BY RSIMS 10/1/2025 12:29:53 PM *** 10/6/25: Cancelled by Applicant in person at @ 1340. Stated not ready. 10/1/25: Check at Insulation Inspection. 1). No gauge or pressure on water piping. FBCR P2503.7 2). Left side bathtub : slab needs to be repaired fully with cement product to meet minimum thickness and provide termite prevention. FBC R506.1 (dirt in hole will need to be removed before patching) / FBCR 318 3). SGD was in the process of being installed. Could not inspect at the time of this inspection. FBC[A]-110.1
PEP TANK INSTALLATION REQUEST 10/06/2025 CANCELLED BY APPLICANT WEB
ALL ROUGH 10/01/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 10/1/2025 12:29:53 PM *** 10/1/25: Check at Insulation Inspection. 1). No gauge or pressure on water piping. FBCR P2503.7 2). Left side bathtub : slab needs to be repaired fully with cement product to meet minimum thickness and provide termite prevention. FBC R506.1 (dirt in hole will need to be removed before patching) / FBCR 318 3). SGD was in the process of being installed. Could not inspect at the time of this inspection. FBC[A]-110.1
WALL SHEATHING 09/30/2025 APPROVED RSIMS
Note: 9/29/2025 - PREVIOUS INSPECTION NOTES 9/29/25: Cancelled by Applicant via text at @ 0807. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25: Cancelled by Applicant via text at @ 0805.
WALL SHEATHING 09/29/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 9/29/2025 8:09:39 AM *** 9/29/25: Cancelled by Applicant via text at @ 0807. 9/26/2025 - PREVIOUS INSPECTION NOTES 9/26/25: Cancelled by Applicant via text at @ 0805.
WALL SHEATHING 09/26/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 9/26/2025 9:03:59 AM *** 9/26/25: Cancelled by Applicant via text at @ 0805.
ELECTRIC-TUG 09/18/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/18/2025 12:46:41 PM *** 9/18/25: FPL emailed > approved for TUG. 9/16/2025 - PREVIOUS INSPECTION NOTES 9/16/25: 1). No ufer ground, ground to steel or ground rods installed. NEC 250.24(A)(1) & 250.52(A)(3) 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25: NOT READY. SCHEDULED TOO EARLY WORK NOT COMPLETE YET.
ELECTRIC-TUG 09/16/2025 Disapproved -FEE REQUIRED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/16/2025 12:19:43 PM *** 9/16/25: 1). No ufer ground, ground to steel or ground rods installed. NEC 250.24(A)(1) & 250.52(A)(3) 9/2/2025 - PREVIOUS INSPECTION NOTES 9/2/25: NOT READY. SCHEDULED TOO EARLY WORK NOT COMPLETE YET.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/11/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/11/2025 1:23:48 PM *** 9/10/2025 - PREVIOUS INSPECTION NOTES 9/10/25: Cancelled by Applicant via phone call at @ 0923. 9/9/2025 - PREVIOUS INSPECTION NOTES 9/9/25: Could not complete full inspection due to damaged plans found laying on floor in the house. Roof sheathing, truss engineering and down cell checked and approved. 1). Please provide a new set of plans as required. FBC-[A] 107.3.1
ROOF VALLEY & METAL 09/10/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/10/2025 9:32:36 AM *** 9/10/25: Roof sheathing approved during first inspection 2460 performed on 9/9/25. Remaining part of inspection 2460 still needs to be performed.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/10/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 9/10/2025 9:33:25 AM *** 9/10/25: Cancelled by Applicant via phone call at @ 0923. 9/9/2025 - PREVIOUS INSPECTION NOTES 9/9/25: Could not complete full inspection due to damaged plans found laying on floor in the house. Roof sheathing, truss engineering and down cell checked and approved. 1). Please provide a new set of plans as required. FBC-[A] 107.3.1
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/09/2025 PARTIALLY APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 9/9/2025 1:43:07 PM *** 9/9/25: Could not complete full inspection due to damaged plans found laying on floor in the house. Roof sheathing, truss engineering and down cell checked and approved. 1). Please provide a new set of plans as required. FBC-[A] 107.3.1
ELECTRIC-TUG 09/02/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 9/2/2025 11:50:41 AM *** 9/2/25: NOT READY. SCHEDULED TOO EARLY WORK NOT COMPLETE YET.
ROW - DRAINAGE 08/29/2025 Disapproved - NO FEE TPOLACEK
Note: *** NOTES ADDED BY TPOLACEK 8/29/2025 9:02:37 AM *** IN ADDITION TO CONSTRUCTION ENTRANCE BUILDER MUST REESTABLISH TEMPORARY PIPE, REMOVE PORTA JON FROM ROW AND REMOVE SEDIMENT FROM ROADWAY. TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
TIE BEAM / LINTEL 08/21/2025 APPROVED RSIMS
Note: *** NOTES ADDED BY RSIMS 8/21/2025 11:11:29 AM *** 8/20/2025 - PREVIOUS INSPECTION NOTES 8/20/25: 1). Dowel/down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted Orange. Back right corner & front left corner. NOTE: Please have the portble toilet moved from the swale area onto the site property to allow free flow of water through the swale. FBC 3303.5 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 8/12/2025 9:22:37 AM *** 8/12/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: Cancelled by Applicant via text at @ 13:09. 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). No termite bond or intent to treat in permite box. FBCR 318 2). Garage footers are not completed to plan documents. Highlighted on plans. FBC [A]107.4 3). Foreign debris under plastic in main slab needs to be removed. Marked with orange spray paint. FBC R318.6.2 ** Please move portable toilet out of swale to allow free flow of water through the swale. FBC 3303.5
TIE BEAM / LINTEL 08/20/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/20/2025 1:13:08 PM *** 8/20/25: 1). Dowel/down rods do not meet the minimum clearance (2" from face of block and/or 3/4: from inside of block) as required. (FBC-R606.3.4) Spray painted Orange. Back right corner & front left corner. NOTE: Please have the portble toilet moved from the swale area onto the site property to allow free flow of water through the swale. FBC 3303.5 Inspector Notes from Inspection 2250 *** NOTES ADDED BY RSIMS 8/12/2025 9:22:37 AM *** 8/12/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: Cancelled by Applicant via text at @ 13:09. 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). No termite bond or intent to treat in permite box. FBCR 318 2). Garage footers are not completed to plan documents. Highlighted on plans. FBC [A]107.4 3). Foreign debris under plastic in main slab needs to be removed. Marked with orange spray paint. FBC R318.6.2 ** Please move portable toilet out of swale to allow free flow of water through the swale. FBC 3303.5
MONOLITHIC SLAB 08/12/2025 APPROVED - AS NOTED RSIMS
Note: *** NOTES ADDED BY RSIMS 8/12/2025 9:22:37 AM *** 8/12/25: At the time of Inspection all of the requirements for the Monolithic Slab as detailed on the plans and in accordance with FL Building Code have been met. It is the sole responsibility of the Contractor to assure that everything remains the same. 8/8/2025 - PREVIOUS INSPECTION NOTES 8/8/25: Cancelled by Applicant via text at @ 13:09. 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). No termite bond or intent to treat in permite box. FBCR 318 2). Garage footers are not completed to plan documents. Highlighted on plans. FBC [A]107.4 3). Foreign debris under plastic in main slab needs to be removed. Marked with orange spray paint. FBC R318.6.2 ** Please move portable toilet out of swale to allow free flow of water through the swale. FBC 3303.5
MONOLITHIC SLAB 08/08/2025 CANCELLED BY APPLICANT RSIMS
Note: *** NOTES ADDED BY RSIMS 8/8/2025 1:40:55 PM *** 8/8/25: Cancelled by Applicant via text at @ 13:09. 8/7/2025 - PREVIOUS INSPECTION NOTES 8/7/25: 1). No termite bond or intent to treat in permite box. FBCR 318 2). Garage footers are not completed to plan documents. Highlighted on plans. FBC [A]107.4 3). Foreign debris under plastic in main slab needs to be removed. Marked with orange spray paint. FBC R318.6.2 ** Please move portable toilet out of swale to allow free flow of water through the swale. FBC 3303.5
MONOLITHIC SLAB 08/07/2025 Disapproved - NO FEE RSIMS
Note: *** NOTES ADDED BY RSIMS 8/7/2025 1:29:07 PM *** 8/7/25: 1). No termite bond or intent to treat in permite box. FBCR 318 2). Garage footers are not completed to plan documents. Highlighted on plans. FBC [A]107.4 3). Foreign debris under plastic in main slab needs to be removed. Marked with orange spray paint. FBC R318.6.2 ** Please move portable toilet out of swale to allow free flow of water through the swale. FBC 3303.5
FORMBOARD SURVEY (OFFICE USE ONLY) 08/05/2025 APPROVED RRICKS
ROW - DRAINAGE 08/05/2025 APPROVED - AS NOTED TPOLACEK
Note: 09-18-25 TPOLACEK*** BUILDER MUST REMOVE PORTA POTTY FROM ROW. APPROVING AS NOTED 8/29/2025 - PREVIOUS INSPECTION NOTES TPOLACEK*** ALL CONSTRUCTION SITES AS OF 07/01/25 SHALL FOLLOW RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM ATTACHED TO PERMIT. BUILDER HAS 7 DAYS TO MAKE CORRECTIONS. COPY AND PASTE LINK BELOW FOR FULL DIAGRAM OF RESIDENTIAL CONSTRUCTION ENTRANCE DIAGRAM. . https://copc-strapi-production.s3.amazonaws.com/Construction_Entrance_Subdivision_1_a50b435283.pdf . Contractor shall ensure that all litter and deleterious materials are cleaned up on a daily basis. No litter, debris, construction materials, or other deleterious material shall be left within the R.O.W. Damage to swales resulting from construction activity shall be repaired at the end of each work day.
PLUMBING 1ST ROUGH UNDERGROUND 08/01/2025 APPROVED MGIBSON
Note: 7/31/2025 - PREVIOUS INSPECTION NOTES 7/30/2025 - PREVIOUS INSPECTION NOTES NOT COMPLETED, WATER DISTRIBUTION LINES NOT RAN, NO HEAD TEST HEAD TEST NOT HOLDING 5' WATER, FBCR-P-2503.5, FBC 3303.5 SWALE BLOCKED BY PORTABLE, NOTE LEFT ON PORTABLE BY CITY ALREADY
PLUMBING 1ST ROUGH UNDERGROUND 07/31/2025 Disapproved -FEE REQUIRED MGIBSON
Note: 7/30/2025 - PREVIOUS INSPECTION NOTES NOT COMPLETED, WATER DISTRIBUTION LINES NOT RAN, NO HEAD TEST HEAD TEST NOT HOLDING 5' WATER, FBCR-P-2503.5, FBC 3303.5 SWALE BLOCKED BY PORTABLE, NOTE LEFT ON PORTABLE BY CITY ALREADY
PLUMBING 1ST ROUGH UNDERGROUND 07/30/2025 Disapproved -FEE REQUIRED MGIBSON
Note: NOT COMPLETED, WATER DISTRIBUTION LINES NOT RAN, NO HEAD TEST
GEOTECHNICAL REPORT APPROVAL (OFFICE USE) 07/29/2025 APPROVED PKNAPIK
WATER METER INSTALLATION REQUEST 06/25/2025 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 02/20/2025 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
BLD COMPLETE 12/22/2025 12/29/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 09/17/2025 09/22/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 08/05/2025 08/05/2025
Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM Engineer Letter Submitted and approved.
ZON COMPLETE 08/05/2025 08/05/2025
Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM
BLD COMPLETE 07/29/2025 07/29/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
SW1 COMPLETE 04/24/2025 05/01/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/24/2025 04/25/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 04/24/2025 04/24/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/26/2025 02/28/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Take care when forming and pouring your foundation. The max FFE to stay within 10" of the lowest adjacent neighbor is 29.14.
SW1 HOLD 02/26/2025 03/05/2025
Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Per Patrick Buckley - Due to this proposed property FFE being over the 10" rule with no other options we are requirng the following to move forward: Lot Grading & Drainage Confirmation Letter 1. A Florida Professional Engineer (not Surveyor) to review the Site Plan / Survey. 2. If P.E. determines Site Plan is within his / her ability to provide a Final Lot Grading & Drainage Certificate for this lot that includes a Certification Statement in accordance with Florida Administrative Code 61G15-18.011certify at completion of the final grading and installation of landscaping, then the P.E. writes a letter to the Palm Coast Building Department to Patrick Buckley's attention confirming he will be able to provide said Final Lot Grading & Drainage Certificate and Certification statement. If the P.E. is unable to provide this confirmation letter, than the P.E. shall provide a revised Site Plan / Survey that includes design of lot drainage and grading adjustments, improvements, conveyances necessary for the P.E. to provide a Final Lot Grading & Drainage Certificate and Certification Statement as noted above. The revised Site Plan / Survey shall include a confirmation letter as described above. Please note the reference below to the required Certification Statement: Florida Administrative Code 61G15-18.011 Definitions. (4) "Certification" shall mean a statement signed and sealed by a professional engineer representing that the engineering services addressed therein, as defined in Section 471.005(7), F.S., have been performed by the professional engineer, and based upon the professional engineer’s knowledge, information and belief and in accordance with commonly accepted procedures consistent with applicable standards of practice, and is not a guaranty or warranty, either expressed or implied. Please be advised, an inspection hold has been added to this permit until such time as the Lot Grading & Drainage Confirmation Letter has been submitted and reviewed and approved by the Palm Coast Building Department. Please call or email should you have any questions.
BADMIN COMPLETE 02/12/2025 02/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
BLD COMPLETE 02/12/2025 02/19/2025
Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM
CUSVC COMPLETE 02/12/2025 02/12/2025
Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM
ELEC COMPLETE 02/12/2025 02/19/2025
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 02/12/2025 02/12/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
GAS CANCEL 02/12/2025 02/14/2025
LOCATE COMPLETE 02/12/2025 02/18/2025
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 02/12/2025 02/18/2025
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 02/12/2025 02/19/2025
Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM
ZON COMPLETE 02/12/2025 02/12/2025
Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM
SWALE COMPLETE 02/12/2025 03/03/2025
Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM
PLENV COMPLETE 02/12/2025 02/20/2025
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 02/20/25 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. If any gopher tortoises are located in the future further coordination may be necessary.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/05/2025
REINSPECTION RESIDENTIAL ¤40.00 12/05/2025
REINSPECTION RESIDENTIAL ¤40.00 12/05/2025
REINSPECTION RESIDENTIAL ¤40.00 12/05/2025
REINSPECTION RESIDENTIAL ¤40.00 12/05/2025
SW ENG - INSPECTION 20 ¤20.00 12/05/2025
SW ENG - INSPECTION 20 ¤20.00 12/05/2025
SW ENG INSPECTION 80 ¤80.00 05/28/2025
SW ENG PRE APRON ¤30.00 05/28/2025
SW ENG - REVIEW 20 ¤20.00 05/28/2025
SW ENG RES REVIEW 200 ¤200.00 05/28/2025
SEWER CREDIT (¤1,147.00) 05/28/2025
SEWER INSPECTION ¤25.00 05/28/2025
SEWER CAPITAL FACILITY ¤6,120.52 05/28/2025
WATER CAPITAL FACILITY FEE ¤4,351.14 05/28/2025
SITE PLAN 30 ¤30.00 05/28/2025
WATER- TURN ON ¤25.00 05/28/2025
ADJUSTMENT 10% (¤123.02) 05/28/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 05/28/2025
INSPECTION - RESIDENTIAL ¤935.00 05/28/2025
PLAN REVIEW - RESIDENTIAL ¤265.20 05/28/2025
CONNECTION FEES ¤1,187.26 05/28/2025
FC IMPACT FEE EMS ¤62.00 05/28/2025
IMPACT FEE FIRE ¤434.51 05/28/2025
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 05/28/2025
FC IMPACT FEE LIBRARY ¤268.00 05/28/2025
IMPACT FEE PARKS ¤1,828.01 05/28/2025
IMPACT FEE SCHOOL ¤5,450.00 05/28/2025
IMPACT FEE TRANSPORTATION ¤1,916.00 05/28/2025
WATER -IRRIGATION INSPECTION ¤25.00 05/28/2025
SURCHARGE FS 533.721 ¤11.07 05/28/2025
SURCHARGE - FS 468.631 ¤16.61 05/28/2025
SW ENG - FOUNDATION SURVEY ¤20.00 05/28/2025
Fees Total Due: ¤0.00 Total Paid: ¤22,518.30