I want to search for...
Permit #2025020706
Permit Details
Status: COED
| Parcel Id: 07-11-31-7065-00360-0040 |
| CONDITIONED SPACE: 1800 sqft |
| GARAGE: 410 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| Total Square Footage: 2246 sqft |
| Block: 00360 |
| Subdivision: - |
| Job Phone: 689-250-2429 |
| Location Address: 34 KATHLEEN TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/26/2025 |
| NOC: RECORDED |
| Applicant name: RYAN M COURECH |
| Owner: A AND R-MERIDIAN REAL ESTATE DEVELOPMENT LLC |
|
Address 34 KATHLEEN TRAIL PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤208,000.00 |
| Job Description: SINGLE FAMILY DWELLING |
| Type: CN |
| Original Permit #: 2024010999 |
Contractor
MCH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
668 N ORLANDO AVE, STE 207 MAITLAND, FL 32751 |
CBC1262898 (Exp: 08/31/2026) | 407-602-8257 |
Sub Contractors
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
DUSTIN ARCHER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2785 WRIGHTS ROAD SUITE 1133 OVIEDO, FL 32765 |
CMC1251099 (Exp: 08/31/2026) | 407-391-1145 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 11/18/2025 | APPROVED | FSLADISH |
| Note: 11/18/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/18/2025 | APPROVED | FSLADISH |
| Note: 11/18/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS INSPECTION. AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ________________________________________________________________________________________________________________________ 10/23/2025 - PREVIOUS INSPECTION NOTES 1) NEED TO CREAT A 4:1 SLOPE ON THE LEFT SIDE FROM TOP OF BERM TO FENCE LINE BUT NOT PUT DIRT ON FENCE. 2) THE SLOPE IN THE BACK NEEDS TO BE A 2:1 SLOPE AND NOT A 4:1 SLOPE NEED TO CORRECT WHEN THE DEVELOPEMENT BEHIND THIS ONE LOT IT WILL NOT IMPACT THE LOTS. 3) AREA IN THE FRONT SWALE NEEDS TO BE SODED -------------------------------------------------------------------------------------------- 10/16/2025 - PREVIOUS INSPECTION NOTES 10/16/25 UPON WALKING PROPERTY DETERMINED YOU HAVE CORRECTIONS TO MAKE. YOU WILL NEED TO BUILD A BERM IN THE LEFT REAR CORNER AROUND TO FRONT OF FENCE. THERE ARE LOW/WASHED IN AREAS THAT REALLY MUSHSY AND ARE CAUSING DRAINAGE TO ADVERSELY AFFECT NEIGHBORING PROPERTY. THERE IS A LOW SPOT ON THE RIGHT SIDE OFF OF THE REAR OF THE STRUCTURE. THESE AREAS ARE OUTLINED IN PAINT. LEFT SIDE SWALE IS EXTREMELY WIDE AND FLAT HOLDING WATER, THIS WILL NEED TO BE ADDRESSED ALSO. | |||
| ROW - STORMWATER FINAL | 11/18/2025 | APPROVED | FSLADISH |
| Note: 11/18/25 AT THE TIME OF THIS INSPECTION ALL MINIMUM COPC REQUIREMENTS ARE MET. BUILDER TO BE HELD RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/23/2025 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CREAT A 4:1 SLOPE ON THE LEFT SIDE FROM TOP OF BERM TO FENCE LINE BUT NOT PUT DIRT ON FENCE. 2) THE SLOPE IN THE BACK NEEDS TO BE A 2:1 SLOPE AND NOT A 4:1 SLOPE NEED TO CORRECT WHEN THE DEVELOPEMENT BEHIND THIS ONE LOT IT WILL NOT IMPACT THE LOTS. 3) AREA IN THE FRONT SWALE NEEDS TO BE SODED -------------------------------------------------------------------------------------------- 10/16/2025 - PREVIOUS INSPECTION NOTES 10/16/25 UPON WALKING PROPERTY DETERMINED YOU HAVE CORRECTIONS TO MAKE. YOU WILL NEED TO BUILD A BERM IN THE LEFT REAR CORNER AROUND TO FRONT OF FENCE. THERE ARE LOW/WASHED IN AREAS THAT REALLY MUSHSY AND ARE CAUSING DRAINAGE TO ADVERSELY AFFECT NEIGHBORING PROPERTY. THERE IS A LOW SPOT ON THE RIGHT SIDE OFF OF THE REAR OF THE STRUCTURE. THESE AREAS ARE OUTLINED IN PAINT. LEFT SIDE SWALE IS EXTREMELY WIDE AND FLAT HOLDING WATER, THIS WILL NEED TO BE ADDRESSED ALSO. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/16/2025 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/16/2025 | Disapproved - NO FEE | FSLADISH |
| Note: 10/16/25 UPON WALKING PROPERTY DETERMINED YOU HAVE CORRECTIONS TO MAKE. YOU WILL NEED TO BUILD A BERM IN THE LEFT REAR CORNER AROUND TO FRONT OF FENCE. THERE ARE LOW/WASHED IN AREAS THAT REALLY MUSHSY AND ARE CAUSING DRAINAGE TO ADVERSELY AFFECT NEIGHBORING PROPERTY. THERE IS A LOW SPOT ON THE RIGHT SIDE OFF OF THE REAR OF THE STRUCTURE. THESE AREAS ARE OUTLINED IN PAINT. LEFT SIDE SWALE IS EXTREMELY WIDE AND FLAT HOLDING WATER, THIS WILL NEED TO BE ADDRESSED ALSO. | |||
| BLD - BUILDING FINAL | 10/09/2025 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 09/05/2025 | APPROVED | FSLADISH |
| Note: 9/5/24 BUILDER REFER TO CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. . IF FIBERGLASS OPTION IS USED, BUILDER REQUIRED TO USE 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED DOCUMENTATION OF THE ( FRC) CONTAINING THE FIBERGLASS MUST BE ATTACHED TO THE PERMIT PRIOR TO REQUESTING AN AFTER-POUR INSPECTION. 8.b. IF MESH OPTION IS USED, IT SHALL BE IN PLACE AT THE TIME OF THE PRE-POUR AT THE TIME OF THE INSPECTION READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK SITE FOR ANY STANDING WATER. ALSO VERIFY PIPE ELEVATION HAS NOT CHANGED. NO EXPANSION JOINTS ALLOWED, 8/29/2025 - PREVIOUS INSPECTION NOTES 8/29/25 THIS SITE IS NOT READY FOR A PREPOUR INSPECTION AT THE TIME OF THIS INSPECTION. PLEASE SEE PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES 8/19/25 RECEIVED CALL FROM JASON CM TO PLEASE CANCEL PREPOUR INSPECTION FOR TODAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/29/2025 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 8/29/25 THIS SITE IS NOT READY FOR A PREPOUR INSPECTION AT THE TIME OF THIS INSPECTION. PLEASE SEE PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 8/19/2025 - PREVIOUS INSPECTION NOTES 8/19/25 RECEIVED CALL FROM JASON CM TO PLEASE CANCEL PREPOUR INSPECTION FOR TODAY. | |||
| ROW - DRAINAGE | 08/22/2025 | APPROVED | FSLADISH |
| Note: 8/22/25 REQUIRED CORRECTIONS COMPLETED AT THE TIME OF THIS DRAINAGE REINSPECTION. IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN CONSTRUCTUION SITE TO COPC STANDARDS THROUGHOUT THE CONSTRUCTION PROCESS. WILL MONITOR SITE FOR CONTINUED COMPLIANCE. ________________________________________________________________________________________________________________________ 8/15/2025 - PREVIOUS INSPECTION NOTES NEED TO DO THE FOLLOWING 1) NEED TO REMOVE THE PORTER JON OUT OF THE RIGHT OF WAY AND PLACE IT ON YOUR LOT. 2) NEED TO OPEN SWALE AND THE TEMP. CULVERT SO WATER WILL FLOW TO OUTFALL. 3) NEED TO CLEAN UP TRASH AND DEBRIS FROM LOT AND PLACE IT IN A DUMPSTER. YOU WILL HAVE 7DAY TO CORRECT ALL ISSUE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/19/2025 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 8/19/25 RECEIVED CALL FROM JASON CM TO PLEASE CANCEL PREPOUR INSPECTION FOR TODAY. | |||
| GRAVITY SEWER TEST | 08/15/2025 | Approval - Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 08/15/2025 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 08/15/2025 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO DO THE FOLLOWING 1) NEED TO REMOVE THE PORTER JON OUT OF THE RIGHT OF WAY AND PLACE IT ON YOUR LOT. 2) NEED TO OPEN SWALE AND THE TEMP. CULVERT SO WATER WILL FLOW TO OUTFALL. 3) NEED TO CLEAN UP TRASH AND DEBRIS FROM LOT AND PLACE IT IN A DUMPSTER. YOU WILL HAVE 7DAY TO CORRECT ALL ISSUE OR THERE WILL BE A INSPECTION HOLD ON THIS PERMIT. | |||
| U - SEWER TIE IN | 08/13/2025 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 08/13/2025 | APPROVED - AS NOTED | BWRIGHT |
| Note: No IRR, No CC | |||
| INSULATION | 07/29/2025 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 07/28/2025 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 07/24/2025 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 07/18/2025 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/16/2025 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 07/11/2025 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 07/10/2025 | APPROVED | RRICKS |
| LATH/BRICK/ WATER BARRIER | 07/03/2025 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 06/27/2025 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/11/2025 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 06/11/2025 | Approval - Private Provider | PPROVIDER |
| GEOTECHNICAL REPORT APPROVAL (OFFICE USE) | 06/09/2025 | APPROVED | JMUNSON |
| WATER METER INSTALLATION REQUEST | 03/25/2025 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 07/09/2025 | 07/10/2025 |
| Note: Released By: RODNEY RICKS - (386)986-4726 - RRICKS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/09/2025 | 07/09/2025 |
| Note: Released By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/09/2025 | 06/09/2025 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/24/2025 | 02/26/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/14/2025 | 02/19/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 02/14/2025 | 02/19/2025 |
| Note: Released By: REBECCA SANDERS - - RSANDERS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/14/2025 | 02/14/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM Be aware that the maximum FFE for this lot is 24.89. That leaves only .09 tolerance for pouring the foundation higher than proposed before you exceed the 10" maximum with the adjacent neighbor. | |||
| LOCATE | COMPLETE | 02/14/2025 | 02/19/2025 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/14/2025 | 02/18/2025 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/14/2025 | 02/18/2025 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/14/2025 | 02/20/2025 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R403.7 FBC Energy Conservation 2023 8Th Edition | |||
| BADMIN | INFORMATION | 02/14/2025 | 02/14/2025 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM NOC MUST BE RECORDED WITH FLAGLER COUNTY CLERK OF COURT | |||
| SWALE | COMPLETE | 02/14/2025 | 02/25/2025 |
| Note: Released By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/14/2025 | 02/20/2025 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RSI REINSPECTION 1 | ¤35.00 | 11/18/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/18/2025 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/18/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 11/18/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 02/26/2025 |
| SW ENG RES REVIEW 200 | ¤200.00 | 02/26/2025 |
| SEWER CREDIT | (¤2,465.75) | 02/26/2025 |
| SEWER INSPECTION | ¤25.00 | 02/26/2025 |
| SEWER CAPITAL FACILITY | ¤6,120.52 | 02/26/2025 |
| WATER CAPITAL FACILITY FEE | ¤4,351.14 | 02/26/2025 |
| SITE PLAN 30 | ¤30.00 | 02/26/2025 |
| SW ENG INSPECTION 80 | ¤80.00 | 02/26/2025 |
| SW ENG PRE APRON | ¤30.00 | 02/26/2025 |
| SURCHARGE FS 533.721 | ¤3.27 | 02/26/2025 |
| SURCHARGE - FS 468.631 | ¤4.90 | 02/26/2025 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 02/26/2025 |
| WATER- TURN ON | ¤25.00 | 02/26/2025 |
| ADJUSTMENT 10% | (¤11.32) | 02/26/2025 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 02/26/2025 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 02/26/2025 |
| PLAN REVIEW - APPROVED MASTER | ¤83.20 | 02/26/2025 |
| CONNECTION FEES | ¤1,187.26 | 02/26/2025 |
| FC IMPACT FEE EMS | ¤62.00 | 02/26/2025 |
| IMPACT FEE FIRE | ¤434.51 | 02/26/2025 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 02/26/2025 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 02/26/2025 |
| IMPACT FEE PARKS | ¤1,828.01 | 02/26/2025 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 02/26/2025 |
| IMPACT FEE TRANSPORTATION | ¤1,916.00 | 02/26/2025 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 02/26/2025 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,264.74 |