I want to search for...
Permit #2025020565
Permit Details
Status: COED
| Parcel Id: 07-11-31-7039-00050-0090 |
| CONDITIONED SPACE: 2302 sqft |
| GARAGE: 724 sqft |
| OPENED PORCH (WITH ROOF) : 405 sqft |
| Total Square Footage: 3431 sqft |
| Block: 00050 |
| Subdivision: 7039 - |
| Job Phone: 386-237-8427 |
| Location Address: 13 PENINSULA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/28/2025 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: PARSON JAMES A |
|
Address 13 PENINSULA LN PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤396,943.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/20/2025 | APPROVED | TPOLACEK |
| Note: 11-20-25 TPOLACEK *** CULVERT IS CLEAN AT THE TIME OF INSPECTION. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/18/2025 - PREVIOUS INSPECTION NOTES 11-18-25 TPOLACEK*** AS STATED IN PREVIOUS INSPECTION AND IN PHOTO ATTACHED TO PERMIT THE CULVERT PIPE IS 1/2 FULL OF SEDIMENT AND MUST BE CLEANED FROM END TO END NOT JUST THE MITERED ENDS. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/14/2025 - PREVIOUS INSPECTION NOTES 11-14-25 TPOLACEK*** CULVERT IS 1/2 FULL OF SEDIMENT AND MUST BE CLEAN FROM END TO END. | |||
| ROW - STORMWATER FINAL | 11/18/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-18-25 TPOLACEK*** AS STATED IN PREVIOUS INSPECTION AND IN PHOTO ATTACHED TO PERMIT THE CULVERT PIPE IS 1/2 FULL OF SEDIMENT AND MUST BE CLEANED FROM END TO END NOT JUST THE MITERED ENDS. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/14/2025 - PREVIOUS INSPECTION NOTES 11-14-25 TPOLACEK*** CULVERT IS 1/2 FULL OF SEDIMENT AND MUST BE CLEAN FROM END TO END. | |||
| BLD - BUILDING FINAL | 11/18/2025 | Approval - Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 11/14/2025 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL APRON (AFTER POUR) | 11/14/2025 | APPROVED - AS NOTED | TPOLACEK |
| Note: 11-14-25 TPOLACEK*** CULVERT IS 1/2 FULL OF SEDIMENT AND MUST BE CLEAN FROM END TO END. APPROVING AS NOTED . PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT , HOT PATCH COMPLETE, AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 11/14/2025 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 11-14-25 TPOLACEK*** CULVERT IS 1/2 FULL OF SEDIMENT AND MUST BE CLEAN FROM END TO END. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/13/2025 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/13/2025 | APPROVED | TPOLACEK |
| Note: UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U-CROSS CONNECTION | 11/13/2025 | APPROVED | BWRIGHT |
| TUB SET | 09/19/2025 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 2095 THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 08/27/2025 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 08/22/2025 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| SEWER TIE IN | 08/12/2025 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 07/17/2025 | Approval - Private Provider | PPROVIDER |
| INSULATION | 07/07/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/02/2025 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 07/01/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 05/23/2025 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/21/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 05/06/2025 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 04/30/2025 | APPROVED | RRICKS |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/15/2025 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 04/15/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 04/15/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 04/08/2025 | APPROVED | PKNAPIK |
| WATER METER INSTALLATION REQUEST | 03/26/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 04/30/2025 | 04/30/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM No new siteplan to review. | |||
| ZON | COMPLETE | 04/30/2025 | 04/30/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/30/2025 | 04/30/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/08/2025 | 04/08/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/26/2025 | 02/27/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/25/2025 | 02/25/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Foundation plantings must wrap both corners. Right side missing plantings. Both sides should have four along each side. Legend doesn't show gallon size of plantings around AC. Must be 7 gallon Landscape plan must have sod type and if irrigation will be installed | |||
| SW1 | COMPLETE | 02/25/2025 | 02/26/2025 |
| Note: Released By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/25/2025 | 02/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/12/2025 | 02/19/2025 |
| Note: Released By: PETER KNAPIK - (386)986-3783 - PKNAPIK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/12/2025 | 02/12/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/12/2025 | 02/12/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 02/12/2025 | 02/19/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 02/12/2025 | 02/19/2025 |
| Note: Held By: RODNEY RICKS - - RRICKS@PALMCOASTGOV.COM Front right property line must be even with or higher than edge of pavement. | |||
| ZON | HOLD | 02/12/2025 | 02/13/2025 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan will not open. Please submit a new one for review Site plan/survey has incorrect lot square footage | |||
| SWALE | COMPLETE | 02/12/2025 | 02/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 11/19/2025 |
| RSI REINSPECTION 1 | ¤35.00 | 11/17/2025 |
| SURCHARGE FS 533.721 | ¤2.52 | 02/28/2025 |
| SURCHARGE - FS 468.631 | ¤3.78 | 02/28/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/28/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/28/2025 |
| SW ENG PRE APRON | ¤30.00 | 02/28/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/28/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/28/2025 |
| SEWER CREDIT | (¤2,817.70) | 02/28/2025 |
| SEWER INSPECTION | ¤25.00 | 02/28/2025 |
| SEWER CAPITAL FACILITY | ¤5,441.03 | 02/28/2025 |
| WATER CAPITAL FACILITY FEE | ¤3,994.51 | 02/28/2025 |
| SITE PLAN 30 | ¤30.00 | 02/28/2025 |
| WATER- TURN ON | ¤25.00 | 02/28/2025 |
| ADJUSTMENT 10% | (¤3.00) | 02/28/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/28/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 02/28/2025 |
| CONNECTION FEES | ¤1,187.26 | 02/28/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 02/28/2025 |
| IMPACT FEE FIRE | ¤434.51 | 02/28/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/28/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/28/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 02/28/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/28/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 02/28/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/28/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,764.92 |