Permit #2025020798

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7016-00100-0860
Block: 00100
Subdivision: -
Job Phone: 386-872-8025
Location Address: 8 CHESAPEA CT
Type: SW - SEAWALL
Issue Date: 03/14/2025
NOC: RECORDED
Applicant name: STEPHEN SEAN LAWRENCE
Owner: AMARAL, MICHAEL JOHN & TIFFANY MARIE

Address

3 HARBOR ROAD NK

MATTAPOISETT, MA 02739

Lot: 0860
Contracted Stated Job Value: ¤45,000.00
Job Description: SEAWALL
Type: CN

Contractor

ACANTHUS CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

54 BURNELL DRIVE

PALM COAST, FL 32137

CGC1535903 (Exp: 08/31/2026) 386-318-1125

Inspection History

Type Request Date Result Inspector
SEAWALL FINAL 11/17/2025 FINAL APPROVED HCAMACHO
Note: Virtual Inspection for the items noted. 11/14/2025 - PREVIOUS INSPECTION NOTES 1. Turbidity needs to be removed. 2. Construction materials and garbage still on the job site. *Please clean up and then call for Final Inspection*
SEAWALL FINAL 11/14/2025 Disapproved - NO FEE HCAMACHO
Note: 1. Turbidity needs to be removed. 2. Construction materials and garbage still on the job site. *Please clean up and then call for Final Inspection*
ROW - STORMWATER FINAL 11/13/2025 APPROVED - AS NOTED EMADISON
Note: ** 11/13/25 5 5 FT ROW OF SOD INSTALLED ALONG SEAWALL ALONG WITH SILT FENCE __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9215 ** 06/23/25 TURBIDITY BARRIER TO REMAIN IN PLACE THROUGHOUT THE SEAWALL PROJECT ** ENSURE TURBIDITY BARRIER DOES NOT IMPEDE THE CANAL AND BOAT TRAFFIC _______________________________________________________________________________________________________________________ 6/17/2025 - PREVIOUS INSPECTION NOTES TURBIDITY BARRER NOT IN PLACE AT THIS TIME
ROW - FINAL INSPECTION 11/13/2025 APPROVED - AS NOTED EMADISON
Note: ** 11/13/25 5 5 FT ROW OF SOD INSTALLED ALONG SEAWALL ALONG WITH SILT FENCE __________________________________________________________________________________________________________________
SEAWALL DEADMAN CAP 10/29/2025 APPROVED HCAMACHO
SEAWALL DEADMAN CAP 10/28/2025 Disapproved - NO FEE HCAMACHO
Note: 1. New wall on left side is not tied to the existing wall, per plans. Please call back when ready.
ROW -TURBIDITY BARRER 06/23/2025 APPROVED - AS NOTED EMADISON
Note: ** 06/23/25 TURBIDITY BARRIER TO REMAIN IN PLACE THROUGHOUT THE SEAWALL PROJECT ** ENSURE TURBIDITY BARRIER DOES NOT IMPEDE THE CANAL AND BOAT TRAFFIC _______________________________________________________________________________________________________________________ 6/17/2025 - PREVIOUS INSPECTION NOTES TURBIDITY BARRER NOT IN PLACE AT THIS TIME
ROW -TURBIDITY BARRER 06/17/2025 Disapproved -FEE REQUIRED PFLANAGAN
Note: TURBIDITY BARRER NOT IN PLACE AT THIS TIME

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 03/14/2025 03/14/2025
Note: Released By: LEVI SALYERDS - (386)986-2575 - LSALYERDS@PALMCOASTGOV.COM
ZON COMPLETE 02/19/2025 02/19/2025
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 HOLD 02/18/2025 02/27/2025
Note: Held By: LEVI SALYERDS - (386)986-2326 - LSALYERDS@PALMCOASTGOV.COM 1. On your site or engineering plan, please call out connection type and/or sealing of joints at existing seawalls as necessary. 2. On your engineering plan, the notes on sheet 1 call for the use of SG325 vinyl sheets whilst the notes on sheet 4 call for ESP4.1 sheets and the drawing depicts SG425 sheets. Please revise. 3. On your engineering plan, you specify the removal and replacement of 38' of existing seawall but you do not depict the existing seawall that will be removed on your engineering plan or site plan. Please revise. 4. Some sections of your engineering plan are very difficult to read. The lineweight appears to be too high in some sections.
ZON HOLD 02/18/2025 02/18/2025
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please make a note on the site plan that the seawall will be grey in color as is required by the Land Development Code.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION- SITE INSPECTOR ¤40.00 11/12/2025
SURCHARGE FS 533.721 ¤2.00 03/14/2025
SURCHARGE - FS 468.631 ¤2.52 03/14/2025
SW ENG REVIEW- 40 ¤40.00 03/14/2025
SW ENG - INSPECTION 20 ¤20.00 03/14/2025
SW ENG - REVIEW 20 ¤20.00 03/14/2025
SITE PLAN 15 ¤15.00 03/14/2025
ADJUSTMENT 10% (¤18.63) 03/14/2025
ADMINISTRATIVE RESIDENTIAL ¤30.00 03/14/2025
INSPECTION - RESIDENTIAL ¤123.75 03/14/2025
PLAN REVIEW - MISC 32.50 ¤32.50 03/14/2025
Fees Total Due: ¤0.00 Total Paid: ¤307.14