Permit #2025020556
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00420-0010 |
| CONDITIONED SPACE: 1801 sqft |
| GARAGE: 406 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| Total Square Footage: 2281 sqft |
| Block: 00420 |
| Subdivision: - |
| Job Phone: 407-476-8195 |
| Location Address: 18 UNIBERRY PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/27/2025 |
| NOC: RECORDED |
| Applicant name: CARLETTE RENE WITTE |
| Owner: INB BFS LLC |
|
Address 3670 MAGUIRE BOULEVARD ORLANDO, FL 32803 |
|
Address SUITE 220 ORLANDO, FL 32803 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
INNOVATIVE NATIONWIDE BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD #220 , |
CRC1330026 (Exp: 08/31/2026) | 855-694-6634 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/20/2026 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 01/20/2026 | FINAL APPROVED | BHAINES |
| Note: Inspector Notes from Inspection 9035 No CC, No IRR. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/16/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/16/2026 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/16/2026 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 01/16/2026 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 01/07/2026 | APPROVED - AS NOTED | BHAINES |
| Note: No CC, No IRR. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/12/2025 | APPROVED | FSLADISH |
| Note: 12/12/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. PIPE INVERT IS GOOD AT THIS INSPECTION. BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. AT THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 12/9/2025 - PREVIOUS INSPECTION NOTES 12/9/25 POUR AREA TOO SOFT, PIPE UNSTABLE AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO HAVE A 4:1 SLOPE BEHIND THE CULVERT PIPE IT IS CURRENTLY A CLIFF. SEE PHOTO FOR REFERENCE. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/09/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 12/9/25 POUR AREA TOO SOFT, PIPE UNSTABLE AT THE TIME OF THIS INSPECTION. YOU WILL NEED TO HAVE A 4:1 SLOPE BEHIND THE CULVERT PIPE IT IS CURRENTLY A CLIFF. SEE PHOTO FOR REFERENCE. | |||
| SEWER TIE IN | 11/20/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION WITH LATERAL MADE WITH THE HELP OF UTILITY SEWER TIE IN NOT MADE YET, WILL BE DONE AT A LATTER DATE | |||
| ELECTRIC - EARLY POWER | 11/14/2025 | APPROVED | CVANSTRAHLEN |
| Note: | |||
| ELECTRIC - EARLY POWER | 11/12/2025 | Disapproved - NO FEE | RSIMS |
| Note: *** NOTES ADDED BY RSIMS 11/12/2025 3:21:23 PM *** 11/12/25: 1). Attic light above garage is not safed off as required. NEC-110.27 11/7/2025 - PREVIOUS INSPECTION NOTES 11-7-25 1. Not ready. Inspector Notes from Inspection 2200 1. Clear swale of porta jon and bedris to allow water to flow freely 2. Keep silt fence in orginal condition through out build ***Make both reapirs before next inspection, Emailed FPL @ 1:30pm for power release*** | |||
| ELECTRIC - EARLY POWER | 11/07/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 11-7-25 1. Not ready. Inspector Notes from Inspection 2200 1. Clear swale of porta jon and bedris to allow water to flow freely 2. Keep silt fence in orginal condition through out build ***Make both reapirs before next inspection, Emailed FPL @ 1:30pm for power release*** | |||
| GRAVITY SEWER TEST | 11/03/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: SEWER TIE IN NOT MADE YET, WILL BE DONE AT A LATTER DATE | |||
| SEWER TIE IN | 11/03/2025 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 10/16/2025 | APPROVED | CVANSTRAHLEN |
| Note: 10/15/2025 - PREVIOUS INSPECTION NOTES 10/10/2025 - PREVIOUS INSPECTION NOTES 10-10-25 1. Bolts still have not been installed into ledger board. 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Bolts are still not in ledger board. 2. Some bats have fallen out in garage area. 3. Only half the house has insulation all the way up the wall. 4. Front door area is not insulated. Inspector Notes from Inspection 2420 10-6-25 1. Missing bolts in ledger board in garage. Inspector Notes from Inspection 2467 9/24/25 Following items need to be address by next inspection to avoid failure and fees 1. Dumpster is on site but site needs to be cleaned up from garbage and debris 2. Swale needs to be cleared out and Porta-Jon moved out of swale Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| INSULATION | 10/15/2025 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 10/14/2025 - PREVIOUS INSPECTION NOTES 10/14/25 Previous note still not rectified 1. Bolts still have not been installed into ledger board. Also: 1. Large hole/chip in block on right side of house not properly prepped for stucco 2. Electrical conduit going into house from meter/main not properly secured to building 10/10/2025 - PREVIOUS INSPECTION NOTES 10-10-25 1. Bolts still have not been installed into ledger board. 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Bolts are still not in ledger board. 2. Some bats have fallen out in garage area. 3. Only half the house has insulation all the way up the wall. 4. Front door area is not insulated. Inspector Notes from Inspection 2420 10-6-25 1. Missing bolts in ledger board in garage. Inspector Notes from Inspection 2467 9/24/25 Following items need to be address by next inspection to avoid failure and fees 1. Dumpster is on site but site needs to be cleaned up from garbage and debris 2. Swale needs to be cleared out and Porta-Jon moved out of swale Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| LATH/BRICK/ WATER BARRIER | 10/15/2025 | APPROVED | BTAYLOR |
| Note: 10/14/2025 - PREVIOUS INSPECTION NOTES 10/14/25 1. Large hole/chip in block on right side of house not properly prepped for stucco 2. Electrical conduit going into house from meter/main not properly secured to building | |||
| LATH/BRICK/ WATER BARRIER | 10/14/2025 | Disapproved - NO FEE | MCONTRYMAN |
| Note: 10/14/25 1. Large hole/chip in block on right side of house not properly prepped for stucco 2. Electrical conduit going into house from meter/main not properly secured to building | |||
| INSULATION | 10/14/2025 | Disapproved -FEE REQUIRED | MCONTRYMAN |
| Note: 10/14/25 Previous note still not rectified 1. Bolts still have not been installed into ledger board. Also: 1. Large hole/chip in block on right side of house not properly prepped for stucco 2. Electrical conduit going into house from meter/main not properly secured to building 10/10/2025 - PREVIOUS INSPECTION NOTES 10-10-25 1. Bolts still have not been installed into ledger board. 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Bolts are still not in ledger board. 2. Some bats have fallen out in garage area. 3. Only half the house has insulation all the way up the wall. 4. Front door area is not insulated. Inspector Notes from Inspection 2420 10-6-25 1. Missing bolts in ledger board in garage. Inspector Notes from Inspection 2467 9/24/25 Following items need to be address by next inspection to avoid failure and fees 1. Dumpster is on site but site needs to be cleaned up from garbage and debris 2. Swale needs to be cleared out and Porta-Jon moved out of swale Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| INSULATION | 10/10/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 10-10-25 1. Bolts still have not been installed into ledger board. 10/8/2025 - PREVIOUS INSPECTION NOTES 10-8-25 1. Bolts are still not in ledger board. 2. Some bats have fallen out in garage area. 3. Only half the house has insulation all the way up the wall. 4. Front door area is not insulated. Inspector Notes from Inspection 2420 10-6-25 1. Missing bolts in ledger board in garage. Inspector Notes from Inspection 2467 9/24/25 Following items need to be address by next inspection to avoid failure and fees 1. Dumpster is on site but site needs to be cleaned up from garbage and debris 2. Swale needs to be cleared out and Porta-Jon moved out of swale Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| INSULATION | 10/08/2025 | Disapproved - NO FEE | BTAYLOR |
| Note: 10-8-25 1. Bolts are still not in ledger board. 2. Some bats have fallen out in garage area. 3. Only half the house has insulation all the way up the wall. 4. Front door area is not insulated. Inspector Notes from Inspection 2420 10-6-25 1. Missing bolts in ledger board in garage. Inspector Notes from Inspection 2467 9/24/25 Following items need to be address by next inspection to avoid failure and fees 1. Dumpster is on site but site needs to be cleaned up from garbage and debris 2. Swale needs to be cleared out and Porta-Jon moved out of swale Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| ALL ROUGH | 10/06/2025 | APPROVED - AS NOTED | BTAYLOR |
| Note: 10-6-25 1. Missing bolts in ledger board in garage. Inspector Notes from Inspection 2467 9/24/25 Following items need to be address by next inspection to avoid failure and fees 1. Dumpster is on site but site needs to be cleaned up from garbage and debris 2. Swale needs to be cleared out and Porta-Jon moved out of swale Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| ROOF VALLEY & METAL | 09/24/2025 | APPROVED - AS NOTED | MCONTRYMAN |
| Note: 9/24/25 Following items need to be address by next inspection to avoid failure and fees 1. Dumpster is on site but site needs to be cleaned up from garbage and debris 2. Swale needs to be cleared out and Porta-Jon moved out of swale Inspector Notes from Inspection 2460 *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| ELECTRIC-TUG | 09/22/2025 | APPROVED - AS NOTED | MKRASKI |
| Note: 1. Clear swale of porta jon and bedris to allow water to flow freely 2. Keep silt fence in orginal condition through out build ***Make both reapirs before next inspection, Emailed FPL @ 1:30pm for power release*** | |||
| WALL SHEATHING | 09/18/2025 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/18/2025 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 9/18/2025 2:32:00 PM *** Miss type will check items at All rough. 1. Missing Lags in double ledger in garage. Per S4 detail LD16 2. Missing 2x4 L Brace at gables per D2 detail GE01 3. Missing HGA10's at diagonal brace to block plate at gables. per D2 GE01 Will check at Insulation. | |||
| TIE BEAM / LINTEL | 09/04/2025 | APPROVED | CVANSTRAHLEN |
| FORMBOARD SURVEY (OFFICE USE ONLY) | 09/03/2025 | APPROVED | RRICKS |
| MONOLITHIC SLAB | 08/27/2025 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/22/2025 | APPROVED | MGIBSON |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 08/19/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 08/12/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | HOLD | 09/02/2025 | 09/02/2025 |
| Note: Held By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM There is no benchmark on the formboard survey, | |||
| ZON | COMPLETE | 09/02/2025 | 09/02/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/02/2025 | 09/03/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/02/2025 | 09/02/2025 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/19/2025 | 08/19/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 02/28/2025 | 03/03/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/12/2025 | 02/19/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/12/2025 | 02/19/2025 |
| Note: Held By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM Truss layout and package are for the wrong address. | |||
| CUSVC | COMPLETE | 02/12/2025 | 02/12/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 02/12/2025 | 02/19/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/12/2025 | 02/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 02/12/2025 | 02/14/2025 |
| LOCATE | COMPLETE | 02/12/2025 | 02/18/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/12/2025 | 02/18/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/12/2025 | 02/19/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/12/2025 | 02/13/2025 |
| Note: Released By: NICOLE DIMATTINA - - NDIMATTINA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 02/12/2025 | 02/24/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2026 |
| RSI REINSPECTION 1 | ¤35.00 | 01/16/2026 |
| SURCHARGE FS 533.721 | ¤10.85 | 06/27/2025 |
| SURCHARGE - FS 468.631 | ¤16.28 | 06/27/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/27/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/27/2025 |
| SW ENG PRE APRON | ¤30.00 | 06/27/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/27/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/27/2025 |
| SEWER INSPECTION | ¤25.00 | 06/27/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 06/27/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 06/27/2025 |
| SITE PLAN 30 | ¤30.00 | 06/27/2025 |
| CONNECTION FEES | ¤1,187.26 | 06/27/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 06/27/2025 |
| IMPACT FEE FIRE | ¤434.51 | 06/27/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/27/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/27/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 06/27/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/27/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 06/27/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/27/2025 |
| WATER- TURN ON | ¤25.00 | 06/27/2025 |
| ADJUSTMENT 10% | (¤120.55) | 06/27/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/27/2025 |
| INSPECTION - RESIDENTIAL | ¤915.75 | 06/27/2025 |
| PLAN REVIEW - RESIDENTIAL | ¤259.74 | 06/27/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤23,477.51 |